26.10.2013 Views

Master Plan Update - Florida's Turnpike

Master Plan Update - Florida's Turnpike

Master Plan Update - Florida's Turnpike

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

18<br />

MASTER PLAN ANNUAL UPDATE<br />

table 5.5 Unfunded needs <strong>Plan</strong><br />

Interchange Projects through the Year 2035<br />

FPN<br />

(if any)<br />

County<br />

Interchange Modifications<br />

Facility<br />

Milepost / Location<br />

Description Figure<br />

406110-1 Sumter <strong>Turnpike</strong> 309 / Interstate 75 Geometric, Operational, and Safety Enhancements 6.4<br />

Broward <strong>Turnpike</strong> 71 / Sawgrass Expwy. Ramp Capacity 6.2<br />

Broward <strong>Turnpike</strong> 62 / Commercial Blvd. Add Southbound-to-Westbound Ramp 6.2<br />

406103-1 Broward <strong>Turnpike</strong> 58 / Sunrise Blvd. Geometric, Operational, and Safety Enhancements 6.2<br />

251938-1 Miami-Dade HEFT 39 / Interstate 75 Expansion to Add Ramps To/From North 6.1<br />

Miami-Dade HEFT 29 / NW 41 st St. Ramp/Intersection Capacity 6.1<br />

Miami-Dade HEFT 0X / Golden Glades Ramp Capacity 6.1<br />

Broward Sawgrass 1A / Sunrise Blvd. Ramp Capacity 6.2<br />

Potential New Interchange Locations - <strong>Turnpike</strong> Initiatives<br />

Orange <strong>Turnpike</strong> 257 / Sand Lake Rd. New Full Interchange 6.4<br />

258958-1 Pasco Suncoast 25 / (Future) Ridge Rd. New Full Interchange 6.7<br />

Potential New Interchange Locations - Proposed by and to be Funded by Others<br />

Sumter <strong>Turnpike</strong> 302 / C.R. 468 New Half-Interchange (to/from S.) 6.4<br />

Lake <strong>Turnpike</strong> 279 / Hills of Minneola New Full Interchange 6.4<br />

243017-1 Orange <strong>Turnpike</strong> 251 / S.R. 417 New Partial Interchange (to/from South and East) 6.4<br />

Miami-Dade HEFT 37 / NW 170 th St. New Full Interchange 6.1<br />

Miami-Dade HEFT 1 / Lucy St. New Half-Interchange (to/from N.) 6.1<br />

table 5.6 Unfunded needs <strong>Plan</strong><br />

aet conversion Projects through the Year 2035<br />

FPN<br />

(if any)<br />

County<br />

Facility<br />

Milepost / Toll Plaza Description Figure<br />

Orange, Lake, Sumter <strong>Turnpike</strong> 240-296 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.4<br />

Orange Beachline 6 / Beachline West Plaza Conversion to All-Electronic Tolling, Phase 7 6.5<br />

Osceola, Orange Southern Connector 1-3 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5<br />

Osceola, Orange Western Beltway 1-11 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5<br />

Seminole Seminole Expressway 38-52 / All Plazas Conversion to All-Electronic Tolling, Phase 7 6.5<br />

Palm Beach, Martin,<br />

St. Lucie, Osceola,<br />

Okeechobee<br />

<strong>Turnpike</strong> 88-236 / All Plazas Conversion to All-Electronic Tolling, Phase 8 6.3<br />

Polk Polk Parkway 3-23 / All Plazas Conversion to All-Electronic Tolling, Phase 9 6.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!