documents referenced in the SSMP to describe the recipient’s approach to performing specific safety and<br />
security management activities.<br />
Based on the degree of satisfaction with the requirements, the PMOC should rate each Item as:<br />
• Compliant (C),<br />
• Marginal (M), or<br />
• Noncompliant (N).<br />
An N rating means the <strong>FTA</strong>’s intent was not adequately addressed and revision is required before the<br />
SSMP can be recommended for acceptance. An M rating means the <strong>FTA</strong>’s intent was addressed but that<br />
the content is inconsistent with other SSMP sections or other plans, or that the deficiency is not so serious<br />
that it prevents acceptance of the SSMP at the current phase but should be corrected in later phases of the<br />
project. A C rating means that <strong>FTA</strong>’s intent was addressed in the SSMP or referenced documents.<br />
For each Item rated M or N, the PMOC should describe the noncompliance or deficiency and, if possible,<br />
make recommendations or suggestions to bring it to full compliance.<br />
Appendix A of Circular 5800.1 provides additional guidance regarding the types of activities <strong>FTA</strong><br />
expects of recipients during various project phases.<br />
6.1.3 SSMP Adherence Review<br />
To assess the recipient’s implementation of the SSMP for specific project phases, the PMOC must<br />
conduct an SSMP Adherence Review. This Review can be divided into five activities:<br />
• Planning the review – based on activities, documentation, committees, and responsibilities identified<br />
in the SSMP, prepare a list of documents and materials to review, individuals to interview, and sites<br />
to visit; materials not in possession of the PMOC should be requested and a delivery schedule and a<br />
schedule for the interviews and site visits should be developed<br />
• Reviewing plans, policies, and procedures – to determine whether they are consistent with the<br />
SSMP and with the <strong>FTA</strong>’s intent for management of safety and security programs<br />
• Reviewing documentation, including memoranda, reports, records, and minutes of safety- and<br />
security-related committees – to verify that the program has been implemented and plans and<br />
procedures are being followed<br />
• Interviewing recipient and consultant staff (senior and middle managers and consultant personnel<br />
identified in the SSMP and others with safety and security responsibilities in the agency and<br />
throughout the project) – to verify that personnel charged with carrying out the safety and security<br />
programs are aware of the SSMP and their responsibilities and are capable of meeting them<br />
• Inspecting selected sites – to view evidence that safety and security programs are being<br />
implemented throughout the project area<br />
6.1.3.1 Planning the Review<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page 6 of 11