25.10.2013 Views

Arthw D Little - Former Fort Ord - Environmental Cleanup

Arthw D Little - Former Fort Ord - Environmental Cleanup

Arthw D Little - Former Fort Ord - Environmental Cleanup

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.0 References<br />

Arthur D. <strong>Little</strong>, Inc., On-Site Inspection and Assessment of <strong>Fort</strong> Oral, California,<br />

July 26, 1993 through August 5, 1993; Helicopter Survey of <strong>Fort</strong> Oral, August 2,<br />

1993.<br />

Dames & Moore, Remedial Investigation Report Remedial Investigation/Feasibility<br />

Study <strong>Fort</strong> <strong>Ord</strong> Landfills, June 8, 1993.<br />

Diagnostic Engineering, Inc. (DEI), Asbestos Survey Report for <strong>Fort</strong> <strong>Ord</strong> Installation,<br />

Executive Summary, Prepared for U.S. Army Corps of Engineers under Contract No.<br />

DACA05-89-C-018 1, April 26, 1993.<br />

EA Engineering, Science, and Technology, <strong>Fort</strong> <strong>Ord</strong> Base-wide Remedial<br />

Investigation/Feasibility Study, Volume I: Literature Review and Base Inventory<br />

Report, Prepared for U.S. Army Corps of Engineers, Omaha District Contract No.<br />

DACW-4588-D-0009. March 1991.<br />

<strong>Fort</strong><strong>Ord</strong> DEH, Hazardous Materials Division, <strong>Fort</strong> <strong>Ord</strong> Hazardous Waste<br />

Management Plan, September 1992.<br />

<strong>Fort</strong> <strong>Ord</strong> DEH, Results of Radon Survey conducted during FY89/FY90 at <strong>Fort</strong> Oral,<br />

Memorandum AFZW-DE-P (200- lc) from Wesley A. Ludwig, COL, EN, DEH.<br />

<strong>Fort</strong> <strong>Ord</strong> ENRB, Inventory of Underground Storage Tanks at <strong>Fort</strong> Oral.<br />

Harding Lawson Associates, Action Plan, <strong>Environmental</strong> Restoration Acceleration,<br />

<strong>Fort</strong> Oral, California, March 12, 1993.<br />

Harding Lawson Associates, Basewide Hydrogeologic Characterization (Draft)<br />

Volumes I through V, June 7, 1993.<br />

Harding Lawson Associates, Basewide Storm Drain and Sanitary Sewer Investigation,<br />

Remedial Investigation Feasibility Study (Draft), <strong>Fort</strong> Oral, California, July 6, 1992.<br />

Harding Lawson Associates, Basewide Surface Water Outfall Investigation (Draft)<br />

<strong>Fort</strong> Oral, California, April 5, 1993.<br />

Harding Lawson Associates, Briefing Document for Presentation prepared for U.S.<br />

Army Corps of Engineers Sacramento Disrnct, <strong>Fort</strong> Oral, California, February 1993.<br />

Harding hwson Associates, Data Evaluation and Recommendation Repom, Sites 2<br />

and 12, <strong>Fort</strong> Oral, Ctilifomia (Draft), May 5, 1993.<br />

Harding Lawson Associates, Data Evaluation and Recommendation Repon, Site 5-<br />

Range 36A (EOD Range), <strong>Fort</strong> ~ California, January 14, 1993.<br />

<strong>Arthw</strong> D <strong>Little</strong><br />

P6707m7TEPSaSs.c+d.OUDUPT.lxt~ 132


6.0 References<br />

HardingLawson Associates, Data Evaluation and Recommendation Report, Site 10-<br />

Burn Pit, <strong>Fort</strong> Oral, California (Draft), June 6, 1993. -<br />

Harding Lawson Associates, Data Evaluation Report, Site 11 - Army and Air Force<br />

Exchange Service (AAFES) Fueling Station, <strong>Fort</strong> Oral, California, (Pre-Draft),<br />

February 26, 1993.<br />

Harding Lawson Associates, Data Summary and Work Plan, Site 39- Inland Ranges,<br />

<strong>Fort</strong> Oral, California (Draft), January 1, 1994.<br />

Harding Lawson Associates, Groundwater and Soil Treatment System Report of<br />

Quarterly Monitoring (September-November 1992) and Yearly Evaluation (December<br />

1991 through November 1992), Fritzsche Army Airfield, <strong>Fort</strong> Oral, California,<br />

January 5, 1993.<br />

Harding Lawson Associates, Record of Decision, Remedial Action Selection,<br />

Fritzsche Army Airfkld Building 511, <strong>Fort</strong> Oral, California (Draft), November 27,<br />

