• Interim Guidance on Design-Build<br />

• Quality Assurance and Quality Control Guidelines<br />

• Project and Construction Management Guidelines, 2003 Update<br />

• Value Engineering Process Overview, January 1998<br />

5.0 PROJECT SPONSOR SUBMITTALS<br />

In advance of performing the review, the PMOC should meet with the <strong>FTA</strong> Regional Office, the<br />

Project Sponsor and their consultants, visit the project sites, discuss the purpose of the review, and<br />

obtain and study the available project documents:<br />

To verify the status of the LPA<br />

• MPO adopted Long Range Transportation Plan<br />

• Transportation Improvement Program<br />

Narrative and drawing material<br />

• Written project narrative, project description<br />

• Project sponsor’s New Starts submittal<br />

• Final Alternatives Analysis Report<br />

• Environmental studies, Draft Environmental Impact Statement, Environmental Assessment<br />

• Design Criteria, Design Standards<br />

• Planning diagrams and drawings, materials used in public presentations<br />

• Plans, profiles, cross sections, special studies for locations with large uncertainties Cost and<br />

schedule information<br />

• Capital cost estimating methodology memo<br />

• Cost estimate and back up detail in Project Sponsor’s original format<br />

• Schedule in hard copy and acceptable electronic format i.e. Primavera, .PRX, etc.<br />

• Cost estimate and schedule in <strong>FTA</strong>’s Standard Cost Category format<br />

• Operating and Maintenance Cost Estimates and Assumptions<br />

• <strong>Transit</strong> Agency Operating and Capital Budget<br />

Other Documentation<br />

• Project Sponsor Organization and Staffing<br />

• Project Management Plan<br />

• Operating Plan<br />

• Rail Fleet Management Plan<br />

• Bus Fleet Management Plan<br />

• Risk Register and Mitigation Plan<br />

• Contracting Plan for Preliminary Engineering<br />

• Contingency Management Plan (identifying significant areas of uncertainty in scope, cost,<br />

and schedule)<br />

• Real Estate Acquisition Management Plan<br />

• System Safety and Security Management Plan<br />

• Quality Assurance/Quality Control Plan<br />

• Third Party Agreements and Permits<br />

OP 46.1 LPA Review and Readiness to enter PE<br />

Revision 0, June 2008<br />

Page 3 of 8