design.<br />

Note:<br />

SSMP Element Compliant<br />

with<br />

DRAFT<br />

Guideline<br />

s<br />

5.4 Deviations and Changes<br />

Requirement: Identify procedures for ensuring that changes to safety and security design<br />

criteria are appropriately reviewed and approved for their impacts on the level of<br />

operational safety and security designed into the system.<br />

Note:<br />

6 Safety and Security Verification Process (including final certification)<br />

6.1 Design Criteria Verification Process<br />

Requirement: Describe process to verify that safety and security design criteria have<br />

been addressed in project specifications and contract requirements and that all required<br />

tests have been incorporated into project test plans.<br />

Note:<br />

6.2 Construction Specification Conformance Process<br />

Requirement: Describe process to ensure that elements of the system provided under<br />

construction, procurement and installation contracts conform to the specifications.<br />

Note:<br />

6.3 Testing/Inspection Verification<br />

Requirement: Describe process to ensure that the as-built (or delivered) configuration<br />

contains the safety- and security-related requirements identified in the applicable<br />

specifications and other contract documents. Identify key interfaces for ensuring safety<br />

and security involvement in those tests and reviews.<br />

Note:<br />

6.4 Risk Resolution Verification<br />

Requirement: Describe process to ensure that safety and security design criteria and<br />

safety and security analysis have effectively identified, categorized and resolved project<br />

risks to a level acceptable by management.<br />

Note:<br />

OP 22 Safety and Security Management Plan Review<br />

Revision 0, June 2008<br />

Page E-4