DRAFT 11 TH - 1 - FIVE YEAR PLAN 20072012 & ANNUAL PLAN 2007 – 08 AGRICULTURE DEPARTMENT (CROP HUSBANDRY) CROP HUSBANDRY (AGRICULTURE) INTRODUCTION : The complete strategy for the XI th Plan has emerged from an extensive process of survey and a bottom up grass root level study of the agricultural status in the state. Regional backwardness is the main issue of concern in Mizoram. Lack of adequate rural infrastructure, sectoral investment and research backup facilities are the main bottleneck of sustainable and accelerated growth of agriculture sector. By diversification of agriculture farming, private corporate investment through contract farming system is expected to accelerate the rural economy by expanding the rural –urban trade for domestic processing and promoting exports. The approach plan is first step in this process by suggesting broad objectives, targets and the associated challenges and implication for policy of Plan period. An ambition of doubling the incomes of the average farmers of Mizoram in less than five years with a commitment to reduce poverty to less than 10% in the same period with a target growth rate of GDP at around 4% would ensure that the projected growth is broader base than in the past. The approach plan suggests that this is feasible but it cannot be achieved without special effort, especially if the growth is to be more inclusive. Therefore, the main point of focus identified for potential growth of agriculture sector in Mizoram to achieve the milestone of XI th Plan target are Infrastructure development coupled with the sustainable economic activities for the rural poor. The strategy for Infrastructure development includes an additional increase of. 2000 ha. WRC areas by Land development, 2000 ha. of Terraces for Settlement of Jhumia families, Construction of 250 km and maintenance of existing Potential Area Connectivity roads, Establishment and maintenance of laboratories and farm etc. Under Economic activities intensified cultivation of maize, soyabean, pulses, oilseeds, rice and sugarcane by pit digging and micro irrigation system on a large scale will be taken up as a settlement of jhummia families, Production and distribution of certified seeds through seed village programme/registered growers, Introduction of crop insurance scheme, Subsidy on farm inputs like machineries & implements, fertilizers, chemicals etc. Alongside this the development of cash crop especially Red Oil Palm has been given due focus and to realize this an extensive action plan through the PPP and contractual farming mode has been chalked out which is envisage to cover more than 60,000 Ha of Agro-climatically suitable and identified land mainly jhumias which will cut across the subsequent Five Year Plan. As for Research back up, revitalization of extension services through ATMA scheme will be given due importance. The total budget size of Rs.21974.00 Lakhs for XI Plan, out of which an annual plan for 2007-2008 amount to Rs.3428.00 Lakhs has been projected. Therefore, to accelerate the process of development for this under developed agrarian economy of Mizoram an ambitious, challenging and target oriented vision for achieving 4% GDP Growth has been formulated for the Eleventh Plan.

<strong>DRAFT</strong> 11 TH - 1 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

CROP HUSBANDRY (AGRICULTURE)<br />

INTRODUCTION :<br />

The complete strategy for the XI th Plan has emerged from an extensive process of<br />

survey and a bottom up grass root level study of the agricultural status in the state.<br />

Regional backwardness is the main issue of concern in <strong>Mizoram</strong>. Lack of adequate rural<br />

infrastructure, sectoral investment and research backup facilities are the main bottleneck of<br />

sustainable and accelerated growth of agriculture sector. By diversification of agriculture<br />

farming, private corporate investment through contract farming system is expected to<br />

accelerate the rural economy by expanding the rural –urban trade for domestic processing<br />

and promoting exports. The approach plan is first step in this process by suggesting broad<br />

objectives, targets and the associated challenges and implication for policy of Plan period.<br />

An ambition of doubling the incomes of the average farmers of <strong>Mizoram</strong> in less than five<br />

years with a commitment to reduce poverty to less than 10% in the same period with a<br />

target growth rate of GDP at around 4% would ensure that the projected growth is broader<br />

base than in the past. The approach plan suggests that this is feasible but it cannot be<br />

achieved without special effort, especially if the growth is to be more inclusive. Therefore,<br />

the main point of focus identified for potential growth of agriculture sector in <strong>Mizoram</strong> to<br />

achieve the milestone of XI th Plan target are Infrastructure development coupled with the<br />

sustainable economic activities for the rural poor. The strategy for Infrastructure<br />

development includes an additional increase of. 2000 ha. WRC areas by Land<br />

development, 2000 ha. of Terraces for Settlement of Jhumia families, Construction of 250<br />

km and maintenance of existing Potential Area Connectivity roads, Establishment and<br />

maintenance of laboratories and farm etc. Under Economic activities intensified<br />

cultivation of maize, soyabean, pulses, oilseeds, rice and sugarcane by pit digging and<br />

micro irrigation system on a large scale will be taken up as a settlement of jhummia<br />

families, Production and distribution of certified seeds through seed village<br />

programme/registered growers, Introduction of crop insurance scheme, Subsidy on farm<br />

inputs like machineries & implements, fertilizers, chemicals etc. Alongside this the<br />

development of cash crop especially Red Oil Palm has been given due focus and to realize<br />

this an extensive action plan through the PPP and contractual farming mode has been<br />

chalked out which is envisage to cover more than 60,000 Ha of Agro-climatically suitable<br />

and identified land mainly jhumias which will cut across the subsequent Five Year Plan.<br />

As for Research back up, revitalization of extension services through ATMA scheme will<br />

be given due importance.<br />

The total budget size of Rs.21974.00 Lakhs for XI Plan, out of which an<br />

annual plan for <strong>2007</strong>-2008 amount to Rs.3428.00 Lakhs has been projected.<br />

Therefore, to accelerate the process of development for this under developed<br />

agrarian economy of <strong>Mizoram</strong> an ambitious, challenging and target oriented vision for<br />

achieving 4% GDP Growth has been formulated for the Eleventh Plan.


<strong>DRAFT</strong> 11 TH - 2 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

AN APPROACH TO THE ELEVENTH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> UNDER AGRICULTURE.<br />

The <strong>Mizoram</strong> ecosystem is primarily mountainous which can broadly be<br />

classified as fragile. The ecosystems and the traditional primary production systems are<br />

under stress due to several causes such as population growth, over use of natural resources<br />

and lack of appropriate development technologies. The high rainfall in the areas combined<br />

with deforestation leads to high level of erosion, land degradation and siltation.<br />

<strong>Mizoram</strong> is a typical example of many of the worlds poorest areas which<br />

are small, mountainous landlocked state. These are characterized by diversity of a micro-<br />

environment in which flat areas and terraces are under intense land use. Horticultural and<br />

Plantation Crops are most often an alternative to the annual field crops. The major<br />

constraints are fragile, steep slope and related soil loss, deforestation and limited access to<br />

market and infrastructure<br />

Government of <strong>Mizoram</strong> endorsed the draft approach to 11 th Five year Plan<br />

especially in Agricultural Sector. The main strategies for accelerating Agricultural growth<br />

during Eleventh Five Year in <strong>Mizoram</strong> for sustainable development as well as self<br />

sufficiency in food grains will be as under:<br />

1. Accelerating Agricultural Growth :<br />

Accelerating GDP growth in Agriculture sector to around 4% is a great<br />

challenge for the economy as a whole. However, in spite of the plethora of hurdles that is<br />

anticipated in achieving this target. The following action plans which gives due<br />

cognizance to the demand-supply issues will give an overview of the strategy attempted to<br />

achieve the goals.<br />

2. The Demand gap. :<br />

The total population of <strong>Mizoram</strong> is 8,88,573 as per 2001 census with the<br />

total decadal growth rate of 29.18%. As per the decadal growth rate, it is estimated that<br />

the total population of <strong>Mizoram</strong> will reach approximately 11, 47,858, during the eleventh<br />

plan period. To meet the minimum food requirements of the projected population of the<br />

state, at least 1,00,000 MT of rice has to be produced annually @ 6.75 kg per capita<br />

consumption per month ( based on NSS 55 th Round, July 1999-June 2000 ).<br />

Regional backwardness is the main issue of concern. Lack of adequate rural<br />

infrastructure, sectoral investment and Research back up is the main bottleneck for the<br />

sustainable and accelerate growth of Agricultural Sector in <strong>Mizoram</strong>. As such, larger<br />

investment of private sector through contract farming will accelerate the rural economy by<br />

expanding rural-rural trade for strengthening support to Agricultural diversification for<br />

domestic processing and promoting exports. This strategies will enhance accelerate<br />

Agriculture growth in <strong>Mizoram</strong> over time.<br />

3. Addressing the Supply issue:<br />

Following steps will be initiated to strengthen Foodgrain Production in<br />

order to attain food security during the eleventh five year plan.<br />

i). Dissemination of modern technology applicable to small holding in hilly<br />

terrain.<br />

ii). Conversion of Jhum land area into permanently cultivated tracts.<br />

iii). Increasing area under HYV of rice, maize, oilseeds, pulses.<br />

iv). Increasing double-cropped area through multiple cropping.


<strong>DRAFT</strong> 11 TH - 3 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

v). Adoption of short duration HYV of rice to fit into the double/multiple<br />

cropping cycle.<br />

vi). Popularization of balanced and integrated use of fertilizers. High yielding<br />

seeds, need based plant protection measures, and Integrated Pest<br />

Management (IPM).<br />

vii). Making available more number of farm machineries to the farmers at<br />

subsidized rates (Like Tractor, Power Tiller etc. including water ppumps<br />

and micro irrigation needs).<br />

viii). Promotion of supplementing environmentally sound micro-enterprises to<br />

agricultural activities like cultivation of medicinal and Aromatic plants,<br />

dairy farming, piggery, poultry farming, apiary and pisiculture through<br />

livelihood support system (Crop diversification).<br />

ix). Promotion of vermi-composting, bio-pesticides and compost manure<br />

production at local level.<br />

x). Development of low cost high volume rainwater harvesting structures for<br />

domestic use and life saving irrigation, Bio-filtration and water recycling<br />

(Micro-Irrigation System).<br />

These strategies would be achieved through :<br />

i). Jhum area of 30,000 Ha will be treated during the eleventh five year plan<br />

under Control of Shifting Cultivation ( WDPSCA)<br />

ii). An additional area of 5,000 Ha fresh land will be developed through<br />

machineries and will be put under Wet Rice cultivation and 3000 Ha of<br />

jhum area will be converted into Terraces cultivation under settlement of<br />

jhumia families .<br />

iii). 2,00,000 nos of Soil Health card will be issued to the farmers<br />

iv). Construction of 1000 KM length of Potential Area Connectivity/road for<br />

transportation of Agriculture produces and inputs and maintenance of 1500<br />

KM existing Potential Area Connectivity<br />

v). Judicious use of fertilizers, Bio- fertilizers and other Organic manures.<br />

vi). Promotion of farm mechanization through subsidy on farm machineries.<br />

vii). Development of Water Harvesting Structures and judicious use of irrigation<br />

water through drip/micro sprinkler irrigation system.<br />

viii). Distribution of quality and HYV seeds through Seed Village programme /<br />

Registered Growers<br />

ix). Mission Mode approach will be encouraged, all resources from Plan Fund<br />

and Macro-Management Mode of Agriculture (CSS) will be converged<br />

with the objective of achieving concerted and accelerated growth in<br />

Agriculture sector.<br />

x). Infrastructures like cold storage, processing plant, market facilities etc, will<br />

be created for value addition and generating regular incomes for the<br />

farming community.


<strong>DRAFT</strong> 11 TH - 4 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

xi). Financial Institution/Banks shall be aggressively impress upon to provide<br />

services at the door steps or at least at the village level to help the farmers<br />

in availing of various facilities available with the banks. A fresh impetus<br />

to Agriculture as a business will be propagated with the pro active role of<br />

the Banks in treating Agriculture business as a “Viable Business<br />

Proposition” and not a mere poverty alleviation programme.<br />

xii). Re allocation of agriculture land such as the potential land for<br />

xiii).<br />

Agriculture within the Riverine Reserve Forest be identified and<br />

demarcated for the purpose of de-reservation and at the same time identify<br />

alternate land in the Upper slope and ridges as a substitute within the same<br />

jurisdiction. This will enable the farmers to take up intensive cultivation in<br />

the river valley as a permanent settlement free from reservation of their land<br />

for any purpose other than Agriculture.<br />

A separate legislation to regulate and promote contract farming<br />

arrangements to promote alternative marketing system, contract farming,<br />

direct marketing and farmers market with growing quality, etc. will be<br />

introduced. This would help in extension of E-trading, direct purchasing,<br />

export, etc. in the State.<br />

xiv). The main work force under agriculture sectors are mainly inhabited in the<br />

rural areas. 50.5% of the total population in the state is still in the rural<br />

areas, sustain their livelihood through farming, which is mere remunerative.<br />

It is just livelihood support systems. To uplift the standard of living and<br />

Generate Employment Opportunities of the rural people, Diversification of<br />

Crops, Organic Farming and Contract Farming through Public Private<br />

Partnership (PPP) will be initiated.<br />

SCHEME NO. I<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 3053.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs 663.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY FOR <strong>2007</strong> - 2008<br />

It is necessary to create infrastructures at Districts, Sub Divisions and Circle<br />

level for smooth and efficient implementation of programmes. It is imperative to create<br />

building facilities in the newly sanctioned Agriculture District at Lawngtlai and Serchhip.<br />

Proper supervision of works at the site itself is one of the important tools<br />

for efficient monitoring, evaluation and implementation. The financial and physical<br />

targets for the 11 th Plan and Annual Plan <strong>2007</strong> – 08 under Direction & Administratio0n<br />

are as below :-


<strong>DRAFT</strong> 11 TH - 5 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

A.P. <strong>2007</strong>-08<br />

Rs. in lakh<br />

11 th Sl. Items Unit<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

No.<br />

Physical Financial Physical Financial<br />

1. Salary No. 64 106.00 64 616.00<br />

2. Misc.<br />

Contingencies<br />

LS - 301.00 - 1275.00<br />

3. Wasges No. 38 25.00 38 132.00<br />

4. Maintenance of<br />

buildings<br />

No. 80 60.00 80 300.00<br />

5. Maint. & hiring of<br />

vehicles<br />

LS - 86.00 - 430.00<br />

6. Constn. of Deptt.<br />

buildings<br />

No. 3 85.00 15 300.00<br />

TOTAL 663.00 3053.00<br />

SCHEME NO. 2<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : FOODGRAIN DEVELOPMENT<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 3098.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs 553.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

Rice and Maize is an utmost necessity for the upliftment and sustainable<br />

economic development of the farmers as a whole for Food Security. The activities<br />

prioritize for the XI th Plan are categorized as follows :<br />

a) Agriculture Infrastructure Development :<br />

i) Land Development for WRC : Increase in arable land resulted into increase in<br />

food grain production an additional area of in food grain production. An additional area of<br />

5000 ha. is to be develop during XI Plan.<br />

ii) Potential Area Connectivity: Communication is one of the vital point to be<br />

consider for the overall economic growth of the farmers. Under PAC- 1535 km. Of newly<br />

construction and 1321 km. of maintenance of existing road is target for the XI Plan<br />

b) Rice Production Programme : Emphasis is given for increases in the productivity<br />

and enhancement of Seed Replacement Rate, Production and distribution of certified seeds<br />

through Seed Village Programme /Registered Growers and Field Demonstration of<br />

cropping system.<br />

c) Maize Production Programme: Due importance in increases of productivity<br />

and seed replacement rate, Production and distribution of certified seeds through Seed<br />

Village Programme/ Registered Growers, cultivation of Maize for settlement of jhumia<br />

families on contract farming are envisaged.


<strong>DRAFT</strong> 11 TH - 6 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items Unit<br />

An additional area of 5000 ha potential fresh land will be developed for WRC and<br />

3000 ha of jhum land will be converted into terraces for Settlement of jhumia families.<br />

Potential Area Connectivity of 1000 Km length are proposed under Foodgrain<br />

Development Programme. Distribution, production of Certified Seeds through seed<br />

Village Programme/Registered Growers and demonstration of cropping systems are given<br />

due importance under this scheme. To achieve the objectives the following components<br />

are proposed as below:<br />

(Rs. In lakhs)<br />

Sl.<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

No.<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1 Salary of Officers and<br />

staff<br />

No. 21.00 125.50<br />

2. Land Development for<br />

WRC<br />

Ha 297 297.00 1718 1718.00<br />

3. Construction of Potential<br />

Area Connectivity<br />

KM 50 150.00 250 750.00<br />

4 Maintenance of existing<br />

PAC<br />

Km 300 15.00 1500 75.00<br />

5 Rice Production<br />

Programme<br />

1) Seed Distribution<br />

of HYV @<br />

Qtl 1900 11.40 16500 99.00<br />

Rs. 600/qtl<br />

2) Production of certified<br />

seed through SVP/RG @<br />

Rs.200/qtl.<br />

Qtl 1900 3.80 16500 33.00<br />

3) Field Demonstration<br />

on Cropping system @<br />

Rs. 2500 /ha.<br />

Ha 100 2.50 500 13.50<br />

6 Maize Production<br />

Programme<br />

1) Seed Distribution of<br />

HYV @ Rs. 1200/qtl.<br />

Qtl 2540 30.60 13800 165.00<br />

2) Production of seed<br />

through SVP/RG<br />

@ Rs. 500/qtl<br />

Qtl 2540 12.70 13800 69.00<br />

3) Assistance for<br />

production & support @<br />

Rs. 1000/ha<br />

Ha 1000 10.00 5000 50.00<br />

Total 553.00 3098.00


<strong>DRAFT</strong> 11 TH - 7 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

SCHEME NO. 3<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME: : AGRICULTURE FARM AND<br />

QUALITY SEED PRODUCTION<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 550.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 16. 00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

A vision for accelerated growth in agriculture sector for the XI th Plan give<br />

due weight- age to the highly technical approach to scheme the goal. The importance of<br />

Departmental Farm, State Seed Testing and Processing Unit are the tools for dissemination<br />

of technology from Laboratory to Field. Therefore, the following targets are earmarked for<br />

the XI th Plan as follows :<br />

The Departmental Farms will be converted into Model Organic Farms at<br />

Chemphai Thingdawl, Neihbawih and Rotlang. Demonstration on production technology,<br />

Vermiculture and Vermi composting will be carried out to conform the National<br />

Programme for Organic Production (NPOP).<br />

In the seed sector, Seed Villages or Registered Growers will be organized<br />

based on the demand. This would ensure timely availability of seed and reduce the<br />

handling cost. Production and distribution will be carried out through Seed Village<br />

Programme/Registered Growers. The State Seed Certification Agency will be strengthened<br />

and a provision for creation of Seed Processing Units for static and mobile are allocated.<br />

The following activities are proposed to be taken up during the XI th Plan<br />

and Annual Plan of <strong>2007</strong>-08<br />

Sl<br />

No.<br />

Items<br />

1. Operational cost and<br />

maintenance of existing<br />

Departmental Farm<br />

Rs. in lakh<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Units<br />

Physical Financial Physical Financial<br />

Target Outlay Target Outlay<br />

No 4 5.00 4 25.00<br />

2. Operational cost &<br />

Maintenance of State Seed<br />

Testing laboratory<br />

No 1 1.00 1 5.00<br />

3. Creation & maintenance of<br />

Seed Processing Unit<br />

No 5 10.00 260 520.00<br />

Total 16.00 550.00


<strong>DRAFT</strong> 11 TH - 8 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

SCHEME NO. 4<br />

HEAD OF DEVELOPMENT ` : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES AND FERTILIZERS<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 548.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 16.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY <strong>2007</strong> – 2008<br />

The farming practices in all parts of the country are sub optimal. Optimum and balance use<br />

of fertilizer either organic or inorganic is a must for achievement of accelerated growth in<br />

Agricultural Sector during XI Plan. a judicious use of fertilizers is determine by the laboratory as<br />

well.<strong>Mizoram</strong> is one of the Organic States in the country, the consumption of Agricultural<br />

chemicals for crop production is negligible, at the same time the consumption of organic manures,<br />

and bio agents etc. have been increased. The in-balanced use of chemical fertilizers decreases the<br />

productivity of soils.<br />

Emphasis will be given on cultivation of green manuring crops like Dhaincha, Sunhemp,<br />

Cowpea etc, in order to improve the fertility status of the newly developed WRC. Application and<br />

incorporation of Organic manures and strengthening of the existing Bio-fertilizer Production Unit,<br />

Soil Testing laboratory Unit are proposed. This would ensure balanced and integrated use of<br />

fertilizers resulting in adoption of integrated nutrient management for sustains Agriculture.<br />

A. MANURES AND FERTILIZERS.<br />

Sl<br />

No.<br />

Items<br />

Units <strong>2007</strong>-2008<br />

Physical Financial<br />

(Rs. in lakh)<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical Financial<br />

Target Outlay Target Outlay<br />

1 Purchase of green<br />

manure seeds, Neem<br />

based Organic Manures<br />

MT 100 10.00 5200 520.00<br />

2 Operational &<br />

Maintenance of Biofertilizers<br />

production<br />

unit<br />

No 1 2.00 1 10.00<br />

Sub-Total 12.00 530.00<br />

B. SOIL TESTING LAORATORY<br />

Sl<br />

No.<br />

Items<br />

Units <strong>2007</strong>-2008<br />

Physical Financial<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical Financial<br />

Target Outlay Target Outlay<br />

1 Operational cost and<br />

maintenance of Static Soil<br />

Laboratory at Aizawl and<br />

Lunglei.<br />

No 2 2.00 2 10.00<br />

2 Preparation of soil<br />

samples for analysis.<br />

No LS 1.00 LS 5.00<br />

3 Office expenditure and<br />

other contingencies<br />

No LS 1.00 LS 3.00<br />

Sub – Total 4.00 18.00<br />

Total of A & B 16.00 548.00


<strong>DRAFT</strong> 11 TH - 9 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />

SCHEME NO. 5<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 505.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 7.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

<strong>Mizoram</strong> receives high rainfall during Monsoon, humid and warm climate<br />

results in outbreak of insect, pests and diseases and excessive weeds growth. The benefits<br />

of Plant Protection Chemical usage outweigh the criticism at this point of time. In order to<br />

provide the requirement of farmers for various insecticides and Plant Protection<br />

equipments on need basis are proposed for sale at 50% subsidy. This would ensure the<br />

timely availability of pesticides and PP equipments and reduce losses of production due to<br />

incidence of Pest and diseases.<br />

The following activities are proposed during the XI th Plan and Annual Plan of <strong>2007</strong>-08.<br />

(Rs in lakh)<br />

Sl Items Units <strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

No.<br />

Physical Financial Physical Financial<br />

Target Outlay Target Outlay<br />

1 Cost of various<br />

insecticides<br />

including PP<br />

Chemicals for sale<br />

2.<br />

at 50% subsidy<br />

Operational &<br />

Maintenance of IPM<br />

Laboratory<br />

Total :<br />

No.<br />

LS 5.00 LS 495.00<br />

1 2.00 1 10.00<br />

7.00 505.00<br />

SCHEME NO. 6<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : COMMERCIAL CROP<br />

DEVELOPMENT<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 687.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 35.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

Introduction of highly technical know how with intensification of crops per<br />

unit area will enhance more production of Crops in the same area, which will accelerate<br />

the agricultural product in the same capacity. Technical intensified plantation of sugar by<br />

pit digging method will be introduced during XI Plan for settlement of jhumia families.


<strong>DRAFT</strong> 11 TH - 10 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

The main objectives of the scheme are to increase the productivity of<br />

sugarcane together with the production of other crops grown in cropping sequence. The<br />

salient features of the scheme include seed multiplication/ production of improved variety<br />

in order to replace the existing low yielding varieties at farmer’s level and assistance for<br />

pit digging etc.<br />

The following activities are proposed during the XI th Plan and Annual Plan<br />

of <strong>2007</strong>-08.<br />

Sl<br />

No.<br />

Items<br />

1 Sugarcane production<br />

Programme<br />

1)Seed<br />

multiplication/production<br />

of improved varieties at<br />

farmers level @<br />

Rs.2000/ha<br />

2) Assistance for pit<br />

digging @ Rs. 3000/ha.<br />

Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Ha 700 14.00 16300 326.00<br />

Ha 700 21.00 11900 361.00<br />

Total 35.00 687.00<br />

SCHEME NO. 7<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION & FARMERS TRAINING<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 533.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 ; Rs. 14.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

This scheme is to impart knowledge and skill to the farmers through Agril.<br />

Extension Trainings, Seminars, Tour and Print Media are the important tools including<br />

audio-visuals.<br />

The Government of India has recently approved the implementation of a<br />

Centrally Sponsored Scheme “Support to State Extension Programmes for Extension<br />

Reforms” during Xth plan period. This Scheme is a major initiative towards revitalizing<br />

Agricultural extension in the States to make the extension system decentralized and<br />

demand driven. The Scheme shall be implemented through an autonomous District level<br />

institution to be established by the States in the form of Agriculture Technology<br />

Management Agency (ATMA). The resources required for the schemes shall be shared<br />

between centre and State in the ratio of 90:10. The 10% state’s share shall consist of cash<br />

contribution of the state<br />

of <strong>2007</strong>-08.<br />

The following activities are proposed during the XI th Plan and Annual Plan


Sl<br />

No.<br />

1<br />

<strong>DRAFT</strong> 11 TH - 11 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

Publication of<br />

Periodicals such as<br />

Zoram Loneitu, Loneitu<br />

Kantu, Agril. New<br />

letters etc.<br />

2 Purchase of<br />

Book/subscription of<br />

Agril. journals<br />

Units<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical Financial Physical Financial<br />

Target Outlay Target Outlay<br />

No. LS 5.00 LS 25.00<br />

No. LS 1.00 LS 5.00<br />

3 Misc. contingencies No. LS 0.50 LS 3.00<br />

4<br />

10% State matching<br />

share for<br />

implementation of<br />

ATMA<br />

LS 7.50 500.00<br />

Total 14.00 533.00<br />

SCHEME NO. 8<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : AGRIL. MACHINERIES & IMPLEMENTS<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 1876.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 154.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

In order to approach large scale production and higher productivity, various<br />

programmes like land development, construction of potential area connectivity,<br />

procurement of good seeds etc., have been taken up by the state Government. The most<br />

important follow-up programme is an introduction and popularization of utilization of<br />

improved farm power and specialized implements. As the state does not possess Agro<br />

industries either under taken by the Government or privates, it is necessary to procure from<br />

other states.


Sl<br />

No.<br />

<strong>DRAFT</strong> 11 TH - 12 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

1 Subsidy for Tractors<br />

@ Rs. 70,000/- per<br />

tractor.<br />

2 Subsidy for Power<br />

Tiller @ Rs. 30,000/-<br />

per Power Tiller.<br />

3 Subsidy for<br />

Specialized<br />

implements @ Rs<br />

20,000/- per no.<br />

4 Subsidy for water<br />

pump set @ Rs<br />

8,000/- per no.<br />

5 Subsidy for sprinkler<br />

equipment @ Rs<br />

15,000/- per set.<br />

Units<br />

No.<br />

No<br />

.<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical Financial Physical Financial<br />

Target Outlay Target Outlay<br />

24 17.00 411 288.00<br />

100 30.00 1500 300.00<br />

No 160 32.00 1600 320.00<br />

No 300 24.00 3500 280.00<br />

Set 150 22.50 2050 307.50<br />

6 Subsidy for Drip<br />

equipment @ Rs<br />

28,500/- per set.<br />

Set 100 28.50 1300 380.50<br />

Total 154.00 1876.00<br />

SCHEME NO-9<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : CROP INSURANCE<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 7.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> – 2008 : Rs 2.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

The main objectives of the schemes are , to provide insurance coverage and financial<br />

support to the farmers in the event of natural calamities, pest and diseases, to encourage the farmers to adopt<br />

progressive farming practices high value inputs and higher technology and to help stabilize farm incomes,<br />

particularly in disaster years.<br />

Under Maize & Soybean production programme, the department proposes to cover the<br />

contract farmers under the schemes on pilot basis. The premium subsidy @ 50% is allowed in respect of<br />

small (A cultivator with a land holding of 2 Ha ( 5 acres) or less) & marginal farmers (a cultivator with a<br />

land holding of 1 Ha ( 2.5 acres).to be shared equally by the Govt of India and State Govt.<br />

The introduction of Crop Insurance Scheme for contract farming and as a<br />

whole would ensure generation of additional income to the farming communities. The<br />

following activities are proposed during the XI th Plan and Annual Plan of <strong>2007</strong>-08.


<strong>DRAFT</strong> 11 TH - 13 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

(The premium is calculated as, Maize- Rs 20,000/- Ha, Soybean- Rs 17500/- ha)<br />

Sl<br />

No.<br />

1<br />

2<br />

3<br />

Items<br />

Kharif - Maize premium<br />

subsidy @ 2.5% of SI or<br />

Actuarial rates, which ever is<br />

less<br />

Kharif - Soybean (which is<br />

taken as Pulse) premium<br />

subsidy@ 2.5% of SI or<br />

Actuarial rates, which ever is<br />

less<br />

Rabi –Maize premium<br />

subsidy@ 2. % of SI or<br />

Actuarial rates, which ever is<br />

less<br />

Units<br />

Ha<br />

Ha<br />

Ha<br />

Physical<br />

Target<br />

500<br />

600<br />

500<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

0.68<br />

0.82<br />

0.5<br />

Physical<br />

Target<br />

2000<br />

1000<br />

2000<br />

( Rs in lakhs)<br />

Financial<br />

Outlay<br />

3.00<br />

1.50<br />

2.50<br />

Total 2.00 7.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : OILSEEDS DEVELOPMENT<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 72.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> – 2008 : Rs. 11.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

SCHEME NO-10<br />

The Oil Seeds are the main crop of focus for growth in the Agricultural<br />

Sector for the XI Plan. Increase growth can be possible merely through plausible yield<br />

increase in currently low yield district/areas.<br />

One of the specific constrain yield gap identified for achieving second<br />

green revolution is good quality seeds at the farmers level in a right time, in a right quality.<br />

Therefore, under the Oil Seeds Development Scheme the following programme will be<br />

prioritize during XI th Plan such as, Organization of seed villages in each District,<br />

Production of Certified Seeds through Seed Village Programme/Registered growers, Use<br />

of improved Varieties, Use of quality seeds, optimum seed rate and timely sowing and<br />

Distribution of Certified Seeds to the farmers .<br />

This would ensure increases in the production of Oilseeds in the state and to<br />

achieve self sufficiency enhancement of seed replacement rate, productivity and cropping<br />

intensity. The following activities are proposed during the XI th Plan and Annual Plan of<br />

<strong>2007</strong>-08.


Sl<br />

No.<br />

<strong>DRAFT</strong> 11 TH - 14 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

1 Oilseed Production<br />

Programme<br />

1) Distribution of Soyabean<br />

@ Rs. 300/qtl<br />

Units<br />

Physical<br />

Target<br />

(Rs. in lakh)<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Qtl 1000 3.00 7166 21.50<br />

Sesamum @ Rs. 1000/qtl Qtl 35 0.35 275 2.75<br />

Mustard @ Rs. 1000/qtl. Qtl 160 1.60 900 9.00<br />

2) Production of certified<br />

seeds through SVP/RG<br />

Soyabean @ Rs. 500/qtl Ha 1000 5.00 6500 32.50<br />

Sesamum@ Rs. 500/qtl Ha 35 0.25 275 1.75<br />

Mustard @ Rs. 500/qtl Ha 160 0.80 900 4.50<br />

Total 11.00 72.00<br />

SCHEME NO-11<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : PULSES DEVELOPMENT<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 667.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 26.00 lakhs<br />

1. PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

The Pulses are the main crop of focus for growth in the Agricultural Sector<br />

for the XI Plan. Increase growth can be possible merely through plausible yield increase in<br />

currently low yield district/areas.<br />

One of the specific constrain yield gap identified for achieving second green revolution is<br />

good quality seeds at the farmers level in a right time, in a right quality. Therefore, under the Pulses<br />

Development Scheme the following programme will be prioritize during XI th Plan such as, Organization of<br />

seed villages in each District, Production of Certified Seeds through Seed Village Programme/Registered<br />

growers, Use of improved Varieties, Use of quality seeds, optimum seed rate and timely sowing and<br />

Distribution of Certified Seeds to the farmers .<br />

This would ensure increases in the production of Pulses in the state and to<br />

achieve self sufficiency, enhancement of seed replacement rate, productivity and cropping<br />

intensity. The following activities are proposed during the XI th Plan and Annual Plan of<br />

<strong>2007</strong>-08..


Sl<br />

No.<br />

<strong>DRAFT</strong> 11 TH - 15 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

Units<br />

Physical<br />

Target<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

1 Pulses Production<br />

Programme<br />

1) Distribution of certified<br />

seeds<br />

Redgram @ Rs. 800/qtl Qtl 200 2.00 14625 117.00<br />

Field pea @ Rs.1800/qtl Qtl 500 9.00 8972 161.50<br />

Rajmah @ Rs. 1800/qtl Qtl 500 9.00 8422 151.60<br />

2) Production of certified<br />

seeds through SVP/RG<br />

Redgram @ Rs. 500/qtl Ha 200 1.00 21630 108.15<br />

Field pea @ Rs. 500/qtl Ha 500 2.50 22550 112.75<br />

Rajmah @ Rs. 500/qtl Ha 500 2.50 3200 16.00<br />

Total 26.00 667.00<br />

SCHEME NO-12.<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : STATE SOIL SURVEY ORGANISATION<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 673.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 35.00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

Soils are our most precious natural resource. As such, knowledge of soils in<br />

respect of their extent, distribution, characteristics and potential use is extremely important<br />

for optimizing land use. Areas to be put under intensive use and management or other<br />

priority areas call for Detail or High Intensity Survey for accurate and sound planning, to<br />

prevent further deterioration and to avoid risk of failure. As such a Detailed Soil Survey of<br />

potential areas for Agriculture, Horticulture etc. is imperative and it is proposed to conduct<br />

detail survey of potential areas.<br />

The assistance for the functioning of the State Land Use Board (SLUB) will<br />

be continued in order to achieve the above objective.


