eport and the most recent <strong>FTA</strong> New Start profile. Notwithstanding the foregoing, the task order manager<br />

or COTR may direct the PMOC to use an identifiable draft version of these materials.<br />

Review and Analysis of Project Contingency<br />

Conclusion<br />

Recommendations<br />

• Scope Review checklists for design and construction reviews.<br />

• Recommendations for Conditional Approval to Enter PE/FD<br />

• Recommendations for Project Development Agreement/FFGA.<br />

Appendix A: Grantee Project Data<br />

This section shall identify and characterize the Grantee’s structure and quality of the Grantee’s project<br />

data reviewed for the spot report or other deliverables. The intent is to determine the extent, nature, detail<br />

and quality of the Grantee project data and the steps the PMOC took to determine its value. The PMOC<br />

shall identify, and discuss Grantee or third party data it accepted without adjustment.<br />

Appendix B: Methodology<br />

The purpose of this section is to describe the PMOC’s methodology.<br />

Include other appendices as necessary or directed.<br />

7.2 Contractual Risk Allocation Report<br />

Unless otherwise directed by the <strong>FTA</strong>, the delivered report will be sectioned as follows:<br />

Executive Summary<br />

Unless otherwise directed by the task order manager or COTR, not to exceed 3 pages.<br />

Project Background<br />

Project descriptions and data shall be consistent with the Monitoring report guidance, current monitoring<br />

report and the most recent <strong>FTA</strong> New Start profile. Notwithstanding the foregoing, <strong>FTA</strong> may direct the<br />

Contractor to use an identifiable draft version of these materials.<br />

Sub sectioning shall also include Guideway Components, Project Delivery Method, inclusive of the<br />

proposed Contract Packaging Strategy, and, as applicable, Master Planning for the Corridor.<br />

Review and Analysis of Contract Package Level Cost Mapping<br />

The first subsection shall identify and characterize the subject contract package pricing/compensation into<br />

cost accounting categories such as subcontracted direct costs, contractor direct labor, direct material,<br />

direct equipment, field and home office overheads, project contingency, engineering, construction<br />

OP 35 Project Contingency and Contract Package Review<br />