Glasgow, The Saltire Center 63<br />

52. The study floors are not open to the atrium and sound baffle panels<br />

are used instead of suspended ceilings.<br />

53. Two lifts are available including a fire evacuation lift.<br />

54. N/A<br />

55. CCTV and magnetic security systems operate at all entrances + exits.<br />

56. – 58. N/A<br />

D Schedule of the building process<br />

59. 2002<br />

60. N/A<br />

61. 2002<br />

62. 2003<br />

63. two years<br />

64. December 2004<br />

65. January 2005<br />

E Costs<br />

66. – 69. N/A<br />

70. 22 000 000 £<br />