Sl<br />

No.<br />

1<br />

2<br />

<strong>DRAFT</strong> 11 TH - 16 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

Salary/TE of Officers and Staff,<br />

JD(LUB)-1,(ASSO-3,UDC-<br />

2,LDC-4,Investigator-1,Driver-<br />

II-2,Tracer-1,OSA-I,Steno-1 IV<br />

Grade-3) assistant-I<br />

Maintenance of Soil Survey,<br />

Remote Sensing Laboratory<br />

3 Delineation of potential area for<br />

WRC, Maize, Soybean etc and<br />

documentation<br />

Units<br />

Physical<br />

Target<br />

(Rs. In lakh)<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

No 12 31.00 12 183.00<br />

No<br />

.<br />

1 1.00 1 5.00<br />

Ha 6500 3.00 1050510 485.00<br />

Total 35.00 673.00<br />

SCHEME NO. 13<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : CONTROL OF SHIFTING CULTIVATION<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> <strong>2007</strong>-12 : Rs. 4700.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 705 .00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

Watershed Development Programme in Shifting Cultivation Areas is<br />

a Special Central Assistance to State Plan Programme for the benefits of the jhumia<br />

families who are living below poverty line. The financing of the scheme includes<br />

treatment of arable and non-arable land, drainage line, creation of water bodies,<br />

development of agriculture/horticulture/plantation crops/forestry and land<br />

based/household production system as package of rehabilitation components. As a<br />

whole the focus is on natural resource management, economic enhancement,<br />

leading to poverty alleviation and eco friendly living<br />

During the 11 th Five Year Plan the spill over of sixty one (61 nos)<br />

projects will be continued with a treatment target area of 30,000 ha. The following<br />

activities are proposed as per guidelines during the XI th Plan and Annual Plan <strong>2007</strong>-<br />

08.


Sl<br />

No.<br />

1<br />

<strong>DRAFT</strong> 11 TH - 17 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items<br />

Management Components<br />

Units<br />

Physical<br />

Target<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-2008 <strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay<br />

Physical<br />

Target<br />

Financial<br />

Outlay<br />

Administration 8 60.00 8 300.00<br />

Community Organization 15.00 225. 00<br />

Training 30.00 150.00<br />

Sub Total<br />

2 Development Components 3900 Ha 390.0 3500.00<br />

3.<br />

Rehabilitation Components<br />

210.00 525.00<br />

Total 705.00 40000 Ha 4700.00<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : BAFFACOS<br />

SCHEME NO. 14<br />

1. PROPOSED OUTLAY FOR <strong>2007</strong> - 2008 : Rs. 68 .00 lakhs<br />

PHYSICAL TARGET AND FINANCIAL OUTLAY<br />

Famine visit <strong>Mizoram</strong> at regular intervals during the flowering of<br />

Melocanna baccifera and Bambusa tulda. The occurrence of the past famines is due<br />

to the outbreak of rats, thereby causing a famine in the state. Thus, the government<br />

of <strong>Mizoram</strong> has formulated a comprehensive programme of Bamboo flowering and<br />

Famine Combat Scheme (BAFFACOS), with an aim to reduce poverty among<br />

farmers during famine period.<br />

This programme would be achieved through Rodent Control, cultivation of<br />

early maturing variety of rice in jhum, and construction of rural market connectivity


Sl<br />

No.<br />

<strong>DRAFT</strong> 11 TH - 18 -<br />

<strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (CROP HUSBANDRY)<br />

Items Units Physical<br />

Target<br />

1 Survey of rodent incidence in jhum,<br />

WRC and forest<br />

2 Rodent pest management :<br />

Purchase of pesticides &<br />

Rodenticides<br />

Financial<br />

Outlay<br />

Ha 2544 12.70<br />

Ha 30000 39.00<br />

Publicity- awareness campaign and<br />

etc.<br />

No 40 6.00<br />

3 Research & Documentation etc. 10.30<br />

Total 68.00<br />

……


- 19 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

MIZORAM INTODELHNA PROGRAMME (MIP)<br />

<strong>Mizoram</strong>, a hill state in the strategic North East, predominantly inhabited by<br />

tribal population, is still economically far behind the rest of the country despite its abundant<br />

natural resources. <strong>Mizoram</strong> is basically an agrarian economy characterized by traditional<br />

practice of shifting hill farming (jhum) which is becoming less productive due to the shrinking<br />

jhum cycle. The persistence of this primitive and destructive method tend to cause soil<br />

erosion and forest regression with adverse effect on environment and ecology. Earlier<br />

attempts at progressively weaning away the jhumia families to permanent system of<br />

cultivation or other means of livelihood has not yielded the desired results.<br />

The <strong>Mizoram</strong> Intodelhna Programme (MIP) attempts at addressing the<br />

problems as it obtains today and seeks to plug the gaps that are perceived to be the cause of<br />

failure of settling the jhumias communities. These probable causes of failures are more or less<br />

eliminated in <strong>Mizoram</strong> Intodelhna Programme (MIP). It is expected that the <strong>Mizoram</strong><br />

Intodelhna Programme (MIP) would serve the people better in achieving its objectives of<br />

alleviating their problems.<br />

The present Government accords its highest priority in solving the critical<br />

issues of backwardness, unemployment particularly in rural areas, harnessing available local<br />

resources and generating income and employment amongst the rural poor. Thus, the<br />

Government of <strong>Mizoram</strong> in their endeavour for a major breakthrough in the developmental<br />

process has considered it necessary to work-out a developmental strategy aiming at efficient<br />

exploitation of local resources, increasing productivity and generating employment<br />

particularly amongst the rural poor. Accordingly a Task Force was constituted to study the<br />

whole gamut of the causes of the rural poverty, the shortcomings that plagued similar<br />

schemes previously launched, and formulate a scheme for development of the rural economy<br />

at the grassroots. The said Task Force composed of experts from different discipline,<br />

progressive farmers, experts and prominent citizens prepared a scheme called <strong>Mizoram</strong><br />

Intodelhna Programme (A project for Self Sufficiency of the Rural poor in <strong>Mizoram</strong>).<br />

The main purpose of this project is upliftment of the rural poor especially the shifting<br />

cultivators. Its main concern is attainment of self-sufficiency, food security and better<br />

livelihood for the cultivators. This programme, is aimed at minimizing the undesirable<br />

consequences of Shifting Cultivation such as destruction of forest, removal of top soils,<br />

landslides and degradation of land. The farmers will to adopt a more profitable, sustainable,<br />

permanent system of farming through Agro-Horticulture and Soil Conservation methods.<br />

AN APPROACH TO THE 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong><br />

UNDER MIZORAM INTODELHNA PROGRAMME<br />

Agriculture in <strong>Mizoram</strong> has remained primitive due to the practice of jhuming<br />

or shifting cultivation. For various reasons this method of cultivation has not undergone<br />

significant changes till date. The main reasons attributed to the persistence of the old farming<br />

practices are the lack of suitable land for wet rice cultivation (WRC), lack of adequate water,<br />

ignorance and mostly lack of adequate resources. Even though shifting cultivation is<br />

destructive for environment, back-breaking and unremunerative for the cultivators, the vast<br />

majority of rural and semi-urban householders have to resort to this primitive method of<br />

cultivation for want of any alternative farming system or occupation. Rice is the staple food of<br />

the people and the paddy harvested from jhums as a whole, is still much more than that<br />

harvested from WRC. These cultivators are eagerly looking forward to the day when they will<br />

be emancipated from this jhum cultivation. The mountainous country with its steep slopes and


- 20 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

narrow valleys and a few level areas led to this tradition of method in cultivation. This<br />

practice, which leads to severe soil erosion (as well as environmental damage), eventually<br />

results in reduced yields, abandonment of the plots and moving on to other plots. The<br />

<strong>Mizoram</strong> Government is seized of the implications and disadvantages of the method and<br />

proposed to implement a programme that will lead to permanent cultivation of the land by a<br />

transition to terrace farming by construction of terraces on the moderate slopes.<br />

:<br />

The main aims and objectives of <strong>Mizoram</strong> Intodelhna Programme (MIP) are as follows<br />

1. To conserve, upgrade and utilise land, water, plants, animals and human resources in<br />

an integrated manner to meet the growing demands of cereals, pulses, oilseeds, and<br />

cash/commercial crops.<br />

2. To generate massive employment during project period and regular employment after<br />

project period for Small and Marginal Farmers.<br />

3. To improve environment, restore ecological balance and promote Agril. Production<br />

through Scientific On-farm Land Development and Terraces.<br />

4. To promote development of Water Resources for domestic use as well as Small Scale<br />

irrigation by constructing Rain Water Harvesting Dams.<br />

5. To promote cultivation of commercial crops like Oil Palm, Passion fruit, Jatropha and<br />

Patchouli etc. and create market linkages for the produce.<br />

6. To promote marketing support system, create networking of collection centres etc..<br />

Thus, the ultimate objectives of the project is to sustain its production and<br />

productivity in Agriculture and allied Sectors, improve the standard of living of poor farmers<br />

and endeavour for restoration of ecological balance.<br />

SCHEME NO.15<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : <strong>Mizoram</strong> Intodelhna Programme<br />

PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> : Rs. 5005.00 lakhs<br />

Proposed Outlay for <strong>2007</strong>-08 : Rs. 1123.00 lakhs<br />

<strong>Mizoram</strong> Intodelhna Programme is a special programme for enhancing the<br />

capabilities of local people to select appropriate livelihood opportunities, access required<br />

financial resources, manage new technologies and institutional at the village level. Moreover,<br />

this will open up scope for increasing income through sustainable income generating<br />

cultivations and on-farm enterprises at micro and small scale level.<br />

The major activity aims at accelerating agro-based growth through selection of<br />

thrust crops .Besides the objectives of plugging the loopholes and gaps of the normal annual<br />

plan as it would give a major boost to <strong>Mizoram</strong> economy particularly in the field of poverty<br />

alleviation of the rural poor. The requirement of fund for <strong>Mizoram</strong> Intodelhna Programme<br />

(MIP) <strong>2007</strong>-<strong>2012</strong> under different components would be as mentioned below :-


- 21 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

A. SCHEME PROPOSED UNDER MIZORAM INTODELHNA PROGRAMME<br />

Component-I<br />

State Matching Share for Oil Palm (ISOPOM)<br />

Oil Palm development scheme under ISOPOM is launched in <strong>Mizoram</strong> for self<br />

sufficiency in edible oil, to motivate farmers to switch over from jhum cultivation to<br />

permanent settlement and to create income generation opportunities for small and marginal<br />

farmers. State Matching Share for Oil Palm under Integrated Scheme of Oil Seeds, Pulses, Oil<br />

palm and Maize (ISOPOM) is a Centrally Sponsored Scheme on 75:25 sharing basis between<br />

Government of India and Government of <strong>Mizoram</strong>. The Scheme is expected to generate a<br />

self sustain economy with the help of Central Government and this scheme will be a<br />

development model for <strong>Mizoram</strong>.<br />

Component-II<br />

Management Component<br />

<strong>Mizoram</strong> Intodelhna Programme (MIP) envisages investment of fund in various sectors<br />

of the economy to fill in the shortcomings and gaps of the plan allocation for a major<br />

boast to the farming economy covering the whole state. Various developmental schemes are<br />

contained in the programme which require technocrats and staff for supervision and<br />

monitoring of works including office maintenance.<br />

Component-III<br />

Development of Oil Palm Cultivation:<br />

Oil Palm development scheme under ISOPOM is launched in <strong>Mizoram</strong> for self<br />

sufficiency in edible oil, to motivate farmers to switch over from jhum cultivation to<br />

permanent settlement and to create income generation opportunities for small and marginal<br />

farmers. Godrej Agrovet Ltd. and Food, Fats Fertilizers Ltd. agreed to buy the oil palm<br />

bunch from <strong>Mizoram</strong> at a reasonable price .The various provisions made under Oil Palm<br />

Development which is mainly to plug the gaps in resources are -1).Cost of Planting materials<br />

@ Rs 30/-per seedlings 2) Transportation charges of seedlings 3) Potential Connectivity for<br />

Oil Palm cultivation areas @ Rs 3.00 lakh per Km. 4) Creation of Irrigation- (a) Community<br />

Water Tank @ Rs 1.00 lakh (b) Water Harvesting Structure @ Rs 0.5 lakh (c) Drainage line<br />

treatment @ Rs 8350/-per 100 mt, 5) Construction of Table top/halfmoon terraces for<br />

plantation of oil palm @ Rs 0.3 lakh per ha. .<br />

Component-IV<br />

Development of Passion Fruit<br />

Passion Fruit, is a choice crop of the tropical and sub-tropical belts and yields a<br />

sprightly juice with a sweet fragrance rich in Vitamin A. As <strong>Mizoram</strong> has the ideal climatic<br />

condition it has performed exceptionally well in the higher elevation of the state, especially<br />

after the Technology Mission (TM) intervention. This is extremely conducive for increasing<br />

the area under Passion fruit which will not only uplift the economy of the poor farmers but<br />

will also help in adequate supply of raw materials to the Juice Extraction Plant at<br />

Chhingchhip. Besides the above, this crop is being given due importance in the year of<br />

Mautam (Bamboo flowering) as an alternate crop choice with the anticipation that the pergola<br />

technology of cultivation would be less susceptible to rodent damage.


- 22 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

Component-V<br />

Development of Turmeric<br />

Turmeric is an important crop with many uses in drug and cosmetic industries<br />

besides being used for culinary purposes. It is widely used as a medicinal plant for external<br />

application and taken internally as a curative and stimulant. So this crop having high<br />

marketability and demand with manifold uses is being taken up in a big way under MIP<br />

through the Horticulture Department. Akin to the objective of selecting Passion fruit, Turmeric<br />

too has been opted for as an alternate crop. Since it is a known fact that they are relatively less<br />

susceptible to damage by rodents – that are expected to attack other standing crops.<br />

Component-VI<br />

Development of Patchouli Cultivation :<br />

Patchouli is a herbaceous plant native to South East Asia. The leaves yield<br />

Patchouli Oil which is of great importance in the perfume industry. The MIP have initiated<br />

cultivation of Patchouli because of its market assurrance and high price and perhaps more<br />

importantly after a successful pilot demonstration of the crop during 2005-2006.<br />

Component-VII<br />

Development of Jatropha Cultivation :<br />

MIP in its best effort to diversify agriculture to bring socio-economic<br />

transformation especially in rural areas of the state is aware of the need to tow the line of<br />

growth with clean development mechanism. The importance is therefore given to the call of<br />

the National Bio fuel mission by Government of India. With the above in view and with the<br />

objective of securing the energy security environmental friendly and economic benefits of<br />

green fuel development, MIP has placed due thrust to the extensive propagation of Jatropha<br />

cultivation. Moreover, the program is expected to provide continuous direct and indirect<br />

employment opportunities to the rural poor. Vast area and lands besides the cultivable area<br />

would be utilised for Jatropha plantation due to its wide adaptability features which would<br />

help in utilizing the available vacant lands. Also Jatropha could replace existing nonrenumerative<br />

crops with its higher productivity.<br />

Component-VIII<br />

Development of Maize and Soyabean:<br />

Maize is an important cereal, over 85% of its production in India is consumed<br />

directly as food in various forms. Since maize is a short duration-crop, it conveniently fits into<br />

a wide range of crop rotations. Green maize plants acts as succulent fodder crop. It is also<br />

widely used in animal feed particularly as poultry feed.<br />

Soyabean treated as both oilseed and pulse crop is a crop with high percentage<br />

of protein content (40 %) and oil (20 %) content in the seed. Many different products can be<br />

made out of Soyabean, besides it being a widely acclaimed health food. Soyabean is also<br />

widely used in animal feed as it forms an important ingredient in production of animal feed.<br />

Thus Maize and Soyabean are two important crops which is required for preparation of animal<br />

feed in the state. As the production of Maize and Soyabean is not adequate in the state, the<br />

present production level is grossly insufficient to feed the two newly commissioned animal<br />

feed plant in the state viz. under PIGFED, ITI Veng, Aizawl with a production of 20-30 qtl.<br />

per day requiring 20 qtls of Maize/ day and 7 qtls of Soyabean/day and Animal Feed Plant<br />

(MODAFER) under Department of AH & Vety with a capacity of 50 ton/day and requiring 50<br />

qtls. maize/day and 10 qtls. soyabean/day. To meet the requirement of these two Animal feed


- 23 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

plants, MIP has embarked on a program to increase the area and production of these two crops<br />

in the state. This project therefore constitutes one of the core thrust area for MIP.<br />

Component-IX<br />

Sericulture Development<br />

Sericulture can be considered as one of the trades to effectively and<br />

systematically create sustainable permanent occupation to the rural poors, enhance selfemployment<br />

avenues at large to uplift the rural economy of the state. The Sericulture<br />

development program has particularly performed very satisfactorily in the State, and has<br />

provided for sustained source of income to many farmers who have opted for this trade. The<br />

Government has flagged this program as one of the effective option for poverty alleviation and<br />

thus find an important place in MIP programming.<br />

Component-X<br />

Marketing Development.<br />

Marketing of Agriculture produces is a priority component of MIP. A<br />

marketing Sub committee is in place to conduct search and research of marketing avenues to<br />

access remunerative markets. Moreover, MIP is also prepared in emergencies to intervene in<br />

market operation to ensure that farmers get remunerative prices for the produces. Thus while<br />

their will be requirement of funds for market feasibility study, networking of collection<br />

centres, post harvest management, there is also a need to provide for funds for direct<br />

intervention by way of creating a revolving funds. Which will utilized for immediate payment<br />

to the farmers for the produces like passion fruit etc. which will stand replenished after the<br />

sale/disposed to the end buyers. This market support arrangement will go a long way to help<br />

the farmers who are otherwise vulnerable to distress sale of their produces as has been<br />

experienced in the past.<br />

Component-XI<br />

Development of Sugarcane<br />

Sugarcane, the main source of sugar in the country is widely grown in the state<br />

of <strong>Mizoram</strong>. The department of Agriculture is taking up Organic Sugarcane development in a<br />

major way and MIP aims at filling up the gaps under NCA. The requirement of fund for<br />

sugarcane development is proposed at Rs.130.00 lakh for the year <strong>2007</strong>-2008 and Rs.390.00<br />

lakh for the 11 th Five Year Plan.<br />

Component -XII<br />

Development of Potato<br />

Potato, continues to have a special place and value as food, and forms an<br />

important part of the daily palate in almost all the houses in the country, North Eastern States<br />

is no exception. This crop is very well suited to the climatic conditions of the state. It is<br />

particularly, a prefered crop for multi-Cropping practice to which the farming communities<br />

have been encouraged to practice.


- 24 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (MIP)<br />

Component – XIII<br />

Hydrogers/hydrams<br />

<strong>Mizoram</strong> receives an abundant rainfall from the month of May – November<br />

while the months of January to April and December is dry and there is an acute shortage of<br />

water during these period. The state can boast of irrigation channels/rivulets with perenials<br />

source of water. The drops of water along these channels and the water from rivulets can be<br />

utilised as a good source of irrigation to the needy cultivators during the dry months.<br />

Component XIV<br />

Construction of Project Area Connectivity (Link Road)<br />

Department of Agriculture and Horticulture have launched various schemes for<br />

production programmes for oilseeds, fruits and vegetables, etc. To provide better mobility of<br />

inputs and farm produces it is very important to construct proper road connectivity<br />

infrastructure. MIP also has taken up additional programmes for large scale production of<br />

Agri-Horti produces which require 592.67 km of road connectivity with an estimated cost of<br />

Rs.348.00.<br />

Component XV<br />

Integrated Land Development<br />

Goverment of <strong>Mizoram</strong> launched scheme for increasing production of various crops<br />

through on-farm land development and terraces for the extension of area for cultivation of<br />

oilpalms, aromatic plants, fruits and vegetables. To increase their productivity, proper land<br />

development is highly essential.<br />

Increase in arable land results in increase in food grain production. Under On farm<br />

development for WRC are various components viz.Leveling, Bunding, Reshaping, Drainage<br />

etc. and construction of terraces at various places is proposed.<br />

……


- 25 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (RESEARCH & EDUCATION)<br />

INTRODUCTION<br />

AGRICULTURE (RESEARCH & EDN.)<br />

The Directorate of Agriculture (Research & Education) was bifurcated from Agriculture<br />

Department during 2002 with a responsibilities to transfer of improved Agriculture technology<br />

to the farmers by conducting adaptive research, demonstration and training in different subject<br />

of agricultural programme.<br />

The effort of the Department of Agriculture (R&E) is concentrated in looking after a<br />

basic agriculture and allied training center established under the name of Integrated Training<br />

Center under which inservice and preservice candidates were trained in a two year training<br />

course.<br />

Production of seeds and demonstration of new farming system were other areas of<br />

thrust taken up by the Department. But these activities were hampered by lack of Infrastructure<br />

particularly in the field of production of certified seeds. The activity is taken up in two<br />

departmental farms Situated at Chemphai and Rotlang. Good field demonstrations lead to<br />

higher adoption of demonstrated practices by the farmers as they develop confidence amongst<br />

them in the practices demonstrated. Field demonstrations provided and effective learning<br />

situation as farmers “ See the crop themselves “, interact with the scientists and extension<br />

workers in the fields “ and “ gets doubts clarified then and there itself. Therefore, Field<br />

Demonstrations are very important tools of educating the farmers in a drive for attaining self<br />

sufficiency in food production. During 11 th Five Year Plan it is proposed to introduce<br />

Demonstration under Agril Research and Education as a new scheme.<br />

Under the department there are two functioning KVKs under Kolasib and Lunglei<br />

Districts . During 2005-2006, ICAR sanctioned five new KVKs under Lawngtlai, Saiha,<br />

Serchhip, Champhai and Mamit Districts. The same will be maintained during <strong>2007</strong>-<strong>2012</strong>.<br />

At present the Department is giving stipend and book grant B.Sc Agri. Under different<br />

Agriculture Universities in the country. It is Proposed to continue the programme. Also,<br />

additional allocation of seats has been requested from different Agricultural Universities to<br />

accommodate the growing demand from candidates who have opted to study B.Sc. Agri.<br />

SCHEME NO. 1<br />

HEAD OF DEPARTMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION<br />

1. PROPOSED OUTLAY <strong>2007</strong>-<strong>2012</strong> : Rs. 56.00 Lakhs<br />

2. Proposed Outlay for <strong>2007</strong> – 08 : Rs. 10.00Lakhs<br />

The Directorate of Agriculture (Research & Education ) was bifurcated from<br />

Agriculture Department during 2002 for transfer of technology of improved Agriculture<br />

technology. It is proposed to maintain the Department during 11 th Five Year Plan.


- 26 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (RESEARCH & EDUCATION)<br />

SCHEME NO. 2.<br />

HEAD OF DEVELOPMENT :CROP HUSBANDRY<br />

NAME OF THE SCHEME :AGRIL FARM & QUALITY SEED PRODUCTION<br />

1. PROPOSED OUTLAY <strong>2007</strong>-<strong>2012</strong> : Rs. 102.00 Lakhs<br />

2. ANTICIPATED EXPENDITURE 2006-<strong>2007</strong> : Rs. 15.00 Lakhs<br />

3. Proposed Outlay <strong>2007</strong> – 08 : Rs. 15.00 lakhs<br />

The Directorate of Agriculture (Research & Education ) is looking after two<br />

Departmental farms at Chemphai and Rotlang. The farms are utilized for purposed of seed<br />

production and demonstration of new farming system. During the 11 th Five Year Plan it is<br />

proposed to further utilize the farms for production of certified seed. The infrastructure<br />

available with the Department of Agriculture (CH & MI) such as Seed Testing Laboratory and<br />

Seed Processing Units at chemphai will be utilised to the fullest extend for the certifying<br />

process. In addition to these, the farms will be utilised for On- Farm Demonstration of latest<br />

Agriculture technology and On Farm Testing of new variety of seeds to find their suitability for<br />

local adoption. The exercise will be conducted in departmental farm as well as farmers fields .<br />

The technical staff under KVKs will assist in the programme.<br />

SCHEME NO. 3<br />

HEAD OF DEPARTMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : INTEGRATED TRAINING CENTRE<br />

1. PROPOSED OUTLAY <strong>2007</strong>-<strong>2012</strong> : Rs.64.00 Lakhs<br />

2. ANTICIPATED EXPENDITURE 2006-<strong>2007</strong> : Rs. 9.00 Lakhs<br />

3. Proposed Outlay <strong>2007</strong> – 08 : Rs. 9.00 lakhs<br />

Integrated Training Center was established at Hnahthial in 1980 and since then more<br />

500 In-Service trainees comprising of Gram Sevaks. Demonstrators, VLWs etc from different<br />

Department such as Agriculture, Horticulture and Rural Development had been imparted<br />

training on basic Agriculture and allied subjects. In addition to the inservice trainees a good<br />

number of pre-service trainees a good number of pre-service trainees were also recruited in the<br />

Center.<br />

The training progrmme comprises of two main components i.e. theory and practical .<br />

The theory subjects includes agronomy, plant protection, extension education, soil science<br />

horticulture, animal husbandry etc and practical field training involving cultivation of kharif<br />

and rabi crop cultivation were conducted in the demonstration areas with the trainees being<br />

allotted their own practical plots. Pre-service trainees will be provided as stipend of<br />

Rs.1000.00 per month and a book grant of Rs.1000.00 per year. It is envisaged to recruit a<br />

batch of 25 pre-service trainees per year during 11 th Five Year Plan.<br />

SCHEME NO.4<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION & FARMERS TRAINING<br />

1. PROPOSED OUTLAY <strong>2007</strong>-<strong>2012</strong> : Rs.100.00Lakhs<br />

2. ANTICIPATED EXPENDITURE 2006-<strong>2007</strong> : Rs. 20.00Lakhs<br />

3. Proposed Outlay <strong>2007</strong> – 08 : Rs. 20.00 lakhs


- 27 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (RESEARCH & EDUCATION)<br />

<strong>Mizoram</strong> is having two functional KVKs at Kolasib and Hnahthial, during 2004-2005<br />

five additional KVKs were sanctioned by ICAR, Government of India Mamit, Khawzawl,<br />

Saiha, Lawngtlai and Mamit. In the MoU signed between the Govt. of India and the Govt.of<br />

<strong>Mizoram</strong>, the State Govt. has to provide basic infrastructure like land, road connection to KVK<br />

Complex, internal roads, electricity, drainage etc. In this connection, the old KVKs requires<br />

fund for maintenance of existing roads, electricity etc and the newly sanctioned KVKs requires<br />

further improvements in the construction of the roads, setting up of transformers for electricity<br />

,construction of the roads, setting up of transformers for electricity, construction of drainage<br />

lines, water connection etc. To provide these basic infrastructures and future maintenance fund<br />

may be provided for the KVKs as State share.<br />

SCHEME NO.5<br />

HEAD DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DEMONSTRATION<br />

1. PROPOSED OUTLAY FOR 11 th <strong>PLAN</strong> : Rs. 26.00 lakhs<br />

2. PROPOSED OUTLAY FOR <strong>2007</strong>-2008 : Rs. 1.00 lakhs<br />

Demonstration in farmers’ field is a long term educational activity conducted in a<br />

systematic manner on farmers fields to show worth of a new practice/technology “ Seeing is<br />

believing “ is the basic philosophy of field demonstrations. Only proven technologies are<br />

therefore, selected for filed demonstration. Field Demonstrations educate farmers through<br />

results obtained in terms of varieties resistance to diseases and pest, quality of the grains, and<br />

overall higher yields. In addition it also educates the farmers in terms of inputs-output ratio and<br />

economic gains in terms of net returns. Basically, there are two types of field demonstration:<br />

i) Single practice demonstration : A single Practice Demonstration aims at<br />

providing the worth of a single practice such as effects of balance fertilizers in rice crop, higher<br />

yields from the newly released varieties of hybrid maize, effect of irrigation at crown root<br />

initiation stage of wheat , effect of new pesticide on fruit borer in gram etc.<br />

ii) Composite demonstration : A Composite Demonstration is a combination of<br />

field based result demonstrations and achain of skill oriented method demonstrations. A long<br />

sequential method demonstrations (Composite Demonstration) aim at demonstrating the<br />

superiority of package of practices in growing a field crops. Here the effect of one practice<br />

harnessing the effect of other practices is also demonstrated and studied. For example,<br />

combined effect of irrigation and fertilizer application on grain yield and quality of a newly<br />

released mustard variety may be demonstrated as a composite demonstration.<br />

AGRICULTURE RESEARCH & EDUCATION<br />

The Scheme has been implemented by the Department for quite a long time and the<br />

impact of the Scheme has been very encouraging . This scheme is being implemented under<br />

the following sub-head.<br />

Adaptive Research : One of the goal in Agriculture is higher and sustainable<br />

production through diversified farming. In order to achieve this, a multi-disciplinary approach<br />

to the application of technology in the development of agriculture is necessary. Therefore,<br />

ICAR has been entrusted to conduct fundamental and applied research in the field of


- 28 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AGRICULTURE DEPARTMENT (RESEARCH & EDUCATION)<br />

agriculture and allied sector . Adaptive research is done by the state department of agriculture<br />

which have adequate resources and wide jurisdiction through out the Agro-climatic region of<br />

the State. Since, the main objective of the state Government of <strong>Mizoram</strong> is to reach selfsufficiency<br />

in food, it is necessary to conduct different adaptive research and demonstration<br />

through KVK for farmers education and also for transfer of technology to the farmers.<br />

Agriculture Education : Education under agriculture broadly all the farmers,<br />

education in the subject from the school to university level and also informal and non-formal<br />

education for those who are involved in agriculture in various ways. So far, only one centre has<br />

been established to give training to in–service and pre-service candidate in respect of<br />

agriculture and allied subjects. There is a need to strengthen the Institution to provide training<br />

in agriculture not only to in-service and pre-service candidate but also to school drop-outs. This<br />

will help in crop production programme as the trained personal will do for agriculture<br />

production programme. It is further proposed to continue farmers training and other<br />

programme through KVKs during 11 th plan period.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> : Rs. 54.00 lakhs<br />

PROPOSED OUTLAY FOR A.P. <strong>2007</strong>-08 : Rs. 9.00 lakhs<br />

…..


