24 luglio 2009<br />

THE MONOLITHIC SUSPENSION<br />

STATUS FOR THE VIRGO<br />

INTERFEROMETER<br />

Helios Vocca<br />

University of Perugia<br />

on behalf of <strong>the</strong> Virgo collaboration<br />

helios.vocca@pg.infn.it


24 luglio 2009<br />

NEW VIRGO+ SENSITIVITY<br />

Sensitivity curve of Virgo+ including <strong>monolithic</strong> <strong>suspension</strong>s:<br />

New <strong>the</strong>rmal noise evaluation by Piergiovanni, Punturo and Puppo includes<br />

<strong>the</strong> viscous contribution of <strong>the</strong> marionette<br />

10 Hz<br />

Qmario=300<br />

Qmario=1000<br />

No viscous<br />

Simple pendulum<br />

F. Piergiovanni, M.Punturo, P.Puppo, The<br />

<strong>the</strong>rmal noise of <strong>the</strong> Virgo+ and Virgo Advanced<br />

Last Stage Suspension (The PPP effect), Virgo<br />

Note: VIR-015C-09.<br />

MG12 Paris - July 12 - 18, 2009 2


24 luglio 2009<br />

MONOLITHIC SUSPENSIONS<br />

Activity tasks<br />

MG12 Paris - July 12 - 18, 2009<br />

Involved Virgo groups:<br />

!Firenze/Urbino<br />

!Perugia<br />

!Roma<br />

!EGO<br />

General Strategy <strong>for</strong><br />

Monolithic Suspensions<br />

Planning:<br />

!Payload parts assembled in<br />

<strong>the</strong> new 1500West Clean Room<br />

!Mirrors prepared at LMA<br />

(Lyon)<br />

! IF Possible (by cleanliness<br />

tests): payloads assembled in<br />

1500W Clean Room<br />

3


24 luglio 2009<br />

THE MONOLITHIC ASSEMBLY<br />

!.$./0%4$01,*<br />

'2%")#%10-.'2#3#<br />

!.$./0%02/)'-*<br />

!"##$%&'(%"'%)'*"%")#%+,,#-%*.$./0<br />

/$01,%'2%")#%10-.'2#30<br />

!.$./0"#%&'27.25<br />

4'+,$.25%"'%")#%1.--'-%60"*%")-'+5)%$0"#-0$%*+,,'-"*<br />

MG12 Paris - July 12 - 18, 2009<br />

4


24 luglio 2009<br />

FIBRES PRODUCTION<br />

100 W CO2 laser<br />

Laser pulling of 1.5 mm thick<br />

silica bars:<br />

!Welding<br />

!Annealing<br />

!Controlled pulling<br />

MG12 Paris - July 12 - 18, 2009<br />

5


100 W CO2 laser pulling facility developed in collaboration with Glasgow group<br />

Produced fibres are:<br />

24 luglio 2009<br />

FIBRES PRODUCTION<br />

!Very reproducible in diameter and length<br />

!Ready to be characterized and assembled<br />

MG12 Paris - July 12 - 18, 2009<br />

6


24 luglio 2009<br />

FIBRES CHARACTERIZATION<br />

Inspection of <strong>the</strong> diameter regularity and check of neck<br />

reproducibility<br />

Profiles of <strong>the</strong> necks are equal<br />

within a 10 µm accuracy level<br />

MG12 Paris - July 12 - 18, 2009<br />

7


!Measurement of bending lenghts and violin/bouncing frequencies<br />

!Statistics on breaking strength<br />

Violin<br />

mode<br />

24 luglio 2009<br />

FIBRES CHARACTERIZATION<br />

Bouncing<br />

Mode (Hz)<br />

4 GPa<br />

5 kg<br />

Distance between<br />

bend. Points (mm)<br />

453±1 6.0±0.1 669.5±0.2<br />

453±1 6.0±0.1 669.8±0.2<br />

452±1 6.0±0.1 670.2±0.2<br />

451±1 6.0±0.1 669.6±0.2<br />

450±1 6.0±0.1 669.6±0.2<br />

Bending lengths fix <strong>the</strong> low frequency dynamics of<br />

<strong>the</strong> <strong>suspension</strong>.<br />

MG12 Paris - July 12 - 18, 2009<br />

8


PAYLOAD SUSPENSION AND<br />

LOCAL CONTROL<br />

24 luglio 2009<br />

• Steel AlSl304 Marionetta prototype with PVC arms<br />

• Dummy reaction mass, coils with peek supports<br />

• A mirror is inserted in <strong>the</strong> holder and <strong>the</strong> system is balanced<br />

