22.10.2013 Views

Untitled - Kütüphane

Untitled - Kütüphane

Untitled - Kütüphane

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LIBER 14 th LAG Seminar Hungary 2008 45<br />

The scheme is a wedge-shaped addition along the Eastern facade of<br />

the Boole. The footprint is dictated by the constraints of topography,<br />

existing mature tress and the requirement to provide both pedestrian<br />

and vehicular access to areas of the new building. The building height<br />

matches the existing. The materials proposed for the external facades<br />

are pre-oxidised copper cladding, natural sandstone and glass. The<br />

dark red/brown tones of the sandstone and copper oxide will form<br />

an interesting contrast with the white limestone used on adjacent<br />

buildings and on the pavement material to the new Honan Square.<br />

There is a precedent for this mix of colours in the typically Cork use<br />

of red sandstone and white limestone on many church buildings<br />

throughout the city.<br />

The elevations are a composition of these materials arranged as quite<br />

distinct elements, which break down the scale of the building.<br />

The Southern element is a canted copper oxide clad box, the surface<br />

of which is punctuated by horizontal raised seams and staggered windows.<br />

The Eastern element is a red/brown sandstone clad wall with vertical<br />

strip windows arranged in a random pattern. This solid/void ratio is<br />

based on a 600 mm wide module which introduces a human scale to<br />

this large elevation. The Northern element is a fully glazed facade,<br />

given interest by the introduction of a series of serrations ond overhangs<br />

that break down the scale in a manner similar to the North face<br />

of the existing. The proximity of marvellous mature tree species adds<br />

a further layer of pattern and texture to the overall composition.<br />

C Technical information about the new building<br />

a) Floor area (in m 2 )<br />

24. 15 649 m 2<br />

25. 8 788 m 2<br />

26. 150 m 2<br />

27. 400 m 2<br />

28. 450 m 2<br />

29. IT Training Room, Seminar Room & Conference Room 200 m 2<br />

30. 50 m 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!