follow, have different names for similar documents, the PMOC should follow the recommendations in<br />

Appendices A (SSMP Review Checklist -- Circular 5800.1), B (List of Suggested Documents), and E<br />

(SSMP Review Checklist — Chapter II, Section 6, Circular 5200.1A), and should review the Scope of<br />

Work to understand which documents may be required and how to assure they are provided within an<br />

appropriate time-frame and in compliance with relevant security provisions for their circulation.<br />

6.0 SCOPE OF WORK<br />

Appendices referred to or helpful in complying with this section include:<br />

Appendix A: SSMP Review Checklist – Circular 5800.1<br />

Appendix B: List of Suggested Documents<br />

Appendix C: List of Possible Interviewees<br />

Appendix D: Sample interview Questionnaire<br />

Appendix E: SSMP Review Checklist – Chapter II, Section 5, Circular 5200.1A<br />

Appendix F: Sample Spot Report Outline<br />

Appendix G: Acronyms<br />

<strong>FTA</strong>’s Project Management <strong>Oversight</strong> Procedure (OP) No. 19, Simplified Spot Report Procedure,<br />

explains procedures for producing specialized assessments for recipient projects. <strong>FTA</strong> considers the<br />

SSMP Review a specialized assessment because PMOCs will conduct them as an “infrequently<br />

reoccurring” requirement when:<br />

• For major capital projects involving construction of a new fixed guideway or extension of an<br />

existing fixed guideway, at a minimum, with the recipient’s request to enter each phase of <strong>FTA</strong>’s<br />

New Starts Planning and Development Process and whenever <strong>FTA</strong> requires the PMP to updated.<br />

• For major capital projects involving rehabilitation or modernization of an existing fixed guideway<br />

with a total project cost in excess of $100 million, at a minimum, with the recipient’s initial PMP<br />

submission and any other time the SSMP is updated as part of a required PMP submission to <strong>FTA</strong>.<br />

• For major capital projects designated by the Administrator, at a minimum, with the recipient’s<br />

initial PMP submission and when the SSMP is updated as part of a PMP submission to <strong>FTA</strong>.<br />

The SSMP Review does not include on-going monitoring (i.e., monthly quarterly or bi-weekly) of the<br />

recipient’s PMP/SSMP or other management plans, which is not within the scope of the SSMP Review.<br />

<strong>FTA</strong> may require of the PMOC products or services that include more specialized assessments of<br />

recipient’s safety and security management program. As part of the SSMP Review, <strong>FTA</strong> will require the<br />

PMOC to deliver products and services using the standardized procedures specified in this guidance and<br />

in conformance to individual work orders.<br />

Whether the SSMP is a separate document or a chapter referenced within the PMP, the PMOC shall<br />

evaluate the plan based on applicable conformance requirements that will be identified in the work order.<br />

<strong>FTA</strong> may assign an individual work order for the SSMP Review to:<br />

• The PMOC that provides on-going monitoring of the recipient’s major capital project, or<br />

• A PMOC that specializes in the performance of SSMP Reviews.<br />

OP 22 Safety and Security Management Plan Review<br />

Revision 0, June 2008<br />