68<br />
LIBER 14 th LAG Seminar Hungary 2008<br />
43. 7 200 linear metres publications, 8 850 linear metres shelf potential<br />
44 5 400 linear metres publications, 6 500 linear metres shelf potential<br />
45. 8 300 linear metres publications, 9 500 linear metres shelf potential<br />
46. - 47. N/A<br />
48. 45<br />
c) Mechanical features<br />
49. machinary ventilation. Special attention to the exhaust air heat recovery<br />
and need based ventilation.<br />
50. central heating. Special attention was given to achieve very low specific<br />
heat energy consumption.<br />
51. natural light through glaswalls and electric lighting<br />
52. acoustic panels<br />
53. 2 lifts<br />
54. transportation system: trolleys, non-automatic system<br />
55. magnetic detection gates<br />
56. ventilation and heating control are computerised<br />
57. cabling type CAT 5, 100Mb<br />
58. N/A<br />
D Schedule of the building process<br />
59. 1 -6/1996<br />
60. 12/1995 - 5/1996<br />
61. 8/1996 - 1997<br />
62. 10/1997<br />
63. 1998-1999, 18 months<br />
64. 1999<br />
65. 1.9.1999<br />
E Costs<br />
66. site work is included in building costs, a separate parking house was<br />
built nearby, total costs were 2 000 000 € (without VAT). The parking<br />
lot serves a larger area, not only the Korona building.<br />
67. 13 000 000 € (without VAT)<br />
68. 2 000 000 € (without VAT)<br />
69. included in building costs<br />
70. 17 000 000 € (without VAT)