22.10.2013 Views

Regulatory Framework on Natural Gas in Hong Kong - Near You

Regulatory Framework on Natural Gas in Hong Kong - Near You

Regulatory Framework on Natural Gas in Hong Kong - Near You

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

R<str<strong>on</strong>g>Regulatory</str<strong>on</strong>g> l t <str<strong>on</strong>g>Framework</str<strong>on</strong>g> F k ffor<br />

<strong>Natural</strong> <strong>Gas</strong> under<br />

<strong>Gas</strong> Safety Ord<strong>in</strong>ance, Cap. 51<br />

Ir Eric WONG<br />

<strong>Gas</strong> Standards Office<br />

Electrical and Mechanical Services Department<br />

HKSAR Government


2<br />

C<strong>on</strong>tents<br />

General<br />

Approval &<br />

overview Assessment<br />

Self-<br />

regulat<strong>in</strong>g<br />

Duty of RGSC


3<br />

<strong>Gas</strong> Safety Ord<strong>in</strong>ance, Cap. 51<br />

LPG<br />

Town<br />

<strong>Gas</strong><br />

7 Regulati<strong>on</strong>s


4<br />

<strong>Gas</strong> Safety Ord<strong>in</strong>ance, Cap. 51<br />

7 Regulati<strong>on</strong>s<br />

Cap Cap.51A 51A <strong>Gas</strong> Safet Safety (<strong>Gas</strong> QQuality) alit ) Reg Regulati<strong>on</strong>s lati<strong>on</strong>s<br />

Cap.51B <strong>Gas</strong> Safety (<strong>Gas</strong> Supply) Regulati<strong>on</strong>s<br />

Cap Cap.51C 51C <strong>Gas</strong> Safety (Installati<strong>on</strong> and Use) Regulati<strong>on</strong>s<br />

Cap.51D <strong>Gas</strong> Safety (Registrati<strong>on</strong> of <strong>Gas</strong> Installers and <strong>Gas</strong><br />

C<strong>on</strong>tractors) Regulati<strong>on</strong>s<br />

Cap.51E <strong>Gas</strong> Safety (Registrati<strong>on</strong> of <strong>Gas</strong> Supply Companies)<br />

Regulati<strong>on</strong>s<br />

CCap.51F 51F G<strong>Gas</strong> SSafety f t (Mi (Miscellaneous) ll ) Regulati<strong>on</strong>s<br />

R l ti<br />

Cap.51G <strong>Gas</strong> Safety (<strong>Gas</strong>holders Exam<strong>in</strong>ati<strong>on</strong>) Regulati<strong>on</strong>


5<br />

General Overview<br />

1993 2013<br />

Number of Submar<strong>in</strong>e <strong>Gas</strong> Pipel<strong>in</strong>es 0 4<br />

1995<br />

海南


6<br />

General Overview<br />

1993 2013<br />

Number of Submar<strong>in</strong>e <strong>Gas</strong> Pipel<strong>in</strong>es 0 4<br />

2006


7<br />

General Overview<br />

1993 2013<br />

Number of Submar<strong>in</strong>e <strong>Gas</strong> Pipel<strong>in</strong>es 0 4<br />

2012<br />

(Map Source: CNPC)


8<br />

General Overview<br />

1993 2013<br />

Number of Submar<strong>in</strong>e <strong>Gas</strong> Pipel<strong>in</strong>es 0 4<br />

Installed Capacity of <strong>Gas</strong>-fired Power 0 MW <br />

GGenerat<strong>in</strong>g i UUnits i<br />

~3,200MW 3 200MW


9<br />

General Overview<br />

1993 2013<br />

Number of submar<strong>in</strong>e gas pipel<strong>in</strong>es 0 4<br />

Installed capacity of gas-fired power 0 MW <br />

generat<strong>in</strong>g i units i<br />

~3,200MW 3 200MW<br />

% of town gas produced by natural 0% <br />

gas >50% 50%<br />

One Figure No Change, What’s that ?


