SSMP Element Compliant<br />

with<br />

DRAFT<br />

Guideline<br />

s<br />

6.5 Operational Readiness Verification<br />

Requirement: Describe process to ensure that rules and procedures are developed and<br />

effectively incorporate all safety and security requirements specified during design and<br />

identified through safety and security analysis. Also describe process to ensure that the<br />

project has provided training and is using qualified and capable operations and<br />

maintenance personnel to initiate revenue service.<br />

Note:<br />

6.5 Certification Requirements<br />

Requirement: Describe requirements which must be met to deliver final certification that<br />

the project is safe and secure for passengers, employees, public safety personnel and the<br />

general public, including individual certificates issued for specific elements to be<br />

verified.<br />

Note:<br />

7 Construction Safety and Security<br />

7.1 Construction Safety and Security Program Elements<br />

Requirement: Describe the requirements to be implemented by contractors and reports to<br />

be received by transit management for implementing and tracking construction safety<br />

programs and plans.<br />

Note:<br />

7.2 Incentives<br />

Requirement: Describe any safety incentives that may be in place to support<br />

implementation of the construction safety program.<br />

Note:<br />

8 49 CFR Part 659 Requirements (if applicable)<br />

8.1 Implementation Activities and Schedule<br />

Requirement: Identify the activities and schedule required to comply with 49 CFR Part<br />

659 requirements.<br />

Note:<br />

8.2 Coordination<br />

Requirement: Identify how the project will work with the State and designated oversight<br />

agency regarding implementation of 49 CFR Part 659 requirements.<br />

OP 22 Safety and Security Management Plan Review<br />

Revision 0, June 2008<br />

Page E-5