downloaded in PDF - NGO Forum on ADB
downloaded in PDF - NGO Forum on ADB downloaded in PDF - NGO Forum on ADB
Fourth Quarter 2010 BANKWATCH s 1
- Page 2 and 3: Table of Contents Lessons Learned f
- Page 4 and 5: 2 s BANKWATCH Fourth Quarter 2010
- Page 6 and 7: Việt Nam với Cơ chế giải t
- Page 8 and 9: 6 s BANKWATCH Fourth Quarter 2010 T
- Page 10 and 11: 8 s BANKWATCH Fourth Quarter 2010 M
- Page 12 and 13: SUKA CITA TANPA HARUS LUPA Sungguhp
- Page 14 and 15: a significant role through its vari
- Page 16 and 17: ’ 14 s BANKWATCH Fourth Quarter 2
- Page 18 and 19: Comments and Suggestions on the Acc
- Page 20 and 21: Existing Accountab
- Page 22 and 23: Submission to the Accountability Me
- Page 24 and 25: Financial Intermed
- Page 26 and 27: List of related documents Problems
- Page 28: 26 s BANKWATCH Fourth Quarter 2010
Fourth Quarter 2010 BANKWATCH s<br />
1
Table of C<strong>on</strong>tents<br />
Less<strong>on</strong>s Learned from the Impact of the Highway 1<br />
(HW1) Rehabilitati<strong>on</strong> Project<br />
By S<str<strong>on</strong>g>in</str<strong>on</strong>g> Chh<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
Vietnam and Mechanism Resp<strong>on</strong>sibility of <strong>ADB</strong><br />
By Shayla Pham<br />
Not People-Friendly Accountability Mechanism<br />
By T<str<strong>on</strong>g>in</str<strong>on</strong>g>at<str<strong>on</strong>g>in</str<strong>on</strong>g> Ismayilova<br />
Water is Life for All But a Curse to Us<br />
By Mar<str<strong>on</strong>g>in</str<strong>on</strong>g>a Juthi<br />
Tall Talks<br />
By Tulsi Oram, Harihar Nath and Manorajan Seth<br />
Effective Mediati<strong>on</strong><br />
By Za<str<strong>on</strong>g>in</str<strong>on</strong>g>uri Hasyim,Endang Sri Masliha and<br />
Erna Kasypiah<br />
Frame a Just Accountability Mechanism or<br />
Give Up Your Immunity<br />
By Souparna Lahiri<br />
On SPF’s Site Visit<br />
By Toshiyuki Doi<br />
Comments and Suggesti<strong>on</strong>s <strong>on</strong> the<br />
Accountability Mechanism<br />
By Kay Leak<br />
Exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g Accountability Mechanism: Beh<str<strong>on</strong>g>in</str<strong>on</strong>g>d<br />
the Masquerade<br />
By Diana Goeltom<br />
EXECUTIVE EDITOR<br />
Dr. Avilash Roul<br />
avilash@forum-adb.org<br />
MANAGING EDITOR<br />
Angela D<strong>on</strong><br />
abby@forum-adb.org<br />
An <strong>on</strong>-l<str<strong>on</strong>g>in</str<strong>on</strong>g>e editi<strong>on</strong> of this publicati<strong>on</strong> is available at<br />
www.forum-adb.org<br />
BANKWATCH <str<strong>on</strong>g>Forum</str<strong>on</strong>g>'s quarterly magaz<str<strong>on</strong>g>in</str<strong>on</strong>g>e,<br />
features development perspectives and<br />
critiques of <strong>ADB</strong> policies and programs.<br />
BANKWATCH is a member of the Philipp<str<strong>on</strong>g>in</str<strong>on</strong>g>e<br />
Press Institute (PPI)<br />
Cambodian families affected by the<br />
<strong>ADB</strong>-funded Highway One project.<br />
Photo by Dr. Avilash Roul/<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g><br />
<strong>on</strong> <strong>ADB</strong>.<br />
Submissi<strong>on</strong> to the Accountability Mechanism<br />
Review<br />
Pr<str<strong>on</strong>g>in</str<strong>on</strong>g>ted with soya-based <str<strong>on</strong>g>in</str<strong>on</strong>g>k <strong>on</strong> recycled paper.<br />
The op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s expressed <str<strong>on</strong>g>in</str<strong>on</strong>g> these articles are the views of<br />
the authors and not necessarily the views of the <str<strong>on</strong>g>Forum</str<strong>on</strong>g>.<br />
Permissi<strong>on</strong> to quote from them or copy them for n<strong>on</strong>commercial<br />
purposes is hereby granted so l<strong>on</strong>g as attributi<strong>on</strong><br />
is given.<br />
2 s BANKWATCH Fourth Quarter 2010<br />
1<br />
4<br />
5<br />
6<br />
7<br />
8<br />
11<br />
14<br />
16<br />
18<br />
20<br />
Editorial<br />
Accountable to Affected People<br />
The jo<str<strong>on</strong>g>in</str<strong>on</strong>g>t <strong>ADB</strong> Board and Management Work<str<strong>on</strong>g>in</str<strong>on</strong>g>g Group<br />
<strong>on</strong> the Accountability Mechanism Review has released the<br />
c<strong>on</strong>sultati<strong>on</strong> paper “Further Strengthen<str<strong>on</strong>g>in</str<strong>on</strong>g>g the Accountability<br />
Mechanism.” This came out <strong>on</strong> February 4, 2011, exactly 15<br />
days after its stipulated release.<br />
The delay <str<strong>on</strong>g>in</str<strong>on</strong>g> release is teem<str<strong>on</strong>g>in</str<strong>on</strong>g>g with <str<strong>on</strong>g>in</str<strong>on</strong>g>side stories of rifts<br />
am<strong>on</strong>g lead borrow<str<strong>on</strong>g>in</str<strong>on</strong>g>g and borrower countries, as well as <str<strong>on</strong>g>in</str<strong>on</strong>g>house<br />
debates and discussi<strong>on</strong>s. This release however comes<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> the wake of several regi<strong>on</strong>al c<strong>on</strong>sultati<strong>on</strong>s. While the name<br />
of the c<strong>on</strong>sultati<strong>on</strong> paper <str<strong>on</strong>g>in</str<strong>on</strong>g>dicates the strengthen<str<strong>on</strong>g>in</str<strong>on</strong>g>g of the<br />
mechanism, it is still the affected people who, <str<strong>on</strong>g>in</str<strong>on</strong>g> the end are the<br />
last and least priority <str<strong>on</strong>g>in</str<strong>on</strong>g> the new avatar of the 2003 policy.<br />
The time has come for each citizen to ask how every dollar<br />
is spent <strong>on</strong> development activities which have affected and<br />
c<strong>on</strong>t<str<strong>on</strong>g>in</str<strong>on</strong>g>ue to affect their lives. The beneficiaries are the <strong>on</strong>es who<br />
should know about and participate <str<strong>on</strong>g>in</str<strong>on</strong>g> decisi<strong>on</strong>s <strong>on</strong> where the<br />
m<strong>on</strong>ey will be spent. The power centers <str<strong>on</strong>g>in</str<strong>on</strong>g> Tokyo, Wash<str<strong>on</strong>g>in</str<strong>on</strong>g>gt<strong>on</strong>,<br />
Manila, New Delhi, Beij<str<strong>on</strong>g>in</str<strong>on</strong>g>g, Jakarta and Phnom Penh should<br />
not determ<str<strong>on</strong>g>in</str<strong>on</strong>g>e and decide <strong>on</strong> their own as to how the landscape<br />
of develop<str<strong>on</strong>g>in</str<strong>on</strong>g>g Asia would look like and how the <strong>ADB</strong> would be<br />
accountable. The Bank must listen to the likes of Chh<str<strong>on</strong>g>in</str<strong>on</strong>g>, Pham,<br />
Ismayilova, Oram and many more who have been affected by<br />
<strong>ADB</strong> projects.<br />
This Bankwatch issue is dedicated to the affected people<br />
who c<strong>on</strong>vey their messages regard<str<strong>on</strong>g>in</str<strong>on</strong>g>g the Accountability<br />
Mechanism. Spoken and written <str<strong>on</strong>g>in</str<strong>on</strong>g> the language they are most<br />
comfortable with, each of them speak of the same issues and<br />
c<strong>on</strong>cerns.<br />
More than 10 years after the road project has been<br />
completed, project-affected communities <str<strong>on</strong>g>in</str<strong>on</strong>g> Cambodia are still<br />
wait<str<strong>on</strong>g>in</str<strong>on</strong>g>g for the promised livelihood restorati<strong>on</strong> program. In<br />
Vietnam, people affected by <strong>ADB</strong> projects are not even familiar<br />
with the accountability mechanism. They do not know that such<br />
a mechanism exists and that they can file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t and seek<br />
redress. In Kyrgyzstan, affected people po<str<strong>on</strong>g>in</str<strong>on</strong>g>t out that the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
mechanism processes are not so people-friendly. In Odisha,<br />
people are suggest<str<strong>on</strong>g>in</str<strong>on</strong>g>g how to make use of such a mechanism<br />
for the benefit of the poor. In Ind<strong>on</strong>esia, groups discern some<br />
gaps <str<strong>on</strong>g>in</str<strong>on</strong>g> the first phase of the mechanism and suggest ways to<br />
make it effective and efficient.<br />
The messages <str<strong>on</strong>g>in</str<strong>on</strong>g> the local language <strong>on</strong> this issue reiterate<br />
the predicament of the ‘participatory development process.’<br />
The structures, processes and <str<strong>on</strong>g>in</str<strong>on</strong>g>tenti<strong>on</strong>s of the Accountability<br />
Mechanism determ<str<strong>on</strong>g>in</str<strong>on</strong>g>e the s<str<strong>on</strong>g>in</str<strong>on</strong>g>cerity of the Bank <str<strong>on</strong>g>in</str<strong>on</strong>g> uphold<str<strong>on</strong>g>in</str<strong>on</strong>g>g its<br />
accountability to the project-affected people.<br />
Now is the opportunity to do so.<br />
Dr. Avilash Roul
Fourth Quarter 2010 BANKWATCH s<br />
1
2 s BANKWATCH Fourth Quarter 2010
A community member expla<str<strong>on</strong>g>in</str<strong>on</strong>g>s an issue to a representative of <strong>ADB</strong>.<br />
Photo courtesy of Mek<strong>on</strong>g Watch<br />
Fourth Quarter 2010 BANKWATCH s<br />
3
Việt Nam với Cơ chế giải trình<br />
trách nhiệm của <strong>ADB</strong><br />
H<br />
iện nay, Việt Nam là một tr<strong>on</strong>g những nước<br />
ưu tiên nhận tài trợ của <strong>ADB</strong> tr<strong>on</strong>g chương<br />
trình Tiểu vùng sông Mek<strong>on</strong>g. Việt Nam<br />
cũng là một tr<strong>on</strong>g những nước nhận được nhiều<br />
khoản tài trợ nhất từ quỹ Phát triển Châu Á (ADF).<br />
Tr<strong>on</strong>g khi chúng ta có thể dự báo trước được sẽ ngày<br />
càng có nhiều khoản đầu tư của <strong>ADB</strong> tại Việt Nam<br />
thì vấn đề là rất ít tr<strong>on</strong>g số những dự án này được<br />
xem là có sự tham gia của người dân bị ảnh hưởng<br />
bởi dự án. Với tư cách là một thể chế tài chính công<br />
thì các chính sách, chương trình và dự án của <strong>ADB</strong><br />
được cho là cần phải có tính giải trình trách nhiệm<br />
và m<str<strong>on</strong>g>in</str<strong>on</strong>g>h bạch.<br />
Hầu hết người dân Việt Nam nói chung và<br />
người dân bị ảnh hưởng bởi các dự án do <strong>ADB</strong> tài<br />
trợ đều không biết đến cơ chế giải trình trách nhiệm.<br />
Họ không hề biết rằng có một cơ chế như thế tồn tại<br />
để họ có thể nêu những ý kiến về những ảnh hưởng<br />
tiêu cực của các dự án đến đời sống của họ. Lí do<br />
có thể là: ngân hàng dùng những từ ngữ rất “ngân<br />
hàng” hay quá cao siêu để mô tả những chính sách,<br />
cơ chế của họ mà những người dân bình thường<br />
không có chuyên môn không thể hiểu được; khi một<br />
dự án vào đến địa phương không có một cơ quan<br />
nào phổ biến cho họ là khi phát hiện ra dự án có vấn<br />
đề thì họ có thể dựa vào cơ chế nào để cất tiếng nói.<br />
Ngân hàng và các đơn vị thực thi dự án đều biết<br />
đến vấn đề này nhưng họ cảm thấy không cần phải<br />
có trách nhiệm để phổ biến cho người dân. Có thể<br />
khẳng định ngoài những người có chuyên môn thì<br />
không một người dân nào biết đến cái gọi là Cơ chế<br />
giải trình trách nhiệm. Đây phải chăng là sự vi phạm<br />
chính quy định của <strong>ADB</strong> tr<strong>on</strong>g chính sách công bố<br />
thông t<str<strong>on</strong>g>in</str<strong>on</strong>g> cho người dân? Ngay bản thân thuật ngữ<br />
“Cơ chế giải trình trách nhiệm” đã mang tính kỹ<br />
thuật và khó tiếp nhận đối với những người không<br />
có chuyên môn. Vì vậy, tính đến nay tại Việt Nam<br />
có rất ít trường hợp gửi thư khiếu nại lên Cơ chế giải<br />
Photo courtesy of Shayla Pham<br />
4 s BANKWATCH Fourth Quarter 2010<br />
trình trách nhiệm của <strong>ADB</strong>, kể cả đối với những dự<br />
án có quy mô ảnh hưởng sâu rộng. Vào năm 2006,<br />
với dự án Phát triển du lịch tiểu vùng sông Mek<strong>on</strong>g<br />
mở rộng đã có một trường hợp gửi thư khiếu nại lên<br />
Cơ chế giải trình trách nhiệm của <strong>ADB</strong> nhưng sau<br />
đó được cho là không hợp lệ. Vấn đề đặt ra là ai sẽ<br />
là người kiểm chứng tính đúng sai khi <strong>ADB</strong> cho nó<br />
là không hợp lệ? Để cho Cơ chế giải trình thực sự<br />
hiệu quả thì <strong>ADB</strong> nên công khai tất cả các trường<br />
hợp khiếu nại dù cho nó hợp lệ hay không, đối với<br />
trường hợp mà <strong>ADB</strong> cho rằng không hợp lệ để xem<br />
xét giải quyết thì phải chỉ ra nó không hợp lệ ở điểm<br />
nào.<br />
Một tr<strong>on</strong>g những vấn đề khiến Cơ chế giải trình<br />
trách nhiệm khó phát huy hiệu quả ở Việt Nam là<br />
hầu hết người dân đều không thông thạo tiếng Anh<br />
mà nguồn tham khảo chủ yếu lại là tiếng Anh. Vì<br />
vậy, khuyến nghị <strong>ADB</strong> nên có tất cả các thông t<str<strong>on</strong>g>in</str<strong>on</strong>g> về<br />
Cơ chế giải trình trách nhiệm của họ dưới dạng tiếng<br />
