to FD phase of the project, should be incorporated into the OP 46.2 assessment of readiness to<br />

enter final design.<br />

• The PMOC shall assess the constructability of the project as defined in the PE design documents.<br />

Constructability review procedures are described in OP 16, Design and Constructability Reviews.<br />

The results of this review, if performed commensurate with the completion of PE/Entry to FD<br />

phase of the project, should be incorporated into the OP 46.2 assessment of readiness to enter final<br />

design.<br />

• PMOC shall obtain results of completed risk assessments to evaluate the grantee's predicted<br />

adherence to the proposed project budget and schedule; risks and opportunities facing the project<br />

that should be addressed during the final design phase; the Grantee’s risk management plan and<br />

whether it is being implemented as planned; the Grantee’s Project Development Plan; and whether<br />

the Grantee has incorporated a risk-based management approach to project development.<br />

Risk assessments are to be performed in accordance with OP No. 40. The PMOC may be<br />

directed to perform a risk assessment as part of its review of project readiness to enter final<br />

design.<br />

• The PMOC shall evaluate the content and adequacy of other readiness documents such as the<br />

project operations plan, project implementation (contracting) plan, Document Control Plan,<br />

Configuration Management Plan, and Change Control Plan. Consistency of these plans with<br />

the current scope (engineering plans), schedule and budget is to be confirmed.<br />

As a general guide in the performance of tasks in this section the PMOC should also refer to<br />

Appendix A, which includes a checklist of activities, milestones, and documentation that should<br />

accompany Grantee completion of PE.<br />

7.0 REPORT, PRESENTATION, RECONCILIATION<br />

The PMOC shall synthesize the work performed in Section 6.0 into a formal Spot Report(s) following<br />

the format and administrative requirements described in OP 01<br />

Reports should include, at minimum, the following information and sections:<br />

• Title page, Table of Contents, List of Acronyms<br />

• Executive Summary<br />

• Introduction/Background<br />

• List of PMOCs and Data Sources/Materials<br />

• Methodology<br />

• Findings and Recommendations<br />

• Conclusions<br />

• Appendices<br />

• References, as appropriate.<br />

OP 46.2 Readiness to Enter Final Design<br />

Revision 0, June 2008<br />

Page 9 of 11