orders:<br />

5.6.2.1 Is PDR consistent with the specification;<br />

5.6.2.2 Is FDR consistent with specification, with all issues of<br />

design and analysis closed;<br />

5.6.2.3 Does the FAI validate all items of production;<br />

5.6.2.4 Are the performance tests a full validation of the<br />

vehicle performance;<br />

5.6.2.5 Does vehicle acceptance validate the fleet<br />

performance within acceptable tolerances;<br />

5.6.2.6 Does analysis and test precede production to minimize<br />

changes after production has started;<br />

5.6.3 The Supplier’s QA program and the Grantee’s<br />

oversight will assure delivery of “as designed”<br />

vehicles;<br />

5.7 Quality Assurance. Review the Grantee’s QA plan to<br />

assure:<br />

5.7.1 Grantee has qualified inspector(s) on site during<br />

manufacturing, including during pre-production of jigs<br />

and fixtures;<br />

5.7.2 The Grantee and Supplier reporting provides sufficient<br />

independence to allow issues to be raised;<br />

5.7.3 Discrepant material will be properly managed to<br />

assure it is quarantined and disposed of appropriately;<br />

5.7.4 The schedule is such that choices between corrective<br />

action and meeting schedule do not drive quality;<br />

6 Scope of Work. While undertaking the reviews<br />

detailed in section 5, The PMOC shall pay special<br />

attention to the following:<br />

6.1 Schedule. Issues potentially or actually affecting<br />

schedule;<br />

6.2 Vehicle Safety Issues;<br />

6.3 Vehicle Reliability, Availability and Maintainability<br />

issues;<br />

6.4 Issues impacting Vehicle Operability;<br />

6.5 Faulty or unreliable vehicle designs;<br />

6.6 Known component or material design deficiencies.<br />

These check lists are to be supplemented as needed by the PMOC.<br />