1989.<br />

Harding Lawson Associates, Record of Decision, Remedial Action Selection,<br />

Fritzsche Army Airfkld, <strong>Fort</strong> Oral, California (Draft) April 25, 1989.<br />

Harding Lawson Associates, Sampling and Analysis Plan, Part I-Field Sampling Plan,<br />

Remedial Investigation Feasibility Study$ <strong>Fort</strong> C)rd, California, December 12, 1991.<br />

Harding Lawson Associates, Site 13- Railroad Right of Way (Draft), <strong>Fort</strong> Oral,<br />

California, December 10, 1992.<br />

Harding Lawson Associates, Site 7 - Ranges 40 and 41 (Fire Demonstration Area)<br />

(Draft), <strong>Fort</strong> Oral, California, December 30, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 15- DEH Yard, <strong>Fort</strong><br />

Oral, California (Draft), November 19, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 16- DOL<br />

Maintenance Yard and Pete’s Pond, <strong>Fort</strong> Oral, California (Pre-Draft), March 19, 1993.<br />

Harding Lawson Associates, Site Characterization Report, Site 21- 4400/4500 Motor<br />

Pool, East Block, Fofi Oral, California (Draft), September 20, 1993.<br />

Harding Lawson Associates, Site Characterization Report, Site 21- 4400/4500 Motor<br />

Pw1, East Block. <strong>Fort</strong> Oral, California (Pre-13raft), April 8, 1993.<br />

Harding Lawson Associates, Site Characterization Repoz Site 27- Army Reserve<br />

Motor Pd, FOHOral, California (Draft), July 24, 1992.<br />

P6T07tB~Psmwss. miORDRPT.htcawqi 133


6.0 References<br />

Harding Lawson Associates, Site Characterization Report, Site 28- Barracks and<br />

Main Garrison Area, <strong>Fort</strong> Oral, California (Draft), February 25; 1994.<br />

Harding Lawson Associates, Site Characterization Report, Site 29- Defense<br />

Reutilization and Marketing Office, <strong>Fort</strong> Oral, California (Draft), December 4, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 30- Driver Training<br />

Area, <strong>Fort</strong> Oral, California (Pre-Draft), February 11, 1993.<br />

Harding Lawson Associates, Site Characterization Report, Site 30- Driver Training<br />

Area, <strong>Fort</strong> Oral, California (Draft), September 20, 1993.<br />

Harding Lawson Associates, Site Characterization Report, Site 31- <strong>Former</strong> Dump<br />

Site, <strong>Fort</strong> Oral, California (Draft), October 27, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 32- Data Evaluation<br />

and Recommendation Report, East Garrison Sewage Treatment Plant, <strong>Fort</strong> Oral,<br />

California (Pre-Draft), March 25, 1993.<br />

Harding Lawson Associates, Site Characterization Report, Site 34- Part I - Fritzsche<br />

Army Airlleld Fueling Facility, <strong>Fort</strong> Oral, California (Draft), June 2, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 37- Trailer Park<br />

Maintenance Shop, <strong>Fort</strong> Oral, California (Draft), November 20, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 6- Range 39,<br />

Abandoned Car Dump, <strong>Fort</strong> Oral, California (Draft), November 18, 1992.<br />

Harding Lawson Associates, Site Characterization Report, Site 9- Range 40A, FFE<br />

Training Area, <strong>Fort</strong> Oral, California (Draft), November 5, 1992.<br />

Harding Lawson Associates, Site Characterization, Site 14- 707th Maintenance<br />

Facility (Pre-Draft), <strong>Fort</strong> Oral, California, January 8, 1993,<br />

Harding Lawson Associates, Site Characterization, Site 17-1400 Bluk Motor Pool<br />

and Suspected Disposal Area (Draft), <strong>Fort</strong> Oral, California, August 6, 1993.<br />

Harding Lawson Associates, Site Characterization, Site 19-2200 Block Facility<br />

(Draft), <strong>Fort</strong> Oral, California, October 27, 1992.<br />

Harding Lawson Associates, Site Characterization, Site 20- South Parade Ground,<br />

3800 and 517th Motor Pools (Pre-Draft), <strong>Fort</strong> Oral, California, March 29, 1993.<br />

Harding Lawson Associates, Site Characterization, Site 20- South Parade Ground,<br />

3800 and 517th Motor Pools (Draft), <strong>Fort</strong> Oral, California, September 13, 1993.<br />

