• Interim Guidance on Design-Build<br />
• Quality Assurance and Quality Control Guidelines<br />
• Project and Construction Management Guidelines, 2003 Update<br />
• Value Engineering Process Overview, January 1998<br />
5.0 PROJECT SPONSOR SUBMITTALS<br />
In advance of performing the review, the PMOC should meet with the <strong>FTA</strong> Regional Office, the<br />
Project Sponsor and their consultants, visit the project sites, discuss the purpose of the review, and<br />
obtain and study the available project documents:<br />
To verify the status of the LPA<br />
• MPO adopted Long Range Transportation Plan<br />
• Transportation Improvement Program<br />
Narrative and drawing material<br />
• Written project narrative, project description<br />
• Project sponsor’s New Starts submittal<br />
• Final Alternatives Analysis Report<br />
• Environmental studies, Draft Environmental Impact Statement, Environmental Assessment<br />
• Design Criteria, Design Standards<br />
• Planning diagrams and drawings, materials used in public presentations<br />
• Plans, profiles, cross sections, special studies for locations with large uncertainties Cost and<br />
schedule information<br />
• Capital cost estimating methodology memo<br />
• Cost estimate and back up detail in Project Sponsor’s original format<br />
• Schedule in hard copy and acceptable electronic format i.e. Primavera, .PRX, etc.<br />
• Cost estimate and schedule in <strong>FTA</strong>’s Standard Cost Category format<br />
• Operating and Maintenance Cost Estimates and Assumptions<br />
• <strong>Transit</strong> Agency Operating and Capital Budget<br />
Other Documentation<br />
• Project Sponsor Organization and Staffing<br />
• Project Management Plan<br />
• Operating Plan<br />
• Rail Fleet Management Plan<br />
• Bus Fleet Management Plan<br />
• Risk Register and Mitigation Plan<br />
• Contracting Plan for Preliminary Engineering<br />
• Contingency Management Plan (identifying significant areas of uncertainty in scope, cost,<br />
and schedule)<br />
• Real Estate Acquisition Management Plan<br />
• System Safety and Security Management Plan<br />
• Quality Assurance/Quality Control Plan<br />
• Third Party Agreements and Permits<br />
OP 46.1 LPA Review and Readiness to enter PE<br />
Revision 0, June 2008<br />
Page 3 of 8