Việt chứ không chỉ một vài tài liệu mang tính hình<br />
thức để người dân có thể dễ dàng tiếp cận hơn. Hơn<br />
thế nữa, <strong>ADB</strong> cũng nên có chính sách chấp thuận tất<br />
cả các trường hợp khiếu nại kể cả từ một cá nhân và<br />
bằng ngôn ngữ mẹ đẻ của họ.<br />
Photo courtesy of Shayla Pham
Недружелюбный Механизм<br />
Подотчетности<br />
Тинатин Исаева<br />
За последние полтора года или около того, Центральная Азия и Кавказ на регулярной основе<br />
с некоторыми промежутками времени, направляла жалобы в АБР согласно Механизму<br />
Подотчетности (МП). Когда пострадавшие люди и их соответствующие местные представители<br />
Организаций Гражданского Общества знают об этом механизме, они стремятся решать воздействия<br />
проектов финансируемых АБР. Однако, многие люди на местах не знают о существовании такого<br />
механизма. На фоне существующих систем управления в каждой из этих стран данного региона,<br />
Механизм Подотчетности позволяет требовать права и справедливости для людей.<br />
Одна из легитимных жалоб в Кыргызстане на первом этапе МП<br />
проходит через так называемый Офис Специального<br />
Проектного Посредника (ОСПП), который пытается решить<br />
данный вопрос. Однако, несмотря на то, что уже прошло шесть<br />
месяцев, с тех пор как жалоба была направлена в ОСПП, до<br />
сих пор вопрос пострадавших людей еще не решен. Несмотря<br />
на то, что жалоба была признана легитимной, что означает<br />
о наличии проблем и нарушений при реализации проекта,<br />
этот вопрос остается все еще нерешенным и пострадавшие<br />
люди находятся сейчас в отчаянии как экономически, так как<br />
и психологически.<br />
Похоже, функции и роль первого этапа МП АБР<br />
ограничен в решении вопросов компенсации по проекту<br />
строительства дороги. В жалобах данного региона<br />
многие вопросы связаны с переселением, но следует<br />
отметить, что вопросы переселения подняты в жалобе<br />
в связи с отсутствием информации, консультаций<br />
и участия пострадавших людей во время фазы подготовления проекта.<br />
К сожалению, ни новая политика рассмотрения МП, ни новый Рабочий документ по Политике по<br />
связям с общественностью не включают ясного разъяснение о том, как должна распространяться<br />
информация о Механизме Подотчетности на местах.<br />
В ходе расследования ОСПП, как правило, местные сообщества начинают узнавать о дополнительных<br />
проблемах и нарушениях проекта. Однако, проблемы, кроме тех, что указанны в жалобе, не<br />
рассматриваются ОСПП, так как для этого надо писать новую жалобу. Консультационный проект<br />
политики Механизма Подотчетности подготовленный в феврале 2011 года по-прежнему не включает<br />
в себя вопросы, кроме тех, что были подняты в жалобе для рассмотрения ОСПП.<br />
В Консультационном проекте политики МП утверждает, что бюджет ОСПП и Группа экспертов по<br />
соответствию условиям (CRP) слишком огромный и должен быть сокращен. Однако, их работа принесла<br />
значимые результаты, и жалобы поспособствовали тому, что все стейкхолдеры стали принимать<br />
участие в решении проблем и узнали о демократическом и активном участии в процессе принятия<br />
решений, узнали о требованиях Политики по мерам защиты и прекращения практики штамповки<br />
проектов. Если банк серьезно относится к своей прозрачности и подотчетности, рассмотрение проекта<br />
МП должны более конкретными в вопросах легкого доступа и своевременного разрешения жалоб.<br />
Fourth Quarter 2010 BANKWATCH s<br />
Cutt<str<strong>on</strong>g>in</str<strong>on</strong>g>g trees for road widen<str<strong>on</strong>g>in</str<strong>on</strong>g>g.<br />
Photo courtesy of T<str<strong>on</strong>g>in</str<strong>on</strong>g>at<str<strong>on</strong>g>in</str<strong>on</strong>g> Ismayilova.<br />
5
6 s BANKWATCH Fourth Quarter 2010<br />
The plight of communities <str<strong>on</strong>g>in</str<strong>on</strong>g> Keshobpur<br />
Upazilla sub district, Jessore, Bangladesh.<br />
Photos courtesy of Initiative for Right View.
Photo courtesy of Ranjan Panda<br />
Fourth Quarter 2010 BANKWATCH s<br />
7
8 s BANKWATCH Fourth Quarter 2010<br />
Menjadi Perantara<br />
Pengalaman 3 <str<strong>on</strong>g>NGO</str<strong>on</strong>g> Dalam Memfasilitasi Masyarakat Korban Proyek<br />
Melalui Mekanisme Akuntabilitas <strong>ADB</strong> i<br />
Za<str<strong>on</strong>g>in</str<strong>on</strong>g>uri Hasyim,Endang Sri Masliha,Erna Kasypiah ii<br />
S<br />
ejak 2003, tiga <str<strong>on</strong>g>NGO</str<strong>on</strong>g> berkegiatan bersama<br />
masyarakat desa penerima Proyek CERD<br />
[Loan 1765-INO (OCR) & 1766-INO (SF)]<br />
Tahun 2002 Kalimantan Selatan-INDONESIA.<br />
Proses bersama dalam memecahkan kasus-kasus<br />
yang terjadi dalam Proyek CERD berujung pada<br />
pengajuan k<strong>on</strong>sultasi kepada Office Special Project<br />
Facilitator (OSPF) <strong>ADB</strong>. Pilihan <str<strong>on</strong>g>in</str<strong>on</strong>g>i dilakukan<br />
setelah beragam upaya advokasi yang kami<br />
lakukan di t<str<strong>on</strong>g>in</str<strong>on</strong>g>gkat kabupaten h<str<strong>on</strong>g>in</str<strong>on</strong>g>gga pusat tidak<br />
mendapatkan penelesaian yang menyeluruh dan<br />
berkeadilan bagi beneficiaries. Walaupun demikian,<br />
pilihan menawarkan Mekanisme Akuntabilitas<br />
<strong>ADB</strong>, yang merupakan mekanisme <str<strong>on</strong>g>in</str<strong>on</strong>g>ternal <strong>ADB</strong>,<br />
kepada masyarakat korban kami jalankan dengan<br />
kekhawatiran akan <str<strong>on</strong>g>in</str<strong>on</strong>g>dependensi OSPF <strong>ADB</strong>.<br />
MEMBEDAH TAHAP KOMPLAIN<br />
Lebih dua tahun melakukan upaya pemecahan<br />
masalah-masalah proyek tanpa mendapatkan<br />
penyelesaian yang berkeadilan, menyebabkan<br />
masyarakat korban di 5 desa penerima proyek<br />
bersepakat untuk bersama-sama menggunakan<br />
mekanisme akuntabilitas <strong>ADB</strong>. Ini Bahan-bahan<br />
pendukung yang dapat kami kumpulkan tentang<br />
mekanisme kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> mulai dibedah bersama.<br />
Pertemuan berlangsung di antara waktu luang<br />
masyarakat di desa, siang atau malam. Beberapa<br />
bahan harus kami perbanyak, ditulis ulang,<br />
diterjemahkan ke dalam bahasa Ind<strong>on</strong>esia, bahkan<br />
tak jarang harus pula disederhanakan dengan bahasa<br />
daerah setempat saat diskusi.<br />
Pemahaman kami dan masyarakat juga bertambah<br />
dengan mempelajari pengalaman pengajuan<br />
kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> kepada <strong>ADB</strong> di negara la<str<strong>on</strong>g>in</str<strong>on</strong>g>. iii Diskusi<br />
dengan beberapa teman di berbagai negara la<str<strong>on</strong>g>in</str<strong>on</strong>g> juga<br />
kami lakukan untuk mendapatkan pemahaman yang<br />
utuh tentang mekansme <str<strong>on</strong>g>in</str<strong>on</strong>g>i. Penggalangan dukungan<br />
dari masyarakat desa la<str<strong>on</strong>g>in</str<strong>on</strong>g>nya juga dilakukan para<br />
masyarakat pem<strong>on</strong>itor. Dan pada 16 Pebruari 2005,<br />
surat pengajuan kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> yang ditandatangani 5<br />
orang perwakilan dari masyarakat di 5 desa dan 3<br />
orang dari <str<strong>on</strong>g>NGO</str<strong>on</strong>g> dikirimkan ke OPF iv<br />
BERPERAN SEBAGAI PERANTARA<br />
Peran sebagai perantara ternyata tidak dibatasi<br />
dalam setiap tahapan proses kompla<str<strong>on</strong>g>in</str<strong>on</strong>g>. Kami tetap<br />
mengambil peran sebagai penghubung komunikasi<br />
antara OSPF & manajemen proyek dengan<br />
masyarakat. Kamipun secara resmi menjadi tempat<br />
berdiskusi dan berk<strong>on</strong>sultasi, serta menjadi sumber<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>formasi utama bagi masyarakat pengaju kompla<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
untuk mengetahui perkembangan proses k<strong>on</strong>sultasi.<br />
Menjadi perantara bukanlah tanpa masalah. Mulai<br />
dari tud<str<strong>on</strong>g>in</str<strong>on</strong>g>gan sebagai provokator oleh beberapa<br />
orang di manajemen proyek dan perangkat desa,<br />
h<str<strong>on</strong>g>in</str<strong>on</strong>g>gga beragam ’ketidakpuasan’ yang akhirnya<br />
harus dibuang jauh karena compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ants dan<br />
masyarakat desa menyetuju<str<strong>on</strong>g>in</str<strong>on</strong>g>ya. K<strong>on</strong>disi <str<strong>on</strong>g>in</str<strong>on</strong>g>i terjadi<br />
menjelang pelaksanaan review & assessment, di<br />
mana tim OSPF yang tidak dikenal sebelumnya,<br />
hanya menghubungi lewat telep<strong>on</strong> untuk kepastian<br />
pelaksanaan <str<strong>on</strong>g>in</str<strong>on</strong>g>i. Di mana aspek komunikasi resmi<br />
di s<str<strong>on</strong>g>in</str<strong>on</strong>g>i? Atau saat laporan review & assessment tidak<br />
membahas seluruh aspek dalam surat pengajuan<br />
kompla<str<strong>on</strong>g>in</str<strong>on</strong>g>.<br />
Demikian juga dengan cakupan permasalahan yang<br />
ditangani OSPF. Lembaga <str<strong>on</strong>g>in</str<strong>on</strong>g>i hanya berk<strong>on</strong>sentrasi<br />
pada masalah‐masalah yang terjadi di desa pengaju<br />
kompla<str<strong>on</strong>g>in</str<strong>on</strong>g>. Padahal, <str<strong>on</strong>g>in</str<strong>on</strong>g>dikasi pelanggaran terhadap<br />
desa<str<strong>on</strong>g>in</str<strong>on</strong>g> proyek <str<strong>on</strong>g>in</str<strong>on</strong>g>i tidak hanya terjadi di 5 desa<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i. Sedari awal kami berharap, proses k<strong>on</strong>sultasi
<str<strong>on</strong>g>in</str<strong>on</strong>g>i akan menghasilkan suatu keputusan untuk<br />
mendesa<str<strong>on</strong>g>in</str<strong>on</strong>g> ulang pelaksanaan proyek <str<strong>on</strong>g>in</str<strong>on</strong>g>i secara<br />
keseluruhan. Melalui proses <str<strong>on</strong>g>in</str<strong>on</strong>g>i pula, kami berharap<br />
adanya <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigasi terhadap berbagai masalah yang<br />
terjadi.<br />
MENJADI BAHAN PEMBELAJARAN<br />
Proses k<strong>on</strong>sultasi yang difasilitasi OSPF menjadi<br />
bahan pembelajaran yang luar biasa bagi masyarakat<br />
dan kami. Banyak hal yang bisa dipelajari dari<br />
proses <str<strong>on</strong>g>in</str<strong>on</strong>g>i. Kami dan masyarakat mengenal dan juga<br />
melihat bahwa OSPF mencoba berada pada posisi<br />
netral dan menunjukkan objektivitasnya. OSPF telah<br />
berperan sebagaimana disebutkan dalam prosedur,<br />
dan masyarakat cukup puas dengan kesepakatan<br />
yang dicapai. Sungguhpun demikian, dalam proses<br />
k<strong>on</strong>sultasi OSPF perlu memperhatikan hal-hal di<br />
bawah <str<strong>on</strong>g>in</str<strong>on</strong>g>i.<br />
1. OSPF harus memahami k<strong>on</strong>disi dan kultur<br />
masyarakat, kebiasaan, dan komunikasi<br />
yang mereka gunakan.<br />
Seorang compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant dari Kabupaten Tanah<br />
Laut menyatakan bahwa dir<str<strong>on</strong>g>in</str<strong>on</strong>g>ya sempat serba<br />
salah ketika staf OSPF berkunjung ke rumahna<br />
dalam rangka eligibility check. Kehadiran staf<br />
OSPF <str<strong>on</strong>g>in</str<strong>on</strong>g>i bertepatan dengan waktu shalat,<br />
sementara sang tamu tetap mengajukan beragam<br />
pertanyaan. ”Dia mempersilakan kami shalat<br />
tapi pertanyaan tetap terus diajukannya. Dia<br />
tidak tahu kebiasaan-kebiasaan masyarakat, itu<br />
wajar (sebagai orang as<str<strong>on</strong>g>in</str<strong>on</strong>g>g), tapi menjadi tidak<br />
wajar ketika dia tidak mau belajar mengenai<br />
budaya setempat,” ujar compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant tersebut.<br />
2. OSPF harus menyiapkan cara yang pal<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
mudah agar maksud dan tujuan OSPF bisa<br />
dimengerti masyarakat (seh<str<strong>on</strong>g>in</str<strong>on</strong>g>gga tidak<br />
terjadi salah persepsi di t<str<strong>on</strong>g>in</str<strong>on</strong>g>gkat masyarakat).<br />
Beragam alat, bahan dan metode perlu<br />
disediakan untuk mendapatkan proses &<br />
hasil yang pal<str<strong>on</strong>g>in</str<strong>on</strong>g>g efektif.<br />
Rekomendasi <str<strong>on</strong>g>in</str<strong>on</strong>g>i tak datang tanpa sebab.<br />
Penyampaian Hasil Pen<str<strong>on</strong>g>in</str<strong>on</strong>g>jauan & Penilaian<br />
terjadi dengan m<strong>on</strong>ot<strong>on</strong>, Staf OSPF berbicara<br />
atau membacakan (dalam bahasa Inggris)<br />
kemudian diterjemahkan ke bahasa Ind<strong>on</strong>esia,<br />
demikian terjadi berulang. Untungnya, k<strong>on</strong>disi<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i tertol<strong>on</strong>g pada 4 desa la<str<strong>on</strong>g>in</str<strong>on</strong>g>nya setelah kami<br />
melakukan penterjemahan kembali ke bahasa<br />
setempat.<br />
Hal yang juga kami sesalkan adalah OSPF<br />
kurang bisa memahami kebiasaan masyarakat<br />
dalam menangkap <str<strong>on</strong>g>in</str<strong>on</strong>g>formasi. Padahal ada tiga<br />
