[R] System Safety<br />
Program Plan (SSPP)<br />
[R] System Security Plan<br />
(SSP)<br />
[R] Emergency<br />
Management Plan (EMP)<br />
[R] Security and<br />
Emergency Preparedness<br />
Plan (SEPP)<br />
[R] Standard Operating<br />
<strong>Procedures</strong> (SOPs) and<br />
Emergency Operating<br />
<strong>Procedures</strong> (EOPs)<br />
[R] Quality Assurance<br />
Plan (QAP)<br />
[R] Design Criteria<br />
Manual (DCM)<br />
SSI<br />
Preliminary<br />
Engineering<br />
Final Design<br />
FFGA<br />
Application<br />
Construction<br />
Testing and<br />
Start-Up<br />
Y Y Y Y Y<br />
Y Y Y Y Y Y<br />
Y Y Y Y Y Y<br />
Y Y Y Y Y Y<br />
Y Y Y Y Y<br />
Y Y Y Y<br />
Y Y Y Y Y<br />
NOTES<br />
This will likely not exist until late<br />
construction or testing and start-up phase if<br />
it is recipient’s initial project.<br />
This will likely not exist until late<br />
construction or testing and start-up phase if<br />
it is recipient’s initial project. Distribution<br />
will be password protected, as will be all<br />
other SSI documents.<br />
This may not exist until late construction or<br />
testing and start-up phase if it is recipient’s<br />
initial project. Document may also be<br />
called Emergency Preparedness Plan or<br />
other similar title.<br />
Many recipients are combining the SSP<br />
and EMP into an SEPP. PMOC must be<br />
aware of the nomenclature within the<br />
recipient’s agency to assure that proper<br />
documents are reviewed.<br />
Some recipients have separate EOPs and<br />
some include them in the SOPs. PMOC<br />
should review to assure conformance with<br />
SSMP to determine responsibilities for<br />
emergencies, particularly in agencies<br />
where there is no fully commissioned<br />
police force. Usually, completeness of<br />
SOPs and EOPs will increase as project<br />
moves through its phases.<br />
PMOC should review to assess QA<br />
personnel role in oversight and audit of<br />
safety and security requirements across the<br />
project phases.<br />
Recipient document applied to all projects.<br />
If recipient has no DCM, documents that<br />
include safety and security design<br />
recommendations and requirements,<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page B-2