Introduction<br />

- 29 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

HORTICULTURE<br />

During 11 th Plan the Department of Horticulture propose to continue all the schemes<br />

taken up during 10 th Plan. Some additional sub-schemes which are considered very important<br />

are incorporated in the 11 th Plan. The total proposed outlay for the 11 th Plan is Rs. 4,510.00<br />

Lakhs and the proposed Annual Plan for <strong>2007</strong>-2008 is Rs. 753.00 Lakhs under Crop<br />

Husbandry and in addition Rs. 4.00 lakh is proposed under Agriculture/Horticulture Research<br />

& Education.<br />

The Annual Plan <strong>2007</strong>-2008 gives priority to Area Expansion of Fruit Crops, Vegetable<br />

Crops, Spices Crops, Floriculture & Landscaping, Plant Protection and Rain Water Harvesting.<br />

Emphasis will also be given on construction of Potential Area Connectivity, Organic<br />

Farming, cultivation of Mushroom, Training of Farmers and Demonstration with Adoption<br />

Trail.<br />

Construction of Departmental Quarter and maintenance of existing buildings will also<br />

be taken up. All the existing posts of different categories will also be maintained during the<br />

year.<br />

It is proposed to give opportunity to young and promising students to go for B.Sc.<br />

(Horti.) studies at different institutions.<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION.<br />

Scheme No.-I<br />

The Department of Horticulture is now functioning with 1 (one) Directorate, 8 (eight)<br />

Divisions, 3 (three) Sub-Divisions and 37 (thirty seven) Circles. All existing posts will be<br />

maintained during the year 207-2008.<br />

Construction of ADHO Quarter, Kolasib, ADHO Quarter, Serchhip and Farm Manager Quarter<br />

at Thingdawl will be taken up and maintenance of existing building will continue during <strong>2007</strong>-<br />

08<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 1866.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> = Rs. 325.00 lakh<br />

<strong>PLAN</strong> <strong>2007</strong>-2008


- 30 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

A. DIRECTION<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Salary/T.E. of<br />

Officers and Staff<br />

2 Wages<br />

3 Maintenance of<br />

existing building<br />

4 Maintenance of<br />

Vehicles<br />

i) Heavy<br />

ii) Light<br />

5 Office Expenditure<br />

No.<br />

30<br />

366.00<br />

30<br />

67.00<br />

No. 20 40.00 20 6.00<br />

No. 1 13.00 1 2.00<br />

No. 1 16.00 1 2.00<br />

No. 3 27.00 3 4.00<br />

No. 30 36.0 30 6.00<br />

Total: 498.00 87.00


- 31 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

B. ADMINISTRATION<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

B.<br />

1<br />

Salary/T.E. of<br />

Officers and Staff<br />

2 Wages<br />

3 Construction of<br />

ADHO Quarter at<br />

Kolasib<br />

4 Construction of<br />

ADHO Quarter at<br />

Serchhip<br />

5 Construction of<br />

Farm manager<br />

Quarter at<br />

Thingdawl<br />

6 Maintenance of<br />

existing building<br />

7 Cost of POL etc.<br />

8 Office Stationary<br />

etc.<br />

ADMINISTRATION<br />

No. 84 1026.00 84 186.00<br />

No. 57 67.00 57 12.00<br />

No. 5.00<br />

No. 20 110.00 5.00<br />

No. 5.00<br />

No. 40 50.00 10 10.00<br />

Lit. 1,25,000 50.00 25,000 10.00<br />

No. 84 78.00 84 14.00<br />

Total 1381.00 247.00<br />

Total of A & B 1866.00 325.00


- 32 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-II<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE FARM AND SEED<br />

PRODUCTION<br />

The Departmental Farms at Tuitlawk, Rihte, Champhai, Khanpui, Vairengte, Thingdawl and<br />

Zawlnuam will be maintained. Quality planting materials will be produced in these farms and<br />

distribute to the growers. Nurseries as per <strong>Mizoram</strong> Nursery Registration Act will be<br />

established under Private and Public Sector during the year for production of quality seeds,<br />

seedlings and other planting materials<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 315.00<br />

lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 19.00<br />

lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target for<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay<br />

for <strong>2007</strong>-<br />

2008<br />

1 2 3 4 5 6 7<br />

1 Field contingencies for<br />

raising of seedlings etc<br />

and maintenance of<br />

existing farms<br />

No. 7 273.00 7 10.00<br />

2 Maintenance of<br />

godown/quarter in<br />

farm.<br />

3 Maintenance of farm<br />

fencing, inter<br />

roads/approach roads<br />

etc.<br />

No. 7 15.00 7 3.00<br />

No. 7 7.00 6.00<br />

4 Establishment of<br />

nursery for production<br />

of quality planting<br />

materials<br />

a) Private Sector No. 1 10.00<br />

b) Public Sector No. 2 10.00<br />

Total 315.00 19.00


- 33 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-III<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : MANURES AND FERTILIZERS<br />

Organic manures, bio fertilizers and soil amendment materials will be made available to the<br />

farmers at subsidized rates. Besides these micro-nutrients and plant hormones will also be<br />

given to the farmers at subsidy. Transportation of these materials to different Divisional<br />

Officers will be arranged by the Department.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 50.00<br />

lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 10.00<br />

lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Purchase of<br />

fertilizer, organic<br />

manures & biofertilizer<br />

& soil<br />

amendment like<br />

slaked lime etc for<br />

distribution at 50%<br />

subsidy<br />

2 Micro-nutrients,<br />

plant hormones etc<br />

for sale at 50%<br />

subsidy.<br />

3 Transportation &<br />

handling charges<br />

Ton 200 40.00 40 8.00<br />

Ton 5 5.00 1.00 1.00<br />

Ton 200 5.00 4 1.00<br />

Total 50.00 10.00


- 34 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-IV<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : <strong>PLAN</strong>T PROTECTION<br />

Pests and diseases of crops may occur at any time and when it becomes economic threshold<br />

tackling the problem is quit difficult. To combat the menace of pests and diseases on<br />

Horticulture crops, Plant Protection chemicals and equipments will be distributed to the<br />

farmers at subsidized rate. The Plant Health Clinic of the Department will be maintained for<br />

detection of diseases and pests which will help in correct recommendation of remedial<br />

measures.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 75.00<br />

lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 15.00<br />

lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Purchase of PP<br />

chemicals including<br />

organic bio<br />

pesticides etc for<br />

distribution at 50%<br />

subsidy.<br />

2 Cost of PP<br />

equipment for<br />

distribution at 50%<br />

subsidy.<br />

3 Maintenance of<br />

Plant Health Clinic<br />

4 Transportation and<br />

handling charges<br />

Qtls/Lit<br />

No<br />

1500 30.00 300 6.00<br />

Nos. 1750 35.00 350 7.00<br />

No 1 5.00 1 1.00<br />

Qtl/No 3250 5.00 650 1.00<br />

Total 75.00 15.00


- 35 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-V<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : EXTENSION AND FARMERS TRAINING<br />

Extension provides to the farmers by way of organizing seminars, exhibitions, training and<br />

publication of magazines. Farmer will be given opportunity to acquaint themselves with the<br />

latest technology on various horticulture activities.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 =Rs. 96.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 19.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Exhibition/Seminar<br />

a) State Level<br />

b) District Level<br />

2 Farmers Training<br />

3 Publication of<br />

a) Magazines<br />

b) Booklet, leaflets<br />

etc<br />

4 Purchase/subscripti<br />

on of book, journal,<br />

dailies etc<br />

5 Office expenses<br />

including<br />

advertisement<br />

No. 5 25.00 1 5.00<br />

No. 15 15.00 3 3.00<br />

No. 10 5.00 5 1.00<br />

No. 125000 21.00 23800 4.00<br />

No. 150000 15.00 30000 3.00<br />

No. 5000 5.00 900 1.00<br />

No. LS 10.00 LS 2.00<br />

Total 96.00 19.00


- 36 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VI<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : HORTICULTURE ENGINEERING<br />

Modern improved tools and implements which are giving efficiency in farm operations will be<br />

made available for the farmers at subsidized rates. Thus will help them minimize working time<br />

and improve even quality of produce.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 30.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 6.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Purchase of<br />

Horticulture tools &<br />

implements for<br />

distribution at 50%<br />

subsidy<br />

2 Miscellaneous<br />

expenses and<br />

transportation<br />

charges<br />

No 5000 25.00 1000 5.00<br />

No 500 5.00 1000 1.00<br />

Total 30.00 6.00


- 37 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

A. Fruit Development<br />

The Department of Horticulture will give emphasis on area expansion of fruit crops like<br />

Passionfruit, Banana, Mandarin Orange, Grape and Papaya.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 =Rs. 392.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 100.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Area Expansion Scheme on fruit crops<br />

1) Passion Fruit<br />

2) Banana<br />

3) Orange<br />

4) Grape<br />

Ha. 243 200.00 80 50.00<br />

Ha. 400 40.00 100 10.00<br />

Ha. 157 65.00 50 15.00<br />

Ha. 30 25.00 10 5.00<br />

5) Papaya<br />

Ha. 450 25.00 100 5.00<br />

6) Other Fruit crops Ha. 20.00 100 10.00<br />

2 Transportation<br />

charges etc<br />

No. LS 17.00 LS 5.00<br />

Total 392.00 100.00


- 38 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VIII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

B. Vegetable Development<br />

In order to minimize import of vegetables from outside the State, to increase productivity it is<br />

propose to conduct cultivation of quality vegetable seeds under protected structure like Green<br />

House and provision for purchase of vegetable seeds, planting materials of roots and tuber<br />

crops that are not easily affordable to the farmer for area expansion will be continued during<br />

2006-<strong>2007</strong>,<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 =Rs. 440.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 71.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Protected cultivation<br />

a) Tomato<br />

b) Coloured capsicum<br />

2 a) Area Expansion<br />

Scheme on vegetable<br />

crops<br />

b) Purchase of<br />

vegetable seeds for<br />

distribution at 50%<br />

subsidy<br />

3 Procurement of<br />

Planting Materials of<br />

root & tubers crops<br />

for distribution at<br />

50% subsidy.<br />

4 Transportation<br />

charges etc<br />

No 20 100.00 4 20.00<br />

No 20 100.00 4 20.00<br />

Acre 500 50.00 - -<br />

Qtls 100 50.00 20 6.00<br />

Ton 50 100.00 10 20.00<br />

Ton LS 40.00 LS 5.00<br />

Total: 440.00 71.00


- 39 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

C. Spices Development<br />

To improve the economy of the rural poor it is propose to increase area under spices by<br />

cultivation of Turmeric and Bird Eye Chillies.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 205.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 46.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Area Expansion<br />

Scheme on spices<br />

crops<br />

a) Turmeric<br />

b) Bird eye chillies<br />

2 Transportation and<br />

handling charges<br />

Acre 2100 130.00 800 40.00<br />

Acre 200 50.00 80 4.00<br />

Qtls LS 25.00 LS 2.00<br />

Total 205.00 46.00


- 40 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

D. Floriculture and Landscaping<br />

Floriculture in <strong>Mizoram</strong> has been flourishing and many growers earn their livelihood by<br />

cultivation of flowers as a result of the Department undertaking. The Department will take up<br />

area expansion on Rose, Anthurium and Leather Leaf Fern to increase the farmer’s income.<br />

Provision for distribution of seeds, bulbs, pots and planting materials at 50% subsidy and<br />

beautification of VIP Complexes, Parks and Tourist complexes will be continued.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 315.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 39.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target for<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1 Area Expansion Scheme on Floriculture<br />

a) Leather Leaf Fern Acre 40 40.00 10 10.00<br />

2 Maintenance of flower garden at<br />

a) District park,<br />

Lunglei<br />

No 1<br />

b) Aitiangtlang,<br />

Tuidam<br />

No 0.5<br />

c) Hringlangtlang,<br />

Champhai<br />

d) Horticulture<br />

No<br />

4 30.00 4<br />

0.5<br />

Flower Garden at No.<br />

1<br />

Reiek<br />

3 Maintenance of VIP<br />

complex including<br />

Directorate roof top<br />

4 Purchase of flower<br />

seeds/bulbs, pot etc<br />

at 50% subsidy<br />

No 4 105.00 4 12.00<br />

Pkt/No LS 120.00 LS 12.00<br />

5 Transportation<br />

charges etc<br />

Qtls LS 20.00 LS 2.00<br />

Total 315.00 39.00


- 41 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

D. Mushroom Development<br />

Due to availability of spawn production Laboratory at private sector in <strong>Mizoram</strong>, the<br />

Department will continue to maintain Mushroom Laboratory at Chite, Champhai, Lunglei,<br />

Tuidam, Thingdawl. Provision is made to conduct training on cultivation of mushroom for the<br />

farmers and area expansion on mushroom cultivation during <strong>2007</strong>-2008.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 =Rs. 134.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 17.00<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay<br />

for <strong>2007</strong>-<br />

2008<br />

1 2 3 4 5 6 7<br />

1<br />

Area Expansion<br />

Scheme on<br />

Mushroom<br />

2 Maintenance of<br />

Mushroom Lab &<br />

Mushroom<br />

demonstration<br />

centre including<br />

supply of different<br />

materials for<br />

production of spawn<br />

3 Training expenses<br />

No. 350 40.00 50 5.00<br />

No. 5 80.00 5 10.00<br />

No. 500 14.00 100 1.50<br />

4 Office Expenses LS LS 0.50<br />

Total 134.00 17.00


- 42 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

E. Plantation Development<br />

To maximizes land use and to improve the economy of the rural poor it is propose to take up<br />

area expansion on plantation crops like Arecanut and Coconut during <strong>2007</strong>-2008.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 123.50 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 24.50 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Area Expansion<br />

Scheme on<br />

Plantation crops like<br />

Arecanut, coconut<br />

etc<br />

2 Transportation and<br />

handling charges etc<br />

Ha 1000 107.50 300 22.50<br />

No LS 16.00 LS 2.00<br />

Total 123.50 24.50


- 43 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

F. Construction of Potential Area Connectivity<br />

Creation of Potential Area Connectivity for Tractor plyable road to facilitate conveyance of<br />

farm inputs and outputs from the gardens to the villages or main road will still be given high<br />

priority during the year. Moreover, provision for maintenance of existing ones is also made.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 255.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 35.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for <strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Survey, formation,<br />

cutting and<br />

supervision etc of<br />

Potential Area<br />

connectivity road.<br />

2 Maintenance of<br />

Potential Area<br />

Connectivity road.<br />

KM 64 190.00 10 30.00<br />

KM LS 65.00 LS 5.00<br />

Total 255.00 35.00


- 44 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

G. Post Harvest Management<br />

In order to sale farm produces to the market and to earn economic returns, provision is made to<br />

procure packing materials, post harvest machineries and preservatives and to construct grading<br />

house/unit etc. Training and demonstration on post harvest management is to be conducted to<br />

familiarize farmers to latest technology.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 74.50 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 8.50 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target for<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay<br />

for <strong>2007</strong>-<br />

2008<br />

1 2 3 4 5 6 7<br />

1<br />

Supply of packing<br />

materials/plastic<br />

crates etc<br />

2 Supply of post<br />

harvest machineries<br />

and preservatives<br />

etc<br />

3 Training and<br />

demonstration of<br />

Post Harvest<br />

Technology<br />

4 Construction of post<br />

harvest<br />

infrastructure like<br />

grading unit etc<br />

No 2000 10.00 200 1.00<br />

No 50 2.50 10 0.50<br />

No 200 10.00 20 1.00<br />

No 35 52.00 4 6.00<br />

Total 74.50 8.50


- 45 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

H. Bee Keeping<br />

Gardeners will be encouraged to take up Bee Keeping by giving Bee Colonies and accessories,<br />

in order to increase the productivity of crops through cross-pollination and to earn additional<br />

income from honey production.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 13.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 1.50 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target for<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Purchase of bee<br />

hives box, bee<br />

colony with hives<br />

etc<br />

2 Purchase of<br />

accessories for bee<br />

keeping<br />

No. 250 8.00 50 1.00<br />

No. LS 5.00 LS 0.50<br />

Total 13.00 1.50


- 46 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

I. Rain Water Harvesting<br />

Rain water harvesting structure needs to be emphasized at individual farmer’s field so as to<br />

increase the productivity and production of crops through irrigation during dry spell period.<br />

Therefore, the Department proposes to make provision for this programme.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 85.00 lakhs<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 10.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target for<br />

<strong>2007</strong>-2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay<br />

for <strong>2007</strong>-<br />

2008<br />

1 2 3 4 5 6 7<br />

1<br />

Construction of rain<br />

water harvesting<br />

structures at<br />

individual farmer<br />

field<br />

No 200 85.00 20 10.00<br />

Total 85.00 10.00


- 47 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME : VEGETABLE FRUIT DEVELOPMENT<br />

J. Aromatic and Medicinal Plants<br />

The Department made provision for Area Expansion of Aromatic plants during <strong>2007</strong>-08 like<br />

Patchouli and Citronella etc<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 21.00 lakh<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 2.30 lakh<br />

APPROVAL OUTLAY DURING 2006-<strong>2007</strong> =<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay<br />

for <strong>2007</strong>-<br />

2008<br />

1 2 3 4 5 6 7<br />

1<br />

Area Expansion<br />

Scheme on<br />

Aromatic plant<br />

2 Transportation<br />

charges<br />

Ha 60 15.00 10 2.00<br />

Qtl LS 6.00 LS 0.30<br />

Total 21.00 2.30


- 48 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HORTICULTURE DEPARTMENT<br />

Scheme No.-VIII<br />

HEAD OF DEVELOPMENT : CROP HUSBANDRY<br />

NAME OF THE SCHEME<br />

EDUCATION<br />

: HORTICULTURE RESEARCH AND<br />

Provision is made to meet expenses for stipend and book grants, research of students studying<br />

B.Sc, (Horti), Msc. (Horti) etc. sponsored by Government of <strong>Mizoram</strong>.<br />

PROPOSED OUTLAY FOR 11 TH <strong>PLAN</strong> <strong>2007</strong>-20012 = Rs. 20.00 lakh<br />

PROPOSED FINANCIAL OUTLAY FOR <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 = Rs. 4.00 lakh<br />

Sl.<br />

No.<br />

Item Unit<br />

Physical<br />

Target for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Financial<br />

Outlay for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Physical<br />

Target<br />

for<br />

<strong>2007</strong>-<br />

2008<br />

(Rs. in lakh)<br />

Financial<br />

outlay for<br />

<strong>2007</strong>-2008<br />

1 2 3 4 5 6 7<br />

1<br />

Stipend, book grants<br />

etc including<br />

research<br />

No. 15 20.00 15 4.00<br />

Total 20.00 4.00<br />

…..


- 49 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

SOIL & WATER CONSERVATION<br />

1.0 Background introduction to 11 th Five Year Plan (<strong>2007</strong>-<strong>2012</strong>) and Annual Plan<br />

(<strong>2007</strong>-2008) :<br />

Land Resource Conservation and Development are crucial for sustained<br />

agricultural Production, water resources enhancement, flood and soil erosion<br />

management and harnessing hydropower potential at the basin. Land and water constitute<br />

the important resource base to meet the essential requirements of society such as food,<br />

fodder, fibre, fuel, timber etc. Land degradation poses a severe challenge to life of<br />

reservoirs, perennial streams and agricultural productivity in the State. Reservoirs of<br />

hydropower, drinking water supply and irrigation potentials are threatened by heavy<br />

siltation due to uncontrolled land degradation and improper land use. Heavy run off with<br />

high siltation annually results in uncontrollable flood in the neighbouring Assam Plains.<br />

The 11 th Plan will focus main thrust on conservation of rainwater through<br />

catchment Area and drainage lines treatments in the micro-watersheds to mitigate flood<br />

and siltation, enhance ground water storage and recharge by a series of check dams. The<br />

thrust will also be on promoting in-situ moisture conservation by eco-friendly agricultural<br />

production systems like terracing, water harvesting structures and appropriate<br />

vegetation/cash crops of economic value. Peoples involvement in the planning, execution<br />

and employment generation will be given importance in the 11 th Plan. Erosion Control in<br />

current Jhum lands will also be a priority scheme in the 11 th Plan.<br />

The 11 th Plan endeavours to achieve the twin objectives of sustainable production<br />

of biomass and restoration of ecological balance in the State. It focuses on :-<br />

(a) Conservation, upgradation and utilization of land, Water, Plant, Animal and<br />

human resources in a harmonious and integrated manner.<br />

(b) Prevention of land degradation by adoption of a multi-disciplinary<br />

integrated approach involving Agronomy, Forestry and Engineering<br />

disciplines in the treated areas.<br />

(c) Improvement of production environments and restoration of ecological<br />

balance through scientific management of land and water.<br />

(d) Employment generation during the project and regular employment after the<br />

project/scheme completion to rural people.<br />

Thus, the ultimate objective of this Plan is to develop the natural resourcebase,<br />

sustain its productivity, improve the standard of living of rural<br />

farmers, and endeavour for restoration of ecological balance.


- 50 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

The Draft Plan outlay on 11 th Five Year Plan is Rs. 2078.00 lakhs and<br />

Annual Plan for <strong>2007</strong>-08 is Rs. 440.00 lakhs.<br />

Scheme wise Description :-<br />

1. Direction & Administration : Under this, all contingent expenditures including<br />

salary under plan posts are met as a normal scheme. Monitoring & Evaluation, Planning<br />

Cell, Information and Publicity, Engineering Cell and Research, Education & Training<br />

Institute (RETI) will be under this scheme in 11 th Plan. Rs,697.00 lakhs and Rs112.80<br />

lakhs are proposed for 11 th Plan and Annual Plan <strong>2007</strong>-2008<br />

2. Hillside Terracing :- Intensive Terracing for Hill Side cultivation/plantation is<br />

the most effective way of retaining soil particles and debris, checking and detaining<br />

surface run-off, and enhancing deep percolation for ground water storage and minimize<br />

discharge to down streams/rivers. This programme is unavoidable wherever Agri. based<br />

activities are intensified. It is also a programme for flood moderation, increasing ground<br />

water resources and water pollution control. This is the continuing scheme from 10 th Plan<br />

of Run-off Retarding Scheme. Rs. 320.00 lakhs and Rs. 56.00 lakhs for 2720 Ha and<br />

476 Ha respectively for 11 th Plan and Annual Plan <strong>2007</strong>-08 are proposed.<br />

3. Mechanical Conservation by Engineering works : Flooding and erosion are<br />

gaining alarming importance in the low lying areas. The source of this hazardous event is<br />

in the hilly places. Considering the ever increasing flood and silt deposits with<br />

complicated problems, drastic conservation measures on agriculturally potential lands<br />

alone are far from satisfactory but intensive treatments by series of silt detention<br />

structures along the rivers ,streams and their tributaries in the hills are top priority to<br />

moderate flood, prevent river bank scouring, detain run-off water and enhance ground<br />

water storage for use in the lean season. The catchment are treatment will be<br />

complimented with live vegetative conservation plantation. This is the scheme of 10 th<br />

Plan to be continued in 11 th Plan on a wider scale. Rs. 110.00 lakhs and Rs. 20.00 lakhs<br />

are proposed for 1100 Nos. and 200 Nos. of structures respectively for 11 th plan and<br />

Annual Plan <strong>2007</strong>-2008.<br />

4. Erosion Control in Jhumland : This is the new scheme for 11 th Plan. Shifting<br />

cultivation is still in practice today. Until and unless viable alternative, easily adoptable<br />

and conveniently suitable culturally to the rural people are found, this practice is likely to<br />

continue for years ahead. As per a reliable estimate, around 30,000 – 40,000 ha. is put<br />

under shifting cultivation every year till today. Soil erosion under shifting cultivation can<br />

be well over 50 tonnes/ha/year. This is much much higher than normally permissible<br />

limit of around 4 tons/ha/year. Considering such enormous loss of soil and plant nutrients<br />

every year, it is just not possible to sit idle and watch the situation from a distance.<br />

Therefore, the Department proposes a comprehensive Scheme for Controlling soil<br />

erosion in jhum lands by logwood bunding and life hedges wherever convenient soon<br />

after jhum burning to minimize heavy Soil loss and enhance production from jhuming.<br />

Rs. 201.00 lakhs and Rs. 55.00 lakhs are proposed for 6700 Ha and 1833 ha respectively<br />

in 11 th Plan & Annual Plan <strong>2007</strong>-2008.


- 51 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOIL & WATER CONSERVATION DEPARTMENT<br />

5. Watershed Survey & Management : Project preparation, engagement of<br />

Consultancy firm for survey, investigation, pre-preparation of projects and State<br />

matching share of CSS are placed under this head of Expenditure. Rs. 40.00 lakhs and<br />

Rs, 15.00 lakhs are proposed for 11 th Plan and Annual Plan <strong>2007</strong>-2008 respectively.<br />

6. Water Resources Conservation & Development : In the midst of abundant<br />

water resources during monsoon season and extreme scarcity of the same in the lean<br />

season even for drinking purposes, water is the biggest constraint in bio-mass production<br />

in the State. This clearly indicates gross neglect in scientific management of water<br />

resources for food production and public health sector. The gap between this extremities<br />

can be effectively bridged by both intensive and extensive programme of rain water<br />

harvesting structures for crop production, animal and human betterment with micro<br />

irrigation on individual basis. Due to peculiar nature of the terrain, water development on<br />

community basis are not feasible in most of the cases, hence, individual basis is<br />

necessary. This is also a continuing scheme from 10 th Plan and a comprehensive scheme<br />

is needed in the 11 th Plan. Rs. 230.00 lakhs and Rs. 68.00 lakhs are proposed for 1150<br />

Nos and 340 Nos Water Harvesting Tanks/Ponds respectively for 11 th Plan and Annual<br />

Plan <strong>2007</strong>-2008.<br />

7. Conservation Plantation : Good bio-mass ground cover maintains ecological<br />

balance, promotes infiltration and percolation of surface run-off, enhances ground water<br />

storage and minimizes soil loss. It is eco friendly measure of conservation and can be<br />

effectively carried out in combination with mechanical conservation measures for village<br />

water sources, river and stream catchment feeding Agri. lands and hydro power stations.<br />

Cash crops can be conveniently used as vegetative cover under this scheme for economic<br />

gain. Cash Crops under rural area development, tree plantation and nursery schemes in<br />

10 th Plan will be combined and continued as CONSERVATION <strong>PLAN</strong>TATION in the<br />

11 th Plan. Rs, 290.00 lakhs and Rs, 80.00 lakhs are proposed for 11 th Plan and Annual<br />

Plan <strong>2007</strong>-08 respectively.<br />

8. Other Expenditures : Expenditure on construction and maintenance of<br />

Buildings, Approach Road, Inputs and Risk Management are placed under this head of<br />

expenditure. Rs. 190.00 lakhs and Rs33.20 lakhs are proposed for 11 th Plan and Annual<br />

Plan <strong>2007</strong>-2008 respectively.<br />

9. Central Sponsored Scheme/Other Source of Funding : More number of<br />

Central Sponsored Schemes and other sources of funding will be explored during the 11 th<br />

Plan. The following schemes are proposed to be implemented as :<br />

Singla, Tlawng & Langkaih RVP/FPR. This has been implemented since<br />

10 th Five Year Plan and will be a continuing scheme in the 11 th Plan. During 10 th Plan,<br />

Rs. 991.22 lakhs had been approved and the anticipated expenditure during 10 th Plan is<br />

Rs. 831.07 lakhs. Rs. 985.81 lakhs and Rs. 495.59 lakhs are proposed for 11 th Plan and<br />

Annual Plan <strong>2007</strong>-2008 respectively.<br />

Proposals are also made for Rubber, Coffee and Terracing with Potato<br />

cultivation (NEC); WDPSCA (CSS), organic farming and vermi composing (CSS),<br />

Establishment of Division Complex, Mamit (NLCPR), etc.<br />

…….


- 52 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

ANIMAL HUSBANDRY & VETERINARY<br />

INTRODUCTION : The Department of Animal Husbandry & Veterinary, Government<br />

of <strong>Mizoram</strong> is currently operating two major heads namely 2403 – Animal Husbandry and<br />

2404 – Dairy Development. A total of Rs. 3887.00 lakhs only is proposed under 2403 –<br />

Animal Husbandry for the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> while the proposal for<br />

2404-Dairy Development is Rs.264.00 lakhs only.<br />

The total proposed outlay for the Annual Plan <strong>2007</strong>-2008 under Animal Husbandry<br />

is Rs.855.00 lakhs only and under Dairy Development is Rs.43.00 lakhs only.<br />

Thus total proposed outlay for annual plan is Rs. 898.00 lakhs.<br />

The followings are the outlay under Animal Husbandry & Veterinary Department :-<br />

(Rs in lakh)<br />

Sl.<br />

No.<br />

A-2403-ANIMAL HUSBANDRY<br />

Eleventh Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Annual Plan<br />

<strong>2007</strong>-2008<br />

1. Direction and Administration 472.00 119.00<br />

2. Vety. Services & Animal Health 780.00 113.00<br />

3. Cattle Development 330.00 83.00<br />

4. Poultry Development 372.50 71.50<br />

5. Piggery Development 417.50 80.50<br />

6. Other Livestock Development 120.00 41.00<br />

7. Feed & Fodder Development 640.00 145.00<br />

8. Vety. Education, Research and Training 280.00 73.00<br />

9. Information & Statistics 130.00 43.00<br />

10. Other Expenditure 130.00 43.00<br />

11. Centrally Sponsored Scheme<br />

Matching Share<br />

215.00 43.00<br />

TOTAL OF 2403 – ANIMAL<br />

HUSBANDRY<br />

B. 2404 – DAIRY DEVELOPMENT<br />

3887.00 855.00<br />

1. Dairy Development 264.00 43.00<br />

TOTAL OF 2404-DAIRY<br />

DEVELOPMENT<br />

264.00 43.00<br />

TOTAL OUTLAY (A+B) 4151.00 898.00<br />

1. DIRECTION & ADMINISTRATION : A total outlay of Rs.472.00 lakhs is<br />

proposed during the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and Rs.119.00 lakhs only for<br />

the Annual Plan of <strong>2007</strong>-2008 under this Sub-Head. It is felt necessary to establish two<br />

new District Officer’s Office at Lawngtlai and Mamit, Sub-Divisional Office at Darlawn<br />

and Hnahthial as a result of creation of new administrative districts by the Government of<br />

<strong>Mizoram</strong>. Strengthening of Planning Cell is also included under this Sub-Head during<br />

Eleventh Plan period.<br />

2. VETERINARY SERVICES AND ANIMAL HEALTH : Establishment of new<br />

Veterinary Polyclinics at Aizawl and establishment of additional 2 Nos. Veterinary<br />

Hospitals, 15 Nos. of Dispensaries and 14 Nos. of Rural animal Health Centres are<br />

proposed to be taken up during the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and the Annual<br />

Plan of <strong>2007</strong>-2008 alongwith maintenance of the existing infrastructure besides animal<br />

health coverage and prevention of animal diseases work. A total of Rs.780.00 lakhs only<br />

and Rs.113.00 lakhs only is proposed for the 11 th Five Year Plan and Annual Plan<br />

respectively.


- 53 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

3. CATTLE DEVELOPMENT : With a total outlay of Rs.330.00 lakhs only for<br />

the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and Rs.83.00 lakhs only for the Annual Plan of<br />

<strong>2007</strong>-2008 is proposed for maintenance of the existing infrastructure and various Cattle<br />

Farms with Mithun Breeding Farm is to be under taken this sub-head.<br />

4. POULTRY DEVELOPMENT : In order to give grant-in-aid to poultry farming<br />

societies and 50% Chick Subsidy and maintenance of the existing infrastructure and<br />

poultry farms a total of Rs.372.50 lakhs only is proposed for the Eleventh Five Year Plan<br />

of <strong>2007</strong>-<strong>2012</strong> and Rs.71.50 lakhs only for Annual Plan <strong>2007</strong>-2008.<br />

5. PIGGERY DEVELOPMENT : A total amount of Rs.417.50 lakhs is earmarked<br />

for the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and Rs.80.50 lakhs only for the Annual Plan<br />

of <strong>2007</strong>-2008. Under this Sub-Head it is proposed to give Grant-in-aids to Piggery<br />

Farming Societies and 50% Breeding Boar Subsidy alongwith maintenance of the existing<br />

Departmental Piggery Farms.<br />

6. OTHER LIVESTOCK DEVELOPMENT : Total proposal of Rs.120.00<br />

lakhs only for the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and Rs.41.00 lakhs only for the<br />

Annual Plan of <strong>2007</strong>-2008 under this Sub-Head. Assistance to Goat rearing families are to<br />

be under taken. Maintenance of Departmental Goat Farm and Rabbit Production Farm are<br />

also included under Other Livestock Development.<br />

7. FEED & FODDER DEVELOPMENT : For purchase of various animal feed<br />

ingredients for different departmental farms and for establishing Animal Grazing Ground<br />

a total outlay of Rs.640.00 lakhs only is proposed for the Eleventh Five Year Plan of<br />

<strong>2007</strong>-<strong>2012</strong> and Rs.145.00 lakhs for the Annual Plan of <strong>2007</strong>-2008 under this sub-head.<br />

8. VETERINARY EDUCATION, RESEARCH & TRAINING : In order to<br />

infuse technical skill for Veterinary Field Assistant Training and for provision of Stipend<br />

and Book grant for M.V.Sc, B.V.Sc. and V.F.A. students a total amount of Rs.280.00<br />

lakhs only for the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and Rs.73.00 lakhs only for the<br />

Annual Plan of <strong>2007</strong>-2008 is proposed under this sub-head.<br />

9. VETERINARY INFORMATION AND STATISTICS : For collection of<br />

informations and data; subsequent publications of these informations for developmental<br />

works there is proposal of Rs.130.00 lakhs only for the Eleventh Five Year Plan and<br />

Rs.43.00 lakhs only for the Annual Plan of <strong>2007</strong>-2008.<br />

10. OTHER EXPENDITURE : A total outlay of Rs.130.00 lakhs only for the<br />

Eleventh Five Year Plan <strong>2007</strong>-<strong>2012</strong> and Rs.43.00 lakhs only for the annual Plan of <strong>2007</strong>-<br />

2008. Regulation of Animal Movement in the State and for establishment of animal<br />

slaughter House are proposed to be undertaken under this sub-head.<br />

11. CENTRALLY SPONSORED SCHEMES : The Department is at present<br />

operated 5 Nos. Centrally Sponsored Schemes which are of matching share in nature. A<br />

total outlay of Rs.215.00 lakhs for the Eleventh Five Year Plan of <strong>2007</strong>-<strong>2012</strong> and<br />

Rs.43.00 lakhs only for Annual Plan of <strong>2007</strong>-2008 is proposed for State Matching Share<br />

of Centrally Sponsored Schemes.<br />

12. DAIRY DEVELOPMENT : There is a good scope of dairy farming in the<br />

State. In order to give incentive to the dairy farmers provision of 50% Dairy Cow Subsidy<br />

and Grant-in-Aid to Dairy Farming Societies and creation of new posts to look after the<br />

existing Dairy Plants are be undertaken during the <strong>2007</strong>-<strong>2012</strong> and <strong>2007</strong>-2008. A total<br />

outlay of Rs.264.00 lakhs only for the Eleventh Five Year Plan and Rs.43.00 lakhs only<br />

for the Annual Plan <strong>2007</strong>-2008.