10<br />

General Overview<br />

1993 2013<br />

Number of submar<strong>in</strong>e gas pipel<strong>in</strong>es 0 4<br />

Installed capacity of gas-fired power 0 MW <br />

generat<strong>in</strong>g i units i<br />

~3,200MW 3 200MW<br />

% of town gas produced by natural 0% <br />

gas >50% 50%<br />

Number of <strong>Natural</strong> <strong>Gas</strong> Incidents 0 0


Three Mile Island Incident<br />

• Unit 2 (TMI-2) reactor partially<br />

melted down <strong>in</strong> March 1979<br />

• Permanent and sweep<strong>in</strong>g changes to<br />

US Nuclear N lea <str<strong>on</strong>g>Regulatory</str<strong>on</strong>g> Reg lato Commissi<strong>on</strong><br />

(NRC) and nuclear <strong>in</strong>dustry<br />

• Nuclear plant design upgraded<br />

• Emergency preparedness enhanced<br />

• Licens<strong>in</strong>g and c<strong>on</strong>trol system<br />

strengthened<br />

• “Authority’s Authority s Inspecti<strong>on</strong>” Inspecti<strong>on</strong> <br />

“Industry’s Self-regulat<strong>in</strong>g”<br />

11<br />

TMI-1<br />

Photo before Incident<br />

TMI-2<br />

(Photo & Diagram Source: Wikipedia)


Industry’s<br />

Self-regulat<strong>in</strong>g<br />

Self-regulat<strong>in</strong>g<br />

Authority’s<br />

Inspecti<strong>on</strong><br />

We have NO bitter experience, but<br />

We have adopted “Self-regulat<strong>in</strong>g” Self-regulat<strong>in</strong>g <strong>in</strong> <strong>Gas</strong> Safety Ord<strong>in</strong>ance<br />

12


13<br />

Who has Self-regulat<strong>in</strong>g Duty?<br />

Registered <strong>Gas</strong> Supply Company (RGSC)<br />

The H<strong>on</strong>g K<strong>on</strong>g and Ch<strong>in</strong>a <strong>Gas</strong> Company Limited<br />

(HKCG)<br />

Castle Peak Power Company Limited (CAPCO)<br />

The H<strong>on</strong>gk<strong>on</strong>g Electric Co. Ltd. (HK Electric)<br />

Import <strong>Natural</strong> <strong>Gas</strong><br />

Supply pp y <strong>Natural</strong> <strong>Gas</strong> to their own plants p for<br />

power generati<strong>on</strong> or town gas producti<strong>on</strong>


14<br />

What is Self-regulat<strong>in</strong>g Duty?<br />

Regulati<strong>on</strong> 9 of <strong>Gas</strong> Safety (Registrati<strong>on</strong> of <strong>Gas</strong> Supply<br />

Companies) Regulati<strong>on</strong>s, Regulati<strong>on</strong>s Cap Cap.51E: 51E:<br />

It shall be the duty y of every y registered g gas g supply ppy<br />

company (RGSC) to ensure, <strong>in</strong> carry<strong>in</strong>g <strong>on</strong> its bus<strong>in</strong>ess<br />

as a gas supply company, so far as is reas<strong>on</strong>ably<br />

practicable, ti bl th the hhealth lth and d safety f t at t work k of f all ll its it<br />

employees and to c<strong>on</strong>duct its operati<strong>on</strong>s <strong>in</strong> a safe<br />

manner so that members of the public are not exposed<br />

to undue risks from gas.


