APPENDIX F: DISCUSSION OF CONTENTS OF AN SSMP REVIEW SPOT REPORT<br />
1.0 Executive Summary<br />
The Executive Summary should begin with a summary introduction to the project, a discussion of<br />
the project’s objectives and benefits, and an indication of its current status.<br />
It should then provide a conclusion as to the compliance of the project’s SSMP to the appropriate<br />
<strong>FTA</strong> requirements and the adequacy of safety and security programs, as documented in the SSMP<br />
and supporting materials, and as implemented based on reviews of operating documents,<br />
interviews, and site inspections.<br />
The balance of the Executive Summary should summarize the major findings of the review that<br />
support the conclusion and any recommendations for improvement.<br />
2.0 Introduction<br />
This section should contain three subsections: a brief introduction to the project (it can be<br />
identical to that included in the Executive Summary or somewhat more detailed); a description of<br />
the objectives of the SSMP review, and a description of the remaining sections of the report.<br />
3.0 Information Reviewed<br />
This section should describe the documents reviewed, the individuals interviewed, and the sites<br />
visited in the course of performing this review.<br />
This section can best be prepared as discussions that refer to tables in an appendix to the Spot<br />
Report, with commentary as required.<br />
4.0 SSMP Compliance Assessment<br />
This section should open with a general assessment of the quality and compliance level of the<br />
SSMP to the applicable <strong>FTA</strong> requirements and then continue with an in-order specific assessment<br />
of how well each of the specific <strong>FTA</strong> requirements are complied with, including clear description<br />
of areas of deficiency and suggestions or recommendations for resolving deficiencies. Either at<br />
the start or end of each Item assessment, the letter C, M, or N should be shown in bold type to<br />
indicate that the Item is either compliant, marginally compliant, or noncompliant with <strong>FTA</strong><br />
requirements.<br />
5.0 SSMP Adherence Assessment<br />
This section should present the results and conclusions from the review of support documentation,<br />
interviews, and site visits and indicate whether or not the SSMP requirements and safety and<br />
security programs are adequate for the current stage of the project, as planned, documented, and<br />
implemented. Findings that support the conclusion and any recommendations for improving or<br />
OP 22 Safety and Security Management Plan Review<br />
Revision 0, June 2008<br />