jenis cara masyarakat menangkap <str<strong>on</strong>g>in</str<strong>on</strong>g>formasi,<br />
yaitu dengan cara mendengarkan (audio),<br />
melihat/membaca (visual) dan melihat/<br />
membaca dan mendengarkan (audio visual).<br />
Seharusnya Staf OSPF menggunakan berbagai<br />
alat bantu seh<str<strong>on</strong>g>in</str<strong>on</strong>g>gga masyarakat benar-benar<br />
dapat menangkap dan memahami hal-hal yang<br />
dipresentasikan.<br />
3. OSPF harus menyiapkan sebuah mekanisme<br />
komunikasi yang lebih mudah seanda<str<strong>on</strong>g>in</str<strong>on</strong>g>ya<br />
pengajuan kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> dilakukan langsung<br />
oleh masyarkat tanpa ada perantara dan<br />
tanpa fasilitas komunikasi yang memadai.<br />
Proses pengajuan kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>i sejak awal<br />
difasilitasi oleh tiga <str<strong>on</strong>g>NGO</str<strong>on</strong>g> (bahkan sejak awal<br />
2003 dalam kegiatan sebelumnya). Posisi kami,<br />
yang akhirnya menjadi perantara, kami nilai<br />
mempermudah dan memperlancar pelaksanaan<br />
kegiatan <str<strong>on</strong>g>in</str<strong>on</strong>g>i. Terbesit dalam pikiran kami, apa<br />
yang akan terjadi jika proses kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>i<br />
terjadi tanpa adanya perantara, langsung ke<br />
masyarakat. Jarak yang jauh –OSPF berada di<br />
Manila dan masyarakat di pelosok desa- dan<br />
keterbatasan alat komunikasi merupakan faktor<br />
penghambat komunikasi, dan <str<strong>on</strong>g>in</str<strong>on</strong>g>i mempengaruhi<br />
kelancaran proses k<strong>on</strong>sultasi.<br />
Sudah seharusnya OSPF memikirkan k<strong>on</strong>disi<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i sebagai antisipasi terhadap pengajuan<br />
k<strong>on</strong>sultasi yang datang langsung dari masyaraat<br />
korban proyek yang didanai utang <strong>ADB</strong>.<br />
4. Proses k<strong>on</strong>sultasi yang memakan waktu<br />
terlalu lama, memunculkan kebosanan di<br />
masyarakat dan memungk<str<strong>on</strong>g>in</str<strong>on</strong>g>kan terjad<str<strong>on</strong>g>in</str<strong>on</strong>g>ya<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>timidasi atau hal la<str<strong>on</strong>g>in</str<strong>on</strong>g> yang membuat upaya<br />
penyelesaian yang ilakukan OSPF menjadi<br />
tidak efektif.<br />
226 hari! Itulah waktu yang harus dilalui<br />
masyarakat untuk sebuah proses kompla<str<strong>on</strong>g>in</str<strong>on</strong>g>,<br />
sejak mengirimkan surat pengaduan h<str<strong>on</strong>g>in</str<strong>on</strong>g>gga<br />
kesepakatan penyelesaian masalah tercapai.<br />
Waktu yang lama <str<strong>on</strong>g>in</str<strong>on</strong>g>i menurunkan kesabaran<br />
masyarakat.<br />
Fourth Quarter 2010 BANKWATCH s<br />
9
SUKA CITA TANPA HARUS LUPA<br />
Sungguhpun proses k<strong>on</strong>sultasi telah menimbulkan<br />
ketidaksabaran, kekuatiran dan kelelahan yang<br />
mendera, namun itu semua telah terbayar melalui<br />
kesepakatan yang berhasil dicapai antara masyarakat,<br />
<strong>ADB</strong>-IRM, dan manajemen proyek. Pemenuhan<br />
komp<strong>on</strong>en proyek yang belum dilaksanakan<br />
(Komp<strong>on</strong>an A dan B) selama <str<strong>on</strong>g>in</str<strong>on</strong>g>i, masyarakat akan<br />
terlibat dan menjadi pengambil keputusan dalam<br />
setiap tahapan pelaksanaan proyek (perencanaan,<br />
pelaksanaan, m<strong>on</strong>itor<str<strong>on</strong>g>in</str<strong>on</strong>g>g), Pen<str<strong>on</strong>g>in</str<strong>on</strong>g>gkatan transparansi<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>formasi perkembangan proyek melalui media dan<br />
pen<str<strong>on</strong>g>in</str<strong>on</strong>g>gkatan k<str<strong>on</strong>g>in</str<strong>on</strong>g>erja fasilitator desa, serta pelatihan<br />
bagi Kelompok Operasi<strong>on</strong>al & Pemeliharaan (Pok-<br />
OP) sarana fisik, dan perbaikan sarana fisik di Desa<br />
Handil Baru Kec. Aluh‐aluh Kab. Banjar.<br />
“Siapa yang akan menyangka, jalan di desa kami itu<br />
akhirnya bisa diperbaiki,” kata seorang compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant<br />
Desa Handil Baru, menyatakan pendapatnya<br />
terhadap hasil kesepakatan. Compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant la<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
menambahi, “Keberhasilan yang kami terima saat<br />
i 3 <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>i adalah Yayasan Duta Awam (YDA) Solo [www.dutaawam.org]; Yayasan Cakrawala Hijau Ind<strong>on</strong>esia (YCHI)<br />
Banjarbaru [www.cakrawalahijau.org]; Lembaga Kajian Keislaman & Kemasyarakatan (LK3) Banjarmas<str<strong>on</strong>g>in</str<strong>on</strong>g>. Proses<br />
Fasilitasi Kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>i berlangsung pada 16 Pebruari 2005 h<str<strong>on</strong>g>in</str<strong>on</strong>g>gga 28 September 2005.<br />
ii Adalah 3 perwakilan <str<strong>on</strong>g>NGO</str<strong>on</strong>g> perantara dalam proses kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>i: Za<str<strong>on</strong>g>in</str<strong>on</strong>g>uri Hasyim (YDA Solo), Endang Sri Masliha<br />
(YCHI Banjarbaru), dan Erna Kasypiah (LK3 Banjarmas<str<strong>on</strong>g>in</str<strong>on</strong>g>).<br />
iiiiiiKami juga mempelajari proses k<strong>on</strong>sultasi serupa yang terjadi di STDP Sri Lanka & MWSP Nepal, sela<str<strong>on</strong>g>in</str<strong>on</strong>g> bahan resmi<br />
dari <strong>ADB</strong> dan bahan dari <str<strong>on</strong>g>NGO</str<strong>on</strong>g> la<str<strong>on</strong>g>in</str<strong>on</strong>g>.<br />
iv Lihat di www.adb.org/spf<br />
v Kompla<str<strong>on</strong>g>in</str<strong>on</strong>g> pertama yang diajukan kepada OSPF <strong>ADB</strong> melalui mekanisme baru <str<strong>on</strong>g>in</str<strong>on</strong>g>i adalah kepada Melamchi Water<br />
Supply Project (MWSP) di Nepal pada Mei 2004, kemudian berturut‐turut Southern Transport Development Project<br />
(STDP) di Sri Lanka pada Juni 2004, Sixth Road Project (SRP) di Filip<str<strong>on</strong>g>in</str<strong>on</strong>g>a pada September 2004, dan Community<br />
Empowerment for Rural Development Project (CERDP) di Ind<strong>on</strong>esia pada Pebruari 2005. MWSP & STDP akhirnya<br />
beralih ke Compliance Reveiw Panel (CRP), sedangkan SRP d<str<strong>on</strong>g>in</str<strong>on</strong>g>yatakan tidak layak (not eligible).<br />
10 s BANKWATCH Fourth Quarter 2010<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i menjadi bukti, orang yang dulu menyatakan<br />
tidak akan ada hasilnya (pengajuan kompla<str<strong>on</strong>g>in</str<strong>on</strong>g>) saat<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i tidak berkomentar apa-apa lagi. Suka cita <str<strong>on</strong>g>in</str<strong>on</strong>g>i<br />
memang layak disyukuri, tanpa harus lupa untuk<br />
mengawal semua kesepakatan dalam waktu yang<br />
telah disepakati.<br />
Kegembiraan serupa juga diungkapkan oleh Staf<br />
OSPF yang sejak awal memfasilitasi proses <str<strong>on</strong>g>in</str<strong>on</strong>g>i. Hal<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>i cukup beralasan karena sepanjang mekanisme<br />
akuntabilitas <str<strong>on</strong>g>in</str<strong>on</strong>g>i diperbaharui (menggantikan<br />
mekanisme lama sejak Mei 2003), kompla<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
masyarakat Kalimantan Selatan kepada <strong>ADB</strong><br />
melalui OSPF <str<strong>on</strong>g>in</str<strong>on</strong>g>i adalah yang keempat. Dan, <str<strong>on</strong>g>in</str<strong>on</strong>g>ilah<br />
satu‐satunya proses k<strong>on</strong>sultasi yang berujung pada<br />
kesepakatan semua pihak. v
Frame a Just Accountability Mechanism<br />
or Give Up Your Immunity<br />
The c<strong>on</strong>cept of natural justice entails that <str<strong>on</strong>g>in</str<strong>on</strong>g> any acti<strong>on</strong> or activity by any state or n<strong>on</strong>-state actor<br />
(sovereign or n<strong>on</strong>-sovereign) that imp<str<strong>on</strong>g>in</str<strong>on</strong>g>ges <strong>on</strong> the rights and entitlements of a pers<strong>on</strong> or a group of<br />
people or that results <str<strong>on</strong>g>in</str<strong>on</strong>g> significant changes <str<strong>on</strong>g>in</str<strong>on</strong>g> the surround<str<strong>on</strong>g>in</str<strong>on</strong>g>g envir<strong>on</strong>ment, ecology, livelihood,<br />
culture and identity, that pers<strong>on</strong> or group has a legitimate right to scrut<str<strong>on</strong>g>in</str<strong>on</strong>g>ize the activities, seek relevant<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong>, and appeal or seek redress before a relevant and appropriate forum.<br />
Therefore, it becomes all the more important<br />
for <strong>ADB</strong> to establish an <str<strong>on</strong>g>in</str<strong>on</strong>g>dependent accountability<br />
mechanism (AM) and a proper grievance redressal<br />
forum which appropriately addresses the lack of<br />
opportunities for the project-affected people to take<br />
<strong>ADB</strong> to court or sue them. The 2003 Policy and<br />
the current review process <str<strong>on</strong>g>in</str<strong>on</strong>g>dicate that the <strong>ADB</strong><br />
management is still not able to understand their<br />
resp<strong>on</strong>sibility or is underm<str<strong>on</strong>g>in</str<strong>on</strong>g><str<strong>on</strong>g>in</str<strong>on</strong>g>g the process of<br />
natural justice.<br />
By Souparna Lahiri<br />
The Problem<br />
First of all, the <strong>ADB</strong> has to recognize its own<br />
resp<strong>on</strong>sibility as an agent of change with a visi<strong>on</strong><br />
to eradicate poverty and to <str<strong>on</strong>g>in</str<strong>on</strong>g>itiate susta<str<strong>on</strong>g>in</str<strong>on</strong>g>able<br />
development. The accountability of a multilateral<br />
development bank, aris<str<strong>on</strong>g>in</str<strong>on</strong>g>g from the impact and<br />
effects of its policies, projects and f<str<strong>on</strong>g>in</str<strong>on</strong>g>ancial support,<br />
cannot be diluted by br<str<strong>on</strong>g>in</str<strong>on</strong>g>g<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> the member countries<br />
and the project developers to shield it. <strong>ADB</strong> plays<br />
The Khulna-Jessore Dra<str<strong>on</strong>g>in</str<strong>on</strong>g>age Rehabilitati<strong>on</strong> Project <str<strong>on</strong>g>in</str<strong>on</strong>g> Bangladesh was <strong>on</strong>e of the projects<br />
filed by <str<strong>on</strong>g>Forum</str<strong>on</strong>g> members under the Accountability Mechanism. The compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t was rejected<br />
by Special Project Facilitator s<str<strong>on</strong>g>in</str<strong>on</strong>g>ce the Project Completi<strong>on</strong> Report has been made. The<br />
failed project has left a legacy of social and envir<strong>on</strong>mental disasters such as <str<strong>on</strong>g>in</str<strong>on</strong>g>undati<strong>on</strong> of<br />
thousands of hectares of land and loss of <str<strong>on</strong>g>in</str<strong>on</strong>g>digenous variety of fish and crops.<br />
File photo/<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>.<br />
Fourth Quarter 2010 BANKWATCH s<br />
11
a significant role through its various <str<strong>on</strong>g>in</str<strong>on</strong>g>struments,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g grants and loans, <str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g>fluenc<str<strong>on</strong>g>in</str<strong>on</strong>g>g policies<br />
of member countries and the projects undertaken.<br />
Sec<strong>on</strong>dly, it is all the more realistic that the<br />
project-affected who are located far away from the<br />
<strong>ADB</strong> headquarters and its Resident Missi<strong>on</strong>s, <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
cases of disputes aris<str<strong>on</strong>g>in</str<strong>on</strong>g>g out of policies and projects<br />
(c<strong>on</strong>nected to and supported by <strong>ADB</strong>), will take<br />
recourse to local and nati<strong>on</strong>al appeal and redress<br />
mechanisms (not even know<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> the first place that<br />
there is an <strong>ADB</strong> c<strong>on</strong>necti<strong>on</strong>). If the projects come <str<strong>on</strong>g>in</str<strong>on</strong>g>to<br />
review under <strong>ADB</strong>’s Accountability Mechanism, it<br />
should be understood that the project-affected have<br />
exhausted all their opti<strong>on</strong>s and that there is no other<br />
alternative left.<br />
‘<br />
. . . . . . . .<br />
Due to the immunities and<br />
privileges enjoyed by the<br />
Asian Development Bank<br />
(<strong>ADB</strong>) under <str<strong>on</strong>g>in</str<strong>on</strong>g>ternati<strong>on</strong>al<br />
