18 MASTER PLAN ANNUAL UPDATE table 5.5 Unfunded needs Plan Interchange Projects through the Year 2035 FPN (if any) County Interchange Modifications Facility Milepost / Location Description Figure 406110-1 Sumter Turnpike 309 / Interstate 75 Geometric, Operational, and Safety Enhancements 6.4 Broward Turnpike 71 / Sawgrass Expwy. Ramp Capacity 6.2 Broward Turnpike 62 / Commercial Blvd. Add Southbound-to-Westbound Ramp 6.2 406103-1 Broward Turnpike 58 / Sunrise Blvd. Geometric, Operational, and Safety Enhancements 6.2 251938-1 Miami-Dade HEFT 39 / Interstate 75 Expansion to Add Ramps To/From North 6.1 Miami-Dade HEFT 29 / NW 41 st St. Ramp/Intersection Capacity 6.1 Miami-Dade HEFT 0X / Golden Glades Ramp Capacity 6.1 Broward Sawgrass 1A / Sunrise Blvd. Ramp Capacity 6.2 Potential New Interchange Locations - Turnpike Initiatives Orange Turnpike 257 / Sand Lake Rd. New Full Interchange 6.4 258958-1 Pasco Suncoast 25 / (Future) Ridge Rd. New Full Interchange 6.7 Potential New Interchange Locations - Proposed by and to be Funded by Others Sumter Turnpike 302 / C.R. 468 New Half-Interchange (to/from S.) 6.4 Lake Turnpike 279 / Hills of Minneola New Full Interchange 6.4 243017-1 Orange Turnpike 251 / S.R. 417 New Partial Interchange (to/from South and East) 6.4 Miami-Dade HEFT 37 / NW 170 th St. New Full Interchange 6.1 Miami-Dade HEFT 1 / Lucy St. New Half-Interchange (to/from N.) 6.1 table 5.6 Unfunded needs Plan aet conversion Projects through the Year 2035 FPN (if any) County Facility Milepost / Toll Plaza Description Figure Orange, Lake, Sumter Turnpike 240-296 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.4 Orange Beachline 6 / Beachline West Plaza Conversion to All-Electronic Tolling, Phase 7 6.5 Osceola, Orange Southern Connector 1-3 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5 Osceola, Orange Western Beltway 1-11 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5 Seminole Seminole Expressway 38-52 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5 Palm Beach, Martin, St. Lucie, Osceola, Okeechobee Turnpike 88-236 / All Plazas Conversion to All-Electronic Tolling, Phase 8 6.3 Polk Polk Parkway 3-23 / All Plazas Conversion to All-Electronic Tolling, Phase 9 6.6
6.0 list of figures fIgUre 6.1 homestead extensIon of florIda’s tUrnPIke (heft) fIgUre 6.2 tUrnPIke - soUthern coIn sYstem fIgUre 6.3 tUrnPIke - tIcket sYstem fIgUre 6.4 tUrnPIke - northern coIn sYstem fIgUre 6.5 soUthern connector extensIon, beachlIne West exPressWaY, semInole exPressWaY fIgUre 6.6 Polk ParkWaY fIgUre 6.7 veterans exPressWaY and sUncoast ParkWaY FY 2011 - FY 2035 19
- Page 1: Master Plan Update FY 2011 - FY 203
- Page 5 and 6: 1.0 introduction MASTER PLAN UPDATE
- Page 7 and 8: available revenues, the estimated t
- Page 9 and 10: system-wide project to convert turn
- Page 11 and 12: Florida’s Turnpike over I-595 thi
- Page 13 and 14: line, and merges into the right sid
- Page 15 and 16: toll plaza. This improvement modifi
- Page 17 and 18: 5.0 list of taBles table 5.1 ten-Ye
- Page 19 and 20: table 5.1 ten-Year finance Plan (fY
- Page 21: table 5.3 Unfunded needs Plan Widen
- Page 25 and 26: figure 6.1 - homestead extension of
- Page 27 and 28: S figure 6.3 - turnpike - ticket sy
- Page 29 and 30: FY 2011 - FY 2035 figure 6.5 - sout
- Page 31 and 32: figure 6.7 - veterans expressway an
6.0 list of figures<br />
fIgUre 6.1 homestead extensIon of florIda’s tUrnPIke (heft)<br />
fIgUre 6.2 tUrnPIke - soUthern coIn sYstem<br />
fIgUre 6.3 tUrnPIke - tIcket sYstem<br />
fIgUre 6.4 tUrnPIke - northern coIn sYstem<br />
fIgUre 6.5 soUthern connector extensIon,<br />
beachlIne West exPressWaY, semInole exPressWaY<br />
fIgUre 6.6 Polk ParkWaY<br />
fIgUre 6.7 veterans exPressWaY and sUncoast ParkWaY<br />
FY 2011 - FY 2035<br />