FTA Oversight Procedures - Federal Transit Administration - U.S. ...
FTA Oversight Procedures - Federal Transit Administration - U.S. ...
FTA Oversight Procedures - Federal Transit Administration - U.S. ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
performed<br />
Quality assurance records To confirm that quality<br />
assurance checks and reviews<br />
have been performed in<br />
accordance with the approved<br />
Quality Assurance Plan<br />
Construction Cost Estimate To confirm that the estimate as<br />
prepared is consistent with the<br />
Plans, Specifications, and<br />
Contract General and Special<br />
Conditions, and that it is based<br />
upon contemporary cost<br />
information<br />
Review by a person with<br />
experience in performing quality<br />
assurance reviews or audits<br />
Review by a cost estimator with<br />
experience in cost estimating,<br />
including the estimation of the<br />
construction cost impacts of<br />
contract special provisions<br />
related to risk transfer and<br />
construction limitations.<br />
Consider interview of agency /<br />
consultant estimator to confirm<br />
that they have reviewed contract<br />
terms and conditions and made<br />
appropriate allowances.<br />
The following reviews and comparisons provide confirmation that the Bid Package is consistent with<br />
the Environmental Documents and previously accepted project management plans.<br />
Review Item Review Objective Review Method<br />
Plans, specifications, and special<br />
contract conditions with respect<br />
to Environmental Documents<br />
Plans, specifications, and special<br />
contract conditions with respect<br />
to Contract Packaging Plan<br />
Plans, specifications, and special<br />
contract conditions with respect<br />
to Project Master Schedule<br />
To confirm compliance of the<br />
Work to be constructed with the<br />
Environmental Documents<br />
To ensure consistency between<br />
the Bid package and the<br />
Contract Packaging Plan<br />
To ensure consistency between<br />
the Bid package and the Project<br />
Master Schedule<br />
Comparison, using qualified<br />
personnel, of the design and<br />
construction requirements of the<br />
Environmental Document with<br />
the designs and requirements of<br />
the Bid package.<br />
Compare bid package scope<br />
with contracting plan using<br />
qualified personnel. Particular<br />
attention should be paid to risk<br />
allocation / transfers and<br />
interfaces between contacts.<br />
Compare bid package schedule<br />
information with Project Master<br />
Schedule using qualified<br />
personnel. Particular attention<br />
should be paid to schedule<br />
contingency for delay and rebid,<br />
and ensuring that<br />
predecessor activities will be not<br />
OP 46.4 Readiness to Bid Construction Work<br />
Revision 0, June 2008<br />
Page 3 of 6