- 54 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

A : DIRECTION :<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

1 Salary<br />

a) Salary of existing Officers and Staff 4 nos. 15.00<br />

2 Wages :<br />

Skilled Labour ( Typist ) 2 nos. 1.00<br />

3 Travelling Expenses L.S. 0.50<br />

4 Office Expenses<br />

a) Payment of Energy bills L.S 2.00<br />

b) Payment of conveyance charges L.S 3.00<br />

c) Purchase of Stationeries etc. L.S. 1.50<br />

5 Minor Works :<br />

Departmental Complexes, Directorate Building<br />

and compound and sunordinate offices<br />

6 Machinery / Equipments :<br />

2 Nos. 2.00<br />

Purchase of Office Equipments, etc. 4 Nos. 2.00<br />

TOTAL OF A : 27.00<br />

B : ADMINISTRATION :<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

B - I Joint Director Office. Lunglei :<br />

1 Salary of Officer and Staff 11 Nos. 10.00<br />

2 Wages :<br />

Unskilled 1 No. 0.40<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 5.00<br />

5 Minor Works :<br />

Maintenace of existing Quarter 4 Nos. 2.60<br />

TOTAL OF B - I : 19.00


- 55 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

B - II DISTRICT OFFICES :<br />

1 a) Salary of Officers and Staff 8 Nos. 21.00<br />

2 Wages :<br />

a) Skilled - II 2 Nos. 1.00<br />

b) Unskilled 3 Nos. 1.00<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses :<br />

a) Conveyance charges 8 units 2.00<br />

b) Purchase of Stationeries, etc. L.S. 2.00<br />

5 Minor Works :<br />

Maintenance of existing buildings 25 Nos. 1.00<br />

6 C.O : 1. Construction of RAHC - Cum - Staff<br />

quarter at Zemabawk and Lengpui<br />

2 nos. 5.00<br />

2. Construction of DVO'S Office, Champhai 1 no. 8.00<br />

3. Construction of DVO'S Subordinate Officice 1 no. 2.00<br />

TOTAL OF B - II : 44.00<br />

B-III SUB-DIVISIONAL OFFICES :<br />

1 Salary of existing Officers and Staff 8 nos. 10.00<br />

2 Wages :<br />

Unskilled 1 no. 0.50<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses L.S. 2.00<br />

Purchase of Stationery Items<br />

5 Minor Works :<br />

Maintenance of existing buildings 14 nos. 3.00<br />

6 C.O : (1) Construction VAS qtr at Chawngte 1 no. 5.00<br />

(2) Construction IV Grade qtr at Chawngte 1 no 2.00<br />

(3) Construction of SVO'S Office at Tlabung 1 no 5.00<br />

TOTAL OF B - III : 29.00<br />

TOTAL OF B : 92.00<br />

TOTAL OF ( A + B) 119.00


- 56 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

C : VETY. SERVICES & ANIMAL HEALTH :<br />

SL. NO ITEMS PHYSICAL<br />

TARGET<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

FINANCIAL TARGET<br />

1 2 3 4<br />

C-I Vety. Hospitals<br />

1 Salary of existing Officers and Staff 13 Nos. 20.00<br />

2 Wages :<br />

Unskilled Labour 2 Nos. 0.80<br />

3 Travelling Expenses L.S. 2.20<br />

4 Office Expenses<br />

Purchase of Office Stationery L.S. 1.00<br />

5 Minor Works :<br />

Maintenance of existing buildings 20 Nos. 4.00<br />

6 Motor Vehicles :<br />

Maintenance of existing vehicle 2 Nos. 1.00<br />

7 C.O : Construction of Vety Hospital at<br />

1 no. 8.00<br />

Serchhip<br />

TOTAL OF C - I : 37.00<br />

C-II VETY. DISPENSARIES :<br />

1 Salary of existing Officers and Staff 13 Nos. 18.00<br />

2 Wages :<br />

Unskilled Labours 20 nos. 6.60<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses L.S. 1.90<br />

Purchase of Office Stationery<br />

5 Minor Works :<br />

Improvement & repair of existing<br />

buildings<br />

6 C.O. :<br />

1) Construction of RAH Centre cum Staff<br />

Qtr at E.Lungdar.<br />

2) Construction of Vety Dispensary Building<br />

at Ngopa.<br />

22 Nos. 2.50<br />

1 No. 3.00<br />

1 No. 4.00<br />

3) Construction of Vety Dispensery, Mamit 1 no. 4.00<br />

TOTAL OF C - II : 42.00


- 57 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

C-III RURAL ANIMAL HEALTH CENTRES :<br />

1 Salary of existing Staff 4 Nos. 4.00<br />

2 Wages :<br />

Unskilled 2 Nos. 0.80<br />

3 Travelling Expenses L.S. 1.00<br />

4 Office Expenses L.S. 1.20<br />

5 Minor Works :<br />

Maintenance of Existing buildings 35 Nos. 3.00<br />

6 Construction of VFA Quarter cum RAH at<br />

N.Sakawrdai, Reiek and Bukpui<br />

3 Nos. 9.00<br />

TOTAL OF C - III : 19.00<br />

C-IV CENTRAL MEDICINE, VACCINE AND<br />

EQUIPMENT DEPOT :<br />

1 Machinery/Equipments :<br />

Purchase of essential Machinery / Equipments<br />

and appliances for Veterinary Services.<br />

5 Nos. 8.00<br />

2 Material/Supply :<br />

1) Cost Vaccine and Medicine L.S 7.00<br />

TOTAL OF C - IV : 15.00<br />

TOTAL OF C : 113.00<br />

D : CATTLE DEVELOPMENT :<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

1 Salary of Existing Staff 10 nos. 28.00<br />

2 Wages<br />

Skilled - II 1 no. 0.40<br />

Unskilled 24 nos. 4.00<br />

3 O.E. L.S 4.00<br />

4 T.E - 1.00<br />

5 Minor Works : Maintenance and repair of existing<br />

farm buildings<br />

6 Machinery & Equipments<br />

(a) Implements like hoe, spade, buckets, chaff<br />

cutter, service racks etc.<br />

12 nos. 10.70<br />

30 Nos. 1.00


- 58 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(b) Maintenance of standby LN2 plan 2 nos 2.00<br />

7 Material Supply :<br />

1. Procurement of A.I equipments appliances and<br />

consumable items<br />

2. Cost of Frozen Semen @ Rs. 25 per straw<br />

including transportation cost.<br />

3. Cost of Liquid Nitrogen @ Rs. 25 per lit.from<br />

outside the State.<br />

8 GRAND IN AID<br />

Dairy Cow Subsidy :<br />

a) 50% dairy cow subsidy @ Rs.15,000 per<br />

cow.<br />

Transportation Subsidy :<br />

b) Transportation cost for 100 nos. @ Rs.<br />

3500/- per cow<br />

50 centres 1.60<br />

10000 straws 0.80<br />

8000 ltrs 1.80<br />

150 cows 22.50<br />

150 cows 5.20<br />

TOTAL OF D - 1 : 83.00<br />

E : POULTRY DEVELOPMENT :<br />

SL. NO ITEMS PHYSICAL<br />

(Rs. In lakh)<br />

FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

E POULTRY<br />

1 Salary of existing Staff 13 nos. 20.00<br />

2 Wages<br />

Skilled 2 Nos 1.00<br />

Unskilled 27 nos. 9.00<br />

3 Office expenses<br />

Stationery, Bulk energy charge of Poultry Farms L.S. 15.00<br />

4 Travelling Expenses L.S. 2.20<br />

5 Minor Works Construction and<br />

Improvement of Poultry Farm buildings 60 Nos. 18.00<br />

6 Machinery/Equipments<br />

Waterer, Feeder, Brooder Battery etc. for 10 nos.<br />

of farms<br />

30 Nos. 4.30<br />

8 Grant-in-Aid :<br />

50 % Chick subsidy @ Rs.10/- per bird 20,000 Nos. 2.00<br />

TOTAL OF E : 71.50


- 59 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong> – 08<br />

F : PIGGERY DEVELOPMENT :---<br />

SL. NO ITEMS PHYSICAL<br />

(Rs. In lakh)<br />

FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

1 Salary of existing Officer & Staff 10 nos. 26.00<br />

2 Wages 18 Nos. 6.00<br />

3 Travelling Expenses L.S. 2.00<br />

4 Office Expenses :<br />

Procurement of Office Stationery etc. L.S. 2.00<br />

5 Minor Works : Maintenance of existing different<br />

Farm Buildings<br />

40 nos. 9.70<br />

6 Grant-in-Aid :<br />

a) Grant-in-aid to PIGFED and Co-operative<br />

Societies<br />

8 Nos 4.00<br />

b) 50% Piglet subsidy @Rs.1000/- per piglet 5600 Nos. 26.00<br />

c) Assistance to promissing farmers of NPV by<br />

providing 4 nos. Piglet each<br />

120 families 4.80<br />

GRAND TOTAL OF ‘F’ 80.50<br />

G : OTHER LIVESTOCK DEVELOPMENT :<br />

SL. NO ITEMS PHYSICAL<br />

(Rs. In lakh)<br />

FINANCIAL<br />

TARGET TARGET<br />

1 2 3 4<br />

1 Goat production :<br />

Wages unskilled labour 6 nos. 2.00<br />

Minor Work : Improvement of existing<br />

Department Goat Farms<br />

Grant – In -Aid<br />

Assistance to 10 farmers by providing 10 nos of<br />

animal per farmer in the form of Grant -In -Aid @<br />

Rs. 2000/- per animal including transportation<br />

cost, incidental charges etc.<br />

2 nos. 4.50<br />

10 farmers 30.00<br />

2 Rabbit Production :<br />

(a) Wages : Unskilled Labour 3 Nos 1.00<br />

Minor Work : Renovation & Repair of existing<br />

rabbit farms<br />

2 Nos 3.50<br />

TOTAL of G 41.00


- 60 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

H-I : FEED AND FODDER DEVELOPMENT :<br />

SL. NO ITEMS PHYSICAL<br />

TARGET<br />

(Rs. In lakh)<br />

FINANCIAL TARGET<br />

1 2 3 4<br />

H-I FEED & FODDER :<br />

1 Salary of existing Staff 3 Nos. 5.00<br />

2 Wages :<br />

(i) Unskilled 20 Nos. 6.40<br />

3 Travelling Expenses L.S 2.00<br />

4 Office Expenses:<br />

a) Energy charge for 2 nos. of Feed Plant,<br />

b) Maintenance of Feed Plant Machinery<br />

Weighing Machine, Weighing Bridge and other<br />

office expenses.<br />

5 M.W. Fodder cultivation for promissing Dairy<br />

farmers @Rs.5000/-<br />

6 Motor Vehicle<br />

Propulsion charges of Heavy Vehicle (Truck) for<br />

transportation of Departmental Feed Plant to<br />

different Departmental Livestock & Poultry Farms.<br />

7 Material Supply<br />

(a) Purchase of Feed Ingredient and ready mixed<br />

feed for Departmental Farms @Rs.1500/- qlts.<br />

4 Nos. 6.60<br />

20 Nos. 10.00<br />

L.S 2.00<br />

4860 qlts. 73.00<br />

8 Grant-in-Aid :<br />

Livestock and Poultry Feed Subsidy @ Rs.3/- per<br />

Kg.<br />

1000 M.Tonnes 30.00<br />

TOTAL OF H – I 135.00<br />

H-II ANIMAL GRAZING GROUND :<br />

Improvement of Grazing Ground at Chawilung, Lungkawlh, Khawhai, Tualpui, Hnahlan, Teikhang,<br />

Sialhawk, Haulawng, S.Vanlaiphai, Suangpuilawn.<br />

1 Material Supply :<br />

Perimetre fencing materials ( barbed wire) 200 qtls. 10.00<br />

TOTAL of H-II 10.00<br />

GRAND TOTAL of H – I & II 145.00


- 61 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

I : VETY EDUCATION RESEARCH & TRAINING :<br />

1 2 3<br />

(Rs. In lakh)<br />

4<br />

I VETY EDUCATION RESEARCH &<br />

TRAINING<br />

1 Salary of existing Officers and Staff 11 Nos. 15.00<br />

2 Wages :<br />

Unskilled 3 Nos. 1.00<br />

3 Travelling Expenses L.S. 3.00<br />

4 Office Expenses L.S. 5.00<br />

5 Professional Charges :<br />

a) Study Tour for Vety. Field Assistant and<br />

B.V.Sc. Students and inservice personnels<br />

and orentation programmes and training.<br />

b) Stipend Book grant for M.V.Sc, B.V.Sc and<br />

VFA students<br />

6 Minor Works : Maintenance of existing<br />

building School of Vety Science<br />

7 Material & Supply : Purchases of<br />

Laboratory equipments, reagents practical<br />

appliances, library books etc.<br />

C.O :- Construction of composite Laboratory,<br />

including internal fittings at School of vety<br />

Science Lunglei<br />

3 times 2.00<br />

54 students 18.50<br />

10 Nos. 12.00<br />

L.S. 6.50<br />

1 no 10.00<br />

TOTAL OF I :<br />

J : VETERINARY INFORMATION WING :<br />

73.00<br />

Draft Annual Plan <strong>2007</strong>-08<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL<br />

TARGET<br />

FINANCIAL TARGET<br />

1 2 3 4<br />

J VETERINARY INFORMATION WING :<br />

1 Salary of existing Staff 3 Nos. 10.50<br />

2 Travelling Expenses L.S. 6.00<br />

3 Office Expenses L.S. 8.00<br />

4 Publication :<br />

Magzine, Leaflets, Periodicals, Advertisement etc. L.S 13.00<br />

5 Materials & Supply :<br />

Purchase of Roll Films, Video Films, etc. L.S. 5.50<br />

TOTAL OF J : 43.00


- 62 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

K : OTHER EXPENDITURE :<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL<br />

TARGET<br />

Draft Annual Plan <strong>2007</strong>-08<br />

FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

K ANIMAL MOVEMENT<br />

A Wages<br />

i) Skilled 3Nos. 2.50<br />

ii) Unskilled 12 Nos. 4.00<br />

iii) Office expenses L.S 2.50<br />

B Animal Slaughter House<br />

i) Office expenses L.S 8.00<br />

II) Minor Works L.S 26.00<br />

T O T A L OF K 43.00<br />

L : CENTRALLY SPONSORED SCHEMES :<br />

(Rs. In lakh)<br />

SL. NO ITEMS PHYSICAL TARGET FINANCIAL<br />

TARGET<br />

1 2 3 4<br />

L-I NATIONAL PROJECT ON RINDERPEST<br />

ERADICATION :<br />

1 Salary of existing Officers and Staff 21 Nos. 10.00<br />

-<br />

2 Travelling Expenses L.S. 0.50<br />

3 Office Expenses : L.S. 0.50<br />

TOTAL OF L - I : 11.00<br />

L-II ASCAD (Assistance to State for Control of<br />

Animal Disease :<br />

1 Travelling expenses L.S. 0.50<br />

2 Office Expenses L.S. 0.50<br />

3 Material & Supply L.S. 2.00<br />

TOTAL OF L - II : 3.00<br />

L-III PROFESSIONAL EFFICIENCY DEVELOPMENT :<br />

STATE VETERINARY COUNCIL :<br />

1 Office Expenses L.S. 1.25<br />

TOTAL OF L - III : 1.25<br />

L-IV ANIMAL HUSBANDRY AND STATISTICS :<br />

SAMPLE SURVEY & STATISTICS :<br />

1 Salary of Existing Staff 6 Nos. 5.00<br />

2 Travelling Expenses L.S. 0.25<br />

3 Office Expenses : L.S. 0.50<br />

4 Publication :<br />

Sample Survey and Statistical Hand Book, etc. L.S. 1.00<br />

TOTAL OF L - IV : 6.75


- 63 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

AH & VETY DEPARTMENT<br />

Draft Annual Plan <strong>2007</strong>-08<br />

L-V NATIONAL PROGRAMME ON BIOGAS DEVELOPMENT :--<br />

1 Salary of existing Staff (50% state share) 12 Nos. 10.00<br />

2 Travelling expenses L.S. 0.50<br />

3 Office Expenses<br />

Grand-in-aid<br />

L.S. 0.50<br />

1 Installation of Biogas plant state Govt. share<br />

( 50% state share)<br />

50 units 10.00<br />

TOTAL OF L - V : 30.00<br />

TOTAL OF L : 43.00<br />

Draft Annual Plan <strong>2007</strong>-08<br />

M : DAIRY DEVELOPMENT :<br />

(Rs. In lakh)<br />

SL. NO PARTICULARS / ITEMS PHYSICAL FINANCIAL<br />

1 2 3 4<br />

1 Salary of Existing Officer and Staff 3 nos. 7.50<br />

2 Wages<br />

a)Skilled –II 2 Nos. 1.00<br />

b)Unskilled Labour for Milkman,Dairy 10 Nos. 3.30<br />

Farm Attendant,Milk Collector and<br />

Distributor<br />

3 Travelling Expenses L.S. 1.50<br />

4 Office Expenses<br />

Energy Charges for Bulk Energy L.S 12.00<br />

Supply, Water Supply charges and<br />

Stationeries.<br />

5 Minor Works<br />

Maintenance of Existing FarmBuilding and Dairy<br />

Plant Building<br />

6 Motor Vehicle<br />

10 nos. 5.70<br />

Propulsion of heavy/medium vehicle 4 nos. 7.00<br />

7 Material supply :<br />

Purchase of consumable items like L.S 5.00<br />

Polyfilm, laboratory chemicals, reagents for dairy<br />

plant and dairy farms.<br />

TOTAL OF M : 43.00<br />

…….


INTRODUCTION<br />

- 64 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

FISHERIES<br />

The main thrust during the 11 th Five Year Plan is to bring in more additional<br />

water area under culture sector through Freshwater Aquaculture and Coldwater Fisheries<br />

as well as to develop the Riverine and Reservoir fisheries in <strong>Mizoram</strong>. The state has as<br />

good as 24,000ha of potential land for fish farming and it has been possible to develop<br />

around 2,580ha of water area in the culture sector and also tap in the natural resources of<br />

the rivers to produce around 3500M.T of fishes by the end of 2005-2006.<br />

The strategy to augment the production further during the 11 th Five Year<br />

Plan will require more investment to tap in all the CSS programme by contribution of state<br />

share. The bulk of the total outlay for the 11 th Plan i.e, Rs.369 lakhs out of Rs.999 lakhs<br />

proposed is directly linked to production of fish and fish seeds in the region. Other sources<br />

of CSS fund in the tune of Rs.1123.40 lakhs would significantly play a vital role in<br />

augmenting the fish production to the targeted level of 5000M.T during the 11 th Five Year<br />

Plan.<br />

With a demand lead approach the scheme, ‘Fresh water Aquaculture’ aims<br />

in enhancing fish production towards self sufficiency and employment and income<br />

generation in the rural areas by targeting an additional 3600Ha of water area for fish<br />

culture during the 11 th Plan. The critical scheme like Fish Seed Production-cum-Farming<br />

have been approached with practicability in the field to give a dynamic result in fish seeds<br />

by taking into account the significance of inputs etc.<br />

In the sectors like Extension & Training and Fresh Water Aquaculture the<br />

farmers participatory approach has been considered to result in project sustenance. Further<br />

in order to eliminate the imbalance or workload against the weak manpower of the<br />

Department, creation of new posts has also been proposed under the Direction and<br />

Administration to strengthen the organization of the Department during the 11 th Five Year<br />

Plan.<br />

Highlights of scheme wise break up of proposed outlay for the Draft 11 th<br />

Five Year Plan is shown below:-<br />

(Rs.in lakhs)<br />

Sl.<br />

11<br />

Scheme<br />

th Plan Annual Plan<br />

No<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

Direction & Administration<br />

Fish Seed Production-cum-Farming<br />

Fresh Water Aquaculture, Development of<br />

Waterlogged area and National Fisheries<br />

Development Board schemes<br />

Development of Riverine Fisheries<br />

(Reservoirs/Rivers etc)<br />

Development of Cold water Fisheries<br />

Information, Extension & Training<br />

Marketing<br />

Inland Fisheries Statistics(Database)<br />

Commercial Fish Farming in water bodies in private<br />

sector through contract farming<br />

outlay<br />

462.00<br />

41.00<br />

386.00<br />

23.00<br />

9.00<br />

29.00<br />

38.00<br />

0.50<br />

10.50<br />

<strong>2007</strong>-2008<br />

115.00<br />

18.00<br />

126.00<br />

10.00<br />

4.00<br />

12.90<br />

17.00<br />

0.10<br />

5.00<br />

Total:- 999.00 308.00


- 65 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

DETAILS OF THE SCHEMES DURING 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> (<strong>2007</strong>-<strong>2012</strong>) AND<br />

<strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008.<br />

SCHEME NO.I<br />

1. DIRECTION AND ADMINISTRATION:-<br />

Although the Fisheries Department in <strong>Mizoram</strong> started setting up during the erstwhile<br />

Union Territory in 1972 it has started functioning as a separate Directorate since 1993.<br />

With the increasing work load due to the implementation of various fisheries<br />

developmental activities and growth of resources it is imperative to strengthen its weak<br />

manpower at the Directorate and Administration level. Therefore, the scheme provides for<br />

increasing the manpower by creation of new ponds besides maintenance of the existing<br />

Plan staff and other administrative cost to cope up the growth of activities successfully<br />

during the 11 th Five Year Plan(<strong>2007</strong>-<strong>2012</strong>).<br />

Present organizational set up:- The present organizational structure of Fisheries<br />

Department is shown in details under Annexure ‘C’ at page 31. In fact, the organizational<br />

structure shows a very weak set-up with insufficient manpower infrastructure. There is no<br />

post of Director, however, the Department is headed by a Director on officiating basis at<br />

present. Also, there is no SDO(Fishery) posts even at the Sub-Divisional level not to speak<br />

of Block level. For administration purpose the present 8nos of Districts are clubbed<br />

together into 3 Districts viz:- (1) Aizawl District(undivided) comprising of Aizawl ‘E’,<br />

Champhai, Serchhip, Kolasib and Mamit Districts (2) Lunglei District (3) Chhimtuipui<br />

District (undivided) comprising of Saiha and Lawngtlai Districts and they are looked after<br />

by 3 District Officers and 1 Asst.Director of Fisheries. The Fish Farmers Development<br />

Agency Units(5nos) are also looked after by 3(three) District Fisheries Development<br />

Officers and 1(one) Asst.Director of Fisheries in addition to their normal duties as Chief<br />

Executive Officers which should be in fact, functioned separately. The organizational<br />

structure is also lacking many branches/wings like Planning, Information, Extension &<br />

Training, Marketing etc and there is no proper Nodal Officers viz:- Dy.Director<br />

(Technical/Administration). Planning etc in the Department.<br />

Due to this weak organizational set up the development activities and strategic<br />

planning of fisheries in the state could not pick up the momentum. Therefore, it is<br />

proposed to strengthen the organization as per the requirement shown under Direction and<br />

Administration schemes separately during the 11 th Five Year Plan.<br />

The Draft 11 th Five Year Plan outlay under Direction and Administration is<br />

Rs.262.00 lakhs and Draft Annual Plan <strong>2007</strong>-2008 is Rs.115.00 lakhs as per details shown<br />

below:-<br />

A. DIRECTION:-<br />

(i) Draft 11 th Five Year Plan Outlay :- Rs.185.00 lakhs<br />

(ii) Draft Annual Plan outlay <strong>2007</strong>-2008 :- Rs.46.00 lakhs<br />

(iii) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.30.00 lakhs


- 66 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

The Department requires upgradation into full fledged Directorate with at least 8<br />

wings and function under the Nodal Officers viz:-<br />

(i) Establishment Unit<br />

(ii) Planning Unit<br />

(iii) Fish Seed Production-cum-Farming Unit<br />

(iv) Freshwater Aquaculture<br />

(v) Riverine and Cold Water Fisheries Unit<br />

(vi) Information, Extension, Training & Research Unit<br />

(vii) Marketing Unit<br />

(viii) Fisheries Statistics(Database) Unit<br />

The Department of Fisheries has very weak infrastructures like Office buildings<br />

and staff quarters in the Headquarters, Districts, Sub-Divisional and Circle levels for<br />

proper and smooth functioning of the Department. It is therefore, proposed to construct<br />

Office buildings and staff quarters for the Directorate as well as the District Headquarter<br />

during the 11 th Five Year Plan period. Site for the Directorate Office/Staff Quarters has<br />

already been allotted to the Department for the above purpose.<br />

B. ADMINISTRATION:- The Administrative set up is also required to re-organize<br />

its structure to improve its capacity for implementation of various developmental activities.<br />

At present 3 administrative units are functioning at District level and is headed by District<br />

Fisheries Development Officer. It is difficult to implement the developmental Plan<br />

Schemes smoothly due to lack of supporting staff. With the existence of 8 Districts in the<br />

state it is required to strengthen the organizational structure in Fisheries Department in the<br />

field level during 11 th Plan as shown below:-<br />

Creation of Districts<br />

Creation of Sub-Divisions<br />

EXISTING PROPOSED<br />

3nos 5nos(Kolasib, Mamit,<br />

Champhai, Serchhip and<br />

Lawngtlai)<br />

- 10 nos<br />

The administrative organisation in the District Head Quarters and the set up in the<br />

field level are very weak in infrastructures which poses a constraint in smooth<br />

implementation of various fisheries developmental programme. A strong co-ordination is<br />

required with the staff posted in the field, District Headquarter and the Directorate by<br />

ensuring proper working environments. Hence the working infrastructures viz:- Office<br />

Buildings, Staff Quarters etc can not be looked over and it is quite inevitable to provide<br />

these facilities for concentrating/streamlining effectively on the job.<br />

Therefore, a provision has been made in the 11 th Five Year Plan to construct<br />

District Office Buildings and Staff Quarters for smooth functioning of fisheries<br />

development activities at the District level. This would also curtail the rental charges<br />

towards hiring of buildings.<br />

Details of the scheme with a provisional outlay of Rs.277.00 lakhs under<br />

Administration during the 11 th Five Year Plan are shown below:-<br />

(i) Draft 11 th Five Year Plan outlay :- Rs.277.00 lakhs<br />

(ii) Draft Annual Plan outlay <strong>2007</strong>-2008 :- Rs.69.00lakhs<br />

(iii) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.61.00lakhs


- 67 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

INLAND FISHERIES<br />

2.<br />

SCHEME NO.2<br />

FISH SEED PRODUCTION-CUM-FARMING:-<br />

(i) Draft 11 th Five YearPlan outlay <strong>2007</strong>-<strong>2012</strong>:- Rs.41.00 lakhs<br />

(ii) Draft Annual Plan outlay <strong>2007</strong>-2008 :- Rs.18.00 lakhs<br />

(iii) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.10.00 lakhs<br />

Fish seeds being a crucial input for boosting up fish production of a region its continuous<br />

availability is a must to enhance fish yield in the state. However, the present production of<br />

fish seeds in <strong>Mizoram</strong> is far below the actual requirement. Therefore, the strategy for<br />

producing quality fish seeds in the region during the 11 th Five Year Plan are as follows:-<br />

(a) To produce enough fish seeds by concentrating the efforts exhaustively in the<br />

existing 3 Departmental Fish Seed Farms viz:- Lengpui, Tamdil and Zobawk.<br />

(b) Privatisation of other Departmental Fish Seed Farms for production of fish<br />

seeds and fish.<br />

(c) Setting up fish seed rearing Units at critical remote areas which is quite<br />

potential in fisheries viz:- Champhai, Chawngte etc.<br />

(a) Strategy:- The Departmental Fish Seed Farms at Lengpui, Tamdil and Zobawk<br />

requires a strong organization vamped with sufficient staff to run as a full fledged seed<br />

production unit. More effort towards funding of the farms are required to have sufficient<br />

inputs, labours etc for production of fish seeds. A critical problem faced usually in the Fish<br />

Seed Farms are non-availability of good stock of brooder fishes which could be solved by<br />

raising sufficient fingerlings in the ponds or by purchasing brood stock from other sources<br />

for rearing up in the farms. Therefore, the 11 th Five Year Plan draft proposal provides<br />

funds for meeting the above requirements.<br />

(b) Due to paucity of fund and lack of manpower the Departmental Fish Seed<br />

Farms which are not producing fish seeds adequately may be commercialized by<br />

privatization to the progressive private entrepreneurs(Fisheries Society/Federation etc) of<br />

the region for production of quality fish seeds/fishes to the desired level.<br />

(c) The potential remote areas of fisheries like Champhai, Chawngte etc could be<br />

supplied with adequate fish seeds by constructing fish seed rearing and distribution Units.<br />

Spawns/fry could be raised up to fingerlings in these units for supply to the farmers of<br />

remote areas for enhancing fish production.<br />

A financial outlay of Rs.41.00 lakhs (token provision) has been proposed under the<br />

scheme during the 11 th Five Year Plan as per details shown below:-<br />

(Rs.in lakhs)<br />

11 th Sl.<br />

No<br />

Items Unit<br />

Five Year Plan<br />

Target (<strong>2007</strong>-<strong>2012</strong>)<br />

Physical Financial<br />

Annual Plan Target<br />

for <strong>2007</strong>-08<br />

Physical Financial<br />

1 2 3 4 5 6 7<br />

1. Maintenance of<br />

existing Fish Seed<br />

Farms for<br />

Departmental fish seed<br />

production:-<br />

3 27.00 3 9.00


2.<br />

3.<br />

- 68 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

(i) Cost of<br />

inputs, Labour<br />

charges, nets &<br />

gears<br />

(ii) Machineries<br />

& equipments,<br />

glasswares,<br />

chemicals<br />

(iii) Cost of<br />

renovation/repairing<br />

of ponds<br />

etc(MW)<br />

Setting up fish seed<br />

rearing Units including<br />

of cost of inputs, nets<br />

and hapas, farm<br />

implements, labour<br />

charges<br />

Incidental/contingencie<br />

s for privatization of<br />

Departmental Fish<br />

Seed Farms<br />

Nos of<br />

farm<br />

Nos of<br />

farm<br />

Nos of<br />

farm<br />

Nos of<br />

Unit<br />

Nos of<br />

farm<br />

3<br />

3<br />

3<br />

4<br />

3.00<br />

5.00<br />

5.00<br />

1.00<br />

3<br />

3<br />

1<br />

L/S<br />

1.00<br />

2.50<br />

5.00<br />

0.50<br />

TOTAL:- 41.00 18.00<br />

SCHEME NO.3<br />

(ii) FRESHWATER AQUACULTURE<br />

(i) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.386.00 lakhs<br />

(ii) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.126.00 lakhs<br />

The main thrust during the 11 th Five Year Plan is to boost up the level of fish<br />

production in the State from 3650M.T to 5000M.T in order to bridge the gap of fish<br />

demand in the region. Therefore, the strategy in the Plan is to raise the level of fish<br />

production from 1800kg/ha to 3000kg/ha. For achieving this target it is required to bring<br />

more additional water area under fish culture and strengthen by intensive supply of inputs<br />

viz:- Fish Seeds, Fish Feed etc to the fish farmers under the FFDA(CSS) and National<br />

Fisheries Development Board activities as per the Central pattern of assistance.<br />

Govt.of India has sanctioned 5(five) FFDA(Fish Farmers Development Agency) to<br />

be implemented sharing the fund on approved item of works by Central Govt.and State<br />

Govt.on 75:25 basis at Aizawl, Kolasib, Mamit, Lunglei and Saiha Districts and they are<br />

functioning quite well. To avail the share of Govt.of India it is proposed to avail the<br />

subsidy for farmers for construction of new ponds, renovation of existing ponds, providing<br />

inputs to the fish farmers, training of farmers etc from Govt.of India for increasing more<br />

water areas as well as for Development of Waterlogged areas. Under the scheme there is<br />

provision for availing subsidy to individual farmers for integrated fish farming,<br />

aerator/pumps, setting up freshwater fish seed Hatchery and for establishment of fish feed<br />

unit on private sector during the 11 th Five Year Plan.


- 69 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

Further, the 11 th Plan <strong>2007</strong>-<strong>2012</strong> it also envisages creation of 2(two) new Fish<br />

Farmers Development Agency Units for Champhai and Serchhip District as per the<br />

Govt.of India’s District wise approach of Fish Farmers Development Agency(CSS). The<br />

potentiality and resources for fish farming is high in every District of <strong>Mizoram</strong>. Therefore<br />

functioning Fish Farmers Development Agency Units in every District is necessary for<br />

proper exploitation of resource towards boosting up fish yield by availing the District-wise<br />

Central assistance under Freshwater Aquaculture. This will ensure the fisheries<br />

development much more faster in the individual Districts in achieving the targets of self<br />

sufficiency in fish in <strong>Mizoram</strong>.<br />

The scheme also provides for other activities for boosting up fish production viz:-<br />

Aquaculture in ponds and tanks, Reservoir fisheries and Domestic marketing under the<br />

programme of National Fisheries Development Board during the 11 th Plan.<br />

A provisional outlay of Rs.386.00 lakhs is proposed in the 11 th Five Year Plan as<br />

State share under Freshwater Aquaculture as per details shown below:-<br />

SCHEME NO.4<br />

4. DEVELOPMENT OF RIVERINE FISHERIES UNDER INLAND CAPTURE<br />

FISHERIES(RESERVOIRS/RIVERS ETC)<br />

(i) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.23.00 lakhs<br />

(ii) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.10.00 lakhs<br />

(iii)Anticipated expenditure 2006-<strong>2007</strong> :- Rs.0.50 lakhs<br />

Conservation and protection of Riverine Fisheries is quite essential to enhance the<br />

fish yield from the Rivers/Reservoirs etc(Capture sector). The Department has taken up<br />

ranching programme in the rivers by the stocking fish seeds to propagate the Riverine and<br />

Reservoirs stocks. More efforts are required to study and survey the major riverine system<br />

towards conservation and propagation of economic varieties of fishes.<br />

Inland Capture Fisheries(Reservoirs/Rivers etc) which is a scheme under CSS<br />

Programme of Govt.of India on Development of Inland Fisheries and Aquaculture under<br />

Macro Management approach envisages implementation of schemes through the Fisheries<br />

Department of State Govt.on 75:25 central and state share financing pattern. During the<br />

11 th Five Year Plan it is proposed to implement the scheme under CSS programme by<br />

availing 75% scheme cost from Central Govt.and providing 25% State annual plan fund<br />

taking a view for conservation and protection of Rivers/Reservoirs fisheries.<br />

With the existence of the <strong>Mizoram</strong> Fisheries Act which has been passed by the<br />

<strong>Mizoram</strong> Legislative Assembly on 27.9.2005, its implementation will call for intensive<br />

study and survey of riverine system, fauna and habitats of economically important varieties<br />

of fishes, declaration of fish sanctuary etc for development of Riverine Fisheries in the<br />

state.Besides development of riverine fisheries and reservoir fisheries(in the Hydro<br />

electricity Reservoir and Irrigation water bodies) will generate employment among the<br />

dwellers in the vicinity of the reservoirs.