law and through its charters,<br />
<strong>ADB</strong> is shielded from private<br />
citizen lawsuits <str<strong>on</strong>g>in</str<strong>on</strong>g> member<br />
countries. This immunity<br />
basically denies affected<br />
people an effective forum<br />
to air their grievances and<br />
seek redress.<br />
. . . . . . . .<br />
’<br />
Thirdly, it is also relevant that many of the<br />
develop<str<strong>on</strong>g>in</str<strong>on</strong>g>g countries, while fac<str<strong>on</strong>g>in</str<strong>on</strong>g>g imm<str<strong>on</strong>g>in</str<strong>on</strong>g>ent<br />
lawsuits, can flaunt <strong>ADB</strong>’s immunity thereby<br />
transferr<str<strong>on</strong>g>in</str<strong>on</strong>g>g all the resp<strong>on</strong>sibility and accountability<br />
issues <strong>on</strong>to the shoulders of <strong>ADB</strong>.<br />
Fourthly, impart<str<strong>on</strong>g>in</str<strong>on</strong>g>g justice has to be prompt and<br />
quick, keep<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> m<str<strong>on</strong>g>in</str<strong>on</strong>g>d the universal axiom of ‘justice<br />
delayed is justice denied.’ <strong>ADB</strong>’s appeal mechanism<br />
cannot be mired <str<strong>on</strong>g>in</str<strong>on</strong>g> bureaucratic delays and has to be<br />
simple and understandable to the project-affected.<br />
<strong>ADB</strong> should be resp<strong>on</strong>sible for communicat<str<strong>on</strong>g>in</str<strong>on</strong>g>g its<br />
mechanism <str<strong>on</strong>g>in</str<strong>on</strong>g> detail to the project-affected.<br />
12 s BANKWATCH Fourth Quarter 2010<br />
The member countries, be<str<strong>on</strong>g>in</str<strong>on</strong>g>g both d<strong>on</strong>or and<br />
n<strong>on</strong>-d<strong>on</strong>or members of the <strong>ADB</strong>, subscribe to the<br />
<strong>ADB</strong>’s Charter, and are part of its decisi<strong>on</strong>-mak<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
and adm<str<strong>on</strong>g>in</str<strong>on</strong>g>istrative processes. The countries and<br />
governments, therefore, cannot deny <strong>ADB</strong> the<br />
right to implement its policies which the member<br />
countries have themselves framed and accepted.<br />
Therefore…<br />
The soluti<strong>on</strong> lies <str<strong>on</strong>g>in</str<strong>on</strong>g> the follow<str<strong>on</strong>g>in</str<strong>on</strong>g>g:<br />
i. Adopt a robust Accountability Mechanism<br />
(AM) which is not subjected to the whims<br />
and fancies of its member countries or those<br />
implement<str<strong>on</strong>g>in</str<strong>on</strong>g>g its projects. The AM should<br />
be seen <str<strong>on</strong>g>in</str<strong>on</strong>g>stead as an attempt to restore the<br />
resp<strong>on</strong>sibility and accountability of the<br />
<strong>ADB</strong> to the project-affected, its primary<br />
beneficiaries.<br />
ii. The AM appeal cannot be subjected to the<br />
c<strong>on</strong>diti<strong>on</strong> of go<str<strong>on</strong>g>in</str<strong>on</strong>g>g a priori through local or<br />
nati<strong>on</strong>al dispute resoluti<strong>on</strong> mechanisms.<br />
iii. The AM has to compensate entirely for the<br />
the lack of the right of the project-affected<br />
to file lawsuits aga<str<strong>on</strong>g>in</str<strong>on</strong>g>st the <strong>ADB</strong>. The<br />
immunity should not violate the universal<br />
rights of a pers<strong>on</strong> or a group of pers<strong>on</strong>s.<br />
The AM has to be seen <str<strong>on</strong>g>in</str<strong>on</strong>g> that respect and<br />
it should facilitate a process that makes up<br />
for the immunity that <strong>ADB</strong> enjoys.<br />
iv. The AM should not be subjected to<br />
bureaucratic delays. The time span from the<br />
appeal to its resoluti<strong>on</strong> has to be quick and<br />
fast-tracked with <strong>on</strong>e-w<str<strong>on</strong>g>in</str<strong>on</strong>g>dow resp<strong>on</strong>se.<br />
The Khulna-Jessore Dra<str<strong>on</strong>g>in</str<strong>on</strong>g>age Rehabilitati<strong>on</strong> Project <str<strong>on</strong>g>in</str<strong>on</strong>g> Bangladesh.<br />
File photo/<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>.
v. The AM has to be properly communicated<br />
and popularized am<strong>on</strong>g the locals and<br />
the project-affected through the Public<br />
Communicati<strong>on</strong>s Policy (PCP). Includ<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
AM <str<strong>on</strong>g>in</str<strong>on</strong>g> the project communicati<strong>on</strong> plan<br />
under PCP should be made mandatory.<br />
vi. Site visits under AM should be made<br />
mandatory and l<str<strong>on</strong>g>in</str<strong>on</strong>g>ked <str<strong>on</strong>g>in</str<strong>on</strong>g>tr<str<strong>on</strong>g>in</str<strong>on</strong>g>sically to<br />
the project cycle by <str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g AM as a<br />
necessary project comp<strong>on</strong>ent.<br />
The Khulna-Jessore Dra<str<strong>on</strong>g>in</str<strong>on</strong>g>age Rehabilitati<strong>on</strong> Project <str<strong>on</strong>g>in</str<strong>on</strong>g> Bangladesh.<br />
File photo/<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>.<br />
. . . . . . . .<br />
‘<br />
<strong>ADB</strong> should know that<br />
the current AM Review is<br />
important and significant<br />
towards c<strong>on</strong>ferr<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
legitimate rights to the<br />
communities and the<br />
project-affected for whom<br />
<strong>ADB</strong> vows by its visi<strong>on</strong>s and<br />
missi<strong>on</strong>s. A weak AM will<br />
deny justice to them and<br />
many more milli<strong>on</strong>s<br />
’<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> the future.<br />
. . . . . . . .<br />
The Bangladesh Water Development Board<br />
(BWDB) <str<strong>on</strong>g>in</str<strong>on</strong>g> 1994-1995 <str<strong>on</strong>g>in</str<strong>on</strong>g>itiated the Khulna-Jessore<br />
Dra<str<strong>on</strong>g>in</str<strong>on</strong>g>age Rehabilitati<strong>on</strong> Project <str<strong>on</strong>g>in</str<strong>on</strong>g> southwest coastal<br />
districts with a US$ 62-milli<strong>on</strong> f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g from the<br />
Asian Development Bank. The stated objective of<br />
the project was to mitigate water logg<str<strong>on</strong>g>in</str<strong>on</strong>g>g problem<br />
and alleviate river dra<str<strong>on</strong>g>in</str<strong>on</strong>g>age c<strong>on</strong>gesti<strong>on</strong>. Source:<br />
Untold Realities: How the <strong>ADB</strong> Safeguards have<br />
been violated <str<strong>on</strong>g>in</str<strong>on</strong>g> Bangladesh, India, Laos PDR and<br />
Pakistan, <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>, October 2006.<br />
Souparna Lahiri has been a social activist s<str<strong>on</strong>g>in</str<strong>on</strong>g>ce<br />
1985, hav<str<strong>on</strong>g>in</str<strong>on</strong>g>g worked with People’s Uni<strong>on</strong> for Civil<br />
Liberties (PUCL), Butterflies (Delhi-based <str<strong>on</strong>g>NGO</str<strong>on</strong>g>),<br />
Center for Educati<strong>on</strong> and Communicati<strong>on</strong> and lastly<br />
with Delhi <str<strong>on</strong>g>Forum</str<strong>on</strong>g>. He is actively <str<strong>on</strong>g>in</str<strong>on</strong>g>volved with the<br />
Nati<strong>on</strong>al <str<strong>on</strong>g>Forum</str<strong>on</strong>g> of Forest People and Forest Workers<br />
and Peoples <str<strong>on</strong>g>Forum</str<strong>on</strong>g> aga<str<strong>on</strong>g>in</str<strong>on</strong>g>st <strong>ADB</strong>. He has also been<br />
engaged with many small people’s movements <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
the northeast and other tribal regi<strong>on</strong>s of India. His<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>tellectual work is <str<strong>on</strong>g>in</str<strong>on</strong>g>formed and shaped by reality<br />
at the grassroots.<br />
Fourth Quarter 2010 BANKWATCH s<br />
13<br />
File photo <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>
’<br />
14 s BANKWATCH Fourth Quarter 2010<br />
On SPF’s Site Visit<br />
In the meantime, apparently pressured by<br />
SPF’s <str<strong>on</strong>g>in</str<strong>on</strong>g>terventi<strong>on</strong>, <strong>ADB</strong>’s Cambodia Resident<br />
Missi<strong>on</strong> (CARM) declared the c<strong>on</strong>duct of a new<br />
socio-ec<strong>on</strong>omic survey of the families to resolve<br />
the problems. Faced with two sets of processes, the<br />
families decided to go with the CARM survey and<br />
asked SPF to put the case <strong>on</strong> hold. If CARM still<br />
could not br<str<strong>on</strong>g>in</str<strong>on</strong>g>g about viable soluti<strong>on</strong>s, they thought<br />
that they could rely <strong>on</strong> SPF. In January 2008, SPF<br />
agreed to stay with the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ants.<br />
By Toshiyuki Doi<br />
In July 2007, 63 Cambodian families who were <str<strong>on</strong>g>in</str<strong>on</strong>g>voluntarily relocated by the <strong>ADB</strong>-funded Highway<br />
One Project, filed a grievance with the Special Project Facilitator (SPF). Earlier <str<strong>on</strong>g>in</str<strong>on</strong>g> 2005, the <strong>ADB</strong><br />
management c<strong>on</strong>ducted a project audit; c<strong>on</strong>cluded that the <strong>ADB</strong>’s 1995 resettlement policy had not been<br />
followed; and directed the Cambodian government to repay the affected people with their due compensati<strong>on</strong>.<br />
Although the 63 families had received repayment, they still could not have their livelihoods restored to the<br />
pre-project level. They were heavily <str<strong>on</strong>g>in</str<strong>on</strong>g>debted, too. These problems were attributed to the c<strong>on</strong>siderable delay<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> the project’s compensati<strong>on</strong> delivery. Policy n<strong>on</strong>-compliance was already admitted by <strong>ADB</strong>. The claimants<br />
wanted outstand<str<strong>on</strong>g>in</str<strong>on</strong>g>g issues addressed. The case thus seemed a perfect fit with SPF’s mandate. 1<br />
‘<br />
. . . . . . . .<br />
SPF met two community<br />
representatives <str<strong>on</strong>g>in</str<strong>on</strong>g> Cambodia<br />
and declared the case<br />
eligible <str<strong>on</strong>g>in</str<strong>on</strong>g> September 2007. 2<br />
However, it failed to obta<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
the government’s c<strong>on</strong>sent<br />
to visit the 63 families<br />
aga<str<strong>on</strong>g>in</str<strong>on</strong>g> for a comprehensive<br />
assessment <str<strong>on</strong>g>in</str<strong>on</strong>g> accordance<br />
with SPF procedures.<br />
SPF tried to get around<br />
the obstacle by hir<str<strong>on</strong>g>in</str<strong>on</strong>g>g a<br />
local c<strong>on</strong>sultant who was<br />
assigned to work with<br />
the families.<br />
. . . . . . . .<br />
Photo courtesy of Mek<strong>on</strong>g Watch<br />
SPF’s decisi<strong>on</strong> was welcomed by the 63 families.<br />
However, it would have been better if SPF had<br />
visited them directly for further <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong>. That<br />
would have ga<str<strong>on</strong>g>in</str<strong>on</strong>g>ed for SPF a lead role <str<strong>on</strong>g>in</str<strong>on</strong>g> the case,<br />
which could have arguably shortened the succeed<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
negotiati<strong>on</strong>s between the families and CARM that<br />
ended up tak<str<strong>on</strong>g>in</str<strong>on</strong>g>g nearly two years. In October 2009,<br />
<strong>ADB</strong> f<str<strong>on</strong>g>in</str<strong>on</strong>g>ally approved a USD 500,000 grant project,<br />
which <str<strong>on</strong>g>in</str<strong>on</strong>g>cluded a comp<strong>on</strong>ent to restructure the 63<br />
families’ debts. 3<br />
SPF must ga<str<strong>on</strong>g>in</str<strong>on</strong>g> the claimants’ c<strong>on</strong>fidence <str<strong>on</strong>g>in</str<strong>on</strong>g> its<br />
processes to be able to work effectively. Face-toface<br />
dialogues with affected people are <str<strong>on</strong>g>in</str<strong>on</strong>g>dispensible<br />
to fulfill SPF’s missi<strong>on</strong>. We need to be rem<str<strong>on</strong>g>in</str<strong>on</strong>g>ded<br />
that under the current structure, SPF is still part<br />
SPF also sent its c<strong>on</strong>sultant to the community leaders (M<str<strong>on</strong>g>in</str<strong>on</strong>g>g Chh<str<strong>on</strong>g>in</str<strong>on</strong>g> and M<str<strong>on</strong>g>in</str<strong>on</strong>g>g Vanna)<br />
to expla<str<strong>on</strong>g>in</str<strong>on</strong>g> the SPF mechanism to them.
