Florida’s <strong>Turnpike</strong> over I-595<br />

this project is being implemented under a P3<br />

agreement which is a public-private partnership<br />

that has been created between the florida<br />

department of transportation and acs<br />

Infrastructure development, a private entity that<br />

serves as the project concessionaire. Under the P3<br />

agreement, the concessionaire is responsible for<br />

designing, building, financing, operating, and<br />

maintaining the project. fdot district four and the<br />

turnpike serve as funding partners for this project.<br />

the turnpike will maintain and operate the toll<br />

collection facilities after the project has been<br />

completed.<br />

422349-1<br />

replace and Widen the ramp<br />

bridge over the turnpike<br />

mainline at Pga boulevard in<br />

Palm beach county.<br />

this is a project to replace and widen the existing<br />

ramp bridge over the turnpike mainline/s.r. 91<br />

at Pga boulevard in Palm beach county. the<br />

existing one-lane bridge has a substandard vertical<br />

clearance. also, the existing bridge envelope does<br />

not provide for the future eight-lane widening<br />

of the turnpike mainline in this location. the new<br />

bridge will consist of two spans and two northbound<br />

off-ramp lanes with an overall length of 245 feet.<br />

the vertical clearance will be 17.2 feet. signing,<br />

FY 2011 - FY 2035<br />

lighting, drainage, and other elements are included<br />

in the project design. this project is programmed for<br />

construction in fY 2012.<br />

422350-1<br />

replace the ramp bridge<br />

over the turnpike mainline<br />

at Indiantown road (jupiter<br />

Interchange) in Palm beach<br />

county.<br />

this is a project to replace the existing ramp bridge<br />

over the turnpike mainline/s.r. 91 at Indiantown<br />

road in Palm beach county. the existing bridge has<br />

a substandard vertical clearance. also, the existing<br />

bridge envelope does not provide for the future<br />

eight-lane widening of the turnpike mainline. the<br />

new bridge will consist of two spans with an overall<br />

length of 261 feet. the vertical clearance will be 17<br />

feet. various signing, lighting, drainage, and other<br />

elements are also included in the design. this<br />

project is programmed for construction in fY 2012.<br />

422418-8,<br />

422418-7,<br />

422418-6,<br />

422418-5,<br />

422418-4,<br />

422418-3,<br />

422418-2,<br />

422418-1<br />

construct and Implement<br />

service Plaza <strong>Update</strong>s<br />

system-wide in miami-dade,<br />

broward, Palm beach, st. lucie,<br />

okeechobee, osceola, orange,<br />

and sumter counties.<br />

florida’s turnpike enterprise has eight turnpike<br />

service plazas located at approximately 40-mile<br />

spacing along the turnpike mainline, from snapper<br />

creek in miami-dade county to okahumpka in<br />

sumter county. the service plazas and their<br />

locations are as follows:<br />

•<br />

•<br />

snapper creek service Plaza located at milepost<br />

19 in miami-dade county<br />

Pompano beach service Plaza located at<br />

milepost 65 in broward county<br />

• West Palm beach service Plaza located at<br />

milepost 94 in Palm beach county<br />

7