candidates for the committee so that it can be formed and made operational in the following quarter. 3) Late changes in establishing the alignment have resulted in design delays. The TVA and Emergency Evacuation Plan (EEP) cannot be formally completed until the right of way is finalized. In the opinion of the PMOC, this delay should not affect commencement of revenue operations because the safety and security departments are participating in the design revisions on a real-time basis. 6.0 Conclusions and Recommendations This section should first present the major conclusions reached from the assessment as to the compliance of the SSMP with FTA Circular requirements and the adequacy of grantee adherence to the SSMP, as well as the overall project safety and security program. It should then present a numbered compilation of all recommendations contained in the other sections of the report. (Each recommendation should include a parenthetical reference to the section or subsection where the recommendation was made.) Appendices To simplify the reading of this Spot Report, it is recommended that certain material be placed in appendices at the end of the Report. Suggested appendices are: List of Documents Reviewed List of Personnel Interviewed List of Sites Visited Members of the SSMP Review Team (including PMOC, Recipient, and Project Staff, if any) Detailed Material in Support of Findings Detailed Project Description OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page F-3
APPENDIX G: ACRONYMS CPTED Crime Prevention Through Environmental Design CSM Construction Safety Manual EMP Emergency Management Plan FD Final Design FFGA Full Funding Grant Agreement FRA Federal Railroad Administration FTA Federal Transit Administration OMP Operations and Management Plan PHA Preliminary Hazard Analysis PMO Project Management Oversight PMOC Project Management Oversight Contractor PMP Project Management Plan RFMP Rail Fleet Management Plan SEPP Security and Emergency Preparedness Plan SITP System Integration Testing Plan SOP Standard Operating Procedure SSCP Safety and Security Certification Plan SSCVR Safety and Security Certification Verification Report SSI Security Sensitive Information SSMP Safety and Security Management Plan SSOA State Safety Oversight Agency SSPP System Safety Program Plan SSP System Security Plan SSWG Safety and Security Working Group TO Task Order TOM Task Order Manager TVA Threat and Vulnerability Analysis OP 22 Safety and Security Management Plan Review Revision 0, June 2008 Page G-1
- Page 66 and 67: • Recipients with major capital p
- Page 68 and 69: follow, have different names for si
- Page 70 and 71: documents referenced in the SSMP to
- Page 72 and 73: (2) The effectiveness of the proces
- Page 74 and 75: For recipients with projects affect
- Page 76 and 77: APPENDIX A: SSMP REVIEW CHECKLIST -
- Page 78 and 79: App. No. Checklist Item Plan Requir
- Page 80 and 81: App. No. Checklist Item Plan Requir
- Page 82 and 83: App. No. Checklist Item Plan Requir
- Page 84 and 85: App. No. Checklist Item Plan Requir
- Page 86 and 87: App. No. Checklist Item Plan Requir
- Page 88 and 89: APPENDIX B: LIST OF SUGGESTED DOCUM
- Page 90 and 91: DOCUMENT (Title and acronym; R sign
- Page 92 and 93: DOCUMENT (Title and acronym; R sign
- Page 94 and 95: APPENDIX D: SAMPLE INTERVIEW QUESTI
- Page 96 and 97: APPENDIX E: SSMP REVIEW CHECKLIST -
- Page 98 and 99: Note: SSMP Element Compliant with D
- Page 100 and 101: SSMP Element Compliant with DRAFT G
- Page 102 and 103: APPENDIX F: DISCUSSION OF CONTENTS
- Page 106 and 107: US DOT Federal Transit Administrati
- Page 108 and 109: the time. During preliminary engine
- Page 110 and 111: • Plans - who prepares, who can m
- Page 112 and 113: U.S. Department of Transportation F
- Page 114 and 115: • Serve as a resource by lending
- Page 116 and 117: c. Peak Vehicle Requirement include
- Page 118 and 119: 3 PMOC review of Grantee’s Operat
- Page 120 and 121: Requirement PMOC Review Comments 5C
- Page 122 and 123: waiver is requested are not produce
- Page 124 and 125: (5) To provide PMOCs with recommend
- Page 126 and 127: 4.1.2 Pre-Award Purchaser’s Requi
- Page 128 and 129: 5.0 PMOC REVIEW OF PROJECT SPONSOR
- Page 130 and 131: • If no, examine contract files,
- Page 132 and 133: 6.3.2 Corrective Action: The Grante
- Page 134 and 135: 8.0 APPENDICES 8.1 Sample Review Ce
- Page 136 and 137: comply? 5.3.1.5 Are the vehicle bod
- Page 138 and 139: US DOT Federal Transit Administrati
- Page 140 and 141: including: the applicability of Fed
- Page 142 and 143: • Each document addresses the int
- Page 144 and 145: APPENDIX A: CHECKLIST OP Section Is
- Page 146 and 147: orders: 5.6.2.1 Is PDR consistent w
- Page 148 and 149: design-to-budget approach that main
- Page 150 and 151: 15) Step the project forward using
- Page 152 and 153: 2.2 The New Starts Process New Star
candidates for the committee so that it can be formed and made operational in the<br />
following quarter.<br />
3) Late changes in establishing the alignment have resulted in design delays. The TVA and<br />
Emergency Evacuation Plan (EEP) cannot be formally completed until the right of way is<br />
finalized. In the opinion of the PMOC, this delay should not affect commencement of<br />
revenue operations because the safety and security departments are participating in the<br />
design revisions on a real-time basis.<br />
6.0 Conclusions and Recommendations<br />
This section should first present the major conclusions reached from the assessment as to the<br />
compliance of the SSMP with <strong>FTA</strong> Circular requirements and the adequacy of grantee adherence to the<br />
SSMP, as well as the overall project safety and security program. It should then present a numbered<br />
compilation of all recommendations contained in the other sections of the report. (Each recommendation<br />
should include a parenthetical reference to the section or subsection where the recommendation was<br />
made.)<br />
Appendices<br />
To simplify the reading of this Spot Report, it is recommended that certain material be placed in<br />
appendices at the end of the Report. Suggested appendices are:<br />
List of Documents Reviewed<br />
List of Personnel Interviewed<br />
List of Sites Visited<br />
Members of the SSMP Review Team (including PMOC, Recipient, and Project Staff, if<br />
any)<br />
Detailed Material in Support of Findings<br />
Detailed Project Description<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />
Page F-3