24 luglio 2009<br />
THE MONOLITHIC SUSPENSION<br />
STATUS FOR THE VIRGO<br />
INTERFEROMETER<br />
Helios Vocca<br />
University of Perugia<br />
on behalf of <strong>the</strong> Virgo collaboration<br />
helios.vocca@pg.infn.it
24 luglio 2009<br />
NEW VIRGO+ SENSITIVITY<br />
Sensitivity curve of Virgo+ including <strong>monolithic</strong> <strong>suspension</strong>s:<br />
New <strong>the</strong>rmal noise evaluation by Piergiovanni, Punturo and Puppo includes<br />
<strong>the</strong> viscous contribution of <strong>the</strong> marionette<br />
10 Hz<br />
Qmario=300<br />
Qmario=1000<br />
No viscous<br />
Simple pendulum<br />
F. Piergiovanni, M.Punturo, P.Puppo, The<br />
<strong>the</strong>rmal noise of <strong>the</strong> Virgo+ and Virgo Advanced<br />
Last Stage Suspension (The PPP effect), Virgo<br />
Note: VIR-015C-09.<br />
MG12 Paris - July 12 - 18, 2009 2
24 luglio 2009<br />
MONOLITHIC SUSPENSIONS<br />
Activity tasks<br />
MG12 Paris - July 12 - 18, 2009<br />
Involved Virgo groups:<br />
!Firenze/Urbino<br />
!Perugia<br />
!Roma<br />
!EGO<br />
General Strategy <strong>for</strong><br />
Monolithic Suspensions<br />
Planning:<br />
!Payload parts assembled in<br />
<strong>the</strong> new 1500West Clean Room<br />
!Mirrors prepared at LMA<br />
(Lyon)<br />
! IF Possible (by cleanliness<br />
tests): payloads assembled in<br />
1500W Clean Room<br />
3
24 luglio 2009<br />
THE MONOLITHIC ASSEMBLY<br />
!.$./0%4$01,*<br />
'2%")#%10-.'2#3#<br />
!.$./0%02/)'-*<br />
!"##$%&'(%"'%)'*"%")#%+,,#-%*.$./0<br />
/$01,%'2%")#%10-.'2#30<br />
!.$./0"#%&'27.25<br />
4'+,$.25%"'%")#%1.--'-%60"*%")-'+5)%$0"#-0$%*+,,'-"*<br />
MG12 Paris - July 12 - 18, 2009<br />
4
24 luglio 2009<br />
FIBRES PRODUCTION<br />
100 W CO2 laser<br />
Laser pulling of 1.5 mm thick<br />
silica bars:<br />
!Welding<br />
!Annealing<br />
!Controlled pulling<br />
MG12 Paris - July 12 - 18, 2009<br />
5
100 W CO2 laser pulling facility developed in collaboration with Glasgow group<br />
Produced fibres are:<br />
24 luglio 2009<br />
FIBRES PRODUCTION<br />
!Very reproducible in diameter and length<br />
!Ready to be characterized and assembled<br />
MG12 Paris - July 12 - 18, 2009<br />
6
24 luglio 2009<br />
FIBRES CHARACTERIZATION<br />
Inspection of <strong>the</strong> diameter regularity and check of neck<br />
reproducibility<br />
Profiles of <strong>the</strong> necks are equal<br />
within a 10 µm accuracy level<br />
MG12 Paris - July 12 - 18, 2009<br />
7
!Measurement of bending lenghts and violin/bouncing frequencies<br />
!Statistics on breaking strength<br />
Violin<br />
mode<br />
24 luglio 2009<br />
FIBRES CHARACTERIZATION<br />
Bouncing<br />
Mode (Hz)<br />
4 GPa<br />
5 kg<br />
Distance between<br />
bend. Points (mm)<br />
453±1 6.0±0.1 669.5±0.2<br />
453±1 6.0±0.1 669.8±0.2<br />
452±1 6.0±0.1 670.2±0.2<br />
451±1 6.0±0.1 669.6±0.2<br />
450±1 6.0±0.1 669.6±0.2<br />
Bending lengths fix <strong>the</strong> low frequency dynamics of<br />
<strong>the</strong> <strong>suspension</strong>.<br />
MG12 Paris - July 12 - 18, 2009<br />
8
PAYLOAD SUSPENSION AND<br />
LOCAL CONTROL<br />
24 luglio 2009<br />
• Steel AlSl304 Marionetta prototype with PVC arms<br />
• Dummy reaction mass, coils with peek supports<br />
• A mirror is inserted in <strong>the</strong> holder and <strong>the</strong> system is balanced<br />
• All <strong>the</strong> pieces are secured by safety structures<br />
• Fibre bending points placed on <strong>the</strong> marionetta and mirror CoM<br />
marionette and coils<br />
reaction mass<br />
mirror and magnets<br />
MG12 Paris - July 12 - 18, 2009 9
July ‘08 - Shocks, Dust and Humidity tests<br />
