Master Plan Update - Florida's Turnpike

Master Plan Update - Florida's Turnpike Master Plan Update - Florida's Turnpike

floridasturnpike.com
from floridasturnpike.com More from this publisher
26.10.2013 Views

14 MASTER PLAN ANNUAL UPDATE this Page Intentionally left blank

table 5.1 ten-Year finance Plan (fY 2011- fY 2020) Widening, Interchange, and expansion Projects Widening Projects FPN County Facility From (Milepost / Location) To (Milepost / Location) Widen To \1 FY 2011 - FY 2035 Cost ($xM) \2 Year Figure 406146-1 Orange Turnpike 269 / N. of Beulah Rd. 272 / S.R. 50 8-lanes 82.3 \3 UC 6.4 429324-1 Palm Beach Turnpike 88 / Lantana Toll Plaza 93 / Lake Worth Rd. 6-lanes 12.5 2019 6.2 406097-4 Broward Turnpike 59 / N. of Sunrise Blvd. (NB) 66 / N . of Atlantic Blvd. (NB) 4-lanes 27.0 UC 6.2 406095-4 Broward Turnpike 51 / N. of Johnson St. 53 / Griffin Rd. 8-lanes 94.5 2020 6.2 406095-1 Broward Turnpike 47 / HEFT 51 / N. of Johnson St. 8-lanes 51.5 2020 6.2 429328-1 Miami-Dade HEFT 43 / NW 57 th Ave. 47 / Miramar Toll Plaza 6-lanes 16.1 2020 6.2 427685-1 Miami-Dade HEFT 31 / NW 74 th St. 34 / NW 106 th St. 8-lanes 3.6 2013 6.1 406096-4 Miami-Dade HEFT 23 / Bird Rd. (SW 40 th St.) 26 / S.R. 836 8-lanes+ Incl. \4 UC 6.1 427146-1 Miami-Dade HEFT 20 / Kendall Dr. 23 / Bird Rd. 8-lanes 23.2 2014 6.1 416537-1 Polk Polk Pkwy 23 / S. of Pace Rd. 24 / Interstate 4 4-lanes 14.0 UC 6.6 406151-1 Hillsborough Veterans 3 / Memorial Highway 9 / S. of Gunn Hwy. 8-lanes 301.5 \5 2014 6.7 Interchange Projects FPN County Facility (Milepost / Location) Description Cost ($xM) \2 Year Figure 429331-1 Orange Turnpike 259 / Interstate 4 Widen NB Exit Ramp 3.7 2013 6.4 429332-1 Orange Turnpike 259 / Interstate 4 Widen SB Off-Ramp and SB On-Ramp 5.4 2013 6.4 422350-1 Palm Beach Turnpike 116 / Jupiter Interchange Replace Ramp Bridge (Vertical Clearance) 6.1 2012 6.3 422349-1 Palm Beach Turnpike 109 / PGA Blvd. Replace and Widen Ramp Bridge 8.7 2012 6.3 429334-1 Palm Beach Turnpike 109 / PGA Blvd. Widen SB On-Ramp / Improve Intersection 4.3 2014 6.3 406144-4 Palm Beach Turnpike 93 / Lake Worth Rd. Interchange Modification 20.4 UC 6.3 429339-1 Palm Beach Turnpike 75 / Boca Raton Widen NB Off-Ramp/Improve Intersection Incl. \6 2014 6.2 420809-3 Broward Turnpike 53-54 / Interstate 595 Interchange Modification + Aux. Lanes 158.0 \7 2013-16 6.2 415462-2 Broward Turnpike 49 / Hollywood Blvd. AET Off-Ramp for SB-to-WB Incl. \8 2012 6.2 406099-1 Broward Turnpike 49 / Hollywood Blvd. Interchange Modification 77.3 \9 2020 6.2 415462-2 Broward HEFT/Tpk. 47 / HEFT @ Mainline Widen Ramp, NB HEFT to NB Mainline Incl. \8 2012 6.2 429325-1 Miami-Dade HEFT 25 / SW 8 th St. Widen, Realign SB Exit Ramp 4.3 2013 6.1 429329-1 Miami-Dade HEFT 23 / Bird Rd. Widen Ramps/Improve Intersections 11.2 2013 6.1 427689-1 Miami-Dade HEFT 20 / Kendall Dr. Ramp Intersection Improvements 5.3 2014 6.1 426155-1 Miami-Dade HEFT 16-18 / S.R. 874 New SB Ramp/Add Lane to SB Mainline 10.0 2011 6.1 427690-1 Seminole Seminole 38 / Aloma Ave. Widen Ramps to/from South 11.4 2013 6.5 416537-2 Polk Polk Pkwy 23 / Pace Rd. New Interchange 10.9 UC 6.6 Expansion Projects FPN County Facility Location Description Cost ($xM) \2 Year Figure 258415-1 Hillsborough Expansion Tampa I-4 / Selmon Expressway Connector 85.0 \10 UC 6.7 Notes: UC = Under construction as of this update. \1 Indicates basic number of lanes needed; “+” symbol indicates auxiliary lanes would also be included for at least part of the project length. \2 Costs shown are construction contract costs to-date for projects under construction; for future projects, costs shown are estimated construction costs inflated to the planned construction start year. \3 Includes interchange ramp modification at S.R. 50 ( FPID 417001-1). \4 Addition of auxiliary lanes on this section of HEFT included as part of AET Phase 2. \5 Includes costs for conversion to all-electronic tolling for entire construction project length. \6 Included in AET Phase 5. \7 Project is public/private partnership (PPP) administered by FDOT District Four; funding shown is Turnpike contribution only. \8 Included in AET Phase 4. \9 Project to be constructed with FPN 406095-1. \10 Turnpike contribution programmed for FY 2012 and 2013; balance of funding from state and federal sources administered by FDOT District Seven. 15

14<br />

MASTER PLAN ANNUAL UPDATE<br />

this Page Intentionally left blank

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!