Ihth D <strong>Little</strong> P6707~7TEPSassez.s.wd,ORDRPT.lfi.Mm 134


6.0 References<br />

Harding Lawson Associates, Site Chwactenzation, Site 23-3700 Block Motor Pool<br />

Complex (Pre-llraft), <strong>Fort</strong> Oral, California, October 20, 1992. -<br />

Harding bwson Associates, Site Characterization, Site 25- <strong>Former</strong> DRMO, <strong>Fort</strong><br />

Oral, California (Draft), June 18, 1993.<br />

Harding Lawson Associates, Site Characterization, Site 35- Fritzsche Army Airfield,<br />

Aircraft Cannibalization Yard, <strong>Fort</strong> Oral, California (Draft), June 25, 1993.<br />

Harding Lawson Associates, Site Characterization, Site 38- Army and Air Force<br />

Exchange Service (AAFES) Dry Cleaners (Pre-Draft), <strong>Fort</strong> Oral, California, July 15,<br />

1992.<br />

Harding Lawson Associates, Sustained Yield and <strong>Cleanup</strong> Time Estimates, Upper<br />

Aquifer, <strong>Fort</strong> <strong>Ord</strong> Landfill, Operable Unit 2, <strong>Fort</strong> Oral, California, Comespondence to<br />

Harvey D. Jones, U.S. AmIy Corps of Engineers, Sacramento District, July 22, 1993.<br />

Harding Lawson Associates, Underground Storage Tank Management Plan, <strong>Fort</strong> <strong>Ord</strong><br />

Complex, October 30, 1991.<br />

Harding Lawson Associates, Underground Storage Tank Removal Spill Investigation,<br />

Building 4362 (Dmft) <strong>Fort</strong> Oral, California, December 5, 1990.<br />

Harding Lawson Associates, Work Plan, Remedial Investigation Feasibility Study,<br />

<strong>Fort</strong> Oral, California, December 12, 1991.<br />

Harding Lawson Associates, Work Plan, Site 3- Beach Trainfire Ranges, <strong>Fort</strong> Oral,<br />

California (Draft Final], June 28, 1993.<br />

Harding Lawson Associates, Work Plan, Subsufiace Investigation Buildings 4107,<br />

4110, 4590 and Facility 2754 (Draft), <strong>Fort</strong> Oral, California, April 14, 1993.<br />

Industrial Health, Incorporated - <strong>Environmental</strong>, Site Investigation, Salinas Second<br />

Ward, Old Hilltown Road, Monterey, California (Latter Day Saint Property),<br />

December 30, 1991.<br />

Interviews: See Table 2-1, Section 2.1 of this report.<br />

Roy F. Weston, Inc., Enhanced Preliminary Assessment, <strong>Fort</strong> Oral, California,<br />

Prepared for USATHAMA Contract No. 13AAA15-88-D-0007, December 1990.<br />

Salinas Californian, “Flying Red Horse Oil Company Housed Men,” May 1978<br />

(Newspaper article).<br />

P670m7TEPSSU5$.0,-d.ORORPT.M.~ 135


c“ ,,,.<br />

‘,<br />

1,.’<br />

~:~:-#<br />

6.0 References<br />

U.S.Army CorpsofEngineers, St Louis District, <strong>Ord</strong>nance and Explosive Waste<br />

Archive Search Report (Draft), December 1993.<br />

U.S.Army CorpsofEngineers Maps, Drawing No. 18-02-27: General Site Section<br />

Maps, January 1984; Central Gas and Heating Maps; Training Facilities Map.<br />

U.S.Army Memorandum from Joseph H. Plunkett, Chief, Base. Realignment and<br />

Closure Division, Headquarters Forces Command, December 3, 1993.<br />

U.S.Army <strong>Environmental</strong> Hygiene Agency (Aberdeen ProvingGround,Maryland),<br />

SpillPrevention ControlandCountermeasure Plan(SPCC),<strong>Fort</strong>Oral,California,<br />

December1988.<br />

U.S.<strong>Environmental</strong> Protection Agency,AerialPhotographic Analysisof<strong>Fort</strong><strong>Ord</strong><br />

Military Reservation, Monterey,California, Preparedby LockheedEngineering and<br />

SciencesCompany for <strong>Environmental</strong> Monitoring Systems Laboratory under Contract<br />

No. 68-CO-0050, November 1992.<br />

Woolfendon,John,“A 165-MilePipeline fromCoalinga,” HeraldWeekend Magazine,<br />

April10, 1977.<br />

hthar D <strong>Little</strong> P6707W71EPS.uws. wd.ORDHPT.in.~ 136

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!