Community members of Kra<str<strong>on</strong>g>in</str<strong>on</strong>g>g Ka’ok.<br />
Photo courtesy of Mek<strong>on</strong>g Watch.<br />
The Steung Slot Resettlement Site. This is the <strong>on</strong>ly resettlement site<br />
prepared by the government for the Highway One project. This picture<br />
was taken <str<strong>on</strong>g>in</str<strong>on</strong>g> October 2003.<br />
Photo courtesy of Mek<strong>on</strong>g Watch<br />
of <strong>ADB</strong> management. SPF can thus be viewed as<br />
the management’s last opportunity to improve the<br />
project. In December 2010, <strong>ADB</strong>’s Southeast Asia<br />
Director-General, after hav<str<strong>on</strong>g>in</str<strong>on</strong>g>g received compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts<br />
from communities relocated by <strong>ADB</strong>’s railway<br />
rehabilitati<strong>on</strong> project <str<strong>on</strong>g>in</str<strong>on</strong>g> Cambodia, visited the<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ants and listened directly to their voices.<br />
This, <str<strong>on</strong>g>in</str<strong>on</strong>g> every<strong>on</strong>e’s eyes, would be useful not <strong>on</strong>ly<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> resolv<str<strong>on</strong>g>in</str<strong>on</strong>g>g emerg<str<strong>on</strong>g>in</str<strong>on</strong>g>g problems but also <str<strong>on</strong>g>in</str<strong>on</strong>g> deal<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
with challenges that might be encountered by<br />
families yet to be resettled under the project. If the<br />
Director-General could visit affected communities<br />
for <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong>, why couldn’t the SPF?<br />
. . . . . . . .<br />
‘<br />
SPF f<str<strong>on</strong>g>in</str<strong>on</strong>g>ally revisited the<br />
63 affected families <str<strong>on</strong>g>in</str<strong>on</strong>g> May<br />
2010, but the purpose was<br />
to close the case. SPF’s site<br />
visit should be much less<br />
c<strong>on</strong>troversial, should not<br />
be qualified <str<strong>on</strong>g>in</str<strong>on</strong>g> unnecessary<br />
ways, and should be carried<br />
out as a normal course of<br />
’<br />
<strong>ADB</strong>’s management work.<br />
. . . . . . . .<br />
Mr. Toshiyuki Doi is Representative Director of<br />
Mek<strong>on</strong>g Watch. He can be reached at toshi-doi@<br />
mtd.biglobe.ne.jp<br />
Endnotes:<br />
1 For more details, see: http://www.mek<strong>on</strong>gwatch.org/english/<br />
country/cambodia/HighwayOne/<str<strong>on</strong>g>in</str<strong>on</strong>g>dex.html<br />
2 SPF’s registry of the case is: http://www.adb.org/SPF/<br />
highwayproj-compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t-registry.asp<br />
3 For more details, visit: http://pid.adb.org/pid/TaView.htm?proj<br />
No=43174&seqNo=01&typeCd=2<br />
Fourth Quarter 2010 BANKWATCH s<br />
15
Comments and Suggesti<strong>on</strong>s<br />
<strong>on</strong> the Accountability Mechanism<br />
A<br />
In the case of Highway 1, the project started <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
1999 and ended <str<strong>on</strong>g>in</str<strong>on</strong>g> 2005, but the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t to OSPF<br />
was filed <strong>on</strong>ly <str<strong>on</strong>g>in</str<strong>on</strong>g> 2007! What is wr<strong>on</strong>g with the AM?<br />
Why did the community not compla<str<strong>on</strong>g>in</str<strong>on</strong>g> earlier? All<br />
the answers are with the <strong>ADB</strong> and the Execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
Agency (EA)/government. The OSPF or the CRP,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> particular, can provide the answers.<br />
There is a tremendous lack of <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong> <strong>on</strong><br />
the AM and <strong>on</strong> the various project comp<strong>on</strong>ents,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g the c<strong>on</strong>sequent impacts, am<strong>on</strong>g the<br />
project-affected people <str<strong>on</strong>g>in</str<strong>on</strong>g> <strong>ADB</strong>-funded projects and<br />
technical assistances (TA).<br />
By Kay Leak<br />
s the experience <str<strong>on</strong>g>in</str<strong>on</strong>g> the Highway 1 Project <str<strong>on</strong>g>in</str<strong>on</strong>g> Cambodia shows, a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t of which has been filed to<br />
the Office of the Special Project Facilitator (OSPF) s<str<strong>on</strong>g>in</str<strong>on</strong>g>ce 2007, there are still some issues that need to<br />
be reviewed and that demand feedback from the community and N<strong>on</strong> Government Organizati<strong>on</strong>s.<br />
Another c<strong>on</strong>tentious issue is the numerous steps<br />
for the community to follow. With a l<strong>on</strong>g 8-step<br />
process <str<strong>on</strong>g>in</str<strong>on</strong>g> AM implementati<strong>on</strong>, we suggest that the<br />
follow<str<strong>on</strong>g>in</str<strong>on</strong>g>g be merged: step 3 with step 4 and step 6<br />
with step 7. In our experience, the process of gett<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
approval from the Board or the <strong>ADB</strong> President<br />
takes a l<strong>on</strong>g time to go through each step. So if the<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t was eligible for further <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong>, the<br />
process should not take much l<strong>on</strong>ger anymore. The<br />
affected communities who submitted the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts<br />
need a speedy resoluti<strong>on</strong>.<br />
The <str<strong>on</strong>g>in</str<strong>on</strong>g>specti<strong>on</strong> and <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> process, as<br />
well as its procedures, is too lengthy, complicated<br />
and difficult for most affected people to comply<br />
with.<br />
M<str<strong>on</strong>g>in</str<strong>on</strong>g>g Vanna (<strong>on</strong> the right side) talks to the <strong>ADB</strong> audit team who visited her community <str<strong>on</strong>g>in</str<strong>on</strong>g> April 2005.<br />
Photo courtesy of Mek<strong>on</strong>g Watch.<br />
16 s BANKWATCH Fourth Quarter 2010
We are c<strong>on</strong>cerned that the process rema<str<strong>on</strong>g>in</str<strong>on</strong>g>s<br />
complicated and will not be readily accessible to<br />
many affected communities with<str<strong>on</strong>g>in</str<strong>on</strong>g> Cambodia. These<br />
communities will require professi<strong>on</strong>al assistance<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> lodg<str<strong>on</strong>g>in</str<strong>on</strong>g>g claims. Efforts will need to be made to<br />
educate communities <strong>on</strong> their right to <str<strong>on</strong>g>in</str<strong>on</strong>g>itiate review<br />
acti<strong>on</strong>s.<br />
Another th<str<strong>on</strong>g>in</str<strong>on</strong>g>g that begs an answer is why OSPF<br />
and CRP need the approval of the government.<br />
Under this arrangement, the OSPF and CRP can<br />
never work it out for the community affected by the<br />
project. What is the role then of OSPF and CRP?<br />
What is the <strong>ADB</strong> policy for?<br />
In our view, the team <str<strong>on</strong>g>in</str<strong>on</strong>g> charge of review<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t should be <str<strong>on</strong>g>in</str<strong>on</strong>g>dependent of the pers<strong>on</strong>(s)<br />
resp<strong>on</strong>sible for the decisi<strong>on</strong> that would determ<str<strong>on</strong>g>in</str<strong>on</strong>g>e<br />
the eligibility of the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t.<br />
‘<br />
. . . . . . . .<br />
The <strong>ADB</strong> should disclose<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong> regard<str<strong>on</strong>g>in</str<strong>on</strong>g>g the<br />
Accountability Mechanism to<br />
affected people even before<br />
the project is implemented.<br />
As experienced <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
Cambodia, people affected<br />
by <strong>ADB</strong>-funded projects<br />
never learned or knew<br />
that the <strong>ADB</strong> has its own<br />
Accountability Mechanism<br />
to which they could submit<br />
a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t when the<br />
project has adversely<br />
affected them.<br />
. . . . . . . .<br />
’<br />
Who can file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t? There is a mechanism<br />
at the <strong>ADB</strong> level, but no grievance mechanisms<br />
exist at the local <strong>on</strong>e where <str<strong>on</strong>g>in</str<strong>on</strong>g>dividuals can directly<br />
settle their problems. There should be no restricti<strong>on</strong><br />
<strong>on</strong> the m<str<strong>on</strong>g>in</str<strong>on</strong>g>imum number of compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant. Any<br />
Photo courtesy of Mek<strong>on</strong>g Watch.<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>dividual who has a valid c<strong>on</strong>cern or <str<strong>on</strong>g>in</str<strong>on</strong>g>terest, or has<br />
been affected by a project can file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t. The<br />
process to determ<str<strong>on</strong>g>in</str<strong>on</strong>g>e the eligibility of a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t<br />
at the SPF level heavily depends <strong>on</strong> the op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s of<br />
<strong>ADB</strong> staff, the Execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g Agency (EA)/government<br />
or the private project sp<strong>on</strong>sor (PPS). Those op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s<br />
should be made public as so<strong>on</strong> as a decisi<strong>on</strong> is<br />
made.<br />
Projects that <str<strong>on</strong>g>in</str<strong>on</strong>g>volve a change <str<strong>on</strong>g>in</str<strong>on</strong>g> the envir<strong>on</strong>ment<br />
and <str<strong>on</strong>g>in</str<strong>on</strong>g>voluntary resettlement usually trigger l<strong>on</strong>gterm<br />
impacts bey<strong>on</strong>d the project completi<strong>on</strong><br />
report (PCR). However, as it is, the eligibility of<br />
the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t depends <strong>on</strong> the release of the PCR.<br />
Acceptance of compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts under the accountability<br />
mechanism should not be limited by the issuance of<br />
the PCR.<br />
One more questi<strong>on</strong> rema<str<strong>on</strong>g>in</str<strong>on</strong>g>s: how can the <strong>ADB</strong><br />
make the Accountability Mechanism work?<br />
Mr. Kay Leak is the Executive Director of<br />
C<strong>on</strong>servati<strong>on</strong> and Development <strong>on</strong> Cambodia<br />
(CDCam), an <str<strong>on</strong>g>NGO</str<strong>on</strong>g> directly <str<strong>on</strong>g>in</str<strong>on</strong>g>volved with the<br />
communities affected by <str<strong>on</strong>g>in</str<strong>on</strong>g>voluntary resettlement.<br />
Leak is also an Internati<strong>on</strong>al Committee member<br />
of <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>. He can be reached at<br />
leakkay@yahoo.com.<br />
Fourth Quarter 2010 BANKWATCH s<br />
17
Exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g Accountability Mechanism:<br />
Beh<str<strong>on</strong>g>in</str<strong>on</strong>g>d the Masquerade<br />
Catastrophe for Affected People<br />
Rather, the lack of awareness and more so the<br />
lack of drive to promote awareness <strong>on</strong> the existence<br />
and functi<strong>on</strong>s of AM can be blamed for this. Thus<br />
far, <str<strong>on</strong>g>in</str<strong>on</strong>g> general, <strong>ADB</strong> with its’ standards, mechanisms,<br />
and policies, <str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g the AM, is far from people’s<br />
awareness. With these facts, it is questi<strong>on</strong>able that<br />
<strong>ADB</strong> claimed as a public <str<strong>on</strong>g>in</str<strong>on</strong>g>stituti<strong>on</strong>, but <str<strong>on</strong>g>in</str<strong>on</strong>g> reality it<br />
is actually far from the public.<br />
Mak<str<strong>on</strong>g>in</str<strong>on</strong>g>g AM an <str<strong>on</strong>g>in</str<strong>on</strong>g>tegral part of the project at<br />
its early stages of implementati<strong>on</strong> could have made<br />
th<str<strong>on</strong>g>in</str<strong>on</strong>g>gs different and better. The exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g policy has<br />
not required this to happen. So, the affected people<br />
(AP) have not been able to understand the relevance<br />
and importance of it. This has naturally prevented<br />
them from understand<str<strong>on</strong>g>in</str<strong>on</strong>g>g how and where to address<br />
their compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t prior to project implementati<strong>on</strong>, or<br />
us<str<strong>on</strong>g>in</str<strong>on</strong>g>g it <str<strong>on</strong>g>in</str<strong>on</strong>g> the early stage.<br />
Sec<strong>on</strong>dly, even after ga<str<strong>on</strong>g>in</str<strong>on</strong>g><str<strong>on</strong>g>in</str<strong>on</strong>g>g knowledge<br />
about this mechanism, people still found it rather<br />
hard to use because it is heavily procedural and<br />
bureaucratic. Statements of <str<strong>on</strong>g>in</str<strong>on</strong>g>eligibility such as<br />
“compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ants have yet to address the problem to the<br />
c<strong>on</strong>cerned operati<strong>on</strong>s department” 1 <strong>on</strong>ly burdened<br />
the affected people who are putt<str<strong>on</strong>g>in</str<strong>on</strong>g>g forward their<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t. The material and time lost <str<strong>on</strong>g>in</str<strong>on</strong>g> submitt<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t are not be<str<strong>on</strong>g>in</str<strong>on</strong>g>g taken <str<strong>on</strong>g>in</str<strong>on</strong>g>to account by<br />
the decisi<strong>on</strong>-makers. Supposedly, as a c<strong>on</strong>sequence<br />
of the losses created by the Management and the<br />
Operati<strong>on</strong>s Department, the <str<strong>on</strong>g>in</str<strong>on</strong>g>stituti<strong>on</strong> through<br />
its Accountability Mechanism should have been<br />
18 s BANKWATCH Fourth Quarter 2010<br />
By Diana Goeltom<br />
W<br />
hat would you do when some<strong>on</strong>e displaced you from your land and home without any adequate notice<br />
or preparati<strong>on</strong>? Clearly, all possible efforts will be made to defend your property, which <str<strong>on</strong>g>in</str<strong>on</strong>g>clude<br />
address<str<strong>on</strong>g>in</str<strong>on</strong>g>g the grievances to those who displaced you. <strong>ADB</strong>’S Accountability Mechanism is supposed<br />
to do this <str<strong>on</strong>g>in</str<strong>on</strong>g> projects supported by it.<br />
