[P] Construction bid<br />
documents<br />
[P] General<br />
Architect/Engineering<br />
Contractor (GAEC)<br />
contractual<br />
requirements/procedures<br />
for identifying/resolving<br />
hazards/threats and<br />
vulnerabilities<br />
[P] Preliminary Hazard<br />
Analysis (PHA)<br />
[P] Threat Vulnerability<br />
Analysis (TVA)<br />
[P] Safety and Security<br />
Certification Plan (SSCP)<br />
SSI<br />
Preliminary<br />
Engineering<br />
Final Design<br />
FFGA<br />
Application<br />
Construction<br />
Testing and<br />
Start-Up<br />
Y Y<br />
Y Y Y Y Y<br />
Y Y Y Y<br />
Y Y Y Y Y<br />
Y Y Y Y Y<br />
NOTES<br />
with the PSSP and/or other specific safety<br />
and security requirements identified in the<br />
bid documents<br />
Normally includes the general safety and<br />
security responsibilities of the contractor,<br />
obligations to maintain a safe/secure site,<br />
requirement to submit a CSSP, and any<br />
specific safety and security requirements<br />
that the contractor must comply with<br />
during portions of the work.<br />
Materials determine responsibilities of<br />
GAEC, including general reporting<br />
requirements to Grantee’s safety/security<br />
personnel, and division of performance<br />
authority between Grantee and GAEC for<br />
PHAs, TVAs, operating and maintenance<br />
procedures, training plans, SITP, and the<br />
like.<br />
Determine comprehensiveness and roles in<br />
analyses and procedures for implementing<br />
recommendations; should be compared<br />
with GAEC requirements.<br />
Determine comprehensiveness and roles in<br />
analyses and procedures for implementing<br />
recommendations; should be compared<br />
with GAEC requirements.<br />
Document is normally created prior to PE<br />
for design certification and updated during<br />
FD for construction certification and after<br />
the start of construction for testing and<br />
start-up, training, PRO, and other safety<br />
and security certification requirements.<br />
Should be reviewed for consistency with<br />
SSMP, adequacy of certification<br />
procedures and documentation<br />
requirements, and comprehensiveness of<br />
Certifiable Items List (CIL).<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page B-4