4.1 Legislative<br />

• The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users, or<br />

SAFETEA-LU, Pub.L. 109-59, as amended.<br />

4.2 United States Code<br />

• 49 USC 5309, most recently reauthorized by the Safe, Accountable, Flexible, Efficient<br />

Transportation Equity Act: A Legacy for Users (SAFETEA-LU) in August 2005. SAFETEA-<br />

LU directs <strong>FTA</strong> to evaluate and rate candidate New Starts projects as an input to federal<br />

funding decisions and at specific milestones throughout each project’s planning and<br />

development. SAFETEA-LU further supports a comprehensive planning and project<br />

development process which New Starts projects must follow.<br />

5.0 PROJECT SPONSOR SUBMITTALS<br />

Obtain the following from the Grantee:<br />

• Project narratives/descriptions<br />

• Environmental impact studies and mitigation plans<br />

• Diagrams, drawings, plans, profiles, cross section drawings, special design studies, graphics<br />

• Specifications, design criteria reports<br />

• Capital cost information including:<br />

o Estimating methodology memo (refer to Appendix A)<br />

o Complete cost estimate in project sponsor’s original format including<br />

Calculations for construction escalation by commodity type<br />

Calculations for inflation by year<br />

o Complete cost estimates in <strong>FTA</strong>’s Standard Cost Category (SCC) format. The SCC<br />

worksheets serve as a reporting format. They summarize the actual cost estimate.<br />

(Obtain from the project sponsor the same version of the worksheets the project sponsor<br />

has submitted or will submit to <strong>FTA</strong> for the annual review.)<br />

• Schedule information in project sponsor’s original format and in SCC format<br />

• Risk assessment and mitigation report, when a risk assessment has been conducted<br />

• A copy of the PMOC annual review from previous year<br />

6.0 SCOPE OF WORK<br />

Meet with the project sponsors regarding project conditions and current developments.<br />

1) On an introductory page of your report, provide the following information:<br />

a) Date of your report<br />

b) Project name and location<br />

c) Project sponsor<br />

d) PMOC firm<br />

e) Person (and affiliation if different from PMOC firm) providing this report<br />

f) Length of time PMOC firm and person have been assigned to this project<br />

2) Describe the history and basis of the cost estimate for the project.<br />

a) Verify that the cost estimate in its original and SCC formats are consistent. Identify<br />

discrepancies between the content in the two formats.<br />

b) Indicate the date of the SCC Workbook (see “Today’s Date” on the BUILD Main); attach the<br />

OP 43 Annual Review<br />

Revision 0, June 2008<br />

Page 2 of 4