capable of solv<str<strong>on</strong>g>in</str<strong>on</strong>g>g the problem and <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigat<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
the policy violati<strong>on</strong>s <str<strong>on</strong>g>in</str<strong>on</strong>g> the project. However, the<br />
mechanism has failed to prevent further losses.<br />
‘<br />
. . . . . . . .<br />
The exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g accountability<br />
mechanism is weak <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
its ability to meet the<br />
accountability requirements.<br />
Ind<strong>on</strong>esia recorded 303<br />
loans so far. But s<str<strong>on</strong>g>in</str<strong>on</strong>g>ce AM<br />
was established <str<strong>on</strong>g>in</str<strong>on</strong>g> May<br />
2003, there were <strong>on</strong>ly two<br />
cases submitted, and <strong>on</strong>ly<br />
<strong>on</strong>e was c<strong>on</strong>sidered as<br />
eligible. This near to n<strong>on</strong>e<br />
number of compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts are <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
no way <str<strong>on</strong>g>in</str<strong>on</strong>g>dicator of success<br />
of the projects.<br />
. . . . . . . .<br />
’<br />
The build<str<strong>on</strong>g>in</str<strong>on</strong>g>g of this current mechanism is much<br />
like an ivory tower. It does not proactively reach<br />
the potential affected people 2 and the identified<br />
affected people. In additi<strong>on</strong>, it is impractical for the<br />
APs to use this mechanism. It is far from be<str<strong>on</strong>g>in</str<strong>on</strong>g>g ‘a
friendly and accessible mechanism.’ For a country<br />
that c<strong>on</strong>sists of 17,508 islands, Ind<strong>on</strong>esia faces<br />
difficulties <str<strong>on</strong>g>in</str<strong>on</strong>g> provid<str<strong>on</strong>g>in</str<strong>on</strong>g>g proper communicati<strong>on</strong> and<br />
transportati<strong>on</strong> services for the whole archipelago.<br />
As a c<strong>on</strong>sequence, it is near impossible for the<br />
APs to address their compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts or grievances to<br />
the Ind<strong>on</strong>esian Resident Missi<strong>on</strong> which is based <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
the capital city, Jakarta. Internet service, as <str<strong>on</strong>g>in</str<strong>on</strong>g> most<br />
parts of the develop<str<strong>on</strong>g>in</str<strong>on</strong>g>g countries, can best be termed<br />
as a tertiary good, about which most of the people<br />
are either not aware or are not equipped to access.<br />
Civil society organizati<strong>on</strong>s have criticized the<br />
<strong>ADB</strong>’s AM dur<str<strong>on</strong>g>in</str<strong>on</strong>g>g the <strong>ADB</strong> AM Policy Review<br />
held <str<strong>on</strong>g>in</str<strong>on</strong>g> November 2010 <str<strong>on</strong>g>in</str<strong>on</strong>g> Ind<strong>on</strong>esia. They<br />
c<strong>on</strong>veyed their c<strong>on</strong>cerns <str<strong>on</strong>g>in</str<strong>on</strong>g> at least three areas: 1)<br />
The compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t scope does not cover corrupti<strong>on</strong> and<br />
impact assessment <strong>on</strong> the project (it even tends to<br />
sidel<str<strong>on</strong>g>in</str<strong>on</strong>g>e the issue rather than deliver the problems<br />
to the c<strong>on</strong>cerned department); 2) Tim<str<strong>on</strong>g>in</str<strong>on</strong>g>g of the<br />
project is limited to the submissi<strong>on</strong> of the Project<br />
Completi<strong>on</strong> Report (PCR); and 3) Accountability<br />
Mechanism should be a project comp<strong>on</strong>ent and not<br />
separated from the whole design and implementati<strong>on</strong><br />
of a project.<br />
Envir<strong>on</strong>mental Stand<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
This mechanism <strong>on</strong>ly focuses <strong>on</strong> people who<br />
are go<str<strong>on</strong>g>in</str<strong>on</strong>g>g to be affected. But we are all aware that<br />
the envir<strong>on</strong>ment can potentially be affected or<br />
harmed by any project. The AM does not guarantee<br />
though that the envir<strong>on</strong>ment would be rehabilitated<br />
whenever it is affected. Thus, by us<str<strong>on</strong>g>in</str<strong>on</strong>g>g the<br />
c<strong>on</strong>structi<strong>on</strong> comm<strong>on</strong>ly used <str<strong>on</strong>g>in</str<strong>on</strong>g> envir<strong>on</strong>mental law,<br />
an envir<strong>on</strong>mental legal stand<str<strong>on</strong>g>in</str<strong>on</strong>g>g may be adopted <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
the AM c<strong>on</strong>text. S<str<strong>on</strong>g>in</str<strong>on</strong>g>ce the envir<strong>on</strong>ment is not able to<br />
file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t for itself, then the envir<strong>on</strong>ment could<br />
be represented by envir<strong>on</strong>mental <str<strong>on</strong>g>NGO</str<strong>on</strong>g>s or any<strong>on</strong>e<br />
who shows c<strong>on</strong>cern <str<strong>on</strong>g>in</str<strong>on</strong>g> protect<str<strong>on</strong>g>in</str<strong>on</strong>g>g the envir<strong>on</strong>ment.<br />
As such, the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ants are not <strong>on</strong>ly the affected<br />
people, but also the affected envir<strong>on</strong>ment.<br />
Unless the Bank amends the AM policy <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
order to make the mechanism user-friendly and<br />
sympathetic to both the affected people and the<br />
affected envir<strong>on</strong>ment, the Bank’s accountability<br />
mechanism will rema<str<strong>on</strong>g>in</str<strong>on</strong>g> a masquerade for the Bank.<br />
Will the Bank ever be accountable to the<br />
people?<br />
Ms. Diana Goeltom is a Research Coord<str<strong>on</strong>g>in</str<strong>on</strong>g>ator<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> debtWATCH Ind<strong>on</strong>esia and an Internati<strong>on</strong>al<br />
Committee member of <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>. She<br />
can be reached at dianagoeltom@gmail.com<br />
Endnotes:<br />
1 http://www.adb.org/SPF/registry.asp<br />
2 The term <str<strong>on</strong>g>in</str<strong>on</strong>g> this c<strong>on</strong>text is used to differentiate between the<br />
<strong>ADB</strong>’s exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g def<str<strong>on</strong>g>in</str<strong>on</strong>g>iti<strong>on</strong> up<strong>on</strong> Affected People.<br />
Fourth Quarter 2010 BANKWATCH s<br />
19
Submissi<strong>on</strong> to the<br />
Accountability Mechanism Review*<br />
T<br />
he Accountability Mechanism (AM) has been <str<strong>on</strong>g>in</str<strong>on</strong>g> implementati<strong>on</strong> s<str<strong>on</strong>g>in</str<strong>on</strong>g>ce 2003. However, 27 cases are<br />
be<str<strong>on</strong>g>in</str<strong>on</strong>g>g registered under the C<strong>on</strong>sultati<strong>on</strong> Phase, first phase of AM, <str<strong>on</strong>g>in</str<strong>on</strong>g> seven years. Out of which, 10<br />
were deemed as eligible. Seventeen (17) compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts were declared as not eligible by Special Project<br />
Facilitator (SPF) particularly due to adm<str<strong>on</strong>g>in</str<strong>on</strong>g>istrative issues, i.e. 10 compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts were not raised to the Operati<strong>on</strong>s<br />
Department (OD) prior to the fil<str<strong>on</strong>g>in</str<strong>on</strong>g>g of said compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts. Furthermore, <str<strong>on</strong>g>in</str<strong>on</strong>g> its sec<strong>on</strong>d phase, Compliance Review<br />
Phase, <strong>on</strong>ly 3 compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts were registered so far. There was a five-year gap from 2004 to 2009 as not a s<str<strong>on</strong>g>in</str<strong>on</strong>g>gle<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t was filed to the Compliance Review Panel (CRP). This was not because the <strong>ADB</strong> is do<str<strong>on</strong>g>in</str<strong>on</strong>g>g well<br />
with their projects. But <strong>on</strong> the c<strong>on</strong>trary, it <str<strong>on</strong>g>in</str<strong>on</strong>g>dicates that this policy has not been effective enough to raise the<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>terest and the capacity of the affected people to file such highly technical compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts.<br />
Based <strong>on</strong> the experiences gathered from<br />
more than 40 <strong>ADB</strong>-funded projects, <str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g 11<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts registered under the AM by members<br />
of the <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> the <strong>ADB</strong>, we c<strong>on</strong>clude two<br />
major facts: first, the lack of <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong> about AM<br />
and its procedures am<strong>on</strong>g affected people especially<br />
dur<str<strong>on</strong>g>in</str<strong>on</strong>g>g the early stages of the project; and sec<strong>on</strong>d,<br />
the lack of trust and c<strong>on</strong>fidence am<strong>on</strong>g affected<br />
people <str<strong>on</strong>g>in</str<strong>on</strong>g> fil<str<strong>on</strong>g>in</str<strong>on</strong>g>g a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t to the <strong>ADB</strong> <str<strong>on</strong>g>in</str<strong>on</strong>g> resolv<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
their grievances. There are persist<str<strong>on</strong>g>in</str<strong>on</strong>g>g problems<br />
about the effectiveness and c<strong>on</strong>stra<str<strong>on</strong>g>in</str<strong>on</strong>g>ts faced by<br />
affected people as they seek AM to hold<str<strong>on</strong>g>in</str<strong>on</strong>g>g the <strong>ADB</strong><br />
accountable for its f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> their respective<br />
places due to different political realities.<br />
Issues for c<strong>on</strong>siderati<strong>on</strong>s <str<strong>on</strong>g>in</str<strong>on</strong>g> the AM review are as<br />
follows:<br />
Lack of <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong><br />
There is a tremendous lack of <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong> <strong>on</strong> the<br />
AM as well as about project comp<strong>on</strong>ents, <str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
their respective impacts, am<strong>on</strong>g project-affected<br />
people <str<strong>on</strong>g>in</str<strong>on</strong>g> <strong>ADB</strong>-funded projects and programs <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
develop<str<strong>on</strong>g>in</str<strong>on</strong>g>g member countries (DMCs). Projectaffected<br />
people d<strong>on</strong>’t know if they can file their<br />
grievances <str<strong>on</strong>g>in</str<strong>on</strong>g> such a forum. As the current AM is<br />
a separate mechanism from the project, this leads<br />
to lack of knowledge <str<strong>on</strong>g>in</str<strong>on</strong>g> address<str<strong>on</strong>g>in</str<strong>on</strong>g>g their grievances<br />
20 s BANKWATCH Fourth Quarter 2010<br />
aga<str<strong>on</strong>g>in</str<strong>on</strong>g>st the impact of a project. Most borrowers,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>clud<str<strong>on</strong>g>in</str<strong>on</strong>g>g implement<str<strong>on</strong>g>in</str<strong>on</strong>g>g agencies, either are not<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>formed or are not <str<strong>on</strong>g>in</str<strong>on</strong>g>form<str<strong>on</strong>g>in</str<strong>on</strong>g>g project-affected<br />
people about this mechanism at the earliest stage<br />
of the project cycle. The AM must be <str<strong>on</strong>g>in</str<strong>on</strong>g>cluded as a<br />
mandatory comp<strong>on</strong>ent of each <strong>ADB</strong>-funded or cof<str<strong>on</strong>g>in</str<strong>on</strong>g>anced<br />
projects.<br />
‘Directly affected materially and<br />
adversely’<br />
Impacts of a project go bey<strong>on</strong>d be<str<strong>on</strong>g>in</str<strong>on</strong>g>g material<br />
and direct. Chang<str<strong>on</strong>g>in</str<strong>on</strong>g>g of the envir<strong>on</strong>ment, shelters<br />
and livelihoods, and cultural heritage will not <strong>on</strong>ly<br />
cause material harm such as loss of shelter and<br />
livelihoods, but also n<strong>on</strong>-material harm such as loss<br />
of cultural lives, <str<strong>on</strong>g>in</str<strong>on</strong>g>creas<str<strong>on</strong>g>in</str<strong>on</strong>g>g oppressi<strong>on</strong> and gender<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>justices, and human rights violati<strong>on</strong>s, am<strong>on</strong>g<br />
others.<br />
However, the AM limits its scope to people who<br />
are ”directly affected materially and adversely.”<br />
Though the Envir<strong>on</strong>mental Impacts Assessment<br />
(EIA) under the 2009 Safeguard Policy Statement,<br />
for example, requires assessment of direct and<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>direct envir<strong>on</strong>mental impacts. It means, there is<br />
an acceptance that impacts of a project may also be<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>direct. The AM must broaden its scope to <str<strong>on</strong>g>in</str<strong>on</strong>g>clude<br />
‘<str<strong>on</strong>g>in</str<strong>on</strong>g>direct’ and ‘n<strong>on</strong>-material’ harm to the people.<br />
*<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong> submissi<strong>on</strong> to the Accountability Mechanism Review <strong>on</strong> September 15, 2010
Who can file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g><br />
In most cases, there are no local grievance<br />
mechanism where <str<strong>on</strong>g>in</str<strong>on</strong>g>dividuals can settle their<br />
problems. There should not be restricti<strong>on</strong> <strong>on</strong><br />
m<str<strong>on</strong>g>in</str<strong>on</strong>g>imal numbers of compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant. Any <str<strong>on</strong>g>in</str<strong>on</strong>g>dividual<br />
who has c<strong>on</strong>cern, <str<strong>on</strong>g>in</str<strong>on</strong>g>terest, or has been affected by<br />
a project can file a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t. Attenti<strong>on</strong> must be<br />
paid to the most discrim<str<strong>on</strong>g>in</str<strong>on</strong>g>ated groups like women<br />
and <str<strong>on</strong>g>in</str<strong>on</strong>g>digenous people <str<strong>on</strong>g>in</str<strong>on</strong>g> view of their suppressed<br />
status <str<strong>on</strong>g>in</str<strong>on</strong>g> society. Requests from local, nati<strong>on</strong>al and<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>ternati<strong>on</strong>al legal entities/bodies, whom statutes<br />