- 70 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

SCHEME NO.5<br />

5. COLD WATER FISHERIES(CSS):-<br />

1) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.9.00 lakhs<br />

2) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.4.00 lakhs<br />

3) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.2.50 lakhs<br />

The Annual Plan, 2006-07 envisages to develop cold water fisheries in the state by<br />

initiating with Resource survey works and experimentation for rearing/breeding of cold<br />

water fishes viz:- Mahseer species etc in the Departmental Fish Farms as well as on fish<br />

farmers fish pond situated at higher elevation in <strong>Mizoram</strong> by availing 75% of Central<br />

assistance from Govt.of India under Coldwater Fisheries(CSS).<br />

There is an ample scope for developing the Coldwater Fishery in local rivers,<br />

reservoir lakes etc in <strong>Mizoram</strong>. During the Eleventh Plan it is proposed to develop<br />

Coldwater fish farming in the state for production of Mahaseers etc and propagation by<br />

stocking in the rivers, reservoir etc. Running water fish culture has also immense scope in<br />

the hilly streams and could be developed by renovation/remodeling of many water bodies<br />

in the region. Therefore, the 11 th Plan envisages to promote these ventures for boosting up<br />

the fish production in the state.<br />

The outlay proposed during the 11 th Five Year Plan under the scheme is Rs.9.00<br />

lakhs as State share.<br />

SCHEME NO.6<br />

6. INFORMATION, EXTENSION & TRAINING:-<br />

(i) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.29.00 lakhs<br />

(ii) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.12.90 lakhs<br />

(iii) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.14.00 lakhs<br />

Dissemination of technology at the grass root level is a must for improving the<br />

farmers knowledge and skill to enhance fish production. The whole system of Information<br />

& Extension requires strengthening the infrastructure and manpower for research and<br />

development, and Lab to land application for raising the fish production. The thrust in the<br />

Eleventh Plan is Human Resource Development through the CSS Programme and to<br />

educate the pisciculturists for augmenting fish production. The Scheme also provides for<br />

publication of training and extension manuals under the programme of Fisheries Training<br />

& Extension(CSS). The existing Demonstration Farms are to be renovated and put under<br />

training centres with proper infrastructures for exercising method and result<br />

demonstrations viz:- Culture of Freshwater Prawn etc.<br />

The 11 th Five Year Plan also provides fund for meeting the cost of organizing<br />

training of the fish farmers and deputing In-service/fresh personnels for training in various<br />

courses of fisheries science.<br />

The Information, Extension & Training scheme in Fisheries Department will be<br />

strengthened with the assistance under the CSS scheme, Training and Extension which is<br />

to be implemented on 80:20 Central and State funding pattern. In order to encourage the<br />

farmers participation in fish production with right use of fisheries technology,<br />

Workshop/Seminars and training have been envisaged under the CSS programme during<br />

the 11 th Five Year Plan.


- 71 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FISHERIES DEPARTMENT<br />

SCHEME NO.7<br />

4. INLAND FISH MARKETING:-<br />

(i) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.38.00 lakhs<br />

(ii) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.17.00 lakhs<br />

(iii) Anticipated expenditure 2006-<strong>2007</strong> :- Rs.4.00 lakhs<br />

Fish Marketing in <strong>Mizoram</strong> is very poor due to lack of proper communication, warehousing<br />

and transport facilities. Though the production from culture sector has improved a<br />

lot but due to the above lacunae the produces does not reach the marketing centre timely.<br />

Such being the situation it is felt imperative to improve the Fisheries marketing system by<br />

way of enhancing the capacities of the existing Ice Plans, Cold Storages and providing<br />

transport facilities with Insulated Vans. Besides small Ice Plants of manageable capacities<br />

are also required to set up at the potential areas viz:- Zawlnuam, Tlabung etc for better<br />

disposal of fish produces to the main markets.<br />

Therefore, the scheme provides for maintenance of the existing 3nos of Ice Plants and 2<br />

Cold Storages properly for regular production of ice blocks, purchase of Insulated Van,<br />

setting up of Ice Plants etc during the 11 th Five Year Plan.<br />

SCHEME NO.8<br />

8. DEVELOPMENT OF INLAND FISHERIES STATISTICS (DATABASE):-<br />

The scheme provides for maintenance of the on-going Centrally Sponsored<br />

Scheme for Development of Inland Fisheries Statistics through information, networking,<br />

survey etc. The Scheme is functioning with 100% grant-in-aid from the Central<br />

Government towards Salary of staff, Machineries & Equipments etc. Therefore, a token<br />

provision of Rs.0.50 lakh has been kept towards meeting the incidental charges under the<br />

scheme during the 11 th Five Year Plan.<br />

SCHEME NO.9<br />

(i) 11 th Five Year Plan outlay <strong>2007</strong>-<strong>2012</strong> :- Rs.10.50 lakhs<br />

(ii) Annual Plan outlay <strong>2007</strong>-2008 :- Rs.5.00 lakhs<br />

9. COMMERCIAL FISH FARMING THROUGH CONTRACT FARMING:-<br />

Commercial fish farming could be taken up in water bodies both in private sector<br />

and Govt.sector through contract farming for boosting unit area productivity of fish in the<br />

state. This would form an avenue for transforming primitive and traditional sustainable<br />

farming, to modern commercial fish farming.<br />

Under the scheme the Department proposes to take up large water bodies for fish<br />

farming in the private sector(farmers ponds) by contract farming system. This system<br />

would also offer the farmers a market assurance of his farm produces by undertaking the<br />

marketing of his produces by the Department. Thereby it would encourage them in<br />

enhancing the fish production through motivation and modernization.<br />

The 11 th Plan envisages the Working Group’s recommendation for augmenting the<br />

fish production through contract farming system and it is targeted to advocate the practice<br />

in around 83Ha of water area during the 11 th Five Year Plan.<br />

..…


- 72 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

COOPERATION<br />

Cooperation Department in <strong>Mizoram</strong> has got very important and effective<br />

role in finding solutions to overcome the problems of common people and become selfreliant<br />

through Cooperatives. Presently, there are 1428 Primary Cooperative Societies and<br />

10 (ten) State Level Cooperative Federation in <strong>Mizoram</strong> serving the people for their<br />

upliftment and improving their Socio-Economic Condition.<br />

The 11 th Five Year Plan strategy of Cooperative Department is to strengthen<br />

and enhance the progress of the Cooperative Movement already launched in the 10 th Five<br />

Year Plan which broadly aimed at Socio-Economic Development of the people of<br />

<strong>Mizoram</strong> with special emphasis to the following objectives.<br />

(a) Improvement of Cooperative Farming in Agriculture, Horticulture and allied<br />

activities like Piggery, Dairy, Fishery, Sericulture, Poultry etc.<br />

(b) Strengthening of Cooperative Credit Structure for obtaining credit facilities from<br />

financial institution and revamping the Cooperative Banks.<br />

(c) Establishment of appropriate linkages to ensure remunerative prices to member<br />

farmers of Cooperative Societies through Price Support Scheme.<br />

(d) Cooperative Educations inculcating the Cooperative Principle, ideologies and<br />

movement as a whole among the Cooperative members by introducing suitable progammes<br />

for Cooperative Education, Training and Publicity.<br />

(e) Strengthening the organizational set up of the Department as would boost up<br />

restructuring the Cooperative Movement.<br />

(f) Strengthening the Consumer Movement of the State.<br />

The 11 th Plan <strong>2007</strong> – <strong>2012</strong> is prepared on light of the above<br />

strategies.<br />

Special emphasis will also be made to restructuring Cooperative Movement and<br />

reorganise the Department to cover wider field of activities.<br />

The break-up of the outlay of various schemes for 11 th Plan (<strong>2007</strong> – <strong>2012</strong>) and Annual<br />

Plan 2006-07 is shown below:-<br />

(Rs. In lakhs )<br />

Sl. No.<br />

Schemes<br />

11 th Plan<br />

<strong>2007</strong> –<br />

<strong>2012</strong><br />

Projected<br />

Outlay.<br />

Annual Plan-<br />

<strong>2007</strong>-08<br />

Proposed Outlay<br />

1. Direction and Administration 950.00 190.00<br />

2. Training and Human Resources 10.00 6.00<br />

3.<br />

Development<br />

Audit and Evaluation of Cooperative 124.00 13.00<br />

4. Cooperative Statistics 12.00<br />

5. Planning and Implementation (Internal &<br />

External Project)<br />

5.00 0.50<br />

6. Publicity, Information and Technology 22.00 10.00<br />

7. Assistance to Public Sector and other Coop.<br />

Societies<br />

220.00 74.00<br />

8 Assistance to Credit and Banking 220.00 56.00


- 73 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

9 Cooperative Training and Educations 380.00 81.00<br />

10.<br />

(Coop. Unions, JCTC)<br />

Assistance to Handloom & Weaving Coop.<br />

Societies<br />

200.00 40.00<br />

11. Assistance to Farming, Fruit and Vegetable<br />

Growers.<br />

145.00 35.50<br />

12. Assistance to Dairy and Multi-Commodity 52.00 3.00<br />

Coop.<br />

13 Assistance to Piggery Coop. Societies 25.00 5.00<br />

14. Assistance to Poultry Coop. Societies 15.00 -<br />

15. Assistance to Fishery C.S. 25.00 5.00<br />

16 Assistance to Sericulture Coop. Societies 25.00 5.00<br />

17. Assistance to Women Coop. societies 25.00 5.00<br />

18. Assistance to Industrial Coop. Societies 25.00 -<br />

19. Assistance to Housing C.S. 10.00 -<br />

20. Assistance to other types of Coop. 10.00 10.00<br />

21. Assistance to Multi. & Rural Coop. 10.00<br />

22. Disaster Management - -<br />

TOTAL 2510.00 539.00<br />

1. DIRECTION AND ADMINISTRATION :<br />

Socio-economic development of the people through cooperatives<br />

envisaged reorganization of the department to cover wider field of activities and<br />

effective performance. Therefore, the organizational set up of Cooperation<br />

Department is urgently required to be strengthened and expanded with a view to<br />

restructuring the cooperative movement. Separation of Inspection and Audit with<br />

separate staff to have proper gross checking is found a must and is proposed to be<br />

done during the 11 th Plan period.<br />

LAND AND BUILDING :<br />

During the 11 th Five Year Plan the Department proposed to construct the<br />

Office Building and Staff Quarters in the districts of Kolasib, Champhai, Mamit, Serchhip,<br />

Lunglei and Saiha. The Department has acquired suitable sites in those districts for such<br />

construction.<br />

2. TRAINING AND EDUCATION (HUMAN RESOURCE DEVELOPMENT) :<br />

Specific knowledge has to be acquired for strengthening the Cooperative<br />

Movement and for efficient management of Cooperatives. A numbers of Officers have<br />

been sent to undergo Post Graduate Diploma Course on Cooperative Management in<br />

VAMNICOM, Pune and Higher Diploma Courses in Cooperative Management at the<br />

Institute of Cooperative Management at Guwahati. The Officers and Staff have also been<br />

undergoing various coursed organized by A.T.I, Aizawl. Since, skill management assumes<br />

special significance, it is intended to send more officers for various training courses for the<br />

development of effective and professionalised management.


- 74 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

3. AUDIT AND EVALUATION OF COOPERATIVES :<br />

Audit of Cooperative Societies is statutory. For the evaluation of<br />

Cooperatives functioning, Audit, Inspection and Supervision is profoundly necessary.<br />

Audit Cell has been created under this Department. This establishment maintain Chief<br />

Audit Officer, Accountant, U.D.C, L.D.C and Driver considering the heavy workloads.<br />

This mere skeleton is not enough. In almost all the state of the country, Audit Cell and<br />

Inspection cell are separately maintained. Auditors are doing only audit works. But here in<br />

<strong>Mizoram</strong>, Audit and Inspection are performed by the same person and as such, there can be<br />

no cross checking on the performances of the Auditors. It also give undue heavy workloads<br />

which hamper the efficient performances of the Auditor cum Inspectors. Where as All<br />

India norms is 20 Primary Coop. Societies located in a compact area for one Auditors, in<br />

<strong>Mizoram</strong> one Auditors audited more than 50 primary Cooperative Societies scattered at<br />

every nook and corner of <strong>Mizoram</strong>. Not only this, the same Auditor has to perform<br />

inspection, taking feasibility enquiry for organizing new Coop. Societies, organization,<br />

liquidation etc. It is therefore, suggested that Audit Cell and Inspection Cell be separately<br />

maintained and manned by different person.<br />

4. COOPERATIVE STATISTICS :<br />

For preparations of various statistical statements as desired by the State<br />

Govt., Central Govt. and other agencies and for the information about the position of<br />

Cooperative Movement as per the datas, facts and figures, a Statistical Cell is necessary in<br />

the Department.<br />

5. <strong>PLAN</strong>NING AND IMPLEMENTATION<br />

(INTERNAL AND EXTERNAL PROJECT) :<br />

For effective and proper implementation and planning of various State<br />

Govt’s Projects and Central Govt. Projects a Cell is found necessary to be created. This<br />

will be manned by one Officers and other required Officers and Staff will be pooled from<br />

the existing Officers and Staff.<br />

6. PUBLICITY, INFORMATION AND TECHNOLOGY :<br />

Under this Scheme one Research Officer will be appointed to assess and<br />

evaluate the achievement and implementation of various schemes projected by the<br />

department and will provide needful technical guidance/assistance for different schemes<br />

etc. One of the drawbacks of the Department is the lack of Publicity of its programmes and<br />

their implementations due to absence of the required Fund. For Monitoring the progress of<br />

the Departmental Actions, using Information Technology is the most effective and<br />

cheapest means. For this, the Department is proposing to have fund from the 11 th Plan<br />

period of <strong>2007</strong> - <strong>2012</strong>.<br />

7. AUDIT AND EVALUATION OF COOPERATIVES :<br />

Audit of Cooperative Societies is statutory. For the evaluation of<br />

Cooperatives functioning, Audit, Inspection and Supervision is profoundly necessary.<br />

Audit Cell has been created under this Department. This establishment maintain Chief<br />

Audit Officer, Accountant, U.D.C, L.D.C and Driver considering the heavy workloads.<br />

This mere skeleton is not enough. In almost all the state of the country, Audit Cell and<br />

Inspection cell are separately maintained. Auditors are doing only audit works. But here in<br />

<strong>Mizoram</strong>, Audit and Inspection are performed by the same person and as such, there can be


- 75 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

no cross checking on the performances of the Auditors. It also give undue heavy workloads<br />

which hamper the efficient performances of the Auditor cum Inspectors. Where as All<br />

India norms is 20 Primary Coop. Societies located in a compact area for one Auditors, in<br />

<strong>Mizoram</strong> one Auditors audited more than 50 primary Cooperative Societies scattered at<br />

every nook and corner of <strong>Mizoram</strong>. Not only this, the same Auditor has to perform<br />

inspection, taking feasibility enquiry for organizing new Coop. Societies, organization,<br />

liquidation etc. It is therefore, suggested that Audit Cell and Inspection Cell be separately<br />

maintained and manned by different person.<br />

8. ASSISTANCE TO PUBLIC SECTOR AND OTHER UNDERTAKINGS :<br />

(A) MIZOFED LTD. :<br />

This is the only Consumer Federation in the State. Having 196 share holders Cooperative<br />

Societies this Federation handles Consumers and essential commodities and has controlled<br />

the market to a great extent as well as the Consumer Movement in the State. MIZOFED,<br />

being an agent of Indian Oil Corporation Ltd., also handles major chunk of petroleum<br />

products and LPG imported from outside the State through its network of 8 Depots 6 LPG<br />

Show Room and Storages. Another LPG Show Room is commissioned at Mamit. Efforts<br />

are on the way to install another POL Depot within the Capital City of Aizawl and<br />

Hrangchalkawn, Lunglei in order to meet the increasing demand of the public. The<br />

Federation runs the Consumer Stores in various places of Aizawl and Lunglei and has been<br />

doing fairly well in checking the price roses of certain commodities in the market. It<br />

proposed to expand its consumer and marketing activities during the 11 th Plan period and<br />

made a provision of grant for price support. In some States, it is learnt that priorities have<br />

been given to State Level Consumers and Marketing Federation which, in turn, benefited<br />

its linked grass-roots Cooperative Societies. But in the State of <strong>Mizoram</strong>, MIZOFED is not<br />

given enough priorities on its acativities. To relieve the MIZOFED of Tax burden and to<br />

share the benefits to its share holder members Societies and the general public.<br />

The Petrol Pump managed by MIZOFED at Lunglei and Aizawl Town are<br />

located at Private Land. It is proposed that grant may be given to MIZOFED for purchase<br />

of this site.<br />

(B) PRIMARY CONSUMER COOPERATIVES :<br />

Primary Consumer Cooperative Societies play a significant role in the rural economy. It is<br />

a vital institutional structure in the distribution of various items of essential commodities<br />

throughout the State and thus exert a healthy influence on market prices of essential<br />

commodities of mass consumption. They are also playing consumption. They are also<br />

playing an important role in safeguarding the interest of consumers by eliminating the<br />

unfair practices of private traders. The Consumer Cooperative maintain full time Mangers<br />

to manage the business affairs. It is necessary to provide them managerial subsidy and<br />

transport subsidy as would enable them to sell the commodities at reduced price for the<br />

benefit of the people.<br />

9. ASSISTANCE TO HANDLOOM & WEAVING COOPERATIVE<br />

SOCIETIES :<br />

This Scheme includes MAHCO Ltd., Primary Handloom Cooperatives,Processing<br />

Cooperatives, Carpentry, Black smithy, Shoe Makers Cooperative etc.<br />

(a) MAHCO (<strong>Mizoram</strong> Apex Handloom and Handicraft Cooperative Society Ltd.) :<br />

MAHCO is the only Apex Handloom Cooperative Organisation fundtioning<br />

throughout the entire State. It has 120 affiliated Primary Handloom Cooperative Societies


- 76 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

and a members of Individual Weavers scattered all over the State comprising of 120<br />

members. MAHCO has organized Handloom Fairs in the District Headquarters of the State<br />

in order to boost up Handloom activity and also to popularize the handloom products vis-àvis<br />

speed up the market.<br />

During the 11 th Five Year Plan period of <strong>2007</strong> – <strong>2012</strong> Grant-in-aids is proposed<br />

as would enable MAHCO to play pivotal role in the upliftment of Primary<br />

Handloom Cooperatives for creating income generation to the weavers in the field<br />

of production and marketing handloom products.<br />

(b) PRIMARY HANDLOOM COOPERATIVE SOCIETIES :<br />

Handloom and Weaving is a traditional industry and occupation of <strong>Mizoram</strong>. There<br />

are 146 Handloom Cooperative Societies in the State. There is great prospect of<br />

handloom in the State. Financial assistance is needed for the Primary Handloom<br />

Cooperative Societies for purchase of raw materials and construction of work shed etc.<br />

9. ASSISTANCE TO FARMING, FRUITS AND VEGETABLE GROWERS<br />

COOPERATIVE SOCIETIES :<br />

Farming is the main occupation of the rural people in the State. Growing of<br />

Gingers, Chillies, Paddy, Fruits and Vegetables is the common practice among the<br />

Growers Cooperative Societies. Improvement of the performances of the Farming and<br />

Fruit and Vegetable Growers Cooperative Societies is essential for the economic and<br />

Social Development of the people.<br />

(a) MAFF LTD :<br />

This is the Apex Level Cooperative Federation of Farming, Fruit and Vegetable<br />

Growers Cooperative Societies in the State. It procures agricultural inputs like fertilizers,<br />

pesticides etc. from the National Agencies such as IFFCO, BVFC and supplies to the<br />

member Cooperative Societies. Govt. of <strong>Mizoram</strong> selected MAFF Ltd as one of the dealers<br />

of Agri. Inputs in the State. For procurement and supply of Agricultural input to the<br />

member Cooperative Societies and for procurement of their products like Ginger, Fruits<br />

and Vegetables at a remunerative prices financial assistance as Working Capital Grant is<br />

needed. Besides this, Growers in the State are always incurring losses due to incongruous<br />

high cost of production and law price of the produces in the terminal market. To protect the<br />

growers from incurring heavy losses due to distress sale, provision of price support in the<br />

Department is a must. It is, therefore, proposed that Price Support may be given to<br />

Farming, Fruits and Vegetable Cooperatives of the State.<br />

(b) Primary Farming, Fruit and Vegetable Cooperatives :<br />

Development of Primary Farming, Fruit and Vegetable Cooperative Societies is necessary<br />

for socio-economic condition of poor rural people. At present there are 27 Primary<br />

Farming, Fruits & Vegetable Cooperative Societies in the State. To increase farm<br />

production capacity in the State to combat ensuing famine and to eradicate proverty,<br />

financial support to these Cooperative Societies is much needed.


- 77 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

10. ASSISTANCE TO DAIRY AND LIVESTOCK MULTI-COMMODITY<br />

COOPERATIVE SOCIETIES :<br />

(A) MULCO : The <strong>Mizoram</strong> Multi-Commodity Producer’s Cooperative<br />

Union Ltd. is a State Level Society, engaged in milk procurement, processing and<br />

marketing. It is one of the registered Societies which could post a net profit from resources<br />

mobilized by their efforts from its business. However, demand gap and supply gap has to<br />

be stabilized in such a way that the needs for the organization/Union and the Societies are<br />

actually mattered on a regular basis. Infrastructure need such as Milk Collection Centres in<br />

various suburban localities identified numbering 26 units be strengthen by provision of<br />

clean building, clean utensil and modernized milk testing equipments to ensure clean milk<br />

production. This is an emerging issue where the end consumers shall be given the<br />

privileges of hearing quality milk and milk products. In ensuing this programme the<br />

Department wishes to have a provision in the plan budget to implement in a year wise<br />

phasing.<br />

(B) Primary Livestock Multi-Commodity Cooperative Societies :<br />

These Primary Multi-Commodity Cooperative Societies are rearing Cows and<br />

produce milk which they supply to MULCO Ltd. It is an effective source of livelihood of<br />

rural people. Development of these Cooperative Societies is important.<br />

11. ASSISTANCE TO CREDIT AND BANKING :<br />

(A) MIZORAM COOPERATIVE APEX BANK LTD. :<br />

This State Cooperative Bank has been providing Credit for Agricultural and other<br />

productive purposes. The Bank is presently functioning through the network of 10<br />

Branches throughout the State. The Govt. has deployed one Assistant Registrar of<br />

Cooperative Societies in the Bank to guide the Board in Cooperative Management and<br />

other related matters. Due to introduction of Non-Performing Asset/Prudential Norms by<br />

R.B.I and the poor repayment of Loan, the erosion of assets increased significantly for<br />

which the Bank is booked under section 11 of the Banking Regulation Act, 1949. The<br />

management of the Bank made Action Plan to improve the position of the Bank. The Bank<br />

achieved considerable progress from the implementation of this Action Plan. A<br />

Memorandum of Understanding (MOU) is signed between State Govt. and MCAB Ltd. On<br />

29.11.2004 in which State Government agreed to contribute at least Rs. 355 lakhs as Share<br />

Capital during 2004 – 2008. Out of which Rs. 100.00 lakhs is paid during 2005 – 06 and<br />

Rs. 100.00 lakhs is allocated in the approved Annual Plan of 2006 – <strong>2007</strong> as Share Capital<br />

Contribution. Another 155 lakhs is to be provided as per the MOU. Besides this, the Bank<br />

is venturing to give Agriculture Loan to the poor Farming Cooperatives as well as private<br />

farmers. In such cases failure of repayment can come and the Bank is sure to have NPA as<br />

a result of this. To minimize the losses occurred from this NPA Rs. 130 lakhs is provided<br />

as Share Capital and this will be provided after the expiry of MOU signed for 2004 – 2008.<br />

(B) MIZORAM URBAN COOPERATIVE BANK LTD. :<br />

The Bank is providing credit to the urban poor people for non-farming activities.<br />

This Bank is also functioning as channelising agency of Corporate Loans namely,<br />

NSKFDC, HUDCO and NSFDC. One Assistant Registrar of Cooperative Societies has<br />

been deputed to the Bank as Secretary in order to guide the management matters<br />

concerning with Cooperatives.


- 78 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

MUCO Bank Ltd was classified as Weak Bank by R.B.I with reference to its<br />

financial position. The Bank has been booked under Section 11(1) of Banking Regulation<br />

Act, 1949. Accordingly, proposal has been submitting to the State Govt. for<br />

recapitalization of the Bank with a minimum. The Bank took up an Action Plan to improve<br />

the recovery position and the overall performed with a view to overcome the present<br />

position of the default of section 11(1) of Banking Regulation Act. The progress achieved<br />

in implementing the Action Plan is encouraging. To make the Bank turn around, a capital<br />

investment of Rs. 600 lakhs is proposed by the Bank management which the Govt. of<br />

<strong>Mizoram</strong> agreed in principle. Out of this Rs. 169 lakhs has been given to MUCO Bank and<br />

there is still a balance of Rs. 431 lakhs. It is therefore, proposed that Rs. 400 lakhs may be<br />

provided during the 11 th Five Year Plan of <strong>2007</strong> – <strong>2012</strong>.<br />

12. COOPERATIVE TRAINING AND EDUCATION<br />

(COOP. UNIONS, JCTC ETC.) :<br />

This Scheme includes <strong>Mizoram</strong> State Cooperative Union, Lunglei District<br />

Cooperative Union and Chhimtuipui District Cooperative Union. These institutions are<br />

their jurisdiction areas impart Cooperative Training, Education, Public Journals and<br />

organize seminars from time to time. These Institutions are non-profit making bodies and<br />

as such cent percent financial assistance has been given by the State Govt. for<br />

implementation of various programmes. The Govt. of India also impressed upon the need<br />

to provide suitable fund to Cooperative Unions by the State Govt. in order to discharge<br />

their obligations satisfactorily.<br />

Junior Cooperative Training Centre is set up at Aizawl and placed under<br />

<strong>Mizoram</strong> State Cooperative Union (MSCU) for providing Cooperative Training and<br />

Education to the management staff of Cooperative Institutions and members of the<br />

Cooperative Societies in <strong>Mizoram</strong>.<br />

13. ASSISTANCE FOR PIGGERY AND POULTRY COOPERATIVE<br />

SOCIETIES :<br />

(A) <strong>Mizoram</strong> Pig Producers Cooperative Federation (PIGFED) Ltd., under these<br />

Scheme PIGFED Ltd., is the Apex Level Federation of Pig Producers Cooperative<br />

Societies in the State. It provides better type of pigs and piglets to the Primary Pig<br />

Producer Cooperative Societies. This Federation established one Pig Breeding Farm at<br />

Thenzawl for production of improved quality of pigs. Further, PIGFED supplies good<br />

quality of pig feed to the member Cooperative Societies.<br />

14. PRIMARY PIGGERY AND POULTRY COOPERATIVE SOCIETIES :<br />

There are 196 Piggery and Poultry Cooperative Societies in the State. Piggery and Poultry<br />

is the age-old traditional occupation of the poor rural population. Good number of Piggery<br />

and Poultry Cooperative Societies are functioning in the State. For the upliftment of poor<br />

rural people these Societies should be developed by providing financial assitance.


- 79 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

15. ASSISTANCE TO FISHERY COOPERATIVE SOCIETIES :<br />

Fishery Cooperatives are organized among fishpond owners. There are good<br />

prospects for large-scale catch and marketing of fish through Cooperatives. There are good<br />

numbers of Primary Fishery Cooperatives functioning in the State. The <strong>Mizoram</strong><br />

Cooperative Fish Farming, Marketing and Processing Federation Ltd. (ZOFISFED) is<br />

taking the initiative to feed the market with local fishes owing to the availability of Cold<br />

Storage at Kolasib and Sairang road Aizawl. The ZOFISFED procures fish directly from<br />

member Fishery Cooperative Societies and sell it in Aizawl Market.<br />

16. ASSISTANCE TO SERICULTURE COOPERATIVE SOCIETIES :<br />

There is good potential of Sericulture Development in <strong>Mizoram</strong>. A considerable<br />

number of Primary Sericulture Cooperative Societies in the State are functioning well for<br />

the production of Cocoons. The <strong>Mizoram</strong> Apex Sericulture Cooperative Society Ltd.<br />

(MASCOS) is procuring Cocoons from the member Primary Cooperative Societies at<br />

remunerative prices and market the same through the Sericulture Department.<br />

17. ASSISTANCE TO WOMEN COOPERATIVE SOCIETIES :<br />

The Govt. of India has given priority to participation of women folk in Cooperative<br />

Movement. The Cooperatives have been given directive to initiate various measures for<br />

gender awareness, training programmes for the women leaders, sensitizing the women for<br />

taking leadership role in the Cooperative Movement and encouraging the formation and<br />

promotion of Women Cooperatives.<br />

In <strong>Mizoram</strong>, <strong>Mizoram</strong> State Cooperative Women Federation Ltd. (WOMENFED)<br />

has been taking leading role in the participations of women in cooperative. Around 70 nos.<br />

of Women Cooperative Societies have so far been registered with total membership of<br />

more than 2000.<br />

WOMENFED has been running a common work shed and sewing machines<br />

training installed in rented building. Necessary training is being given to the members to<br />

provide skills and facilitates income generation. The Federation is earning nominal profit<br />

margin against disposal of finished products. To accelerate the activity of Women<br />

Cooperative, the following financial assistance is proposed for WOMENFED.<br />

18. INDUSTRIAL COOPERATIVE DEVELOPMENT :<br />

The Department has been looking after 174 Primary Industrial Cooperative<br />

Societies other than Handloom and Weaving sector. The Department could not provided<br />

Financial Assistance to such societies during the last 15 years back due to lesser plan<br />

provision for the Cooperation Department.<br />

19. HOUSING COOPERATIVE SOCIETIES :<br />

Cooperation Department has been looking after a 18 Primary Housing Cooperatives<br />

without providing Financial Assistance for the last 15 years back due to lesser Plan<br />

allocation for Cooperation Department.


- 80 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

COOPERATION DEPARTMENT<br />

20. Other type of Societies : In <strong>Mizoram</strong> we have more than 25 types of<br />

Primary Cooperative Societies in a grassroots level. 50% of which are different types of<br />

societies such like Service, Livestock, Poultry, Floriculture, Canteen, Consumers and<br />

Multipurpose Societies etc. Other than types of societies mentioned in pre-pages. The<br />

Department could not provided Financial Assistances to such types of societies for the last<br />

15 years back due to lesser Plan outlay for Cooperation Department.<br />

……


- 81 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TRADE & COMMERCE DEPARTMENT<br />

TRADE & COMMERCE<br />

The proposed outlay for 11 th Five Year Plan <strong>2007</strong>-12 is Rs. 1560.00<br />

lakhs and Rs. 220.00 lakhs is proposed for the annual plan <strong>2007</strong> – 2008. No new scheme<br />

has been proposed to be implemented during this period and as such, the Plan mainly<br />

aims at continuing the existing establishment and functions.<br />

The break-up of the Plan outlays are as follows :-<br />

Sl.<br />

No.<br />

Head of Schemes Proposed<br />

Outlay for 11 th<br />

Plan<br />

(Rs in lakh)<br />

Proposed outlay for<br />

A.P. <strong>2007</strong>-08<br />

1. Agricultural Marketing 717.50 160.50<br />

2. Administration 32.50 6.50<br />

3. Grading<br />

Control<br />

& Quality<br />

15.00 1.00<br />

4. Other Expenditure 795.00 52.00<br />

TOTAL 1560.00 220.00<br />

I. MARKETING FACILITIES :<br />

Agriculture Marketing :<br />

The proposed 11 th Five Year Plan is Rs. 717.50 lakhs and Rs. 160.50<br />

lakhs is proposed for Annual Plan <strong>2007</strong> – 08 and break up is given below :<br />

Sl.<br />

No.<br />

Head of Schemes Proposed<br />

Outlay for 11 th<br />

Plan<br />

(Rs in lakh)<br />

Proposed outlay for<br />

A.P. <strong>2007</strong>-08<br />

1. Salary 85.00 14.55<br />

2. Wages 65.00 12.20<br />

3. Medical 5.00 2.45<br />

4. Travelling Expenses 10.00 2.50<br />

5. Office Expenses 100.00 20.00<br />

6. Minor<br />

277.50 76.00<br />

Works/Maintenance<br />

7. Motor Vehicle 15.00 2.30<br />

8. Other Charges 160.00 30.50<br />

TOTAL 717.50 160.50<br />

II. GRADING AND QUALITY CONTROL FACILITIES :<br />

1. Grading & Quality Control : The proposed 11 th Five Year Plan is Rs. 15.00<br />

lakhs and Rs. 1.00 lakhs is proposed for Annual Plan <strong>2007</strong>-08 and break up is given<br />

below :-<br />

Sl.<br />

No.<br />

Head of Schemes Proposed<br />

Outlay for 11 th<br />

Plan<br />

(Rs in lakh)<br />

Proposed outlay for<br />

A.P. <strong>2007</strong>-08<br />

1. Office Expenses 15.00 1.00<br />

TOTAL 15.00 1.00


- 82 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TRADE & COMMERCE DEPARTMENT<br />

2. Administration : The proposed 11 th Five Year Plan is Rs. 32.50 lakhs and Rs.<br />

6.50 lakhs is proposed for Annual Plan <strong>2007</strong> – 08 and break up is given below :-<br />

Sl.<br />

No.<br />

Head of Schemes Proposed<br />

Outlay for 11 th<br />

Plan<br />

(Rs in lakh)<br />

Proposed outlay for<br />

A.P. <strong>2007</strong>-08<br />

1. Office Expenses 30.00 6.00<br />

2. Advertisement 2.50 0.50<br />

TOTAL 32.50 6.50<br />

III. OTHER EXPENDITURE :<br />

The proposed 11 th Five Year Plan is Rs. 795.00 lakhs and Rs. 52.00 lakhs is<br />

proposed for Annual Plan <strong>2007</strong> – 08.<br />

Sl. Head of Schemes Proposed<br />

Rs in lakh)<br />

No.<br />

Outlay for 11 th<br />

Proposed outlay for<br />

Plan<br />

A.P. <strong>2007</strong>-08<br />

1. Other Expenditure (Share<br />

Capital to Public Sector<br />

Undertaking – MAMCO<br />

Ltd.)<br />

795.00 52.00<br />

TOTAL 795.00 52.00<br />

…..


