APPENDIX F: DISCUSSION OF CONTENTS OF AN SSMP REVIEW SPOT REPORT<br />

1.0 Executive Summary<br />

The Executive Summary should begin with a summary introduction to the project, a discussion of<br />

the project’s objectives and benefits, and an indication of its current status.<br />

It should then provide a conclusion as to the compliance of the project’s SSMP to the appropriate<br />

<strong>FTA</strong> requirements and the adequacy of safety and security programs, as documented in the SSMP<br />

and supporting materials, and as implemented based on reviews of operating documents,<br />

interviews, and site inspections.<br />

The balance of the Executive Summary should summarize the major findings of the review that<br />

support the conclusion and any recommendations for improvement.<br />

2.0 Introduction<br />

This section should contain three subsections: a brief introduction to the project (it can be<br />

identical to that included in the Executive Summary or somewhat more detailed); a description of<br />

the objectives of the SSMP review, and a description of the remaining sections of the report.<br />

3.0 Information Reviewed<br />

This section should describe the documents reviewed, the individuals interviewed, and the sites<br />

visited in the course of performing this review.<br />

This section can best be prepared as discussions that refer to tables in an appendix to the Spot<br />

Report, with commentary as required.<br />

4.0 SSMP Compliance Assessment<br />

This section should open with a general assessment of the quality and compliance level of the<br />

SSMP to the applicable <strong>FTA</strong> requirements and then continue with an in-order specific assessment<br />

of how well each of the specific <strong>FTA</strong> requirements are complied with, including clear description<br />

of areas of deficiency and suggestions or recommendations for resolving deficiencies. Either at<br />

the start or end of each Item assessment, the letter C, M, or N should be shown in bold type to<br />

indicate that the Item is either compliant, marginally compliant, or noncompliant with <strong>FTA</strong><br />

requirements.<br />

5.0 SSMP Adherence Assessment<br />

This section should present the results and conclusions from the review of support documentation,<br />

interviews, and site visits and indicate whether or not the SSMP requirements and safety and<br />

security programs are adequate for the current stage of the project, as planned, documented, and<br />

implemented. Findings that support the conclusion and any recommendations for improving or<br />

OP 22 Safety and Security Management Plan Review<br />

Revision 0, June 2008<br />

Page F-1