clearly set forth <str<strong>on</strong>g>in</str<strong>on</strong>g> their missi<strong>on</strong> and objectives to<br />
protect <str<strong>on</strong>g>in</str<strong>on</strong>g>ternati<strong>on</strong>al rights and the envir<strong>on</strong>ment also<br />
should be admitted.<br />
Fil<str<strong>on</strong>g>in</str<strong>on</strong>g>g compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts to SPF/CRP<br />
The compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant should be provided the choice<br />
to file his/her case either to the SPF or CRP, or even<br />
file it simultaneously to both AM phases. For this<br />
purpose, SPF and CRP should provide <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong><br />
about the maximum assistance they can provide to<br />
affected people. C<strong>on</strong>sider<str<strong>on</strong>g>in</str<strong>on</strong>g>g that there are <strong>ADB</strong><br />
projects located <str<strong>on</strong>g>in</str<strong>on</strong>g> remote areas, requests should be<br />
allowed to be submitted <str<strong>on</strong>g>in</str<strong>on</strong>g> writ<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> local language<br />
and a form which is familiar and comfortable to the<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant.<br />
Transparency of eligibility process and<br />
grievance mechanism if SPF deems a<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t as not eligible<br />
The process to determ<str<strong>on</strong>g>in</str<strong>on</strong>g>e eligibility of a<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t at the SPF level heavily depends <strong>on</strong><br />
op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s from <strong>ADB</strong> staff, the Execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g Agency<br />
(EA)/government or PPS (private project sp<strong>on</strong>sor).<br />
Those op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s should be made public when a<br />
decisi<strong>on</strong> is made. Furthermore, a grievance or appeal<br />
mechanism must be provided if a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ant<br />
doesn’t agree with the decisi<strong>on</strong> made.<br />
Assessment of a project as a whole<br />
AM is designed to f<str<strong>on</strong>g>in</str<strong>on</strong>g>d soluti<strong>on</strong> to a problem<br />
caused by a project, either through problem solv<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
or <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> of n<strong>on</strong>-compliance to policies.<br />
N<strong>on</strong>-compliance to policies will def<str<strong>on</strong>g>in</str<strong>on</strong>g>itely affect<br />
the whole project. The exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g role of the CRP<br />
should not merely be c<strong>on</strong>f<str<strong>on</strong>g>in</str<strong>on</strong>g>ed to provid<str<strong>on</strong>g>in</str<strong>on</strong>g>g specific<br />
project site soluti<strong>on</strong> where the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t comes<br />
from. In order to make sure a comprehensive and<br />
adequate result or soluti<strong>on</strong>, submitted compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t<br />
should be treated as the basis to review the whole<br />
project. <strong>ADB</strong> can stop further the implementati<strong>on</strong><br />
of a project if they found major problems at the<br />
prelim<str<strong>on</strong>g>in</str<strong>on</strong>g>ary <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> of the SPF and/or CRP.<br />
Expansi<strong>on</strong> to wider range of issues<br />
It is desirable to <str<strong>on</strong>g>in</str<strong>on</strong>g>clude issues other than the<br />
<strong>on</strong>es raised <str<strong>on</strong>g>in</str<strong>on</strong>g> a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t. Dur<str<strong>on</strong>g>in</str<strong>on</strong>g>g an <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong><br />
by the SPF, usually local communities <strong>on</strong>ly come<br />
to know related problems and violati<strong>on</strong>s under the<br />
project. However, relevant problems other than<br />
specified <str<strong>on</strong>g>in</str<strong>on</strong>g> the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t are not c<strong>on</strong>sidered by SPF<br />
as it is necessary to write and file a new compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t.<br />
PRC should not be the cut-off date for<br />
n<strong>on</strong> eligibility<br />
Projects related to chang<str<strong>on</strong>g>in</str<strong>on</strong>g>g envir<strong>on</strong>ment and<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>voluntary resettlement usually triggerl<strong>on</strong>gterm<br />
impacts bey<strong>on</strong>d the project completi<strong>on</strong> report<br />
(PCR). However, the eligibility of the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t<br />
depends <strong>on</strong> the release of the PCR. Acceptance of<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts to the accountability mechanism should<br />
not be limited until after issuance of the PCR. The<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t must be accepted as l<strong>on</strong>g as a borrow<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
country is repay<str<strong>on</strong>g>in</str<strong>on</strong>g>g the loan amount to the <strong>ADB</strong>.<br />
Private Sector Operati<strong>on</strong>s<br />
In l<str<strong>on</strong>g>in</str<strong>on</strong>g>e with the Public Communicati<strong>on</strong> Policy<br />
(PCP), the AM also protects the c<strong>on</strong>fidentiality of<br />
the private sectors projects. The issue of bus<str<strong>on</strong>g>in</str<strong>on</strong>g>ess<br />
c<strong>on</strong>fidentiality is critically looked at <str<strong>on</strong>g>in</str<strong>on</strong>g> the <strong>on</strong>-go<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
review of the <strong>ADB</strong> PCP. The private sector operati<strong>on</strong>s<br />
must be <str<strong>on</strong>g>in</str<strong>on</strong>g>cluded <str<strong>on</strong>g>in</str<strong>on</strong>g> the purview of the AM as it<br />
directly c<strong>on</strong>travenes the right to <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong> – an<br />
important country-system c<strong>on</strong>stituti<strong>on</strong>al provisi<strong>on</strong>.<br />
Fourth Quarter 2010 BANKWATCH s<br />
21
F<str<strong>on</strong>g>in</str<strong>on</strong>g>ancial Intermediaries and Cof<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
The AM does not clearly def<str<strong>on</strong>g>in</str<strong>on</strong>g>e its applicati<strong>on</strong><br />
<strong>on</strong> f<str<strong>on</strong>g>in</str<strong>on</strong>g>ancial <str<strong>on</strong>g>in</str<strong>on</strong>g>termediaries nor <strong>on</strong> co-f<str<strong>on</strong>g>in</str<strong>on</strong>g>anciers<br />
when it comes to private sector operati<strong>on</strong>s. The AM<br />
must expand its mandate <strong>on</strong> co-f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g projects<br />
as well as F<str<strong>on</strong>g>in</str<strong>on</strong>g>ancial Intermediaries. Like <str<strong>on</strong>g>in</str<strong>on</strong>g> the case<br />
of the Southern Transport Development Project<br />
(STDP) <str<strong>on</strong>g>in</str<strong>on</strong>g> Sri Lanka, the CRP recommended that<br />
<strong>ADB</strong> management should review its co-f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
arrangements for the project to strengthen the its<br />
compliance to the Safeguard Policy. Although a<br />
Memorandum of Understand<str<strong>on</strong>g>in</str<strong>on</strong>g>g was signed between<br />
<strong>ADB</strong> and JBIC, the MOU did not address the issue<br />
of co-f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g compliance.<br />
Immediate resp<strong>on</strong>se rather than lengthy<br />
process<br />
The <str<strong>on</strong>g>in</str<strong>on</strong>g>specti<strong>on</strong> and <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> process, as well<br />
as its procedures, are too lengthy, complicated and<br />
difficult for most affected people. At the beg<str<strong>on</strong>g>in</str<strong>on</strong>g>n<str<strong>on</strong>g>in</str<strong>on</strong>g>g,<br />
the first full <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> also raised c<strong>on</strong>cerns about<br />
the <str<strong>on</strong>g>in</str<strong>on</strong>g>dependence, credibility, transparency and<br />
dissem<str<strong>on</strong>g>in</str<strong>on</strong>g>ati<strong>on</strong> of <str<strong>on</strong>g>in</str<strong>on</strong>g>formati<strong>on</strong>, and the effectiveness<br />
of the <str<strong>on</strong>g>in</str<strong>on</strong>g>specti<strong>on</strong>.<br />
AM is very complicated and usually takes a<br />
l<strong>on</strong>g time to attend to compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts. AM should not<br />
burden the local communities to f<str<strong>on</strong>g>in</str<strong>on</strong>g>d all policy<br />
violati<strong>on</strong>s and it should be the role of AM to f<str<strong>on</strong>g>in</str<strong>on</strong>g>d<br />
them or hire <str<strong>on</strong>g>in</str<strong>on</strong>g>dependent legal and technical experts<br />
to f<str<strong>on</strong>g>in</str<strong>on</strong>g>d such policy violati<strong>on</strong>s. The mechanism needs<br />
to be improved and simplified. It should take shorter<br />
time. The operati<strong>on</strong>s department has not always<br />
been resp<strong>on</strong>sive. It is a waste of time for affected<br />
people to file their grievance to <strong>ADB</strong> management<br />
and borrower government just to have their<br />
respective compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t declared eligible at the SPF.<br />
Although affected people may have already filed<br />
the case to the SPF or CRP, project implementati<strong>on</strong><br />
c<strong>on</strong>t<str<strong>on</strong>g>in</str<strong>on</strong>g>ues, hence add<str<strong>on</strong>g>in</str<strong>on</strong>g>g more burden to affected<br />
people. A project’s implementati<strong>on</strong> should be<br />
put <strong>on</strong> hold while await<str<strong>on</strong>g>in</str<strong>on</strong>g>g the declarati<strong>on</strong> of a<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t’s eligibility unless the grievances have<br />
been addressed completely and satisfactorily with<br />
utmost participati<strong>on</strong> of project-affected people.<br />
22 s BANKWATCH Fourth Quarter 2010<br />
Lack of trust am<strong>on</strong>g affected people<br />
AM should be very c<strong>on</strong>cerned <strong>on</strong> the different<br />
political realities <str<strong>on</strong>g>in</str<strong>on</strong>g> the member countries. Affected<br />
people fear their respective oppressive governments.<br />
This is <strong>on</strong>e of the reas<strong>on</strong>s why they d<strong>on</strong>’t show<br />
their disagreement to a project, not to menti<strong>on</strong> file<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts aga<str<strong>on</strong>g>in</str<strong>on</strong>g>st a project implemented by the<br />
government or a private sector project supported by<br />
the government. The AM <str<strong>on</strong>g>in</str<strong>on</strong>g> its provisi<strong>on</strong>s menti<strong>on</strong><br />
that the SPF or CRP will keep the identities of<br />
the requesters c<strong>on</strong>fidential if requested. This has<br />
not been the case. The requesters feel that due to<br />
their case they have been <str<strong>on</strong>g>in</str<strong>on</strong>g>timidated by execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
agencies. In such situati<strong>on</strong>s, women <str<strong>on</strong>g>in</str<strong>on</strong>g> particular<br />
become vulnerable to physical and psychological<br />
harassment. Many affected people believe that due<br />
to their name <str<strong>on</strong>g>in</str<strong>on</strong>g> the compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t, they were treated<br />
badly by the execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g agencies. There are no clear<br />
provisi<strong>on</strong>s <str<strong>on</strong>g>in</str<strong>on</strong>g> the AM, outl<str<strong>on</strong>g>in</str<strong>on</strong>g><str<strong>on</strong>g>in</str<strong>on</strong>g>g its resp<strong>on</strong>sibilities,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> deal<str<strong>on</strong>g>in</str<strong>on</strong>g>g with fears of affected people from the<br />
possiblity of be<str<strong>on</strong>g>in</str<strong>on</strong>g>g harassed by the execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
agencies <str<strong>on</strong>g>in</str<strong>on</strong>g> borrow<str<strong>on</strong>g>in</str<strong>on</strong>g>g countries.<br />
SPF and CRP: M<strong>on</strong>itor<str<strong>on</strong>g>in</str<strong>on</strong>g>g,<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> and its functi<strong>on</strong><br />
The process is too bureaucratic which affected<br />
people d<strong>on</strong>’t understand. The CRP m<strong>on</strong>itor<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
and <str<strong>on</strong>g>in</str<strong>on</strong>g>vestigati<strong>on</strong> process is not satisfactory. It is<br />
recommended that the CRP team needs assistance<br />
of technical experts to evaluate the specific issues<br />
under a compla<str<strong>on</strong>g>in</str<strong>on</strong>g>t. Many are <str<strong>on</strong>g>in</str<strong>on</strong>g> the op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong> that CRP<br />
must have a technical advisory, advis<str<strong>on</strong>g>in</str<strong>on</strong>g>g them <strong>on</strong><br />
technical issues such as compensati<strong>on</strong>, value of land<br />
and property, and envir<strong>on</strong>mental, am<strong>on</strong>g others.<br />
It is believed that there is a limitati<strong>on</strong> <str<strong>on</strong>g>in</str<strong>on</strong>g> the<br />
CRP’s functi<strong>on</strong>. The 2006 CRP m<strong>on</strong>itor<str<strong>on</strong>g>in</str<strong>on</strong>g>g report <strong>on</strong><br />
STDP <str<strong>on</strong>g>in</str<strong>on</strong>g> Sri Lanka shows that the <strong>ADB</strong> management<br />
and the execut<str<strong>on</strong>g>in</str<strong>on</strong>g>g agency did not complied with<br />
most of the remedial acti<strong>on</strong> proposed <str<strong>on</strong>g>in</str<strong>on</strong>g> the CRP<br />
report issued <str<strong>on</strong>g>in</str<strong>on</strong>g> July 2005. It is also recommended<br />
that the CRP must be allowed to appo<str<strong>on</strong>g>in</str<strong>on</strong>g>t its own<br />
Secretary, not by the management, who will assist<br />
them <str<strong>on</strong>g>in</str<strong>on</strong>g> their tenure. The resp<strong>on</strong>sibility of the CRP<br />
must be clearly menti<strong>on</strong>ed <str<strong>on</strong>g>in</str<strong>on</strong>g> the policy. The CRP<br />
must also have an emergency fund, approved by the<br />
Board of Directors, to address the grievances of the<br />
affected people.