- 83 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

RURAL DEVELOPMENT DEPARTMENT<br />

RURAL DEVELOPMENT<br />

The proposed outlay for 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> is Rs 14,268.00 lakhs and<br />

proposed Annual Plan <strong>2007</strong> – 08 is Rs 2,630.00 lakhs in respect of Rural Development<br />

Department.<br />

Detailed proposals are as below :<br />

1. 2501 - DWCRA<br />

Though the Development of Women and Children in the Rural Areas (DWCRA)<br />

Programme has been terminated, the staff under DWCRA are absorbed to Rural<br />

Development Department. There are at present 52 staff who are drawing their pay and<br />

allowances under DWCRA/Plan.<br />

The proposed outlay for DWCRA during 11 th Plan is Rs. 446.00 Lakh, Rs.<br />

80.00 lakhs for Annual Plan <strong>2007</strong> – 08 as per break up below for maintenance of 52<br />

staff:<br />

Sl<br />

No<br />

Detail Head<br />

Proposed 11 th<br />

Plan<br />

(Rs. In Lakh)<br />

Proposed<br />

Annual Plan<br />

<strong>2007</strong>-08<br />

( Rs. in lakh)<br />

1. Salaries 387.00 68.00<br />

2. Medical Treatment 7.50 1.00<br />

3. Travel Expenses 28.50 6.00<br />

4. Office Expenses 23.00 5.00<br />

Total 446.00 80.00<br />

2. 2501 - State Institute of Rural Development (SIRD)<br />

Since the SIRD is operated under Centrally Sponsored Scheme, 100% of the Non-<br />

Recurring Expenditure is borne by the Central. However, the Recurring Expenditure of<br />

SIRD is shared between the Central and State at the ratio of 50:50. With the newly<br />

created ETC at Thingsulthliah and enhancement of Central assistance of Recurring grant<br />

for ETC from Rs. 5.00 Lakh to Rs. 10.00 Lakh per ETC per year (for which the State<br />

also has to match its share of Rs. 10.00 Lakh per ETC per year), the total outlay<br />

proposed for SIRD during the 11 th Plan is Rs. 115.00 Lakh and the proposed Annual<br />

Plan <strong>2007</strong> – 08 is Rs 28.00 lakhs.<br />

3. 2501 - DRDA Direction & Administration<br />

There are 8 (eight) DRDA’s in the State and the DRDA Administration Fund is shared<br />

between Central and State at the ratio of 75:25. The proposed outlay for DRDA<br />

Administration during the 11 th Plan is Rs. 880.00 Lakh and during the Annual Plan<br />

<strong>2007</strong>-08 is Rs 104.00 lakhs.<br />

4. 2501 - Swarnjayanti Gram Swarozgar Yojana (SGSY)<br />

Like the SGRY, the fund required for implementation of the SGSY is also share<br />

between Central and State on the basis of 75:25. Rs. 850.00 Lakh is proposed for the<br />

same during the 11 th Plan and Rs 110.00 lakhs is proposed for Annual Plan <strong>2007</strong> – 08.


- 84 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

RURAL DEVELOPMENT DEPARTMENT<br />

5. 2501-Integrated Wasteland Development Programme (IWDP) / Hariyali<br />

There are at present 44 IWDP/Hariyali Projects being implemented within the State<br />

covering a total area of 369803 Hactares. The total cost for all these projects is Rs.<br />

22188.18 Lakh, out of which the Central Share is Rs. 20340.05 Lakh and the State Share<br />

is Rs. 1848.18 Lakh. The State Share released against the Central release so far is Rs.<br />

158.90 Lakh keeping a balance of Rs. 1689.28 Lakh. The project period of IWDP is<br />

five years and these on-going 44 projects are expected to be completed during the 11 th<br />

Plan. For completion of the projects the State has to release its entire share to the total<br />

project cost for this, the total amount of Rs. 1689.28 Lakh will be required during the<br />

11 th Plan.<br />

Further, during 2006-07, 8 (eight) new projects have been sanctioned and Rs.<br />

48.00 lakh is required every year, Rs. 319.00 lakhs is proposed for 11 th Plan and Rs<br />

50.00 lakhs is proposed for Annual Plan <strong>2007</strong> – 08.<br />

6. 2505 - Rural Housing (Indira Awaas Yojana)<br />

This is also another CSS wherein the fund is shared between Central and State at the<br />

ratio of 75:25. The proposed outlay for the 11 th Plan is Rs. 427.00 Lakh and the<br />

proposed outlay for Annual Plan <strong>2007</strong> – 08 is Rs 115.00 lakhs.<br />

7. 2505 - Sampoorna Grameen Rozgar Yojana (SGRY)<br />

SGRY is a Centrally Sponsored Scheme (CSS), the expenditure under the Scheme is<br />

shared by Central and State at the ratio of 75:25. The proposed outlay during the 11 th<br />

Plan is Rs. 1323.00 Lakh and proposed outlay for Annual Plan <strong>2007</strong> – 08 is Rs 287.00<br />

lakhs.<br />

8. 2515 - Direction and Administration<br />

There are now 22 existing posts of Officers and staff who draw their pay and allowances<br />

under Plan Fund. In addition, it is proposed that the three Project Officers (PO’s)<br />

absorbed from DWCRA will draw their pay and allowances under this head during the<br />

11 th Plan. Another proposal for filling up of Rural Planning Officer (RPO) post by<br />

conversion has also been submitted to the Government.<br />

The proposed outlay for 11 th Plan is Rs. 453.00 Lakh and proposed Annual Plan<br />

for <strong>2007</strong> – 08 is Rs. 118.00 lakhs as per beak up below:<br />

Sl<br />

No<br />

Detail Head<br />

Proposed 11 th<br />

Five Year Plan<br />

(Rs In Lakh)<br />

Proposed<br />

Annual Plan<br />

for <strong>2007</strong> – 08<br />

(Rs In Lakh)<br />

1. Salaries 258.90 56.00<br />

2. Wages 26.00 8.00<br />

3. Medical Treatment 0.10 3.00<br />

4. Travel Expenses 30.00 15.00<br />

5. Office Expenses 80.00 25.00<br />

6. Publication 15.00 3.00<br />

7. Advertising and Publicity 5.00 1.00<br />

8. Other Charges 15.00 2.00<br />

9. Motor Vehicles 23.00 5.00<br />

Total 453.00 118.00


- 85 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

RURAL DEVELOPMENT DEPARTMENT<br />

9. 2515 - Block Level Administration (BLA)<br />

There are 234 Staff at present who draw their pay and allowances under BLA<br />

and with the creation of three new RD Blocks and upgradation of one RD Block which<br />

makes a total of 26 RD Blocks altogether; there will be more Officers who will draw<br />

their pay and allowances under BLA. Proposal has also been submitted to the<br />

Government for filling up of posts for 4 BDO’s, 6 Assistants, and 4 LDCs to be posted<br />

in the newly created RD Blocks.<br />

The proposed outlay for the 11 th Plan is Rs. 2000.00 Lakh and the proposed A.P.<br />

<strong>2007</strong>-08 is Rs. 500.00 lakhs as per break up shown below:<br />

Sl<br />

No<br />

Detail Head<br />

Proposed Outlay<br />

for 11 th Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

(Rs. In Lakh)<br />

Proposed Outlay<br />

for Annual Plan<br />

<strong>2007</strong>- 08<br />

(Rs. In Lakh)<br />

1. Salaries 1560.00 401.00<br />

2. Wages 50.00 8.40<br />

3. Medical Treatment 10.00 20.00<br />

4. Travel Expenses 107.00 50.00<br />

5. Office Expenses 200.00 10.00<br />

6. Rent 8.00<br />

7. Minor Works 50.00 8.00<br />

8. Other Charges 15.00 2.60<br />

Total 2000.00 500.00<br />

10. 2515 - Pradhan Mantri Gramodaya Yojana – Gramin Awaas<br />

(PMGY – GA)<br />

To fill up the gap of housing shortage and supplement the Rural Housing<br />

Programme in the rural areas the PMGY-GA is being implemented under the State Plan<br />

Fund. The assistance equivalent to Rs. 27500/- and Rs. 12500/- per beneficiary were<br />

given for new construction and upgradation respectively. The total outlay of Rs.<br />

5098.00 Lakh is proposed during the 11 th Plan for construction of 9800 new houses and<br />

upgradation of 5500 existing houses and the proposed outlay for Annual Plan <strong>2007</strong> – 08<br />

is Rs 688.00 lakhs.<br />

11. 2515 - Rural Communication<br />

Due to the never ending need for construction and maintenance of roads<br />

connecting Villages and Village internal roads, it is proposed that fund amounting to Rs.<br />

5.00 Lakh per RD Block be allocated under Rural Communication during the 11 th Plan.<br />

A total outlay of Rs. 1.00 Lakh is proposed for the 26 RD Blocks for 11 th Plan and Rs<br />

0.35 lakh is proposed for Annual Plan <strong>2007</strong>- 08.<br />

12. 2515 – Housing for Project Staff<br />

There are 26 RD Blocks at present in the State, out of which three are newly<br />

created and one upgraded to a full fledged Block recently. New Construction of Office<br />

Buildings, Quarters are required for the three newly created and one upgraded RD<br />

Blocks. And repair, renovation and reconstruction of Office Buildings, Quarters are<br />

required for the rest RD Blocks. Total outlay of Rs. 620.00 lakh is proposed to cover the<br />

26 R.D. Blocks during 11 th Plan and Rs 8.65 lakhs is proposed for Annual Plan <strong>2007</strong> –<br />

08.


- 86 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

RURAL DEVELOPMENT DEPARTMENT<br />

13. 4515 - Social Education<br />

The works carried out under Social Education has been of great help to the Mizo<br />

Community at large. Mostly construction of Community Halls and Public Playgrounds<br />

are undertaken under the Scheme with the aim of shaping the socio-moral life of the<br />

rural youth. It is, therefore, proposed that an outlay of Rs. 1234.00 Lakh is proposed for<br />

the Scheme during the 11 th Plan and Rs 200.00 lakhs is proposed for Annual Plan <strong>2007</strong> –<br />

08.<br />

…..


- 87 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

LAND REFORMS<br />

Proposed Outlay for 11 th Five Year Plan : Rs. 2310.00 lakhs<br />

Proposed outlay for AP <strong>2007</strong> – 08 : Rs. 462.00 lakhs<br />

OBJECTIVE :<br />

<strong>Mizoram</strong> is non - Land record State due to absence of Survey and settlement<br />

Operation in the past. In absence of such reliable Land Information System it is not<br />

possible to take up effective Land Reforms measures. The State Government had<br />

therefore decided to conduct Survey and Settlement Operation with time framed<br />

programme to create Basic Land Records to meet the requirements of land use planning,<br />

land use control, land tenure, land ownership limits, taxation on land and building, land<br />

valuation, land acquisition, land records and registration and conferment of ownership<br />

rights to land holders and inhabitant within of notified areas and villages. Meanwhile,<br />

the Department, due to inadequate administrative infrastructure, cannot cope with the<br />

phenomenal increase in the range and volume of work for the purpose of land<br />

administration. It is therefore required to strengthen the administration.<br />

The Centrally Sponsored for Strengthening of Revenue Administration and<br />

Updating of Land Records as 50:50 (Central : State) sharing basis is being implemented<br />

and the 11th Five Year Plan is also prepared in conformity with this scheme. The<br />

following six schemes (Sl. No. 1-6) are implemented during the 10th Five Year Plan and<br />

the seven schemes (including CLH) will be implemented during the Eleventh Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong>. The proposed outlay for 11 th Five Year Plan is Rs. 2310.00 lakhs and<br />

Rs. 462.00 lakhs is proposed for <strong>2007</strong> – 08.<br />

SCHEME - WISE BREAK - UPS<br />

The Scheme-wise break-ups within the proposed outlay of Rs.<br />

1300.00 lakhs for the Eleventh Five Year Plan <strong>2007</strong> - <strong>2012</strong> is summarised as follows :-<br />

Sl. Name of Scheme 11 th Five yr <strong>2007</strong>-08<br />

No. Plan Outlay Outlay<br />

01. Direction & Administration 540.00 127.60<br />

02. Statistics & Evaluation 138.00 18.60<br />

03. Maintenance of Land Records 1152.00 248.80<br />

04. Other charges (Survey Training) 80.00 16.00<br />

05. Regulation of Land holdings & Tenancy 380.00 50.00<br />

06. BAFFACOS 10.00 0.90<br />

07. Consolidation of Land Holdings 10.00 0.10<br />

TOTAL = Rs. 2310.00 462.00<br />

DETAILS OF THE SCHEMES<br />

I. DIRECTION & ADMINISTRATION (Rs. 127.60 lakhs) :-<br />

1. CONSTRUCTION OF BUILDING : (Rs. 38.00 lakhs)


- 88 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

(a) Construction of Aizawl District Office Building (Rs. 20.00 lakhs)<br />

The Aizawl District Land Revenue & Settlement Office was<br />

accomodated in dilapidated condition with congested rooms. It is therefore proposed to<br />

constructed R.C.C. building to accomodate all infrastructure requirement of District<br />

Office. Hence, necessary fund amounting to Rs. 20.00 lakhs is provided herewith and<br />

the same fund will be utilised for matching contribution of CSS.<br />

(b) Construction of Record Rooms and Staff Quarters : (Rs. 18.00 lakhs)<br />

Lack of village level Record Room and Staff Quarter creates problems<br />

for Revenue Administration at primary unit level. The Department urgently needs<br />

buildings for Record room-cum-residential accomodation for Staff posted at such<br />

centres. Hence, Rs. 18.00 lakhs is earmarked for construction of four Record Roomscum-Staff<br />

Quarters at Aizawl, Champhai, Mamit & Serchhip Districts. The fund will be<br />

utilised with matching contribution of C.S.S.<br />

2. HOUSE SITE <strong>PLAN</strong> (Rs. 8.50 lakhs)<br />

The Department has been taking up the scheme of house site planning at<br />

various convenient locations within town areas. The house sites so planned are meant<br />

for allotment to the poor and needy families. During the year <strong>2007</strong>-2008, it is proposed<br />

to give house sites to 5,000 families. Rs. 8.50 lakhs is provided for house site plan and<br />

the fund will be utilised for matching contribution of C.S.S.<br />

3. PURCHASE OF MACHINERY & EQUIPMENTS (Rs. 6.00 lakhs) :<br />

In order to carry on Survey works, and preparation of Land Records and<br />

issue of certificates with connected documents for earning more and more revenue,<br />

purchase of survey, drawing and printing equipment/ materials is required every year.<br />

For this purpose, Rs. 6.00 lakhs is provided and the same fund will be utilised as a<br />

matching share of C.S.S.<br />

4. CREATION OF POSTS & SALARY (Rs. 42.00 lakhs) :<br />

Lack of man power, both technical and non-technical is the main<br />

problem constantly faced by the Department. The present staff strength is too<br />

inadequate to deal with the increasing volume of works.A provision of Rs. 42.00 lakhs<br />

is provided for maintenance of the existing posts and newly created post. In addition, the<br />

salary for 33 Nos. of trained Surveyors engaged on contract basis is also included in the<br />

provision.<br />

The following post which has already been approved during 2006-07 is<br />

proposed for creation during <strong>2007</strong>-08.<br />

Sl.No. Name of posts No. of Post proposed for creation<br />

1 GROUP 'A'<br />

Already approved Newly proposed Total<br />

Additional Director (Survey)<br />

(Rs. 14,300-18,300) 1 Nil<br />

2 GROUP 'C'<br />

Stenographer (Grade-III)<br />

(Rs. 4500 - 7000) 2 Nil<br />

Total 3 Nil


- 89 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

5. OFFICE EXPENSES : (Rs. 9.00 lakhs) :-<br />

A provision of Rs. 9.00 lakhs is earmarked for Office expenses which<br />

includes purchase of one lightVehicle for replacement of the old one allotted to the<br />

Director, Land Revenue & Settlement, <strong>Mizoram</strong> and the same fund may be utilised for<br />

matching contribution of CSS.<br />

6. TRAVELLING EXPENSES (Rs. 7.00 lakhs) :-<br />

Rs. 7.00 lakhs is earmarked for travelling expenses and the fund will be<br />

utilised with a matching share of C.S.S.<br />

7. I.T. DEVELOPMENT ( Rs. 6.00 lakhs) :-<br />

Government of <strong>Mizoram</strong> has felt the need to work out a practical<br />

modality for improving management of land records on a statewide scale utilising tools<br />

of Information Technology. The Government of India, Ministry of Rural Development,<br />

Department of Land Resources has provided Central assistance for Computerisation of<br />

Land Records, especially for purchase of Computer Hardware/ Software and Data Entry<br />

works. It is the responsibility of the State Government to provide infrastructure,<br />

manpower, maintenance of computers and consumable items and to expand the network<br />

system. The focus to this scheme is to design a multi functional support for creation of<br />

reliable Data Bank for generation of Land Information System to provide information<br />

about the land, the resources upon it and the improvements made to it. Rs. 6.00 lakhs is<br />

provided herewith to meet such expenses and the fund will be utilised with matching<br />

contribution of C.S.S. for Computerisation of Land Records.<br />

9. OTHER CHARGES/ COMPENSATION (Rs. 1.79 lakhs) :-<br />

The Land Reforms measures requires payment of compensation for<br />

acquisition of Private land for public interest. Hence, Rs. 1.79 lakhs is provided as a<br />

token for meeting such expenses and other charges. This fund will be utilised with<br />

matching contribution of C.S.S.<br />

10. ENGAGEMENT OF CONTINGENT KHALASIS (Rs. 8.81 lakhs) :<br />

In order to carry out the works relating to verification and demarcation of<br />

the Inter-State, Inter-District, Inter-Sub-division and Inter- Village boundary assigned<br />

by the Government of <strong>Mizoram</strong>, it is required to engage Contingent Khalasis who are to<br />

encamp in the forest of remote areas from time to time. As such, a provision of Rs. 8.81<br />

lakhs is earmarked for wages, and the fund will be utilised with a matching contribution<br />

of C.S.S.<br />

11. DISASTER MANAGEMENT (Rs. 0.50 lakhs) :<br />

<strong>Mizoram</strong> is also vulnerable to possible disasters like Cyclonic Storm,<br />

landslide, hailstorm, earthquake, flood, fire, lightning etc. A such, it is essential for the<br />

State Government to remain alert and well prepared to face such eventualities at any<br />

time. Hence, Rs. 0.50 lakhs is provided for activities on prevention and mitigation, so as<br />

to reduce the impact of any kind of disaster in <strong>Mizoram</strong> during <strong>2007</strong>-2008 and the same<br />

fund will be utilised for matching contribution of C.S.S.


- 90 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

II. STATISTICS & EVALUATION (Rs. 18.60 lakhs) :<br />

1. SALARY (Rs. 3.00 lakhs) :<br />

Due to increasing volume of work the Department has require the<br />

service of two Joint Director, one to look after Technical Work and another one for<br />

Administration. Recently, the post of Joint Director (Survey) was created and filled up.<br />

It is now required one post of Joint Director (Admn.) It is therefore proposed to create<br />

the said post including Research Officer and Inspector which had already been<br />

approved in order to meet the immediate requirement. The following three posts are<br />

therefore proposed for creation and neccesary fund of Rs. 3.00 lakhs is also provided<br />

herewith to meet such expenses.<br />

Sl. No. Name of Posts No. of post<br />

Already<br />

approved<br />

GROUP 'A'<br />

1. Joint Director 1<br />

2. R.O. 1<br />

3. Inspector 1<br />

TOTAL : 3<br />

2. OFFICE EXPENSES (Rs. 8.00 lakhs) :-<br />

Rs. 8.00 lakhs is earmarked for Office stationery, printing of maps, forms<br />

and Certificates etc,. and the fund will be utilised with matching contribution of C.S.S.<br />

3. TRAVELLING EXPENSES (Rs. 7.00 lakhs) :-<br />

The reliability and accuracy of work relating to collection and<br />

preparation of land datas or statistics mainly depend on the performance of field<br />

Officerss and Staff at various centres. Hence, Rs. 7.00 lakhs is provided for travelling<br />

expenses and other charges and this fund will be utilised with matching contribution of<br />

C.S.S.<br />

4. OT0HER CHARGES/ COMPENSATION (Rs. 0.60 lakhs) :-<br />

The implementation of Land Reforms Programme requires payment of<br />

compensation for acquisition of Land for public interest. Hence, Rs. 0.60 is provided in<br />

token for such purposes and other charges. The fund will be utilised for matching<br />

contribution of C.S.S.<br />

III. MAINTENANCE OF LAND RECORDS (Rs. 248.80 lakhs) :<br />

1. CADASTRAL SURVEY ( Rs. 40.00 lakhs ) :-<br />

Comprehensive Cadastral Survey is considered necessary for preparation of<br />

Cadastral maps and Land Information System. Sixty six (66) notified towns/Sub-towns<br />

have already been cadastrally surveyed. It is proposed to cover atleast 15 Nos. of<br />

notified towns/villages covering 1000.00 Hectares during <strong>2007</strong>-2008. Rs. 40.00 lakhs is<br />

earmarked to meet the expenses of Cadastral Survey including survey station marks of<br />

the Notified areas / Sub-towns and W.R.C., which will be utilised with a matching share<br />

of C.S.S.


- 91 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

2. ENGAGEMENT OF TRAINED SURVEYORS ( Rs. 6.00 lakhs ) :-<br />

The existing technical staff is too inadequate for successful and progressive<br />

implementation of various Schemes especially Cadastral Survey which is one of the<br />

foremost important measures for land reforms. Due to ban on creation of Posts, a<br />

number of persons, who had already completed a two-year course in Survey training at<br />

the Survey Training Institute, Hyderabad, have to be engaged on contract/ Muster Roll<br />

basis as their service is required by the Department for Survey, Settlement and<br />

preparation of land record operations. Thus, Rs. 6.00 lakhs is earmarked for engagement<br />

of 33 trained personnel. The fund will be utilised with a matching contribution of C.S.S.<br />

3. STRENGTHENING OF SURVEY ORGANISATION AND SALARY (Rs.<br />

78.79 lakhs) :-<br />

With the re-organisation of Civil Districts and the increasing volume of Works<br />

in Land Reform Programme, the services of more technical staff are urgently required<br />

by the Department. Therefore, the following posts have already been approved during<br />

2006-<strong>2007</strong> and the same posts are again proposed for creation during <strong>2007</strong>-2008. The<br />

new proposal for creation of Head Clerk, UDC and LDC for District Offices are found<br />

quite necessary as the District Offices can not be functioned effectively without such<br />

clerical staff. Hence, minimum requirement is proposed for Directorate and District<br />

Offices of Champhai, Kolasib, Mamit & Serchhip.<br />

Sl. Name of Posts No. of Posts<br />

No. already Approved<br />

GROUP 'A'<br />

1. Survey Officer 1<br />

2.<br />

(Rs. 10,000 - 15,200)<br />

GROUP 'B'<br />

Head Surveyor<br />

(Rs. 6500 - 10500)<br />

3<br />

3. Surveyor - I<br />

(Rs. 5500 - 9000)<br />

1<br />

4.<br />

GROUP 'C'<br />

Surveyor - II<br />

(Rs. 4500 - 7000)<br />

5<br />

5. Surveyor - III 4<br />

(Rs. 4500 - 7000)<br />

6. Cartographer - II 1<br />

(Rs. 4500 - 7000)<br />

7. Cartographer - III 1<br />

(Rs. 4500 - 7000)<br />

TOTAL 16


- 92 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

A provision of Rs. 78.79 lakhs is earmarked for salary of the existing and<br />

the the proposal for creation of posts during <strong>2007</strong> - 08.<br />

4. PURCHASE OF MACHINERY AND EQUIPMENT (Rs. 6.00 lakhs) :-<br />

In order to achieve a high standard of accuracy in land survey, new and better<br />

quality of various modern Survey, Drawing and Printing equipments/materials have to<br />

be procured this year. It is, therefore, proposed that Rs. 6.00 lakhs be provided for<br />

purchase of machineries and equipments during <strong>2007</strong>-2008 which will be utilised with<br />

a matching share of C.S.S. fund.<br />

4. OTHER CHARGES/ COMPENSATION- (Rs. 0.01 lakhs) :-<br />

The implementation of Land Reforms Programme requires<br />

payment of compensation for acquisition of Land for public interest. Hence, Rs. 0.01 is<br />

provided in token for such purposes and other charges. The fund will be utilised for<br />

matching contribution of C.S.S.<br />

5. OFFICE EXPENSES (Rs. 10.00 lakhs) :-<br />

The Department recently introduced new Land Settlement Certificates which is<br />

more durable and exhaustive by using computerised and laminated material with plastic<br />

channel for the cover. With this end in view, a provision of Rs. 10.00 lakhs is provided<br />

to meet the Office expenses during <strong>2007</strong> - 2008. The fund will be utilised with a<br />

matching share of Central Assistance.<br />

6. TRAVELLING EXPENSES (Rs. 8.00 lakhs) :-<br />

Rs. 8.00 lakhs is earmarked for travelling expenses of the Officers and Staff<br />

during <strong>2007</strong> - 2008 and the fund will be utilised with a matching contribution of C.S.S<br />

fund.<br />

7. AERIAL CADASTRAL SURVEY (Rs. 100.00 lakhs) :-<br />

8.1 The Pilot Project on Aerial Cadastral Survey was taken up by Survey of India in<br />

the District of Aizawl (undivided Aizawl) during 1996 - 98. The area covering 3737.00<br />

Sq.kms was initially photographed at the scale of 1:10,000. The photographs are now<br />

readily available for further processing through photogrammetric instruments for<br />

preparation of line maps and the work has to be taken up by the Department through<br />

Government of India approved agency.<br />

8.2 It is also proposed to take up Pilot Project on combined Satellite<br />

Imaginary with GPS supported Cadastral Survey with the technical assistance of<br />

Government of India approved Company/ Agency to speed up the work on Survey and<br />

Settlement Operation with the physical target of 2000.00 Sq.Km.<br />

Hence, Rs. 100.00 lakhs is provided to meet expenses for further<br />

processing of Aerial Photographs with ground Control Survey works and for Satellite<br />

Imagery combined with Cadastral Survey work. The fund will be utilised for matching<br />

contribution of C.S.S already released during <strong>2007</strong>-08.


- 93 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

IV. SURVEY TRAINING (OTHER CHARGES) ( Rs. 25.00 lakhs) :-<br />

(a) It is proposed to send 50 Nos. pre-service and other in-service<br />

personnel at S.T.I., Hyderabad for Short term Course in Cadastral Survey &<br />

Cartography and also to conduct refresher course for technical personnel during <strong>2007</strong>-<br />

2008. Rs. 5.00 lakhs is earmarked for this purpose which will be utilised for matching<br />

share of C.S.S.<br />

(b) Construction of <strong>Mizoram</strong> Survey Training Institute:-<br />

Necessity for <strong>Mizoram</strong> Survey Training Institute<br />

(1) The lack of trained professionals and local youths in the trade of Land<br />

survey and cartography is the main problem of the State of <strong>Mizoram</strong> due to absence of<br />

Survey Training Institute in the State.<br />

(2) <strong>Mizoram</strong> has mainly depend upon the Survey Training Institute, Uppal,<br />

Hyderabad run by Survey of India. The Course tuition fee under this Institution is too<br />

high, viz. Basic Courses like Surveying Supervisor or Surveying Technician is Rs.<br />

2,83,000/- per trainee for each course. It is therefore very difficult to afford such costly<br />

training requirements.<br />

(3) The medium of teaching and instruction in such institution is Hindi and<br />

English. Most of the in-service personnel of the Department in <strong>Mizoram</strong> used local<br />

language, i.e. Mizo only and it is very difficult for mizos to follow the lectures and<br />

instructions of such Institute.<br />

(4) The survey and settlement works does not concentrate in technology only<br />

but also dealt with Land systems, land revenue, preparation and maintenance of land<br />

records of the State.<br />

(5) The terrains, topography and Vegetation of <strong>Mizoram</strong> has peculiar type<br />

unlike other State of India. It is therefore required to apply modified principles and<br />

methods of survey for Cadastral survey system and in the preparation and maintenance<br />

of land records.<br />

(6) <strong>Mizoram</strong> has no other institute like I.T.I. or polytechnic institute and<br />

Engineering College which is conducting survey training. It is, therefore, no longer<br />

possible to depend upon in the mercy of other Survey Training Institutes to meet the<br />

requirements of the State.<br />

Objectives :<br />

(1) To meet the needs of awareness, skills and competence of the land<br />

revenue and survey personnel in the preparation and maintenance of land records and<br />

land administration of <strong>Mizoram</strong>.<br />

(2) To cater and meet the needs of other various departments of the State and<br />

other organisation or Institutions in the field of Survey, Settlement and Cartography.<br />

(3) To cater and meet the needs of training on comprehensive know-how in<br />

basic principle of Survey, Settlement, Preparation and maintenance of land records,<br />

cartography, photogrammetry and computer application for Probationer Officer of<br />

I.A.S. and M.C.S. (<strong>Mizoram</strong> Civil Service) and other allied Services.


- 94 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

(4) To develop and meet user specific training requirements.<br />

(5) To cater and meet the needs of local youths to work indepently in the<br />

field of Surveying and Valuation of properties as professional license Surveyor and<br />

valuer.<br />

(6) To cater and meet the local needs of Village Council members in the<br />

field of land measurement, demarcation, survey, maintenance of land records and<br />

boundary pillars of village boundary as well as individual land owners of rural villages.<br />

(7) To meet the needs of all development Project Survey in <strong>Mizoram</strong>.<br />

It is therefore proposed to contruct main building of Survey Training<br />

Institute with effect from <strong>2007</strong>-2008 and Rs. 16.00 lakhs is provided herewith for the<br />

same purpose. This fund will be utilised as a matching share of C.S.S.<br />

V. REGULATION OF LAND HOLDINGS & TENANCY (Rs. 50.00 lakhs) :<br />

Summary Survey and Records Operation :-<br />

The Government of <strong>Mizoram</strong> has formulated the New Land Reforms<br />

Policy envisaging Regulation of land holdings and tenancy. The first phase of the<br />

programme covers Summary Survey and Records Operation consisting of verification,<br />

measurement of areas and demarcation of boundaries of land holdings under Permit/<br />

Periodic Patta/ Pass as well as all lands for which ownership are claimed without<br />

Government Permit/ Periodic Patta by the individuals in rural areas. The area covering<br />

18 R.D. Blocks had already been covered. In order to confer ownership rights to land<br />

holders it is required to conduct Revision Survey of 18 R.D. Blocks during <strong>2007</strong>-2008.<br />

01) Field Summary Survey Works (Rs. 29.00 lakhs) :<br />

It is proposed to conducted Summary Survey Operation viz. (a) Control<br />

Survey and (b) Detail Survey. Hence, Rs. 29.00 lakhs earmarked for engagement of<br />

Casual Labours for the said works and fund will be utilised with matching contribution<br />

of C.S.S.<br />

02) Purchase of Machinery & Equipments (Rs. 6.00 lakhs) :<br />

For conducting the Summary Survey and Record Operation it is required<br />

to purchase some minor Survey and Drawing instruments. Hence, Rs. 6.00 lakhs has<br />

been provided and this fund will be utilised as matching share of C.S.S.<br />

03) Office Expenses (Rs. 8.00 lakhs) :<br />

The preparation of Record-of-Rights for issuance of Periodic Patta to<br />

land holders and preparation of Land Records at Directorate and District Office has<br />

require purchase of office stationeries. Hence, Rs. 8.00 lakhs has been provided to meet<br />

such expenses and the same fund will be utilised as matching share of C.S.S.<br />

04) Travelling Expenses (Rs. 7.00 lakhs) :<br />

A provision of Rs. 7.00 lakhs is earmarked for travelling expenses of<br />

field staffs.


