15) Step the project forward using the forecasted ridership for milestones such as opening day of<br />

service and the year of the longer-term ridership forecast. Refer also to milestones listed in the<br />

rail fleet management plan.<br />

16) The PMOC shall determine a cost effective “build out” approach for the transit project from the<br />

revenue operation date out to a future-planning horizon such as 20-50 years into the future<br />

depending upon the useful economic life of project components.<br />

17) PMOC shall estimate the useful economic life for major project elements. Refer to the “Build<br />

Annualized Worksheet” within <strong>FTA</strong>’s Standard Cost Category (SCC) Workbook portrayed on<br />

<strong>FTA</strong>’s public website for a listing of accepted useful life lengths for project components.<br />

18) Recommendations should account for the time value of money as well as the costs associated<br />

with various construction approaches.<br />

7.0 REPORT, PRESENTATION, RECONCILIATION<br />

The PMOC shall provide <strong>FTA</strong> with a written report of its findings, analysis, recommendations, and<br />

professional opinions, including a description of the review activities undertaken. In Appendix A<br />

describe project information on which the review was performed. In Appendix B describe the review<br />

methodology. After <strong>FTA</strong> approval, the PMOC should share the report with the Grantee. In the event<br />

that differences of opinion exist between the PMOC and the Grantee regarding the PMOC’s findings,<br />

the <strong>FTA</strong> may direct the PMOC to reconcile with the Grantee and provide <strong>FTA</strong> with a report addendum<br />

covering the agreed modifications by the Grantee and PMOC.<br />

The report formatting requirements of OP-1 apply. When necessary, PMOC shall perform data<br />

analysis and develop data models that meet <strong>FTA</strong> requirements using Microsoft Office products such as<br />

Excel and Word and use <strong>FTA</strong>-templates when provided. The PMOC may add other software as<br />

required but documentation and report data shall be made available to <strong>FTA</strong>.<br />

OP 32A Project Capacity Review<br />

Revision 0, June 2008<br />

Page 4 of 4