24 luglio 2009<br />
m/s 2<br />
Transportation test (Fi, Pg, Rm with EGO support) on <strong>the</strong> dummy payload<br />
Mechanical vibration monitored with accelerometers<br />
The test was successful (no broken fibers! untill January 2009: see next slide);<br />
MG12 Paris - July 12 - 18, 2009 10
Jan. ‘09 - Shocks, Dust and Humidity tests<br />
Equivalent weight of <strong>the</strong> mirror is 70 kg at <strong>the</strong> moment of breaking<br />
Crash test movie on youtube (search <strong>monolithic</strong> crash)
DUMMY SUSPENSION IN PERUGIA<br />
24 luglio 2009<br />
shadowmeter<br />
Dummy payload installation in <strong>the</strong><br />
vacuum chamber actuators<br />
MG12 Paris - July 12 - 18, 2009<br />
12
24 luglio 2009<br />
LOSS MEASUREMENTS<br />
Pendulum oscillation<br />
decay measurement<br />
loss angle = 2.7 10 -7<br />
K p /K s.b. =2.8 10 -14<br />
K p /K epoxy =5.6 10 -12<br />
Evidence of excess losses, maybe recoil or support losses<br />
! Fur<strong>the</strong>r investigation needed, measurements in progress<br />
MG12 Paris - July 12 - 18, 2009<br />
epoxy glue<br />
waterglass<br />
No excess losses are<br />
expected from epoxy or<br />
silicate bonding<br />
silicate bonding<br />
13
24 luglio 2009<br />
LOSS MESUREMENTS<br />
Tests are going on to identify <strong>the</strong> source of excess loss:<br />
Friction in <strong>the</strong> support:<br />
direct upper clamp<br />
measurement<br />
Measure a 1.5 mm fused<br />
silica bar welded to <strong>the</strong> upper<br />
block and clamped in <strong>the</strong><br />
“<strong>monolithic</strong> <strong>suspension</strong>” way.<br />
Recoil losses: measurement<br />
with new <strong>suspension</strong><br />
MG12 Paris - July 12 - 18, 2009<br />
Different loads (1 kg,<br />
3 kg, 5 kg…) suspended<br />
using two marionette-like<br />
clamps<br />
If <strong>the</strong> losses are due to<br />
recoil of <strong>the</strong> supporting<br />
structure, a linear<br />
relation between Q<br />
and mass should be<br />
measured<br />
14
New (full) <strong>suspension</strong> is in preparation<br />
24 luglio 2009<br />
MG12 Paris - July 12 - 18, 2009<br />
Silicate bonding<br />
has been made 2<br />
weeks ago in Lyon<br />
clean room.<br />
In august <strong>the</strong> FS<br />
<strong>suspension</strong> will be<br />
mounted.<br />
Measurements on<br />
it will go on in<br />
Cascina and<br />
Perugia<br />
15
24 luglio 2009<br />
Toward Advanced Virgo<br />
MG12 Paris - July 12 - 18, 2009<br />
Even if a final<br />
geometry <strong>for</strong> AdV<br />
mirrors has not<br />
been decided yet,<br />
an important<br />
evolution will be to<br />
remove <strong>the</strong> silicate<br />
bonded supports<br />
<strong>for</strong> <strong>the</strong> <strong>monolithic</strong><br />
<strong>suspension</strong>.<br />
16
24 luglio 2009<br />
CONCLUSIONS<br />
!Fiber production validated and well defined;<br />
!Monolithic design <strong>for</strong> fused silica components is ok;<br />
!Payloads are under construction;<br />
!Virgo mirror (old north end) with supports, markers and magnets<br />
ready to be suspended;<br />
NEXT STEPS<br />
!Complete FS <strong>suspension</strong> to be per<strong>for</strong>med in summer in <strong>the</strong> new<br />
1500W clean room (almost ready);<br />
!Measurements of <strong>the</strong> mechanical losses and identification of <strong>the</strong><br />
excess losses will follow;<br />
!Final design of <strong>the</strong> assembly structure to be fixed.<br />
Ready to install at <strong>the</strong> end of 2009<br />
MG12 Paris - July 12 - 18, 2009<br />
17