• Project drawings, project narratives, design criteria, specifications<br />

• Information on third parties, description of interface, status of negotiations/agreements<br />

• Project Management Plan<br />

6.0 SCOPE OF WORK<br />

The PMOC shall assess the completeness of NEPA documentation and the level to which<br />

environmental impacts and mitigations are reflected in the project drawings and specifications so as to<br />

provide a sound basis for the project cost estimate and schedule. The PMOC shall assess the project<br />

documentation and follow these procedures:<br />

• Review and analyze the pertinent information available for completeness, adequacy,<br />

consistency, and appropriateness of the level of detail given the phase of the work;<br />

• Identify any and all discrepancies;<br />

• State findings in descending order of importance (most likely -- largest consequences, least<br />

likely -- moderate/minor consequences) and make recommendations for modifications or<br />

additional work by the project sponsor along with a time frame for the performance of the<br />

work;<br />

• Make recommendations and provide professional opinions.<br />

Review for content as follows:<br />

• Confirm consistency between the environmental document and the project drawings,<br />

narratives, specifications, in how the Project Scope is defined and portrayed; verify that<br />

impacts and mitigations are fully reflected in the project drawings, narratives, specifications,<br />

cost estimate and schedule.<br />

• Review the project sponsor's operating budget to confirm that it reflects the agency’s existing<br />

operation and future operation when the project is built;<br />

• Review the project sponsor's capital cost estimate to confirm that it reflects the defined scope<br />

and schedule;<br />

• Prior to entry to PE:<br />

o Confirm that the Project sponsor has considered a sufficient array of alternatives and<br />

has taken the necessary steps in AA to effectively document the selection of the locally<br />

preferred alternative and other conclusions reached.<br />

o Notify <strong>FTA</strong> immediately if it appears that a reasonable alternative was omitted from the<br />

alternatives analysis.<br />

o Confirm that the LPA was adopted into the MPO's LRTP by obtaining a copy of the<br />

plan. Verify that the Project sponsor’s project scope is included and documented.<br />

o Verify that the LRTP is financially constrained.<br />

OP 32B Environmental Document (NEPA) Review for New Starts Projects<br />

Revision 0, June 2008<br />

Page 5 of 6