App. No. Checklist Item Plan Requirements Reference Assessment & Notes activities will be addressed during design reviews to ensure incorporation of safety and security requirements into the final project design. 5.3 Deviations and Changes 6.1 Operations and Maintenance Personnel Requirements 6.2 Plans, Rules and Procedures • Identifies procedures for ensuring that changes to safety and security design criteria are appropriately reviewed and approved prior to adoption. • Identifies the number of personnel and their specific job classifications required to operate and maintain the project in revenue service. • Specifies the qualifications and core competencies, required by job classification, for these personnel to ensure their abilities to provide safe and secure service and to respond to emergencies. • Emphasizes special needs of frontline personnel (i.e., operators, supervisors, station attendants, and mechanics). • Identifies by name the specific safety, security and emergency plans, rules, procedures, and manuals to be developed for operations and maintenance personnel, and also provides a schedule for their development. 6.3 Training Program • Lists the elements of training to be provided to employees, by job classification, to ensure their capabilities to provide safe and secure service and to respond OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page A-7
App. No. Checklist Item Plan Requirements effectively to emergencies. Reference Assessment & Notes • Provides a schedule for the development and offering of this training, and for completion of any qualifications or certifications required by employees. • Ensures the availability of documented evidence of personnel training and qualifications/certifications. 6.4 Emergency Preparedness • Identifies any exercises, drills, tabletops or other activities that will be performed to ensure the readiness of the project placed in revenue service to respond to emergencies, and how the results of these activities will be assessed (i.e., after action report or equivalent document). 6.5 Public Awareness • Identifies programs that support a commitment to on-going comprehensive public awareness, for both security awareness (such as the Transit Watch “eyes and ears” program) and emergency preparedness (such as emergency evacuation instructions to riders). 7.1 Design Criteria Verification Process 7.2 Construction Specification Conformance Process • Describes the process used by the grant recipient to verify that safety and security design criteria have been addressed in project specifications and contract requirements and that all required inspections and tests have been incorporated into project test plans. • Describes the process used to ensure that elements of the system provided under construction, procurement and installation contracts conform to the specifications. OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page A-8
- Page 31 and 32: v) develop and implement a force ac
- Page 33 and 34: 4.0 REFERENCES The following are th
- Page 35 and 36: o PMOC’s opinion of situations an
- Page 37 and 38: The report formatting requirements
- Page 39 and 40: U.S. DOT Federal Transit Administra
- Page 41: APPENDIX A Sample - Lessons Learned
- Page 66 and 67: • Recipients with major capital p
- Page 68 and 69: follow, have different names for si
- Page 70 and 71: documents referenced in the SSMP to
- Page 72 and 73: (2) The effectiveness of the proces
- Page 74 and 75: For recipients with projects affect
- Page 76 and 77: APPENDIX A: SSMP REVIEW CHECKLIST -
- Page 78 and 79: App. No. Checklist Item Plan Requir
- Page 80 and 81: App. No. Checklist Item Plan Requir
- Page 84 and 85: App. No. Checklist Item Plan Requir
- Page 86 and 87: App. No. Checklist Item Plan Requir
- Page 88 and 89: APPENDIX B: LIST OF SUGGESTED DOCUM
- Page 90 and 91: DOCUMENT (Title and acronym; R sign
- Page 92 and 93: DOCUMENT (Title and acronym; R sign
- Page 94 and 95: APPENDIX D: SAMPLE INTERVIEW QUESTI
- Page 96 and 97: APPENDIX E: SSMP REVIEW CHECKLIST -
- Page 98 and 99: Note: SSMP Element Compliant with D
- Page 100 and 101: SSMP Element Compliant with DRAFT G
- Page 102 and 103: APPENDIX F: DISCUSSION OF CONTENTS
- Page 104 and 105: candidates for the committee so tha
- Page 106 and 107: US DOT Federal Transit Administrati
- Page 108 and 109: the time. During preliminary engine
- Page 110 and 111: • Plans - who prepares, who can m
- Page 112 and 113: U.S. Department of Transportation F
- Page 114 and 115: • Serve as a resource by lending
- Page 116 and 117: c. Peak Vehicle Requirement include
- Page 118 and 119: 3 PMOC review of Grantee’s Operat
- Page 120 and 121: Requirement PMOC Review Comments 5C
- Page 122 and 123: waiver is requested are not produce
- Page 124 and 125: (5) To provide PMOCs with recommend
- Page 126 and 127: 4.1.2 Pre-Award Purchaser’s Requi
- Page 128 and 129: 5.0 PMOC REVIEW OF PROJECT SPONSOR
- Page 130 and 131: • If no, examine contract files,
App. No. Checklist Item Plan Requirements<br />
effectively to emergencies.<br />
Reference Assessment &<br />
Notes<br />
• Provides a schedule for the<br />
development and offering of this<br />
training, and for completion of any<br />
qualifications or certifications<br />
required by employees.<br />
• Ensures the availability of<br />
documented evidence of personnel<br />
training and<br />
qualifications/certifications.<br />
6.4 Emergency<br />
Preparedness<br />
• Identifies any exercises, drills,<br />
tabletops or other activities that will<br />
be performed to ensure the readiness<br />
of the project placed in revenue<br />
service to respond to emergencies,<br />
and how the results of these activities<br />
will be assessed (i.e., after action<br />
report or equivalent document).<br />
6.5 Public Awareness • Identifies programs that support a<br />
commitment to on-going<br />
comprehensive public awareness, for<br />
both security awareness (such as the<br />
<strong>Transit</strong> Watch “eyes and ears”<br />
program) and emergency<br />
preparedness (such as emergency<br />
evacuation instructions to riders).<br />
7.1 Design Criteria<br />
Verification<br />
Process<br />
7.2 Construction<br />
Specification<br />
Conformance<br />
Process<br />
• Describes the process used by the<br />
grant recipient to verify that safety<br />
and security design criteria have<br />
been addressed in project<br />
specifications and contract<br />
requirements and that all required<br />
inspections and tests have been<br />
incorporated into project test plans.<br />
• Describes the process used to ensure<br />
that elements of the system provided<br />
under construction, procurement and<br />
installation contracts conform to the<br />
specifications.<br />
OP 22 Safety and Security Management Plan Review<br />