- 95 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAND REFORMS DEPARTMENT<br />

VI. BAFFACOS (Rs. 0.90 lakhs) :<br />

MULTI-PURPOSE CADASTRE DEVELOPMENT PROJECT<br />

SURVEY FOR ALLOTMENT OF BAMBOO <strong>PLAN</strong>TATION AND TO<br />

FAMINE EFFETCED FAMILIES. (Rs. 0.90 lakhs) (BAFFACOS).<br />

(a) <strong>Mizoram</strong> covers geographical area measuring 21,087.00 Sq.Kms where<br />

jhuming is widely practised. As such jhum control measure has been adopted and at the<br />

same time the land reform programme envisages to wean off such primitive type of<br />

cultivation by means of modern land use planning, allotment and settlement of land to<br />

the famine effected and needy families. The whole activities of the Land Reforms<br />

Department are therefore, closely linked with the New Land Reforms Programme of the<br />

State. Under the New Land Reforms Programme, Summary Land Survey of villages are<br />

conducted since 1999 and now 18 R.D. Blocks are already surveyed and recorded.<br />

Under this programme the Development Project Survey for the allotment of Agricultural<br />

Land for Bamboo Plantation had also been taken up since 2001-2002 in the river valley<br />

of R. Tlawng and R. Tuirial valleys in scatter areas.<br />

The Government of <strong>Mizoram</strong> had therefore proposed to take up the<br />

scheme in large scale since 2004-2005 keeping in view of ensuing Mautam, <strong>2007</strong><br />

(Bamboo flowering). It is estimated that Bamboo grown area in <strong>Mizoram</strong> covers about<br />

10,333.00 Sq. Kms consisting of about 20 species of bamboo. <strong>Mizoram</strong> is having about<br />

14 % of India's bamboo products. It is therefore to conducted multipurpose cadastre<br />

Development Project Survey covering 10,333.00 Sq. Kms during 2004-2006.<br />

(b) SCOPE OF THE PROJECT : The scope of the project is to<br />

conduct multipurpose Cadastre Development Project Survey and allotment and<br />

settlement of Agricultural Land to famine effected families for development of Bamboo<br />

Plantation and to wean off shifting cultivation. So that the famine effected people will<br />

get labour employment to earn money by jungle clearance in the survey work and to sell<br />

the natural bamboo without paying royalty before bamboo flowering. Better quality of<br />

Bamboo may be planted in the land after bamboo flowering year.<br />

(c) PHASING ACTIVITIES<br />

The sequences of activities will be as follows :-<br />

(i) Reconnaissance Survey<br />

(ii) Control Survey<br />

(iii) Detail Survey<br />

(iv) Procurement of Survey, Drawing, printing/ Computer Hardwares<br />

(v) Generation and Production of Village cadastral map/ Parcel Map<br />

(vi) Selection and Allotment of land to individual families<br />

(vii) Identification of plots and construction of survey line marks.<br />

……


- 96 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

1. The Hmar people’s convention (HPC) Party started their political movement for<br />

creation of Hmar Autonomous District Council in 1986. Since the Government of<br />

<strong>Mizoram</strong> did not give satisfactory response to the cause, the HPC Party callled a nonviolence<br />

peaceful bandh in March, 1988. In protest against the first bandh, the State<br />

Government started violence and blood shedding on the HPC people that HPC<br />

volunteers were forced to underground. As a result, Arms confrontation between the<br />

Govt. of <strong>Mizoram</strong> & HPC started on 16.7.1989. As such escalation of violence between<br />

the two took place for quite sometimes. Finally, at the kind initiative of the then<br />

Governor of <strong>Mizoram</strong>, His excellency Mr. Swaraj Kaushal, negotiation has inplemented<br />

and Memorandum of Settlement between the Governor and HPC Party was signed on<br />

27.7.1994.<br />

2. As per para 5.4 of the Memorandum of Settlement thereof the Sinlung Hills<br />

Development Council (SHDC) has been constituted since 1997. The main objective of<br />

the accord is to give edequate autonomy to the Sinlung Hills Development Council, as<br />

per para 3 of the Memorandum of Settlement.<br />

3. Para 5.4 of the Memorandum of Settlement states that separate fund will be<br />

earmarked for schemes which may specified for implementation within the area of the<br />

Council. AS per para 5.4 of the Memorandum of Settlement a provision of Rs. 138.00<br />

lakhs is propose for Annual Plan <strong>2007</strong>-2008 aand 11 th Plan <strong>2007</strong> – <strong>2012</strong> Rs 35.00 lakhs<br />

for execution of different developmental works as below :-<br />

<strong>2007</strong> – 08 <strong>2007</strong> - <strong>2012</strong><br />

(01) - Salary - Rs. 4.10 lakhs 20.50 lakhs<br />

(02) - Wages - Rs. 4.10 lakhs 20.50 lakhs<br />

(06) - Medical Treatment - Rs. 0.50 lakhs 2.50 lakhs<br />

(11) - Domestic Travelling etc. - Rs. 0.70 lakhs 3.50 lakhs<br />

(13) - Office expenses - Rs. 20.00 lakhs 80.00 lakhs<br />

(14) - Rent,Rate,Tax - Rs. 1.60 lakhs 5.50 lakhs<br />

(16) - Publication - Rs. 0.50 lakhs 2.00 lakhs<br />

(27) - Minor works - Rs. 85.00 lakhs 108.00 lakhs<br />

(31) - Grant-in-Aid - Rs. 3.00 lakhs 15.00 lakhs<br />

(50) - Other Charges - Rs. 18.50 lakhs 92.50 lakhs<br />

Total - Rs. 138.00 lakhs 350.00 lakhs<br />

ADMINISTRATION(<strong>2007</strong> –2008)<br />

1. Salary :- The Council is having 6 nos. of temporary sanctioned post and 9<br />

nos. of casual employees. And we have one Chairman and 17 nos. of Council members,<br />

retention of the above mentioned posts are required and a sum of Rs.4.10 lakhs may be<br />

adequate for the Annual Plan <strong>2007</strong> – 08.<br />

2. Wages :- As per approval of the Government of <strong>Mizoram</strong>, Sinlung Hills<br />

Development Council is engaging 9(nine) Muster Roll employees, Rs. 4.10 lakhs is<br />

earmarked for wages of these casual employees for the year <strong>2007</strong>-2008.


- 97 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

3. Travelling Expenses :- The Council covers more than 38 villages which<br />

are far from the State Capital, Aizawl. Chairman and Council members and Officials<br />

required to travel to different villages for different purposes. For which Rs.0.70 lakhs<br />

may be required.<br />

4. Medical Treatment :-For medical expenses in connection with ill-health of<br />

Officials & Chairman and families and Council members. Rs.0.50 lakhs is earmarked<br />

for the Annual Plan <strong>2007</strong> – 08.<br />

5. Office Expenses :- For purchase of Office stationeries. POL for three<br />

vehicles(Gypsy soft top) etc. Rs.20.00 lakhs may be required for the Annual Plan <strong>2007</strong> –<br />

08.<br />

6. Rent :- The Office of Sinlung Hills Development Council and residence of<br />

Chairman are being run in rented building quarter, construction of Office and Quarters<br />

are expected to complete within two years. So 1.60 lakhs is expected to complete rent of<br />

this year <strong>2007</strong> – 08.<br />

7. Other Charges :- The Office of the Sinlung Hills Development<br />

Council is also catering the needs of the people of the area with other NGOs.Village<br />

Councils and NGOs of the area used to give donations/rehabilitations with the discretion<br />

of the Chairman. The other charges head is also used for discretionary fund of<br />

Chairman. For which Rs.18.50 lakhs is necessary for the Annual Plan <strong>2007</strong> – 08.<br />

8. Grant - in –Aid :- The Council is also catering the needs of the recognized<br />

NGOs and private parties by giving Grant-in-Aid for upliftment of the poor people in<br />

order to self sufficiency in different trades. Rs.3.00 lakhs is proposed for <strong>2007</strong> – 08.<br />

9. Publication : The Council provides Rs. 0.50 lakhs for publication of various<br />

information datas & Books etc.<br />

During <strong>2007</strong>- 2008, Sinlung Hills Development Council intends to execute the<br />

following developmental works.<br />

Name of Works Amount Required<br />

1.Construction of truckable Road between<br />

Zohmun to Mauchar – 5Kms. Rs. 20.00 lakhs<br />

2. Construction of Agricultural link road<br />

between Zokhawthiang to kani phai – 2kms Rs. 8.00 lakhs<br />

3. Construction and Maintenance of Step 900mtrs Rs. 6.00 lakhs<br />

4. Construction of Water point – 10 Nos. Rs. 2.00 lakhs<br />

5. Construction of Waiting Shed –5 Nos. Rs. 2.00 lakhs<br />

6. Consturction of Pavilion – 7 Nos. Rs. 2.80 lakhs<br />

7. Construction of Bridges – 5 Nos. Rs. 2.50 lakhs


- 98 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

8. Construction of approach Road to Administrative<br />

Complex at Sakawrdai - 1 km. Rs. 15.00 lakhs<br />

9. Cultivation of Bamboo, Peanaple, and<br />

Passion fruit – 8,00,000 Nos. Rs. 9.20 lakhs<br />

10. Improvement of inter Village path – 5 kms Rs. 2.50 lakhs<br />

11. Kani minor irrigation – 3 kms Rs. 5.00 lakhs<br />

12. Construction of Sakawrdai Community Hall 1 No. Rs. 10.00 lakhs<br />

<strong>2007</strong> – 2008 WORKS JUSTIFICATION<br />

1. Construcrion of Truckable Road between Zohmun to Mauchar(5 Kms) =<br />

Rs. 10.00 lakhs.<br />

Mauchar Village with 170 houses which is 242 Kms from Aizawl have<br />

only Jeepable Road which can be used only during Winter seasons and creates unavoidable<br />

dificulties for the Villages. The Jeepable Road from Zohmun can be widened<br />

and make Truckable within the propose amount of Rs.10.00 lakhs. So, Rs.10.00 lakhs is<br />

proposed for widening of Zohmun to Mauchar Road 5 kms out of 18 Kms during <strong>2007</strong> -<br />

2008.<br />

2. Construction of Agriculture Link Road between Zokhawthiang to Kani<br />

Phai(Tuiruang) (1.5 Kms)<br />

There is a vast river Plain called Kani Phai near Tuiruang river which is<br />

about seven square Kilometres. Almost 30 families are being engaging in this valley<br />

which is very fertile and ideal for different cash-crops. TheValley can be accessible only<br />

by foot. If there is even only a Jeep road from Tinghmun, the valley can be developed<br />

easily and can be produced more and more and can be granary of Sakawrdai area.<br />

For development of this area, the council is intending to construct<br />

Agriculture Link Road between Tinghmun to Kani Phai (14 Kms) a sum of Rs 6.00 is<br />

proposed for Annual Plan <strong>2007</strong> – 2008 to complete only 1.5 kms.<br />

3. Construction and maintenance of Step, Water point, Pavilions, Waiting shed<br />

and Bridges.<br />

The Sinlung Hills Development Council consists of more than 38<br />

Villages, the villages need construction of new Steps, Waiting shed etc. and also need<br />

up-keep and maintenance of the completed works. For this purpose Rs 17.80 lakhs is set<br />

aside for <strong>2007</strong> –2008.<br />

4.Construction of Administrative Complex at Sakawrdai<br />

Sinlung Hills Development Council have no its own office building and<br />

run Office in a rented house since its inception. In addition to this, the council need<br />

Chairman and Staff Quarter, and Conference Hall. Now the council have a suitable plot<br />

of land measuring 24 bighas at Sakawrdai. Construction of Administrative<br />

Complex(which includes Office building, Quarter, Conference Hall, internal road and


- 99 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SINLUNG HILLS DEVELOPMENT COUNCIL<br />

fencing etc.,) shall be constructed in the next five year plan. Rs. 153.00 lakhs is propose<br />

for construction of office building and Rs. 153.00 lakhs for Conference Hall Cum-<br />

Chairman and Staff Quarter.<br />

During <strong>2007</strong> – 2008 the Council is intending to construct 1 Km of<br />

approach road to Administrative Complex at Sakawrdai. For which Rs. 15.00 lakhs is set<br />

aside for this work.<br />

5. Construction of Community Hall at Sakawrdai.<br />

Sakawrdai is the Headquarters of Sinlung Hills Development Council,<br />

but it has no any Community Hall or Indoor Stadium. It is difficult to construct from<br />

other agencies like RD, PWD etc. Due to the extreme neccesity, the people of Sakawrdai<br />

demand immediate construction of Community Hall. Therefore, construction of<br />

Community Hall shall be started to the tune of Rs.10.00 lakhs during the Annual Plan<br />

<strong>2007</strong> – 2008.<br />

6. Cultivation of Bamboo, Pineapple and Passion Fruit.<br />

The Sinlung Hills Development Council is marching for self sufficiency<br />

of the people in defferent ways. From 2004-2005 cultivation of Pineapple had been<br />

introduced within Vairengte. In addition to this the Council extents its Step towards<br />

economic reforms. For this purpose cultivation of Bamboo and Passion fruit is being<br />

introduced within the council area. For maintenance and transportation and cultivation<br />

od 5,00,000 seedlings Rs. 7.00 lakhs is proposed for this Annual Plan.<br />

7. Kani Minor Irrigation.<br />

As pointed out in Para 2 above, a suitable river valley called Kani Phai,<br />

near Tuiruang river can be developed by providing formal irrigation for the fields and<br />

expected more yealdings in different cash crops and rice. Due to extreme need of the<br />

families of this field minor irrigation will be constructed from the river of Pialthleng<br />

which is 3 1/2 Kms. from Kani Phai. To start the works for construction of this minor<br />

irrigation Rs. 5.00 lakhs is proposed during the Annual Plan <strong>2007</strong> – 2008.<br />

Low lying areas available in the reverie forest area may be converted into<br />

cultivable land. Since this lands are productive and fertile land lying without use. The<br />

utilization of these land will generate income and employment to the rural poor.<br />

……


- 100 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

BORDER AREA DEVELOPMENT PROGRAMME (BADP)<br />

BORDER AREA DEVELOPMENT PROGRAMME<br />

Government of India have included the Border Area Development Programme<br />

under Plan Sector since the Annual Plan 1997-1998 of 9 th Five Year Plan, the year-wise<br />

allocation of outlays are as below :-<br />

Original Revised<br />

1. 1997-1998 - Rs. 3.00 Crores Rs. 6.73 Crores<br />

2. 1998-1999 - Rs. 6.82 Crores Rs. 6.82 Crores<br />

3. 1999-2000 - Rs. 8.00 Crores Rs. 8.00 Crores<br />

4. 2000-2001 - Rs. 8.00 Crores Rs. 12.32 Crores<br />

5. 2001-2002 - Rs. 8.32 Crores Rs. 13.32 Crores<br />

6. 2002-2003 - Rs. 8.00 Crores Rs. 16.32 Crores<br />

7. 2003-2004 - Rs. 8.32 Crores Rs. 12.48 Crores<br />

8. 2004-2005 - Rs. 8.32 Crores Rs. 15.56 Crores<br />

9. 2005-2006 - Rs. 9.02 Crores Rs. 9.335 Crores<br />

10. 2006-<strong>2007</strong> - Rs.13.02 Crores -<br />

Total - Rs. 80.82 Crores Rs. 100.885 Crores<br />

In <strong>Mizoram</strong>, there are 5(five) R.D Blocks located along the Indo-Bangladesh<br />

border and 11(eleventh) R.D blocks located along the Indo-Myanmar border as below :-<br />

INDO-BANGLADESH BORDER<br />

1. W.Phaileng R.D Block<br />

2. Bunghmun R.D Block<br />

3. Lungsen R.D Block<br />

4. Chawngte R.D Block<br />

5. Zawlnuam R.D Block (since 2005-2006)<br />

INDO-MYANMAR BORDER<br />

1. Ngopa R.D Block<br />

2. Khawzawl R.D Block<br />

3. Champhai R.D Block (since 2006-<strong>2007</strong>)<br />

4. Khawbung R.D Block<br />

5. Lungdar R.D Block<br />

6. Hnahthial R.D Block<br />

7. Sangau R.D Block<br />

8. Tuipang R.D Block<br />

9. Saiha R.D Block (since 2006-<strong>2007</strong>)<br />

10. Lawngtlai R.D Block<br />

11. Bungtlang ‘S’ R.D Block (since 2006-07)


- 101 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

BORDER AREA DEVELOPMENT PROGRAMME (BADP)<br />

During the Eleventh Five Year Plan Period, Tenth Plan Schemes will be continued<br />

giving priority on road, buildings and sports infrastructure. The proposed outlay for<br />

Eleventh Five Year Plan and Annual Plan <strong>2007</strong>-2008 are as follow<br />

Sl. Name of Schemes / works Eleventh Plan Annual Plan<br />

No.<br />

Proposed Target Proposed Target<br />

1 2 3 4<br />

1. Truck road 94.42 kms 22 kms<br />

2. Jeep road 157.6kms 46.6 kms<br />

3. Maintenance/Extension/link/Bouldering/ IVP of<br />

road<br />

337.50 kms 117.50 kms<br />

4. Community/Conference/Multipurpose Hall<br />

117 nos<br />

33 nos.<br />

5. Other Administrative Building 98 nos 36 nos.<br />

6. School & Hostel Buildings 32 nos. 9 nos.<br />

7. Bazar/Market/Rest shed 13 nos. 2 nos.<br />

8. Pavillion / Wastingshed 19 nos. 27nos.<br />

9. Playground 48 nos. 17 nos.<br />

10. Bridges (Wooden,& RCC) / Culverts/Drainage<br />

117.50 nos. 35 nos.<br />

11. Retaining Wall 49 nos. 14 nos.<br />

12. Public Water Supply scheme – Water point/Water<br />

Reservoir/Water Tank/Hand Pump<br />

77 nos.<br />

17 nos.<br />

13. Irrigation Channel/WRC/Road, River Embankment<br />

12 nos.<br />

6 nos.<br />

14. Cemetryshed/Urinalshed 22 nos. 8 nos.<br />

15. Teniis/Basket Ball /Criket Court 9 nos. 6 nos.<br />

16. Electrification / Fencing 25 nos. 13 nos.<br />

17. Police Outpost / Border Out Post 6 nos. 4 nos.<br />

18. Model Villages 2 nos. -<br />

19. Rural Training Centre / Employment 7 nos. 5 nos.<br />

20. Medical Centre / Sub-Centre 31 nos. 12 nos.<br />

21. Recreation / De-Addiction Centre 16 nos. 7 nos.<br />

22. Information Centre / Library 33 nos. 4 nos.<br />

23.<br />

MONITORING CELL OF BADP<br />

(i) Perspective Plan<br />

(ii) Purchase of T.V and Radio<br />

(iii) Documentation of BADP<br />

The proposed outlay for 11 th Five Year Plan is Rs. 4295.00 lakhs and the<br />

proposed outlay for Annual Plan <strong>2007</strong> – 08 is Rs. 993.00 lakhs<br />

…….


- 102 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MEDIUM IRRIGATION (PWD)<br />

INTRODUCTION :-<br />

MEDIUM IRRIGATION (PWD)<br />

<strong>Mizoram</strong> is having a hilly topography. Shifting cultivation is themain method of<br />

cultivation of food grains and vegetables. The method causes vast destruction of natural<br />

resources in the form of deforestation and heavy soil erosion. However, at a few<br />

scattered pockets in plain areas of major river banks, wet rice cultivation is also carried<br />

out.<br />

The scope of Medium Irrigation in <strong>Mizoram</strong> is therefore very limited, but<br />

protection of riverbanks from overflowing to the existing cultivable plain is very much<br />

required.<br />

ACHIEVEMENT OF THE 10 TH <strong>PLAN</strong> : -<br />

No provision was kept for Direction and Administration during the 10 th Plan (2002<br />

- <strong>2007</strong> ) under this Head of Account.<br />

During the 10 th Plan, Rs 5.00 lakhs was approved for protection of river banks at<br />

R. Tuipui, R. Tlawng at Bairabi and Sairang under this head. Bank protection of R.<br />

Teirei under Kawrthah and Mamit Divisions amounting to Rs 10.00 lakhs were carried<br />

out .<br />

TARGET FOR THE 11 TH <strong>PLAN</strong> : -<br />

A. DIRECTION & ADMINISTRATION :<br />

No provision is kept for Direction and Administration during the 11 th Plan (<strong>2007</strong> -<br />

<strong>2012</strong>) under this Head of Account.<br />

B. WORKS :<br />

During the 11 th Plan, Rs 6.00 lakhs is proposed for protection of river banks at R.<br />

Tuipui and R. Teirei under Mamit Division.<br />

TARGET FOR THE <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> - 08 : -<br />

A. DIRECTION & ADMINISTRATION<br />

No provision is kept for Direction and Administration during <strong>2007</strong> - 08 under this<br />

Head of Account.<br />

B. WORKS :<br />

WORKS :- Rs 1.00 lakhs is proposed for bank protection of R.Teirei under<br />

Mamit Division during <strong>2007</strong> – 08 under this Head of Account .<br />

…….


- 103 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINOR IRRIGATION<br />

MINOR IRRIGATION & COMMAND AREA DEVELOPMENT<br />

The projected outlay (at 2001-02 prices) under Minor Irrigation<br />

and Command Area Development Scheme during the Tenth Plan (2002-07) was<br />

Rs.2,823.00 lakhs while the expenditure upto 2005-06 is Rs.5,210.63 lakhs and the<br />

anticipated expenditures during 2006-07 is Rs.3,168.00 lakhs. Therefore, the total<br />

anticipated expenditure during the Tenth Plan period is Rs.8,378.63 lakhs against the<br />

projected outlay of Rs.2,823.00 lakhs. Anticipated physical achievement had also been<br />

increased substantially during the Tenth Plan period. By end of the Tenth Plan, 207<br />

Minor Irrigation Projects with total Culturable command area of 7,759 ha will be<br />

completed. The targets and anticipated achievements during the Tenth Plan may be<br />

summerised as follows:<br />

Sl.<br />

No<br />

Item<br />

Targets<br />

during 10th<br />

Plan<br />

Anticipated<br />

achievements<br />

during 10th<br />

Plan<br />

1 Financial outlay 2,823.00 8,378.63<br />

2Physical<br />

(i) Irrigation Potential to be created in ha. 2,566 9,000<br />

(ii) Irrigation Potential to be utilised in ha. 1,659 4,550<br />

Remarks<br />

During the Tenth Plan period, On Farm Development works like<br />

land leveling & shaping, contour bunding etc. had been included as a part and parcel of<br />

Minor Irrigation Projects/schemes which had been proved very effective in enhancing<br />

utilisation of created irrigation potentials and helped the farmers in realising project<br />

benefits at early stages of project implementations. This will be continued during the<br />

Eleventh Plan with more involvement of the farmers in the process right from the stage<br />

of project formulation.<br />

Under Bharat Nirman Programme (2005-06 to 2008-09), physical<br />

targets and financial outlay of Minor Irrigation Schemes had been increased<br />

substantially and Programme will continue upto 2008-09.<br />

29 on-going projects and 61 new projects are taken up during the<br />

year 2006-07. Out of these 90 Minor Irrigation Projects, only 38 projects covering total<br />

culturable command area of 1,463 ha are scheduled for completion during 2006-07<br />

while the remaining 52 projects will spill over to the Eleventh Plan.<br />

Therefore, the Eleventh Plan will have to begin with 52 spill-over<br />

projects with total culturable command area of 2,177 ha; all these spill-over projects are<br />

scheduled to be completed during <strong>2007</strong>-08 with an outlay of Rs.2,267.74 lakhs.<br />

The proposed outlay under Minor Irrigation and Command Area<br />

Development Schemes during Eleventh Plan is Rs.16181.00 lakhs as stated below:


Sl.<br />

No.<br />

- 104 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

Major/Minor Heads of<br />

Accounts<br />

MINOR IRRIGATION<br />

Anticipated<br />

Expenditure<br />

during 10th<br />

Plan<br />

Proposed<br />

Outlay during<br />

11th Plan<br />

Proposed<br />

Outlay during<br />

<strong>2007</strong>-08<br />

I MINOR IRRIGATION<br />

( i ) Direction & Administration 769.77 880.00 175.00<br />

( ii ) River Lift Irrigation 0.50 670.00 75.00<br />

( iii ) Sprinkler, Hydrams etc. 0.00 190.00 25.00<br />

( iv ) Survey & Investigation 0.00 0.00 0.00<br />

( v ) Diversion Schemes 7,538.68 14,316.00 3,524.00<br />

Total : Minor Irrigation 8,308.95 16,056.00 3,799.00<br />

II Command Area Development 69.68 125.00 20.00<br />

GRAND TOTAL : 8,378.63 16,181.00 3,819.00<br />

SCHEME NO. I<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION<br />

NAME OF THE SCHEME : DIRECTION & ADMINISTRATION<br />

1.ANTICIPATED EXPENDITURED DURING 10 th Plan : Rs. 769.77 lakhs.<br />

2.11 th Plan PROPOSED OUTLAY : Rs. 880.00 lakhs<br />

3.PROPOSED OUTLAY DURING <strong>2007</strong>-08 : Rs. 175.00 lakhs<br />

There are 140 No. of created posts under Minor Irrigation Schemes, out of which<br />

87 posts are under Plan Scheme. There are four Irrigation Divisions at Aizawl,<br />

Champhai, Kolasib and Lunglei, with nine Sub-Divisions. Minor Irrigation Wing in the<br />

Headquarters is manned by Joint Director (Minor Irrigation) with supporting staff to<br />

assist Director of Agriculture & Minor Irrigation in planning and monitoring of Minor<br />

Irrigation Schemes including Command Area Development Schemes.<br />

The total outlays for Direction & Administration during Eleventh Plan and <strong>2007</strong>-<br />

08 are Rs.880.00 lakhs and Rs.175.00 lakhs respectively and details are as briefly stated<br />

below:<br />

Sl.<br />

No<br />

PHYSICAL TARGETS & FINANCIAL OUTLAY FOR <strong>2007</strong>-08<br />

Items Unit Physical<br />

Targets<br />

Proposed<br />

Outlay during<br />

11 th Plan<br />

Proposed Outlay<br />

during <strong>2007</strong>-08<br />

ESTABLISHMENTS :<br />

1 Salary of Officers & Staff No. 87 705.00 134.00<br />

2 Travelling Expenses No. 87 50.00 15.00<br />

3 Wages L.S. - 45.00 12.00<br />

4 Office Expenses No. 14 60.00 7.50<br />

5 Maintenance of buildings No. 10 15.00 5.00<br />

6 Repairing of vehicle L.S. - 5.00 1.50<br />

Sub-total : Direction & Administration :<br />

- - 880.00 175.00


- 105 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINOR IRRIGATION<br />

SCHEME NO.2<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE<br />

WATER)<br />

NAME OF THE SCHEME : RIVER LIFT IRRIGATION.<br />

1.ANTICIPATED EXPENDITURED DURING 10 th Plan : Rs. 0.50 lakhs.<br />

2.11 th Plan PROPOSED OUTLAY : Rs. 670.00 lakhs<br />

3.PROPOSED OUTLAY DURING <strong>2007</strong>-08 : Rs. 100.00 lakhs<br />

During the Tenth Plan period, Minor Irrigation Schemes concentrated on<br />

flow/gravity schemes under River Diversion Schemes and the only activity under River<br />

Lift Irrigation Scheme had been purchase of power pumpsets for sale at 50 % subsidy.<br />

The scheme for procurement of power pumpsets and sale at 50% subsidy will<br />

continue in Eleventh Plan with the total outlay of Rs.75.00 lakhs.<br />

12 Nos of Lift Irrigation Projects are proposed to be taken up during the Eleventh<br />

Plan with total outlay of Rs.400.00 lakhs to create 400 ha of additional irrigation<br />

potential.<br />

Physical and financial targets during the Eleventh Plan and <strong>2007</strong>-08 are as<br />

briefly stated below:<br />

Sl.<br />

No<br />

Items<br />

Targets during 11th Plan Targets during <strong>2007</strong>-08<br />

Physical Financial Physical Financial<br />

1 Wages for Survey & Investigations L.S. 6.00 L.S. 1.00<br />

2 Lift Irrigation Projects 30 Nos. 589.00 2 84.00<br />

3 Purchase of power pumpsets for sale<br />

at 50 % subsidy 350 Nos. 75.00 80 15.00<br />

4 Irrigation potentials<br />

( i) to be created 400 ha - 50 ha -<br />

( ii ) to be utilised 400 ha - 50 ha -<br />

Total: River Lift Irrigation :<br />

- 670.00<br />

100.00<br />

SCHEME NO.3<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE<br />

WATER)<br />

NAME OF THE SCHEME : DRIP, SPRINKLERS, HYDRAMS .<br />

1.ANTICIPATED EXPENDITURED DURING 10 th Plan : Rs. 0.00 lakhs.<br />

2.11 th Plan PROPOSED OUTLAY : Rs. 190.00 lakhs<br />

3.PROPOSED OUTLAY DURING <strong>2007</strong>-08 : Rs. 25.00 lakhs


- 106 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINOR IRRIGATION<br />

<strong>Mizoram</strong> being hilly, there are many drops/falls along alignments of irrigation<br />

channels and pipelines. In order to harness drops/falls along the channel/pipe lines, a<br />

scheme for installation of hydrams, hydrogers, etc is newly proposed during the<br />

Eleventh Plan to enhance project benefits to the farmers. Rs.100.00 lakhs is earmarked<br />

during Eleventh Plan for installation of hydrams, hydrogers etc.<br />

Another new scheme for promotion and popularization of Drips and Sprinklers is<br />

proposed during the Eleventh Plan for which Rs.60.00 lakhs and Rs.25.00 lakhs are<br />

envisaged for Grant-in-Aid subsidy and On Farm Demonstrations respectively.<br />

Physical and financial targets during the Eleventh Plan and <strong>2007</strong>-08 are as<br />

briefly stated below:<br />

Sl.<br />

No<br />

Items<br />

Targets during 11th Plan Targets during <strong>2007</strong>-08<br />

Physical Financial Physical Financial<br />

1 Wages for Survey & Investigations L.S. 5.00 L.S. 0.50<br />

2 Procurement & installation of<br />

hydrams, hydrogers, etc. 40 100.00 5 10.00<br />

3 Grant-in-Aid subsidy for promotion of<br />

Drips and Sprinklers L.S. 60.00 L.S. 12.00<br />

4 On Farm Demonstration of Drip &<br />

Sprinkler Irrigation 7 25.00 1 2.50<br />

Total: River Lift Irrigation :<br />

- 190.00 25.00<br />

SCHEME No. 4<br />

HEAD OF DEVELOPMENT : MINOR IRRIGATION (SURFACE<br />

WATER)<br />

NAME OF THE SCHEME : DIVERSION SCHEME.<br />

1. ANTICIPATED EXPENDITURED DURING 10 th Plan: Rs. 7,538.68 lakhs.<br />

2. 11 th Plan PROPOSED OUTLAY : Rs. 14,316.00 lakhs<br />

3. PROPOSED OUTLAY DURING <strong>2007</strong>-08 : Rs. 3,799.00 lakhs<br />

29 on-going projects and 61 new projects are taken up during the year 2006-07.<br />

Out of these 90 Minor Irrigation Projects, only 38 projects covering total culturable<br />

command area of 1,463 ha are scheduled for completion during 2006-07 while the<br />

remaining 52 projects will spill over to the Eleventh Plan. The spill-over amount is<br />

Rs.2,267.74 lakhs and all the spill-over projects are scheduled for completion during<br />

<strong>2007</strong>-08. A provision of Rs.22,600.00 lakhs is envisaged in the Eleventh Plan for<br />

execution of Minor Irrigation Projects.


