ADM building uses the central heating system which has three steel boilers,<br />

solar panels and heat exchangers for domestic hot water system (DHW) and area shown<br />

in Figure 2.7 & 2.8. There are 71 AHUs (air handling units) in ADM building. These<br />

are used common heating and cooling.<br />

Figure 2.7. HVAC System Equipment (Heating System).<br />

Total rated cooling capacity is 3300x4 kW and heating capacity is 10450 kW in<br />

ADM building. Supply and return air ducts are located around the perimeter <strong>of</strong> the<br />

building. Hot water supplied from three boilers 2x3700&1x3050 kW (90 ºC/70 ºC).<br />

Total amount <strong>of</strong> supply air to the building is 1.145.000 m 3 /h. There is a variable outdoor<br />

air intake per air handler.<br />