App. No. Checklist Item Plan Requirements Reference Assessment & Notes 7.3 Testing / Inspection Verification 7.4 Hazard and Vulnerability Resolution Verification 7.5 Operational Readiness Verification 7.6 Safety and Security Certification Requirements 8.1 Construction safety and Security Program Elements • Describes the process used to ensure that the as-built (or delivered) configuration contains the safety- and security-related requirements identified in the specifications and other contract documents. • Describes the process used to ensure that safety and security design criteria and safety and security analysis have effectively identified, categorized and resolved hazard and vulnerabilities to a level acceptable by management. • Describes the process used to ensure that rules and procedures are developed to effectively incorporate all safety and security requirements specified during design and identified through safety and security analysis. This includes the process to ensure that the project has provided training to personnel and is using qualified and capable operations and maintenance personnel to initiate revenue service. • Describes the requirements that must be met to deliver final certification that the project is safe and secure for passengers, employees, public safety personnel, and the general public, including individual certificates issued for specific elements to be verified. • Describes the requirements to be implemented by contractors and reports to be received by the grant OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page A-9
App. No. Checklist Item Plan Requirements Reference Assessment & Notes recipient’s management for implementing and tracking construction safety and security programs and plans. 8.2 Construction Phase Hazard and Vulnerability Analysis 8.3 Safety and Security Incentives • Describes the analyses that must be done to identify and resolve or mitigate hazards or threats and vulnerabilities that may be unique to the construction phase. • Describes any incentives that may be in place to support implementation of the construction safety and security program. 9.1 Activities • Identifies the activities that must be performed by the grant recipient to comply with State Safety Oversight Agency (SSOA) requirements implementing 49 CFR Part 659. 9.2 Implementation Schedule 9.3 Coordination Process • If the SSOA has authorities that exceed 49 CFR Part 659 minimum requirements, this section must also explain the grant recipient’s approach for addressing these additional authorities. • Provides an implementation schedule regarding the performance of activities required to meet SSO agency requirements. • Describes the processes to be used to communicate and coordinate with the SSOA. • Identifies by title and name the grant recipient’s primary point of contact working with the SSOA. OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page A-10
- Page 33 and 34: 4.0 REFERENCES The following are th
- Page 35 and 36: o PMOC’s opinion of situations an
- Page 37 and 38: The report formatting requirements
- Page 39 and 40: U.S. DOT Federal Transit Administra
- Page 41: APPENDIX A Sample - Lessons Learned
- Page 66 and 67: • Recipients with major capital p
- Page 68 and 69: follow, have different names for si
- Page 70 and 71: documents referenced in the SSMP to
- Page 72 and 73: (2) The effectiveness of the proces
- Page 74 and 75: For recipients with projects affect
- Page 76 and 77: APPENDIX A: SSMP REVIEW CHECKLIST -
- Page 78 and 79: App. No. Checklist Item Plan Requir
- Page 80 and 81: App. No. Checklist Item Plan Requir
- Page 82 and 83: App. No. Checklist Item Plan Requir
- Page 86 and 87: App. No. Checklist Item Plan Requir
- Page 88 and 89: APPENDIX B: LIST OF SUGGESTED DOCUM
- Page 90 and 91: DOCUMENT (Title and acronym; R sign
- Page 92 and 93: DOCUMENT (Title and acronym; R sign
- Page 94 and 95: APPENDIX D: SAMPLE INTERVIEW QUESTI
- Page 96 and 97: APPENDIX E: SSMP REVIEW CHECKLIST -
- Page 98 and 99: Note: SSMP Element Compliant with D
- Page 100 and 101: SSMP Element Compliant with DRAFT G
- Page 102 and 103: APPENDIX F: DISCUSSION OF CONTENTS
- Page 104 and 105: candidates for the committee so tha
- Page 106 and 107: US DOT Federal Transit Administrati
- Page 108 and 109: the time. During preliminary engine
- Page 110 and 111: • Plans - who prepares, who can m
- Page 112 and 113: U.S. Department of Transportation F
- Page 114 and 115: • Serve as a resource by lending
- Page 116 and 117: c. Peak Vehicle Requirement include
- Page 118 and 119: 3 PMOC review of Grantee’s Operat
- Page 120 and 121: Requirement PMOC Review Comments 5C
- Page 122 and 123: waiver is requested are not produce
- Page 124 and 125: (5) To provide PMOCs with recommend
- Page 126 and 127: 4.1.2 Pre-Award Purchaser’s Requi
- Page 128 and 129: 5.0 PMOC REVIEW OF PROJECT SPONSOR
- Page 130 and 131: • If no, examine contract files,
- Page 132 and 133: 6.3.2 Corrective Action: The Grante
App. No. Checklist Item Plan Requirements Reference Assessment &<br />
Notes<br />
7.3 Testing /<br />
Inspection<br />
Verification<br />
7.4 Hazard and<br />
Vulnerability<br />
Resolution<br />
Verification<br />
7.5 Operational<br />
Readiness<br />
Verification<br />
7.6 Safety and<br />
Security<br />
Certification<br />
Requirements<br />
8.1 Construction<br />
safety and<br />
Security Program<br />
Elements<br />
• Describes the process used to ensure<br />
that the as-built (or delivered)<br />
configuration contains the safety-<br />
and security-related requirements<br />
identified in the specifications and<br />
other contract documents.<br />
• Describes the process used to ensure<br />
that safety and security design<br />
criteria and safety and security<br />
analysis have effectively identified,<br />
categorized and resolved hazard and<br />
vulnerabilities to a level acceptable<br />
by management.<br />
• Describes the process used to ensure<br />
that rules and procedures are<br />
developed to effectively incorporate<br />
all safety and security requirements<br />
specified during design and<br />
identified through safety and security<br />
analysis. This includes the process to<br />
ensure that the project has provided<br />
training to personnel and is using<br />
qualified and capable operations and<br />
maintenance personnel to initiate<br />
revenue service.<br />
• Describes the requirements that must<br />
be met to deliver final certification<br />
that the project is safe and secure for<br />
passengers, employees, public safety<br />
personnel, and the general public,<br />
including individual certificates<br />
issued for specific elements to be<br />
verified.<br />
• Describes the requirements to be<br />
implemented by contractors and<br />
reports to be received by the grant<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page A-9