APPENDIX A<br />

Memo regarding Cost Estimating Methods<br />

The Grantee should develop a memo regarding its cost estimating approach as part of the alternatives<br />

analysis work and should update it with each subsequent estimating effort.<br />

The cost estimating methods memo should explain the structure of the cost estimate, assumptions,<br />

other projects as precedents, and reference points. The memo should describe the approach to cost<br />

information development -- parametric, use of aggregated unit costs per lineal foot of cross-section,<br />

use of segments to estimate similar construction conditions within a complex alignment, etc.<br />

If multiple parties are estimating parts of the project, this memo helps to ensure consistency of<br />

approach.<br />

The memo should note considerations important to the estimate such as characteristics of the physical<br />

context, site constraints, design parameters, institutional constraints, contracting and procurement<br />

plans, project schedule, etc.<br />

The memo should include a plan to track throughout the project life both the cost estimate in original<br />

format (and construction contractor’s cost breakdown) and <strong>FTA</strong>’s Standard Cost Category (SCC)<br />

format. The SCC worksheets are provided on <strong>FTA</strong>’s website for the reporting of capital costs.<br />

OP 45 Small Starts Review<br />

Revision 0, June 2008<br />

Page A-1