The SPF and CRP procedures, as well as the<br />
language used, are too technical. Most projectaffected<br />
people are <str<strong>on</strong>g>in</str<strong>on</strong>g>capable of understand<str<strong>on</strong>g>in</str<strong>on</strong>g>g those<br />
technical terms to file their cases to the AM. There<br />
is a need to simplify the technicalities of the CRP<br />
language and procedures.<br />
After the <str<strong>on</strong>g>in</str<strong>on</strong>g>specti<strong>on</strong>, the CRP sends the<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>specti<strong>on</strong> report to the Board management and<br />
submits its resp<strong>on</strong>se. Like the Japan Bank for<br />
Internati<strong>on</strong>al Cooperati<strong>on</strong> that sends its Exam<str<strong>on</strong>g>in</str<strong>on</strong>g>er<br />
report to all the parties c<strong>on</strong>cerned, CRP report must<br />
be shared with the Requester and pay attenti<strong>on</strong> to<br />
op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s provided, and may send the op<str<strong>on</strong>g>in</str<strong>on</strong>g>i<strong>on</strong>s to<br />
the management. M<str<strong>on</strong>g>in</str<strong>on</strong>g>utes of Board discussi<strong>on</strong>s and<br />
deliberati<strong>on</strong>s about the report should be open to the<br />
public.<br />
Both SPF and CRP, should proceed with claims,<br />
regardless of the cases filed under local legislati<strong>on</strong>s.<br />
In the case of STDP, the <strong>ADB</strong> used the argument<br />
that there is a case pend<str<strong>on</strong>g>in</str<strong>on</strong>g>g <str<strong>on</strong>g>in</str<strong>on</strong>g> the Supreme Court<br />
which delayed the process.<br />
AM should be highly <str<strong>on</strong>g>in</str<strong>on</strong>g>dependent from <strong>ADB</strong><br />
management. It is not acceptable for the SPF nor<br />
CRP to hire former Banks staff to the positi<strong>on</strong>s.<br />
There has been pa<str<strong>on</strong>g>in</str<strong>on</strong>g>ful experience for the claimants<br />
when certa<str<strong>on</strong>g>in</str<strong>on</strong>g> SPF and CRP staff acted bias towards<br />
the <strong>ADB</strong>.<br />
Corrupti<strong>on</strong><br />
The AM excludes the corrupti<strong>on</strong> issue <str<strong>on</strong>g>in</str<strong>on</strong>g> its<br />
ambit. Although the office of the Anti-Corrupti<strong>on</strong><br />
and Integrity deals with allegati<strong>on</strong>s of fraud and<br />
corrupti<strong>on</strong> it fails to combat corrupt practices <str<strong>on</strong>g>in</str<strong>on</strong>g> the<br />
project management at the local and nati<strong>on</strong>al levels.<br />
The present review must look at paragraph 72 <str<strong>on</strong>g>in</str<strong>on</strong>g> the<br />
policy.<br />
We are str<strong>on</strong>gly request<str<strong>on</strong>g>in</str<strong>on</strong>g>g the Jo<str<strong>on</strong>g>in</str<strong>on</strong>g>t Work<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
Group of the AM Review to c<strong>on</strong>sider the issues<br />
<strong>on</strong> the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g AM for its review. We emphasize<br />
that the review must attempt fill <str<strong>on</strong>g>in</str<strong>on</strong>g> pr<str<strong>on</strong>g>in</str<strong>on</strong>g>ciple gaps<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g policy and to make Accountability<br />
Mechanism more accountable and resp<strong>on</strong>sible to<br />
project-affected people.<br />
<str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> the <strong>ADB</strong><br />
85A Masikap Extensi<strong>on</strong>, Brgy. Central,<br />
Diliman, Quez<strong>on</strong> City, Philipp<str<strong>on</strong>g>in</str<strong>on</strong>g>es<br />
Tel: +632 436 1858<br />
Telefax: +632 921 4412<br />
Email: secretariat@forum-adb.org<br />
Website: www.forum-adb.org<br />
Fourth Quarter 2010 BANKWATCH s<br />
23
List of related documents<br />
Problems of the Accountability Mechanism of<br />
the Asian Development Bank<br />
<br />
By the Ind<strong>on</strong>esian Group of <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> the<br />
<strong>ADB</strong><br />
Ind<strong>on</strong>esian members of the <str<strong>on</strong>g>Forum</str<strong>on</strong>g> presents the<br />
press<str<strong>on</strong>g>in</str<strong>on</strong>g>g issues <str<strong>on</strong>g>in</str<strong>on</strong>g> the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g Accountability<br />
Mechanism and suggests a set of recommendati<strong>on</strong>s<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> mak<str<strong>on</strong>g>in</str<strong>on</strong>g>g the mechanism more resp<strong>on</strong>sive to the<br />
c<strong>on</strong>cerns of the affected people.<br />
<strong>ADB</strong> Accountability Mechanism <str<strong>on</strong>g>in</str<strong>on</strong>g> Central Asia<br />
and the Caucasus<br />
<br />
By Maya Eralieva, September 2010<br />
As the number and amount of <str<strong>on</strong>g>in</str<strong>on</strong>g>vestment has<br />
been <str<strong>on</strong>g>in</str<strong>on</strong>g>creased <str<strong>on</strong>g>in</str<strong>on</strong>g> the countries, the number of<br />
issues regard<str<strong>on</strong>g>in</str<strong>on</strong>g>g the impacts of the project has also<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>creased. This paper looks <str<strong>on</strong>g>in</str<strong>on</strong>g>to the <strong>on</strong>go<str<strong>on</strong>g>in</str<strong>on</strong>g>g issues<br />
<strong>on</strong> the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g AM of the <strong>ADB</strong> <str<strong>on</strong>g>in</str<strong>on</strong>g> Central Asia and<br />
the Caucasus.<br />
End of the road: Is the <strong>ADB</strong> accountable <str<strong>on</strong>g>in</str<strong>on</strong>g> Sri<br />
Lanka road project?<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
4&id=187&b=1><br />
By Hemantha Withanage (CEJ) and Dr Avilash<br />
Roul, September 2010<br />
The effectiveness of the <strong>ADB</strong>' Accountability<br />
Mechanism is put to test <str<strong>on</strong>g>in</str<strong>on</strong>g> Sri Lanka. As the<br />
Compliance Review Panel is about to f<str<strong>on</strong>g>in</str<strong>on</strong>g>ish its task<br />
<strong>on</strong> the c<strong>on</strong>troversial Matara-Colombo Highway,<br />
people's c<strong>on</strong>cerns are still unresolved. Where should<br />
they go now?<br />
Hold<str<strong>on</strong>g>in</str<strong>on</strong>g>g <strong>ADB</strong> Accountable: A Look at the<br />
Present Accountability Mechanism<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
13&ref=extras&id=197><br />
by Tea Soentoro, August 2010<br />
As the <strong>ADB</strong> c<strong>on</strong>ducts a review of its Accountability<br />
Mechanism, <str<strong>on</strong>g>Forum</str<strong>on</strong>g> comes up with this brief<str<strong>on</strong>g>in</str<strong>on</strong>g>g paper<br />
that provides a glance <strong>on</strong> the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g Accountability<br />
Mechanism of the <strong>ADB</strong>. It takes a look <str<strong>on</strong>g>in</str<strong>on</strong>g>to the gaps<br />
and barriers <str<strong>on</strong>g>in</str<strong>on</strong>g> fil<str<strong>on</strong>g>in</str<strong>on</strong>g>g compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts, and the present<br />
c<strong>on</strong>stra<str<strong>on</strong>g>in</str<strong>on</strong>g>ts of the AM.<br />
24 s BANKWATCH Fourth Quarter 2010<br />
Effectiveness of Accountability Mechanism <str<strong>on</strong>g>in</str<strong>on</strong>g><br />
Central Asia and Caucasus (news article)<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
4&id=185&b=1><br />
By Maya Eralieva, September 2010<br />
The OSPF recently declared the case of the Educati<strong>on</strong><br />
Sector Reform Project <str<strong>on</strong>g>in</str<strong>on</strong>g> Tajikistan eligible. Out of<br />
the five compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts <str<strong>on</strong>g>in</str<strong>on</strong>g> Central Asia and the Caucasus,<br />
two were deemed eligible under the Accountability<br />
Mechanism. This article talks about c<strong>on</strong>cerns <strong>on</strong> the<br />
AM <str<strong>on</strong>g>in</str<strong>on</strong>g> the regi<strong>on</strong>.<br />
Rati<strong>on</strong>ality of accountability: <strong>ADB</strong> must look<br />
bey<strong>on</strong>d PCR (news article)<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
4&id=186&b=1><br />
By Dr Avilash Roul, September 2010<br />
Under the exist<str<strong>on</strong>g>in</str<strong>on</strong>g>g Accountability Mechanism,<br />
compla<str<strong>on</strong>g>in</str<strong>on</strong>g>ts aga<str<strong>on</strong>g>in</str<strong>on</strong>g>st a project can be filed until the<br />
release of its project completi<strong>on</strong> report. <str<strong>on</strong>g>Forum</str<strong>on</strong>g> takes<br />
<strong>on</strong> the bank's "leave-it-and-forget-about-it" attitude<br />
when communities miss the deadl<str<strong>on</strong>g>in</str<strong>on</strong>g>e.<br />
Accountability Mechanism: A Jailbird of<br />
Democracy (news article)<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
13&ref=extras&id=193><br />
by Hemantha Withanage, 2006<br />
This article questi<strong>on</strong>s the effectiveness of the AM,<br />
po<str<strong>on</strong>g>in</str<strong>on</strong>g>t<str<strong>on</strong>g>in</str<strong>on</strong>g>g out bureucracy <str<strong>on</strong>g>in</str<strong>on</strong>g> the government and<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> the <strong>ADB</strong> serves as the biggest barrier to local<br />
communities.<br />
Handl<str<strong>on</strong>g>in</str<strong>on</strong>g>g the Symptoms but not the Disease<br />
(news article)<br />
< h t t p : / / f o r u m - a d b . o r g / i n n e r. p h p ? s e c =<br />
4&id=134&b=1><br />
by Tea Soentoro, November 2009<br />
This article questi<strong>on</strong>s the capability of the upcom<str<strong>on</strong>g>in</str<strong>on</strong>g>g<br />
review of the AM <str<strong>on</strong>g>in</str<strong>on</strong>g> address<str<strong>on</strong>g>in</str<strong>on</strong>g>g pr<str<strong>on</strong>g>in</str<strong>on</strong>g>ciple gaps and<br />
mak<str<strong>on</strong>g>in</str<strong>on</strong>g>g the Bank more accountable and resp<strong>on</strong>sible<br />
to project-affected people.
LETTER TO THE EDITOR<br />
Please send us your comments to the articles/issues featured<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g> BANKwatch.<br />
Tell us how we can make BANKwatch better and more relevant.<br />
Drop us a l<str<strong>on</strong>g>in</str<strong>on</strong>g>e or send us a letter.<br />
Email us at abby@forum-adb.org.<br />
Write us at <str<strong>on</strong>g>NGO</str<strong>on</strong>g> <str<strong>on</strong>g>Forum</str<strong>on</strong>g> <strong>on</strong> <strong>ADB</strong>, 85-A Masikap Ext.,<br />
Barangay Central, District 4, Diliman, Quez<strong>on</strong> City, 1101<br />
Philipp<str<strong>on</strong>g>in</str<strong>on</strong>g>es.<br />
Fax to +63-2-921-4412<br />
Your letter may be edited for length and clarity.<br />
If you need a back issue or would like to get issues,<br />
write to abby @forum-adb.org.<br />
NEW PUBLICATION<br />
We are pleased to share “Risk and Resilience: Ma<str<strong>on</strong>g>in</str<strong>on</strong>g>stream<str<strong>on</strong>g>in</str<strong>on</strong>g>g Climate Change<br />
Into the Envir<strong>on</strong>mental Impact Assessment Process (Critical Analysis of Projects<br />
Funded by the Asian Development Bank).” This report probes selected projects<br />
funded by the Bank to see if climate change c<strong>on</strong>siderati<strong>on</strong>s were sufficiently taken<br />
<str<strong>on</strong>g>in</str<strong>on</strong>g>to account prior to Country and Bank approval for implementati<strong>on</strong> and f<str<strong>on</strong>g>in</str<strong>on</strong>g>anc<str<strong>on</strong>g>in</str<strong>on</strong>g>g.<br />
The less<strong>on</strong>s drawn seek to <str<strong>on</strong>g>in</str<strong>on</strong>g>form stakeholders of ways by which climate change<br />
could be ma<str<strong>on</strong>g>in</str<strong>on</strong>g>streamed <str<strong>on</strong>g>in</str<strong>on</strong>g> nati<strong>on</strong>al policy development, us<str<strong>on</strong>g>in</str<strong>on</strong>g>g EIA processes as a<br />
fundamental part of the democratizati<strong>on</strong> and development agenda.<br />
To download the full report, you may follow this l<str<strong>on</strong>g>in</str<strong>on</strong>g>k: http://forum-adb.org/docs/Risk-and-resilience.pdf<br />
All studies can be <str<strong>on</strong>g>downloaded</str<strong>on</strong>g> <str<strong>on</strong>g>in</str<strong>on</strong>g> <str<strong>on</strong>g>PDF</str<strong>on</strong>g> format. Please follow these l<str<strong>on</strong>g>in</str<strong>on</strong>g>ks:<br />
REVIEW<br />
The Assam Integrated Flood and Riverbank Erosi<strong>on</strong> Management Project - http://forum-adb.org/docs/Assam-<br />
Integrated-Flood-and-Riverbank-Erosi<strong>on</strong>-Management-Project.pdf<br />
The Sipat Super Thermal Power Plant Project - http://forum-adb.org/docs/Sipat-Super-Thermal-Power-Plant-<br />
Project.pdf<br />
The Visayas Base-Load Power Development Project - http://forum-adb.org/docs/Visayas-Base-Load-Power-<br />
Development-Project.pdf<br />
The Southwest Area Integrated Water Resources Plann<str<strong>on</strong>g>in</str<strong>on</strong>g>g Management Project - http://forum-adb.org/docs/<br />
Southwest-Area-Integrated-Water-Resources-Plann<str<strong>on</strong>g>in</str<strong>on</strong>g>g-Management-Project.pdf<br />
The Masalli-Astara Highway Project is the first project under Azerbaijan’s Road Network Development Program<br />
- http://forum-adb.org/docs/Masalli-Astara-Highway-Project.pdf<br />
To download the executive summary by Dr. Avilash Roul, follow this l<str<strong>on</strong>g>in</str<strong>on</strong>g>k: http://forum-adb.org/docs/Risk-andresilience-exec-summary.pdf<br />
We look forward to hear<str<strong>on</strong>g>in</str<strong>on</strong>g>g from you!<br />
BANKwatch will have a new<br />
secti<strong>on</strong> called “Review.” It’s<br />
a space for review of <strong>ADB</strong><br />
publicati<strong>on</strong>s, project documents<br />
and journals. All FORUM members<br />
are encouraged to share their<br />
views <strong>on</strong> any <strong>ADB</strong> document of<br />
most <str<strong>on</strong>g>in</str<strong>on</strong>g>terest to them.<br />
A brief biographical note about the<br />
c<strong>on</strong>tributor should be provided.<br />
Interested c<strong>on</strong>tributors can submit<br />
their review to abby@forum-adb.<br />
org.<br />
Fourth Quarter 2010 BANKWATCH s<br />
25
26 s BANKWATCH Fourth Quarter 2010