What is RGSC do<strong>in</strong>g? g<br />

<strong>Gas</strong> Leakage Surveys<br />

Deal<strong>in</strong>g with<br />

gas emergencies<br />

15<br />

Deal<strong>in</strong>g with<br />

escap<strong>in</strong>g p g <strong>Gas</strong><br />

9<br />

8<br />

Audit<strong>in</strong>g System<br />

Health & Safety Policy<br />

1<br />

10 Safety Procedures<br />

Self-regulat<strong>in</strong>g g g<br />

Duty<br />

66<br />

2<br />

3<br />

4<br />

Procedures for Design<br />

& C<strong>on</strong>structi<strong>on</strong><br />

Procedures for Operati<strong>on</strong><br />

& Ma<strong>in</strong>tenance<br />

7 5 Qualificati<strong>on</strong> Requirement<br />

of Key Pers<strong>on</strong>s<br />

Competency Assurance System


16<br />

How to dem<strong>on</strong>strate?<br />

RGSC dem<strong>on</strong>strates compliance with its self-regulat<strong>in</strong>g<br />

duty through 2 documents:<br />

Written Statement<br />

Safety Case<br />

• Based <strong>on</strong> Regulati<strong>on</strong><br />

10 of f CCap. 51E<br />

• To provide the<br />

arrangements to carry<br />

out RGSC’s health and<br />

safety policy<br />

• Based <strong>on</strong> registrati<strong>on</strong><br />

c<strong>on</strong>diti<strong>on</strong> diti<br />

• To dem<strong>on</strong>strate the<br />

risk level has been<br />

reduced as low as<br />

reas<strong>on</strong>ably practicable


17<br />

Safety Case<br />

Plant <strong>in</strong>formati<strong>on</strong><br />

Major hazard<br />

Risk analysis<br />

Measures to prevent or c<strong>on</strong>trol<br />

accidents<br />

SSafety f t management t system t<br />

Emergency systems<br />

RGSC GSC updates d Safety S f CCase i<strong>in</strong><br />

every 3 years


18<br />

Approval ?<br />

Approvals for Notifiable gas <strong>in</strong>stallati<strong>on</strong> (NGI)<br />

High pressure gas ma<strong>in</strong>s (P>700kPa)<br />

Pressure-regulat<strong>in</strong>g <strong>in</strong>stallati<strong>on</strong>s (P <strong>in</strong>let>240kPa)<br />

C<strong>on</strong>structi<strong>on</strong> Approval<br />

Approval of Use<br />

Design C<strong>on</strong>structi<strong>on</strong> Operati<strong>on</strong>


19<br />

Approval<br />

C<strong>on</strong>structi<strong>on</strong><br />

Approval<br />

Yes<br />

Supplement<br />

Received<br />

Process<strong>in</strong>g<br />

(≦30 days)<br />

Applicati<strong>on</strong><br />

Received<br />

Process<strong>in</strong>g<br />

(≦60 days)<br />

Additi<strong>on</strong>al Plans<br />

or Particulars?<br />

No<br />

Determ<strong>in</strong>ati<strong>on</strong><br />

of Applicati<strong>on</strong><br />

• Approve<br />

• Approve with c<strong>on</strong>diti<strong>on</strong>s<br />

• Refuse to grant approval


20<br />

Approval<br />

Approval Applicati<strong>on</strong><br />

of f Use Receivedd<br />

Process<strong>in</strong>g<br />

(≦14 work<strong>in</strong>g days)<br />

Determ<strong>in</strong>ati<strong>on</strong><br />

of Applicati<strong>on</strong><br />

• Approve<br />

• AApprove with ith c<strong>on</strong>diti<strong>on</strong>s diti<br />

• Refuse to grant approval


Designer<br />

Approval<br />

Erector Third-party Inspector<br />

Owner Eng<strong>in</strong>eer C<strong>on</strong>sultant<br />

21<br />

Applicati<strong>on</strong><br />

RGSC GSO


22<br />

Assessment <strong>on</strong><br />

RGSC Performance


23<br />

L<strong>on</strong>gford <strong>Gas</strong> Explosi<strong>on</strong><br />

<strong>Gas</strong> Explosi<strong>on</strong><br />

DDate 25 September S b 1998<br />

Locati<strong>on</strong> <strong>Gas</strong> Process<strong>in</strong>g Plant<br />

