Securing the Future (cont’d)<br />

32<br />

Building on Success: Developing Resources for the Future<br />

Rahman hYDRaUlIc tIn SDn<br />

BhD<br />

The ore type is semi hard rock with cassiterite concentrated in<br />

quartz veins situated en-echelon between two dominant North-<br />

South orientated faults. Mining operations are undertaken<br />

in an open-pit and involve drilling and blasting, excavating,<br />

loading and hauling using drill-rigs, excavators, bulldozers and<br />

off-highway trucks. The ore-bearing material is hauled to the<br />

stockpiles at five ore processing plants, whilst the overburden<br />

waste is hauled and dumped at designated waste dumps.<br />

The resource estimates are based on the results of 98 reverse<br />

circulation drill holes and 30 fully cored diamond drill holes with<br />

a combined total of 15,327 drill-metres, blast hole sampling,<br />

trenching and channel sampling and past production records.<br />

Block models have been prepared using Micromine software.<br />

The ore resources are made up of:<br />

(a) The JORC compliant resources mainly from ore bodies<br />

located at the present mine pit updated up to 29 March<br />

2012 with the mined out resources excluded.<br />

(b) Newly identified areas of resources in the new exploration<br />

areas, “ore in waste” as well as depth and lateral extension<br />

of existing ore bodies. Continuing exploration will be<br />

needed to progressively upgrade the resources to the<br />

measured category and replace mined out resources.<br />

RHT’s current mining leases have recently been renewed up to<br />

the year 2030.