• All <strong>the</strong> pieces are secured by safety structures<br />

• Fibre bending points placed on <strong>the</strong> marionetta and mirror CoM<br />

marionette and coils<br />

reaction mass<br />

mirror and magnets<br />

MG12 Paris - July 12 - 18, 2009 9


July ‘08 - Shocks, Dust and Humidity tests<br />

24 luglio 2009<br />

m/s 2<br />

Transportation test (Fi, Pg, Rm with EGO support) on <strong>the</strong> dummy payload<br />

Mechanical vibration monitored with accelerometers<br />

The test was successful (no broken fibers! untill January 2009: see next slide);<br />

MG12 Paris - July 12 - 18, 2009 10


Jan. ‘09 - Shocks, Dust and Humidity tests<br />

Equivalent weight of <strong>the</strong> mirror is 70 kg at <strong>the</strong> moment of breaking<br />

Crash test movie on youtube (search <strong>monolithic</strong> crash)


DUMMY SUSPENSION IN PERUGIA<br />

24 luglio 2009<br />

shadowmeter<br />

Dummy payload installation in <strong>the</strong><br />

vacuum chamber actuators<br />

MG12 Paris - July 12 - 18, 2009<br />

12


24 luglio 2009<br />

LOSS MEASUREMENTS<br />

Pendulum oscillation<br />

decay measurement<br />

loss angle = 2.7 10 -7<br />

K p /K s.b. =2.8 10 -14<br />

K p /K epoxy =5.6 10 -12<br />

Evidence of excess losses, maybe recoil or support losses<br />

! Fur<strong>the</strong>r investigation needed, measurements in progress<br />

MG12 Paris - July 12 - 18, 2009<br />

epoxy glue<br />

waterglass<br />

No excess losses are<br />

expected from epoxy or<br />

silicate bonding<br />

silicate bonding<br />

13


24 luglio 2009<br />

LOSS MESUREMENTS<br />

Tests are going on to identify <strong>the</strong> source of excess loss:<br />

Friction in <strong>the</strong> support:<br />

direct upper clamp<br />

measurement<br />

Measure a 1.5 mm fused<br />

silica bar welded to <strong>the</strong> upper<br />

block and clamped in <strong>the</strong><br />

“<strong>monolithic</strong> <strong>suspension</strong>” way.<br />

Recoil losses: measurement<br />

with new <strong>suspension</strong><br />

MG12 Paris - July 12 - 18, 2009<br />

Different loads (1 kg,<br />

3 kg, 5 kg…) suspended<br />

using two marionette-like<br />

clamps<br />

If <strong>the</strong> losses are due to<br />

recoil of <strong>the</strong> supporting<br />

structure, a linear<br />

relation between Q<br />

and mass should be<br />

measured<br />

14


New (full) <strong>suspension</strong> is in preparation<br />

24 luglio 2009<br />

MG12 Paris - July 12 - 18, 2009<br />

Silicate bonding<br />

has been made 2<br />

weeks ago in Lyon<br />

clean room.<br />

In august <strong>the</strong> FS<br />

<strong>suspension</strong> will be<br />

mounted.<br />

Measurements on<br />

it will go on in<br />

Cascina and<br />

Perugia<br />

15


24 luglio 2009<br />

Toward Advanced Virgo<br />

MG12 Paris - July 12 - 18, 2009<br />

Even if a final<br />

geometry <strong>for</strong> AdV<br />

mirrors has not<br />

been decided yet,<br />

an important<br />

evolution will be to<br />

remove <strong>the</strong> silicate<br />

bonded supports<br />

<strong>for</strong> <strong>the</strong> <strong>monolithic</strong><br />

<strong>suspension</strong>.<br />

16


24 luglio 2009<br />

CONCLUSIONS<br />

!Fiber production validated and well defined;<br />

!Monolithic design <strong>for</strong> fused silica components is ok;<br />

!Payloads are under construction;<br />

!Virgo mirror (old north end) with supports, markers and magnets<br />

ready to be suspended;<br />

NEXT STEPS<br />

!Complete FS <strong>suspension</strong> to be per<strong>for</strong>med in summer in <strong>the</strong> new<br />

1500W clean room (almost ready);<br />

!Measurements of <strong>the</strong> mechanical losses and identification of <strong>the</strong><br />

excess losses will follow;<br />

!Final design of <strong>the</strong> assembly structure to be fixed.<br />

Ready to install at <strong>the</strong> end of 2009<br />

MG12 Paris - July 12 - 18, 2009<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!