DOCUMENT<br />
(Title and acronym; R<br />
signifies Recipient,<br />
P Project)<br />
[R] Change and<br />
Configuration Control<br />
<strong>Procedures</strong><br />
[P] Project Management<br />
Plan (PMP)<br />
[P] Safety and Security<br />
Management Plan<br />
(SSMP)<br />
SSI<br />
Preliminary<br />
Engineering<br />
Final Design<br />
FFGA<br />
Application<br />
Construction<br />
Testing and<br />
Start-Up<br />
Y Y Y Y Y<br />
Y Y Y Y Y<br />
Y Y Y Y Y<br />
[P] FRA Waiver Y Y Y Y<br />
[P] Project Safety and<br />
Security Plan (PSSP)<br />
[P] Contractor Safety and<br />
Security Plan (CSSP)<br />
Y Y Y Y<br />
Y Y<br />
NOTES<br />
particularly egress, train/bus and traffic<br />
control, lighting, cameras, emergency<br />
phones, and other elements of Crime<br />
Prevention Through Environmental Design<br />
(CPTED) and Situational Crime Prevention<br />
(SCP) must be reviewed. The process for<br />
updating the DCM based on PHA, TVA,<br />
and other analyses must also be reviewed.<br />
Document should be examined to<br />
determine how design or configuration<br />
changes that may impact safety/security<br />
will be reviewed and approved by recipient<br />
and to ensure that safety and security<br />
management personnel are involved and<br />
have appropriate sign-off authority.<br />
Key project document should be reviewed<br />
to assure it appropriately identifies the<br />
SSMP as the project’s master plan for<br />
safety and security and that the SSMP<br />
content is consistent with PMP content.<br />
The SSMP is an element of the PMP, but is<br />
a stand-alone document that must comply<br />
with the requirements of the <strong>FTA</strong> Circular.<br />
Required for some projects that involve<br />
sharing of FRA-regulated rights of way.<br />
Document is project-specific; it is distinct<br />
from the recipient’s SSPP, and will pertain<br />
to safety/security plans and policies for all<br />
project phases. It usually contains<br />
requirements of what must be included in<br />
contractor-submitted safety and security<br />
plans. It may be called by other names,<br />
such as Capital Improvement Program<br />
Management Plan or Project Safety<br />
Program.<br />
Document produced by each contractor<br />
that details how the contractor will comply<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page B-3