25.10.2013 Views

Download PDF - ChartNexus

Download PDF - ChartNexus

Download PDF - ChartNexus

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Securing the Future (cont’d)<br />

Ore Reserves and Resources summary as at 30 June 2011<br />

34<br />

Category Volume,<br />

‘000 m 3<br />

Reserves - Proven<br />

- Probable<br />

Building on Success: Developing Resources for the Future<br />

2,473<br />

49,474<br />

Whole-of-Hole<br />

Grade, Kg Sn/m 3<br />

0.29<br />

0.29<br />

Contained Tin<br />

(Sn)<br />

tonnes<br />

725<br />

14,495<br />

Total Reserves 51,947 0.29 15,220<br />

Resources - Measured<br />

- Indicated<br />

- Inferred<br />

pt koBa tIn<br />

PT Koba Tin undertakes alluvial mining operations in the island<br />

of Bangka, Indonesia. It mines the alluvial deposit using a<br />

large capacity bucket line dredge and several gravel pumps<br />

in combination with palong (sluices boxes) units. The mining<br />

units are served by large fleets of earthmoving equipments for<br />

overburden removal and for transfer of tin-bearing materials to<br />

the processing plants.<br />

Exploration activities are ongoing for discovery of new<br />

resources especially at locations previously excluded from the<br />

current production schedule including lower grade areas and<br />

deeper ground as well as in areas designated as “production<br />

forests”. The discovery of additional resources would justify the<br />

extension of its CoW for a further 10 years to 2023.<br />

13,604<br />

36,943<br />

45,617<br />

Total Resources 96,164 0.20 18,935<br />

Total Reserves and Resources 148,111 0.23 34,155<br />

0.32<br />

0.15<br />

0.20<br />

4,393<br />

5,488<br />

9,054

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!