LL<strong>on</strong>gford, f d Vi Victoria, t i AAustralia t li<br />

(Ma<strong>in</strong>ly Produce <strong>Natural</strong> <strong>Gas</strong> and Crude Oil)<br />

Loss • 2death+8<strong>in</strong>jured<br />

2 death + 8 <strong>in</strong>jured<br />

• 3 weeks <strong>Natural</strong> <strong>Gas</strong> Supply Interrupti<strong>on</strong><br />

• 1 billi<strong>on</strong> (USD)<br />

Cause Brittle fracture of heat exchanger (-48°C 230°C)<br />

Vapour p cloud explosi<strong>on</strong> p<br />

(Photo Source: WorkSafe, Victoria, Australia)


24<br />

L<strong>on</strong>gford <strong>Gas</strong> Explosi<strong>on</strong><br />

Team of 40 specialists formed for new regulatory system<br />

NNew regulati<strong>on</strong>s l ti llaunched h d <strong>in</strong> i 2000, 2000 key k pr<strong>in</strong>ciples: i i l<br />

Places the resp<strong>on</strong>sibility <strong>on</strong> the operator<br />

Focus <strong>on</strong> major hazards<br />

Proactive risk based approach<br />

Actively dem<strong>on</strong>strate safe operati<strong>on</strong><br />

Active review of dem<strong>on</strong>strati<strong>on</strong> tied to licence<br />

“Self Self-regulat<strong>in</strong>g regulat<strong>in</strong>g” under <strong>Gas</strong> Safety Ord<strong>in</strong>ance<br />

with dem<strong>on</strong>strati<strong>on</strong> by<br />

Written Statement & Safety Case


25<br />

Victoria’s <str<strong>on</strong>g>Regulatory</str<strong>on</strong>g> System<br />

5 th Year<br />

(Apply for<br />

license renewal)<br />

4 th Year<br />

Update<br />

Safety Case<br />

Safety Case<br />

Assessment<br />

& Inspecti<strong>on</strong><br />

License<br />

Start Date<br />

Start Date 1st 1 Year st Year<br />

3 rd Year<br />

Safety Case<br />

Assessment<br />

& Inspecti<strong>on</strong><br />

Safety Case<br />

Assessment<br />

& Inspecti<strong>on</strong><br />

2 nd Year


26<br />

Victoria’s <str<strong>on</strong>g>Regulatory</str<strong>on</strong>g> System<br />

<strong>Gas</strong> Harm<strong>on</strong>izati<strong>on</strong> Program<br />

(1998) Implement<strong>in</strong>g<br />

New System<br />

In Victoria<br />

2000 2011<br />

Other States/Territories<br />

adopt<strong>in</strong>g<br />

Victoria System


Our Assessment<br />

RGSC’s Documents<br />

(for dem<strong>on</strong>strati<strong>on</strong> of compliance with<br />

Self-regulat<strong>in</strong>g duty)<br />

27<br />

GSO’s Assessment<br />

Written Statement • Annual RGSC Performance<br />

Assessment<br />

• 3 years for <strong>on</strong>e cycle<br />

Safety Case • Annual Procedure Audit<br />

• Risk-base approach (priority<br />

given to high risk area<br />

identified d f d <strong>in</strong> Safety S f C Case) )


28<br />

C<strong>on</strong>clusi<strong>on</strong><br />

<strong>Natural</strong> gas safety relies <strong>on</strong> RGSC’s<br />

compliance with its self-regulat<strong>in</strong>g f<br />

duty.<br />

GSO facilitates compliance through approval<br />

and assessment.<br />

(Photo Source: H<strong>on</strong>g K<strong>on</strong>g Tourism Board)


29<br />

Thank <strong>You</strong>!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!