table 5.1 ten-Year finance <strong>Plan</strong> (fY 2011- fY 2020)<br />

Widening, Interchange, and expansion Projects<br />

Widening Projects<br />

FPN<br />

County<br />

Facility<br />

From<br />

(Milepost / Location)<br />

To<br />

(Milepost / Location)<br />

Widen<br />

To \1<br />

FY 2011 - FY 2035<br />

Cost<br />

($xM) \2<br />

Year Figure<br />

406146-1 Orange <strong>Turnpike</strong> 269 / N. of Beulah Rd. 272 / S.R. 50 8-lanes 82.3 \3 UC 6.4<br />

429324-1 Palm Beach <strong>Turnpike</strong> 88 / Lantana Toll Plaza 93 / Lake Worth Rd. 6-lanes 12.5 2019 6.2<br />

406097-4 Broward <strong>Turnpike</strong> 59 / N. of Sunrise Blvd. (NB) 66 / N . of Atlantic Blvd. (NB) 4-lanes 27.0 UC 6.2<br />

406095-4 Broward <strong>Turnpike</strong> 51 / N. of Johnson St. 53 / Griffin Rd. 8-lanes 94.5 2020 6.2<br />

406095-1 Broward <strong>Turnpike</strong> 47 / HEFT 51 / N. of Johnson St. 8-lanes 51.5 2020 6.2<br />

429328-1 Miami-Dade HEFT 43 / NW 57 th Ave. 47 / Miramar Toll Plaza 6-lanes 16.1 2020 6.2<br />

427685-1 Miami-Dade HEFT 31 / NW 74 th St. 34 / NW 106 th St. 8-lanes 3.6 2013 6.1<br />

406096-4 Miami-Dade HEFT 23 / Bird Rd. (SW 40 th St.) 26 / S.R. 836 8-lanes+ Incl. \4 UC 6.1<br />

427146-1 Miami-Dade HEFT 20 / Kendall Dr. 23 / Bird Rd. 8-lanes 23.2 2014 6.1<br />

416537-1 Polk Polk Pkwy 23 / S. of Pace Rd. 24 / Interstate 4 4-lanes 14.0 UC 6.6<br />

406151-1 Hillsborough Veterans 3 / Memorial Highway 9 / S. of Gunn Hwy. 8-lanes 301.5 \5 2014 6.7<br />

Interchange Projects<br />

FPN<br />

County<br />

Facility (Milepost / Location) Description<br />

Cost<br />

($xM) \2<br />

Year Figure<br />

429331-1 Orange <strong>Turnpike</strong> 259 / Interstate 4 Widen NB Exit Ramp 3.7 2013 6.4<br />

429332-1 Orange <strong>Turnpike</strong> 259 / Interstate 4 Widen SB Off-Ramp and SB On-Ramp 5.4 2013 6.4<br />

422350-1 Palm Beach <strong>Turnpike</strong> 116 / Jupiter Interchange Replace Ramp Bridge (Vertical Clearance) 6.1 2012 6.3<br />

422349-1 Palm Beach <strong>Turnpike</strong> 109 / PGA Blvd. Replace and Widen Ramp Bridge 8.7 2012 6.3<br />

429334-1 Palm Beach <strong>Turnpike</strong> 109 / PGA Blvd. Widen SB On-Ramp / Improve Intersection 4.3 2014 6.3<br />

406144-4 Palm Beach <strong>Turnpike</strong> 93 / Lake Worth Rd. Interchange Modification 20.4 UC 6.3<br />

429339-1 Palm Beach <strong>Turnpike</strong> 75 / Boca Raton Widen NB Off-Ramp/Improve Intersection Incl. \6 2014 6.2<br />

420809-3 Broward <strong>Turnpike</strong> 53-54 / Interstate 595 Interchange Modification + Aux. Lanes 158.0 \7 2013-16 6.2<br />

415462-2 Broward <strong>Turnpike</strong> 49 / Hollywood Blvd. AET Off-Ramp for SB-to-WB Incl. \8 2012 6.2<br />

406099-1 Broward <strong>Turnpike</strong> 49 / Hollywood Blvd. Interchange Modification 77.3 \9 2020 6.2<br />

415462-2 Broward HEFT/Tpk. 47 / HEFT @ Mainline Widen Ramp, NB HEFT to NB Mainline Incl. \8 2012 6.2<br />

429325-1 Miami-Dade HEFT 25 / SW 8 th St. Widen, Realign SB Exit Ramp 4.3 2013 6.1<br />

429329-1 Miami-Dade HEFT 23 / Bird Rd. Widen Ramps/Improve Intersections 11.2 2013 6.1<br />

427689-1 Miami-Dade HEFT 20 / Kendall Dr. Ramp Intersection Improvements 5.3 2014 6.1<br />

426155-1 Miami-Dade HEFT 16-18 / S.R. 874 New SB Ramp/Add Lane to SB Mainline 10.0 2011 6.1<br />

427690-1 Seminole Seminole 38 / Aloma Ave. Widen Ramps to/from South 11.4 2013 6.5<br />

416537-2 Polk Polk Pkwy 23 / Pace Rd. New Interchange 10.9 UC 6.6<br />

Expansion Projects<br />

FPN<br />

County<br />

Facility<br />

Location<br />

Description<br />

Cost<br />

($xM) \2<br />

Year Figure<br />

258415-1 Hillsborough Expansion Tampa I-4 / Selmon Expressway Connector 85.0 \10 UC 6.7<br />

Notes:<br />

UC = Under construction as of this update.<br />

\1 Indicates basic number of lanes needed; “+” symbol indicates auxiliary lanes would also be included for at least part of the project length.<br />

\2 Costs shown are construction contract costs to-date for projects under construction; for future projects, costs shown are estimated construction costs<br />

inflated to the planned construction start year.<br />

\3 Includes interchange ramp modification at S.R. 50 ( FPID 417001-1).<br />

\4 Addition of auxiliary lanes on this section of HEFT included as part of AET Phase 2.<br />

\5 Includes costs for conversion to all-electronic tolling for entire construction project length.<br />

\6 Included in AET Phase 5.<br />

\7 Project is public/private partnership (PPP) administered by FDOT District Four; funding shown is <strong>Turnpike</strong> contribution only.<br />

\8 Included in AET Phase 4.<br />

\9 Project to be constructed with FPN 406095-1.<br />

\10 <strong>Turnpike</strong> contribution programmed for FY 2012 and 2013; balance of funding from state and federal sources administered by FDOT District Seven.<br />