CHAPTER 2 | PROPOSED BUS ROUTE MODIFICATIONS<br />
NET COST OF BUS INTERFACE RECOMMENDATIONS: PASADENA TO AZUSA PROJECT<br />
This section presents a preliminary estimate of operating cost associated with the preceding recommendations. <strong>Gold</strong><br />
<strong>Line</strong> service span and frequency are key variables that will aff ect both the total operating cost of the Pasadena to Azusa<br />
feeder bus network as well as the extent to which schedule coordination between buses and trains may be achieved at<br />
the new rail stations. As actual 2015 rail schedules have yet to be fi nalized, the following assumptions have been drawn<br />
for purposes of plan costing.<br />
• Service Span – It is assumed that the <strong>Gold</strong> <strong>Line</strong> will operate seven days per week generally between the hours of 4:30<br />
a.m. and 1:00 a.m., a daily span of 20.5 hours. This is comparable to the existing service span operated on the <strong>Gold</strong><br />
<strong>Line</strong> between Pasadena and Los Angeles.<br />
• Service Frequency – Design headways recommended during the engineering phase diff er from the current level of<br />
service operated between Pasadena and Los Angeles. Planned Pasadena to Azusa service frequencies by service day<br />
and time period are summarized in Table 2-2.<br />
TABLE 2-2 <strong>Metro</strong> <strong>Gold</strong> <strong>Line</strong> Service Span and Frequency<br />
February 2011<br />
SERVICE FREQUENCY<br />
Service Day Operating Hours Early AM a.m. Peak Base p.m. Peak Night<br />
Weekday 4:30am - 1:00 am 15 10 15 10 20<br />
Saturday 4:30am - 1:00 am 20 20 15 15 20<br />
Sunday 4:30am - 1:00 am 20 20 15 15 20<br />
Two bus service scenarios are included in this section to provide a range of probable operating cost for the Pasadena to<br />
Azusa bus network:<br />
• Base Case – includes all intersecting routes operating on modifi ed alignments as proposed at or near prevailing (2011)<br />
service levels in terms of service span and frequency;<br />
• Enhanced Service Levels – includes all intersecting routes operating on modifi ed alignments as proposed at<br />
enhanced service levels including service span equivalent to that of the <strong>Gold</strong> <strong>Line</strong> and bus frequencies suffi cient to<br />
meet every other train on a directional basis.<br />
Ideally, buses and trains should operate on an even multiple of the same headway to ensure schedule coordination on a<br />
directional basis. However, in consideration of both the suburban character of the Pasadena to Azusa service area and<br />
current 30 to 60 minute headways on many of the existing routes, it is assumed that meeting every train on a directional<br />
basis may be unattainable within the current transit funding environment in California. Therefore it is recommended that<br />
for planning purposes target headways for intersecting bus routes be based on an objective of meeting every other <strong>Gold</strong><br />
<strong>Line</strong> train on a bi-directional basis.<br />
BASE CASE<br />
As indicated in Table 2-3, cumulative annual revenue vehicle hours for all intersecting routes would increase by 0.8<br />
percent, from 394,734 to 398,054 assuming the base case scenario. Key changes include the proposed discontinuation of<br />
<strong>Foothill</strong> Transit Route 494. Additional savings would come from the truncation of <strong>Foothill</strong> Route 690 at the Azusa-Citrus<br />
Station, and truncation of <strong>Foothill</strong> Route 272 at Monrovia Station. These operating cost reductions would be off set by the<br />
extension of <strong>Foothill</strong> Routes 284 to Azusa-Citrus Station, division of <strong>Foothill</strong> Route 187 and <strong>Metro</strong> Route 487 into multiple<br />
routes, and various minor route extensions and span improvements as necessary to support the proposed bus interface<br />
plan.<br />
<strong>Foothill</strong> Extension <strong>Bus</strong> Interface Plan