line, and merges into the right side of the<br />

southbound heft mainline; (2) narrow the existing<br />

three-lane ramp that enters the southbound heft to<br />

two-lanes in order to maintain lane balance with<br />

the southbound heft mainline roadway; and (3)<br />

widen the southbound heft mainline (including the<br />

bridge over the csx railroad) to add one-lane and<br />

eliminate the existing southbound lane drop.<br />

Implementation of this project will improve safety<br />

and operations by eliminating the southbound s.r.<br />

874 traffic weave across southbound HEFT lanes to<br />

exit at sW 152nd street. It will also result in smoother<br />

southbound traffic flows on the HEFT Mainline south<br />

of s.r. 874, and provide a southbound heft mainline<br />

capacity improvement that was deferred by the<br />

postponement of the larger widening project. this<br />

project is scheduled for construction in fY 2011.<br />

427146-1<br />

construct auxiliary lanes on the<br />

heft from kendall drive to bird<br />

road in miami-dade county.<br />

This is an efficiency project to construct auxiliary<br />

lanes in both directions on the heft/s.r. 821<br />

between the kendall drive Interchange and the<br />

bird road Interchange to create an eight-lane<br />

roadway section. This improvement modifies the<br />

existing bridge structures within the project limits by<br />

reducing the inside/outside shoulders to allow for<br />

four, 12-foot travel lanes with eight-foot shoulders.<br />

this is a safety and operational improvement that<br />

will eliminate or reduce the bottleneck for the<br />

existing six-lane segment between kendall drive<br />

and bird road. It will also eliminate congestion for<br />

the northbound on-ramp merge on the heft at<br />

kendall drive, and improve operations for entry and<br />

exit movements at kendall drive. this project is<br />

programmed for construction in fY 2014.<br />

427685-1<br />

construct auxiliary lanes on<br />

the heft from nW 74th street to<br />

nW 106th street in miami-dade<br />

county.<br />

This is an efficiency project to construct auxiliary<br />

lanes in both directions on the heft between nW<br />

74th street and nW 106th street to create an eightlane<br />

section on the heft. the implementation of this<br />

FY 2011 - FY 2035<br />

improvement will reduce the potential for<br />

bottlenecks in this section. It will also eliminate<br />

congestion in the southbound on-ramp merge area<br />

at nW 106th street and will improve operations for<br />

entry and exit movements at nW 106th street. this<br />

project is programmed for construction in fY 2013.<br />

427689-1<br />

modify the heft at the kendall<br />

drive ramp Interchange in<br />

miami-dade county.<br />

This is an efficiency project to implement the<br />

following modifications to the HEFT/Kendall Drive<br />

Interchange: (1) widen the ramp terminal<br />

intersection approach of the southbound exit ramp<br />

to provide three southbound left-turn lanes for the<br />

southbound to eastbound movement and three<br />

right-turn lanes for the southbound to westbound<br />

movement, (2) widen the ramp terminal intersection<br />

approach of the northbound exit ramp to provide<br />

two left-turn lanes for the northbound to westbound<br />

movement and two right-turn lanes for the<br />

northbound to eastbound movement, (3) remove<br />

the slope protection under the heft bridge over<br />

kendall drive on the north side and relocate the<br />

westbound to southbound entry ramp to be<br />

located behind the column line, and (4) widen<br />

kendall drive westbound to four through lanes from<br />

west of mills drive to meet the existing four-lane<br />

section west of the heft southbound exit ramp<br />

intersection. this project is programmed for<br />

construction in fY 2014.<br />

427690-1<br />

Implement to/from south ramp<br />

Modifications on the Seminole<br />

expressway at aloma avenue in<br />

seminole county.<br />

This is an efficiency project to improve the to/from<br />

south ramps on the seminole expressway/s.r. 417 at<br />

Aloma Avenue. Specifically, this project includes<br />

the following: (1) add a right-turn lane for the<br />

northbound off-ramp approach to aloma avenue;<br />

(2) provide extended storage on aloma avenue for<br />

the eastbound and westbound left-turn lanes<br />

entering the seminole expressway; (3) add a rightturn<br />

lane on aloma avenue for the eastbound to<br />

southbound movement entering the seminole<br />

9