- 107 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINOR IRRIGATION<br />

While Operation & Maintenance of completed Minor Irrigation Projects is under<br />

the joint responsibilities of the project beneficiaries and the Department, frequent repairs<br />

and reconstruction of monsoon damages are required due to torrential rains during<br />

monsoon. A provision of Rs.400.00 lakhs is made for repair and reconstruction of<br />

monsoon damages during Eleventh Plan.<br />

Physical and financial targets during the Eleventh Plan and <strong>2007</strong>-08 are as<br />

briefly stated below:<br />

Sl.<br />

No<br />

Items<br />

Targets during 11th Plan Targets during <strong>2007</strong>-08<br />

Physical Financial Physical Financial<br />

1 Wages for Survey & Investigations L.S. 17.50 L.S. 2.50<br />

2 Execution of Minor Irrigation Projects<br />

under<br />

AIBP 300 Nos 12,623.50 86 Nos 3,495.50<br />

NABARD 21 Nos 1,052.00 6 Nos 210.00<br />

STATE 7 Nos 97.00 1 No 19.00<br />

Sub-total : Minor Irrigation Projects 328 Nos 13,790.00 93 Nos 3,727.00<br />

3 Repair & reconstruction of monsoon<br />

damages on completed projects. L.S. 400.00 L.S. 50.00<br />

4 Survey & Drawing Instruments L.S. 51.00 L.S. 7.00<br />

5 Maintenance L.S. 75.00 L.S. 15.00<br />

TOTAL : RIVER DIVERSION - 14,316.00 - 3,799.00<br />

SCHEME NO. 5<br />

HEAD OF DEVELOPMENT : COMMAND AREA DEVELOPMENT PROGRAMME<br />

NAME OF THE SCHEME : COMMAND AREA DEVELOPMENT PROGRAMME<br />

1.ANTICIPATED EXPENDITURED DURING 10 th Plan : Rs. 69.68 lakhs.<br />

2.11 th Plan PROPOSED OUTLAY : Rs. 125.00 lakhs<br />

3.PROPOSED OUTLAY DURING <strong>2007</strong>-08 : Rs. 20.00 lakhs<br />

A study of several completed irrigation projects has revealed that utilisation of<br />

the potentials created by completed minor irrigation projects is low. Absence of<br />

distribution channels, lining of water channels to save water, land levelling and other<br />

activities are main factors. Under Command Area Development Programmes like<br />

adoptive trials, supply of inputs, extension service and other activities as mentioned<br />

above will also be taken up.<br />

As such cluster of 28 completed Minor Irrigation projects in Aizawl, 4 clusters in<br />

Lunglei and 8 clusters in Chhimtuipui covering gross command area of 1361 have been<br />

sanctioned by Government of India to be taken under Command Area Development<br />

Programme w.e.f. 2001-2002. The same projects are approved to be continued in 2005-<br />

06. Detailed Physical and Financial target proposed for 2005-06 are as follows:-


Sl.<br />

No<br />

1<br />

- 108 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINOR IRRIGATION<br />

Items<br />

Targets during 11th<br />

Plan<br />

Targets during <strong>2007</strong>-08<br />

Physical Financial Physical Financial<br />

A. Establishment<br />

(i) Misc. Contingencies L.S 5.00 L.S 0.80<br />

(ii) Maintenance and repair of<br />

Machineries<br />

Vehicle including Pol charges L.S 7.00 L.S 0.80<br />

B. Survey<br />

(i) Soil Survey 250 2.50 50 0.20<br />

(ii) Topological Survey 150 2.50 30 0.20<br />

(iii) Planning & Design 250 0.50 50 0.10<br />

C. Construction of Field Channels<br />

including<br />

control structure 175 50.00 35 12.50<br />

D. Construction of Field drains 100 20.00 20 2.20<br />

E. Land Levelling & Shaping 80 30.00 16 2.00<br />

F. Warabandi 200 5.00 40 1.00<br />

G. Demonstration of Crop Production<br />

Technology.<br />

TOTAL OF COMMAND AREA<br />

10 2.50 2 0.20<br />

DEVELOPMENT SCHEMES :<br />

125.00 20.00<br />

…….


- 109 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

POWER & ELECTRICITY<br />

Introduction: -<br />

POWER & ELECTRICITY<br />

In order to have substantial economic development availability of energy<br />

(Power) to the required level plays an important role. The progress of development in<br />

power sector can be assessed from the budgetary provision for the last 5 years as<br />

highlighted below: -<br />

Sl.<br />

No.<br />

Year<br />

Non-<br />

Earmarked<br />

<strong>ANNUAL</strong> <strong>PLAN</strong> AT A GLANCE<br />

Earmarked<br />

10 th Five Year Plan<br />

NCSE /<br />

IREP<br />

TOTAL<br />

1. 2002- 03 1089.00 3111.00 142.22 4342.22<br />

2. 2003 -04 1076.00 3464.00 61.00 4601.00<br />

3. 2004 -05 1226.00 5560.00 61.00 6847.00<br />

4. 2005-06 2692.00 6363.00 61.00 9116.00<br />

5. 2006-07 3442.00 5258.00 61.00 8761.00<br />

Total 10 th<br />

Plan<br />

9525.00 23756.00 386.22 33667.22<br />

The Draft 11 th Five Year Plan and the Annual Plan of <strong>2007</strong> – 08 is formulated<br />

with the proposed outlays of Rs. 56222.00 lakhs and Rs. 7988.00 lakhs respectively.<br />

Item-wise provision of fund for the Annual Plan of <strong>2007</strong>-08 is as follows :<br />

1. Direction & Administration: For maintenance of the existing staff Rs. 9577.00<br />

lakh is proposed and Rs. 3211.00 lakhs is earmarked for the 11 th Five Year Plan and<br />

Annual Plan of <strong>2007</strong> – 08 respectively.<br />

2. For improvement of various works Rs. 4038.00 lakhs is proposed for <strong>2007</strong> – 08.<br />

3. Rural Electrification Corporation Ltd. Negotiated Loan: This is Negotiated<br />

Loan to be availed from Rural Electrification Corporation Ltd, Government of India<br />

against approved schemes. Normally the loan amount is Rs 658.00 lakhs meant for<br />

developmental works under the Department.<br />

4. Accelerated Power Development & Reform Programme (APDRP) : This<br />

Scheme is under earmarked sector of which Rs. 20.00 lakhs (Capital content) is<br />

earmarked for <strong>2007</strong>-08 for improvement of suib-transmission & Distribution networks<br />

within <strong>Mizoram</strong>.


- 110 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

POWER & ELECTRICITY<br />

5. Non-Conventional Source of Energy (NCSE): For Non-Conventional Source<br />

of Energy Rs 50.00 lakhs is set aside during <strong>2007</strong> - 2008 for taking up non-conventional<br />

system of energy sources. This fund will be transferred to ZEDA as grant-in-aid, as this<br />

organisation is nodal agency for such works.<br />

6. Integrated Rural Electric Programme (IREP) :Under this scheme Rs 11.00<br />

lakhs is made available from Rural Development Ministry and Rs 11.00 lakhs is<br />

earmarked for <strong>2007</strong>-2008. The fund will be transferred to ZEDA as grant-in-aid as<br />

ZEDA is the nodal agency for non-conventional source of energy.<br />

7. District-wise sharing of fund: The function and organisation set-up of the<br />

Department is not based on administrative district of the state. Most of the projects are<br />

inter-related each other as power system is interconnected throughout the state. As such<br />

the project in one district is also benefited to the people in other districts. Hence,<br />

sharing of fund in district wise cannot be properly differentiated<br />

………


- 111 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

A. LARGE & MEDIUM INDUSTRIES :<br />

INDUSTRIES DEPARTMENT<br />

Scheme No. A – 1<br />

Name of the Scheme : Development of Food & Allied Industries :<br />

<strong>Mizoram</strong> Food & Allied Industries Corporation Ltd.<br />

(MIFCO) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

In the ensuing 11th Five Year Plan : <strong>2007</strong>-<strong>2012</strong>, MIFCO proposes to promote<br />

private sector in food processing industries. So much so, a Project Consultancy Cell has<br />

been established so as to render assistance to private entrepreneurs by way of<br />

preparation of Detailed Project Reports for seeking financial assistance from various<br />

sources like Govt. of India, Ministry of Food Processing Industries etc. Moreover,<br />

MIFCO proposes to take up such Projects as to benefit the private sector units like Cold<br />

Storage, Pack House and Value Added Centre. Hence the main thrust of the 11th Five<br />

Year Plan for MIFCO will be on private sector, instead of further promotion of public<br />

sector units.<br />

By the end of the current financial year 2006-<strong>2007</strong>, the paid up capital of<br />

MIFCO would be Rs.16.04 crores, out of the authorised share capital of Rs.20 crores.<br />

As such, MIFCO proposes that the balance amount of Rs.3.94 crores would be<br />

distributed during the 5 years period by reducing the amount year after year. Moreover,<br />

the commissioned units of MIFCO are expected to earn revenue by way of profit from<br />

sales of products thereby earning profit by the end of the 11th Five Year Plan, instead of<br />

incurring losses year after year.<br />

On careful examination of the prevailing industrial scenario in food<br />

processing sector of the State, MIFCO proposes to take up only Services-related<br />

Projects viz. Pack House, Cold Chain, Cold Storage and Value Added Centre for the<br />

benefit of potential private entrepreneurs who will be rendered all possible assistance by<br />

the Corporation.<br />

Main focus of the 11 th Five Year Plan of MIFCO :<br />

* Promotion of Private Sector<br />

(i) Project Consultancy Cell<br />

(ii) Services-related Projects<br />

* Generation of revenue through joint venture with reputed company in passion<br />

fruit juice concentrate<br />

* MIFCO's Office Building<br />

Fund requirement as projected by the Corporation during 11 th . Five Year Plan<br />

<strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as follows :


- 112 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

(Rs. In lakh )<br />

Sl.<br />

No<br />

Head<br />

Draft 11 th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Draft Annual<br />

Plan <strong>2007</strong>-08<br />

1 Equity Share Capital Contribution 393.69 120.00<br />

2 Loans & Other Income 450.00 40.00*<br />

3 Income from Sales 353.15 23.58<br />

Sub-Total 1196.84 183.58<br />

NEW PROJECTS (for which State Matching is required as follows):<br />

1 MIFCO’s Building 100.00 50.00<br />

2 Pack House – 2 nos. 400.00 100.00<br />

3 Cold Chain 150.00 50.00<br />

4 Cold Storage 150.00 -<br />

5 Value Addition Centre 150.00 -<br />

Sub-Total 950.00 200.00<br />

Total : 2146.84 383.58<br />

The authorized share capital of MIFCO has been enhanced from Rs. 10 crores to<br />

Rs. 20 crores and the paid-up capital up to 2005-06 is Rs. 1741.72 lakhs and provision<br />

during 2006-07 is Rs. 100.00 lakhs. As such, it is proposed to continue contributing<br />

share capital to the Corporation during 11 th . Five Year Plan <strong>2007</strong>-12.<br />

Scheme No. A – 2.<br />

Name of Scheme : Setting up of Paper Pulp and Paper Mill (100 MT capacity<br />

per day)<br />

<strong>Mizoram</strong> is rich in natural bamboo resources which remain unutilised for<br />

industrial purposes. They remain felled yearly and burnt for shifting cultivation. If<br />

exploited with modern technology, they will generate good revenue for the State as well<br />

as generating employment for the mass educated youths. Hence, it is proposed to set up<br />

Paper Pulp and Paper Mill of 100 MT capacity per day to be implemented by Bamboo<br />

Development Agency by transferring fund or on turn-key basis for which fund may be<br />

sourced from National Bamboo Mission and a token provision for 11 th . Five Year Plan<br />

<strong>2007</strong>–12 and Annual Plan <strong>2007</strong>-08 is proposed as follows :<br />

The financial proposal for the scheme during 11 th Plan is Rs. 708.00 lakhs and<br />

the Annual Plan <strong>2007</strong> – 08 is Rs. 110.00 lakhs.<br />

B. VILLAGE & SMALL INDUSTRIES :<br />

Scheme No. B – 1.<br />

Name of the Scheme : Direction & Administration<br />

(Strengthening of Administration)<br />

(Budget Head : 2851 – Village & Small Industries, 001(01) –Direction)<br />

This is an on-going scheme under which most of the liabilities of posts and<br />

establishments created during 7 th Five Year Plan are required to be maintained till date<br />

as the same cannot be passed on to Non-Plan side and therefore, these liabilities have to<br />

be carried on during the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>.


- 113 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Provision for 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> and Annual Plan <strong>2007</strong>-08 is<br />

tabulated below :<br />

Draft 11<br />

(Rs. in Lakh)<br />

th . Five Year Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Salary of existing staff – 15 nos 155.00 15 nos. 27.00 15 nos.<br />

2 Wages for muster roll workers :<br />

a) Directorate 13.00 7 nos. 3.00 7 nos.<br />

b) R.M. Depots at Aizawl, Kolasib, West 36.00 17 nos. 7.00 17 nos.<br />

Phaileng, Serchhip, Champhai, Lunglei,<br />

3<br />

Lawngtlai & Saiha , Central Godown,<br />

GDF<br />

Medical Treatment 8.00 L.S 1.00 L.S<br />

4 Travelling Expenses 23.00 L.S 4.00 L.S<br />

5 Office Expenses 150.00 L.S 30.00 L.S<br />

6 Rent for R.M.Depots at Kolasib, West<br />

Phaileng,<br />

Serchhip, Champhai, Lunglei, Lawngtlai,<br />

Saiha<br />

And Gems Cutting & Polishing Centre.<br />

25.00 L.S 5.00 L.S<br />

7 Minor Works/Maintenance :<br />

a) Extension and maintenance of Directorate<br />

building<br />

200.00 1 no. 50.00 1 no.<br />

b) Construction and maintenance of<br />

quarters/offices<br />

890.00 10 nos. 30.00 1 no.<br />

Total : 1500.00 157.00<br />

Scheme No. B – 2<br />

Name of the Scheme : Research, Design & Development :<br />

1. Development of Tea Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 004(01) – Development of Tea<br />

Industries)<br />

Commercial Tea Plantation have been developed in Biate villages during the 9 th<br />

& 10 th Plan period. There are around 42 lakhs Tea Bushes covering 285 hectares of land.<br />

This would be sufficient to feed the existing Tea Factory, commissioned in 2006. It is<br />

therefore, proposed to discontinue commercial Tea Plantation during the 11 th Plan<br />

period. Small Tea growers of Biate are, however, free to expand their garden to earn<br />

more income.<br />

In Ngopa, Commercial Tea Plantation started during the last two years of 9 th<br />

Plan. It is still continued during the 10 th Plan. Therefore, it is proposed to continue<br />

during the 1st three years of 11 th Plan. During this period of ten years, it is expected that<br />

around 49 lakhs tea bushes covering 240 hectares of land would come under Tea<br />

Plantation which would be sufficient to feed one Tea Factory, commissioned in 2004.<br />

It is also proposed to cover three new villages under Commercial Tea Plantation<br />

during the 11 th Plan period. Two villages – Seling and Tlungvel would be covered from<br />

the first year of the Plan and Baktawng village from the fourth year.


Sl<br />

No<br />

- 114 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Proposals for 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as<br />

follows :<br />

(Rs. In lakh )<br />

Items of works<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 2 3 4 7 8<br />

1 Wages for MR Workers 7.40 4 Nos. 1.40 4 Nos.<br />

2 Travelling Expenses 11.60 L.S 1.60 L.S<br />

3 Office expenses 13.60 L.S 2.00 L.S<br />

4 Minor Works / Maintenance : 26.00 3 Nos. 10.00 2 Nos.<br />

5 Advertising/Publicity 3.00 L.S 1.00 -<br />

6 Materials & Supply : Supply of Tea Seeds, Polythene<br />

& Shedding Materials for :<br />

529.00 3306 fly. 43.29 200<br />

1) Commercial Tea Plantation at Ngopa 59.00 225 fly. 15.00 225 Fly.<br />

2) Commercial Tea Plantation at Seling 93.00 200 Fly 8.00 50 Fly<br />

3) Commercial Tea Plantation at Tlungvel 96.00 200 Fly 8.00 50 Fly<br />

4) Commercial Tea Plantation at Baktawng 35.00 100 Fly. - -<br />

7 Grant-in-aid : Financial assistance to tea planters 150.00 725 Fly 10.00 325 Fly.<br />

8 Other Charges 17.50 L.S 2.00 L.S.<br />

9 Motor Vehicle 13.90 2 Nos. 2.00 2 Nos.<br />

Total of B – 2 : 1055.00 107.29<br />

Scheme No. B-3<br />

Name of the Scheme : Development of Industrial Infrastructure :<br />

(Industrial Estates)<br />

(Budget Head : 2851 – Village & Small Industries, 101(02)–Industrial Estate)<br />

This is an on-going scheme and to be continued during the 11th Five Year Plan<br />

also. Development of Industrial Infrastructure is on the priority list on the agenda of<br />

New Industrial Policy of the Govt. of India and therefore, the scheme cannot be<br />

dispensed with. Under the scheme the following projects were taken up.<br />

a) Maintenance of Industrial Growth Centre at Luangmual, Aizawl.<br />

b) Maintenance of Export Promotion Industrial Park, Lengte<br />

c) Maintenance and upgradation of existing Industrial Estate at<br />

Zuangtui, Kolasib and Chawngte<br />

d) Establishment and development of Industrial Estates at at District<br />

Headquarters of Champhai, Mamit, Lawngtlai and Saiha.<br />

e) Establishment of Special Economic Zone at Zokhawthar,<br />

Kawlchaw, Tlabung and Bairabi.<br />

f) Maintenance of Integrated Infrastructure Development Centre<br />

(IIDC), Pukpui.<br />

g) Matching contribution and maintenance for Integrated<br />

Infrastructure Development Centre (IIDC), Zote.


- 115 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

During the 11 th Five Year Plan it is expected that the projects being implemented<br />

under CSS viz. IGC, Luangmual which is in the last phase of implementation will be<br />

completed and that of Export Promotion Industrial Park (EPIP) will also be completed.<br />

Therefore, provision for maintenance of this project is also kept in the 11 th Five Year<br />

Plan.<br />

The existing Industrial Estates at Zuangtui, Kolasib and Chawngte also need<br />

constant maintenance of its internal roads, fencing, demarcation of plots, jungle<br />

clearance and administrative cost for which provision is earmarked in the plan.<br />

Establishment of Special Economic Zone (SEZ) with the assistance of Central<br />

Government is expected during the 11 th Five Year Plan at Zokhawthar, Kawlchaw,<br />

Tlabung and Bairabi for which a token provision is kept for the same.<br />

The construction of Integrated infrastructure Devlopment Centre at Pukpui have<br />

been completed and fund is required for its maintenance and a new IIDC is being<br />

implemented at Zote and matching contribution have to be given. Necessary provision is<br />

kept for this purposes.<br />

Draft outlays and physical target during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :<br />

Sl<br />

No<br />

Items of works<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakhs )<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Salary of existing staff – 5 nos. 40.00 5 Nos 6.80 5 Nos<br />

2 Wages for Muster roll workers at IGC,<br />

Luangmual and Industrial Estates at Zuangtui,<br />

Kolasib , IIDC, Pukpui - 16 nos.<br />

32.00 16 Nos 6.00 16 Nos<br />

3 Medical Treatment 2.00 L.S 0.50 L.S<br />

4 Traveling Expenses 8.00 L.S 1.50 L.S<br />

5 Office Expenses 10.00 L.S. 2.00 L.S<br />

6 Minor Works/Maintenance :<br />

a) Maintenance of IGC, Luangmual 60.00 1 No. 0.10 1 No<br />

b) Maintenance of EPIP 30.00 1 No 0.10 1 No<br />

c) Maintenance and upgradation of existing<br />

Industrial Estate at Zuangtui, Kolasib and<br />

Chawngte<br />

150.00 3 Nos 30.00 3 Nos<br />

d) Establishment and development of Industrial<br />

Estate at District Headquarters of Champhai,<br />

Serchhip, Mamit, Lawngtlai and Saiha<br />

400.00 5 Nos 20.00 5 Nos<br />

e) Establishment of Special Economic Zone<br />

(SEZ) at Zokhawthar, Kawlchaw, Tlabung and<br />

Bairabi (Token provision)<br />

93.00 4 Nos 10.00 1 No<br />

f) Maintenance of IIDC, Pukpui 50.00 1 No 10.00 1 No.<br />

g) Matching contribution for IIDC, Zote and 100.00 1 No 26.00 1 No<br />

maintenance<br />

7 Other Charges 10.00 L.S 2.00 L.S.<br />

8 Motor vehicle - maintenance 10.00 L.S. 2.00 L.S<br />

Total of B - 3: 955.00 117.00


- 116 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Scheme No. B - 4<br />

Name of the Scheme : Promotion of Village, Cottage & Tiny Industries :<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />

This is an on-going scheme under which grants-in-aid are provided to the rural<br />

artisans for setting up of village and cottage industries. The target group of this scheme<br />

is the poorer section of the society. This is a promotional scheme and need to be<br />

continued during the 11th Five Year Plan.<br />

Draft outlays and physical target during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :<br />

Sl<br />

No<br />

Items of works<br />

Draft 11 th . Five Year Plan<br />

<strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakh )<br />

Draft Annual Plan <strong>2007</strong>-08<br />

Outlay<br />

Physical<br />

Target<br />

1 GIA to rural artisans 50.00 2600 nos. 10.00 400 Nos.<br />

Total : 50.00 10.00<br />

Scheme No. B - 5<br />

Name of the Scheme : Entrepreneurial Development & Training<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01)– Supervision of SSI)<br />

This scheme is meant for human resource development in industrial sector. One<br />

of the most important inhibiting factors for industrial development in <strong>Mizoram</strong> is lack of<br />

skilled manpower resources both at the level of official and entrepreneurs. This scheme<br />

is purely promotional in nature and targets to educate and train both industrial workers<br />

and entrepreneurs. The Officers and staff of the Department also need exposure to<br />

acquire up-to-date knowledge of industrial development and therefore, need on the spot<br />

study and tour to different parts of the country.<br />

In addition to operating the promotional scheme, it is required to set up the<br />

Institute at Aizawl to impart entrepreneurship to local educated youths and motivate<br />

them to take up industrial and business ventures including textile sector and capacity<br />

building and personality development. Necessary infrastructures like buildings will<br />

require to be built up and faculties engaged.<br />

Draft outlays and physical targets during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :


Sl<br />

No<br />

- 117 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Items of works<br />

1 Scholarship/Stipend :<br />

a) EDP Training and domestic study tour for<br />

entrepreneurs<br />

Draft 11 th . Five<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakh )<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Outlay Physical<br />

Target<br />

50.00 750 Nos. 10.00 100 Nos.<br />

b) Training & industrial exposure and<br />

capacity building for Departmental Officers<br />

and employees<br />

71.90 115 Nos. 15.00 15 Nos.<br />

2 Gems Cutting & Polishing Training Centre :<br />

a) Rent 6.00 L.S 1.20 L.S<br />

b) Salary for 2 Instructors on contract<br />

basis<br />

7.00 2 nos. 1.30 2 nos.<br />

c) Wages for MR Helpers 3.00 2 nos. 0.72 2 nos.<br />

d) Maintenance of Machineries & 5.00 L.S 1.00 L.S<br />

Equipments<br />

e) O.E. 5.00 L.S 1.68 L.S<br />

f) M & S - Purchase of training materials 10.00 L.S 2.00 L.S<br />

3 Entrepreneurship Development Institute :<br />

Token Provision<br />

0.10<br />

0.10<br />

Total of B - 5: 158.00 33.00<br />

Scheme No. B – 6<br />

Name of the Scheme : Industrial Information<br />

(Supervision of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(01) – Supervision of SSI)<br />

Under this scheme, the Department dessiminates information by means of<br />

publicity, advertisement, etc. Under this scheme, the Department conducts exhibition,<br />

etc. and also participates in International and National Exhibitions. This is a promotional<br />

scheme and therefore need to be continued during the 11th Five Year Plan.<br />

Draft outlays and physical target during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :<br />

Sl<br />

No<br />

Items of works<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakh )<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Office Expenses – collection of industrial data 15.00 L.S 3.00 L.S<br />

2 Rent - Annual Ground Rent/License Fee for<br />

<strong>Mizoram</strong> Pavilion<br />

40.00 L.S 8.00 L.S<br />

3 Advertising :<br />

a) Participation expense for IITF 125.00 5 Nos. 25.00 1 No.<br />

b) Publication of ‘Industry Meichher’ 10.00 L.S 2.00 L.S<br />

c)Dessimination of information, publicity<br />

& production of documentary film and<br />

display advertisement<br />

40.00 L.S 8.00 L.S<br />

d) Printing of product profile & brochure 19.00 L.S 6.00 L.S


- 118 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

e)Participation of North East Expo 35.00 5 nos. 7.00 1 no.<br />

f)Mini Exhibition during Chapchar 10.00 10 nos. 2.00 2 nos.<br />

4<br />

Kut/Thalfavang Kut<br />

Minor Works/Maintenance :<br />

a) Interior decoration of <strong>Mizoram</strong> Pavilion for<br />

IITF<br />

60.00 5 12.00 1<br />

b)Renovation of <strong>Mizoram</strong> Pavillion &<br />

Maintenance<br />

10.00 L.S 5.00 L.S<br />

5 Machinery & Equipment : Purchase of<br />

electronic media equipments<br />

5.00 L.S 1.00 L.S<br />

Total of B – 6 : 369.00 79.00<br />

Scheme No. B - 7<br />

Name of the Scheme : Incentive/ Subsidy to Industries :<br />

(Promotion & Development of Small Scale Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(02) –Pro. & Development of<br />

SSI)<br />

Under this ongoing scheme incentives/ subsidies like Interest Subsidy, Power<br />

Subsidy, Land Subsidy, State Transport Subsidy on Plant & Machinery, Factory Rent<br />

Subsidy, Subsidy on Man Power Development, Subsidy on Drawal of Powerline,<br />

Subsidy on Power Generating Set and Subsidy on Re-Imbursement of the Cost of<br />

Project Report are provided to the Small Scale Industries of <strong>Mizoram</strong> as announced in<br />

the Industrial Policy of <strong>Mizoram</strong> State, 2000. Equity participation by the Government in<br />

the assisted is also entertained. This is a promotional scheme to encourage investment in<br />

industrial sector and therefore to be continued during the 10th Five Year Plan. The<br />

following subsidies are given under this scheme.<br />

Apart from the above subsidy, it is also expedient to match Central Grants for<br />

projects implemented through MIFCO and promoting entrepreneurs in accordance with<br />

the guidelines of such schemes of Central Govt.<br />

Draft outlays and physical target during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :<br />

Sl<br />

No<br />

Items of works<br />

1 Grant-in-aid/Subsidy :<br />

a) Providing State Incentives Subsidies to SSI<br />

Units<br />

b) Matching Grant and Promotional Grant to<br />

MIFCO<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakh )<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

300.00 L.S 25.00 L.S<br />

50.00<br />

-.<br />

35.00<br />

c) Promotional grant to entrepreneurs 50.00 L.S 10.00 L.S<br />

d) ZIDCO’s Office building 20.00 - 10.00 -<br />

Total of B - 7 : 420.00 80.00<br />

-


- 119 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Scheme No. B – 8<br />

Name of the Scheme : District Industries Centre :<br />

(Budget Head : 2851 – Village & Small Industries, 102(03) –District Industries Centre)<br />

Since the Sub-Divisional Industries Offices of Champhai, Serchhip, Kolasib and<br />

Lawngtlai have been upgraded to full fledged District Industries Centre, it is required to<br />

make them functional during the 11 th Five Year Plan by creating necessary<br />

infrastructures such as Office buildings, staff quarters, site development and<br />

beautification of the existing complexes and upgradation of approach road and<br />

maintenance thereof.<br />

During the 11 th Five Year Plan a New District Industries Centre have to be<br />

opened at Mamit by acquiring land and construction of buildings for office and quarters.<br />

The liabilities on existing Sub-Divisional Industries Offices of West Phaileng,<br />

Tlabung and Chawngte have to be carried on during the 11 th Five Year Plan and<br />

necessary provision of fund is earmarked for each Sub-Divisional Industries Offices.<br />

Draft outlays and physical target during 11thFive Year Plan <strong>2007</strong>-<strong>2012</strong> and<br />

Annual Plan <strong>2007</strong>-2008 are as tabulated below :<br />

Sl<br />

No<br />

1<br />

2<br />

3<br />

4<br />

Items of works<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakh )<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

Salary maintenance of existing staff & new posts<br />

a) DIC, Aizawl 140.00 13 nos. 24.31 13 nos.<br />

b) DIC, Lunglei 276.00 14 nos. 47.95 14 nos.<br />

c) DIC, Saiha 296.00 22 nos. 51.38 22 nos.<br />

d) DIC, Kolasib 108.00 23 nos. 7.01 4 nos.<br />

e) DIC, Champhai 106.00 23 nos. 6.37 4 nos.<br />

f) DIC, Serchhip 107.00 23 nos. 6.77 4 nos.<br />

g) DIC, Lawngtlai 107.00 23 nos. 6.68 4 nos.<br />

h) DIC, Mamit 86.00 23 nos. 0.00 -<br />

i) SDIO, W. Phaileng 50.00 4 nos. 8.73 4 nos.<br />

Sub-Total : 1276.00 159.20<br />

Medical Treatment :<br />

a) DIC, Aizawl 6.50 13 nos. 1.30 13 nos.<br />

b) DIC, Lunglei 7.00 14 nos. 1.40 14 nos.<br />

c) DIC, Saiha 11.00 22 nos. 2.20 22 nos.<br />

d) DIC, Kolasib 11.00 23 nos. 0.40 4 nos.<br />

e) DIC, Champhai 11.00 23 nos. 0.40 4 nos.<br />

f) DIC, Serchhip 11.00 23 nos. 0.40 4 nos.<br />

g) DIC, Lawngtlai 11.00 23 nos. 0.40 4 nos.<br />

h) DIC, Mamit 5.00 23 nos. 0.00 -<br />

i) SDIO, West Phaileng 2.00 4 nos. 0.40 4 nos.<br />

Sub-Total : 75.50 6.90<br />

Wages :<br />

a) DIC, Aizawl 5.00 2 nos. 0.91 2 nos.<br />

b) DIC, Lunglei 7.00 3 nos. 1.36 3 nos.<br />

c) DIC, Saiha 12.50 6 nos. 2.48 6 nos.<br />

d) DIC, Lawngtlai 2.25 1 no. 0.45 1 no.<br />

e) SDIO, W. Phaileng 2.25 1 no. 0.45 1 no.<br />

Sub-Total : 29.00 5.65<br />

Travelling Expenses :<br />

a) DIC, Aizawl 20.00 L.S. 4.00 L.S.


5<br />

6<br />

7<br />

8<br />

- 120 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

b) DIC, Lunglei 10.00 L.S. 2.36 L.S.<br />

c) DIC, Saiha 10.00 L.S. 2.00 L.S.<br />

d) DIC, Kolasib 5.00 L.S. 0.50 L.S.<br />

e) DIC, Champhai 5.00 L.S. 0.50 L.S.<br />

f) DIC, Serchhip 5.00 L.S. 0.50 L.S.<br />

g) DIC, Lawngtlai 5.00 L.S. 0.50 L.S.<br />

h) DIC, Mamit 4.00 L.S. 0.00 L.S.<br />

i) SDIO, West Phaileng 2.50 L.S. 0.50 L.S.<br />

Sub-Total : 66.50 10.86<br />

Office Expenses :<br />

a) DIC, Aizawl 40.00 L.S 8.00 L.S<br />

b) DIC, Lunglei 30.00 L.S. 6.00 L.S.<br />

c) DIC, Saiha 25.00 L.S. 5.00 L.S.<br />

d) DIC, Kolasib 10.00 L.S. 1.00 L.S.<br />

e) DIC, Champhai 10.00 L.S. 1.00 L.S.<br />

f) DIC, Serchhip 10.00 L.S. 1.00 L.S.<br />

g) DIC, Lawngtlai 10.00 L.S. 1.00 L.S.<br />

h) DIC, Mamit 10.00 L.S. - L.S.<br />

i) SDIO, West Phaileng 5.00 L.S. 1.00 L.S.<br />

Minor Works/Maintenance :<br />

1) Construction and maintenance of office<br />

building at DIC, Aizawl.<br />

2) Renovation and maintenance of existing<br />

office building and quarters of DIC, Lunglei<br />

3) Renovation and maintenance of existing<br />

office building and quarters of DIC, Saiha<br />

4) Construction of office building & quarters<br />

of DIC, Champhai<br />

5) Construction of office building & quarters<br />

of DIC, Kolasib<br />

6) Construction of office building & quarters<br />

of & DIC, Serchhip<br />

7) Construction of office building & quarters<br />

of DIC, Lawngtlai<br />

8) Construction of office building & quarters<br />

of DIC, Mamit<br />

9) Construction of office building & quarters<br />

of SDIO, West Phaileng, Tlabung and<br />

Chawngte.<br />

Sub-Total : 150.00 24.00<br />

100.00 100% 30.00 50%<br />

50.00 100% 20.00 20%<br />

50.00 100% 20.00 20%<br />

100.00 100% 20.00 50%<br />

100.00 100% 20.00 50%<br />

100.00 100% 20.00 50%<br />

100.00 100% 20.00 50%<br />

150.00 100% 10.00 53%<br />

100.00 100% 15.00 50%<br />

Sub-Total : 850.00 175.00<br />

GIA/Subsidy to rural artisans :<br />

a) DIC, Aizawl 12.50 500 nos. 2.50 100 nos.<br />

b) DIC, Lunglei 12.50 500 nos. 2.50 100 nos.<br />

c) DIC, Saiha 10.00 250 nos. 1.00 50 nos.<br />

d) DIC, Kolasib 5.00 200 nos. 1.00 40 nos.<br />

e) DIC, Champhai 5.00 200 nos. 1.00 40 nos.<br />

f) DIC, Serchhip 5.00 200 nos. 1.00 40 nos.<br />

g) DIC, Lawngtlai 5.00 200 nos. 1.00 40 nos.<br />

h) DIC, Mamit 2.50 100 nos. 0.00 -<br />

i) SDIO, West Phaileng 2.50 100 nos. 1.00 40 nos.<br />

Sub-Total : 60.00 12.00<br />

Machinery & Equipment : (purchase & maintenance of Computer & peripherals, EPABX,<br />

Photocopier<br />

a) DIC, Aizawl 10.00 L.S 1.00 L.S<br />

b) DIC, Lunglei 15.00 L.S 1.00 L.S<br />

c) DIC, Saiha 15.00 L.S 1.00 L.S<br />

d) DIC, Kolasib 15.00 L.S 1.00 L.S<br />

e) DIC, Champhai 15.00 L.S 1.00 L.S


- 121 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

f) DIC, Serchhip 15.00 L.S 1.00 L.S<br />

g) DIC, Lawngtlai 15.00 L.S 1.00 L.S<br />

h) DIC, Mamit 15.00 L.S 1.00 L.S<br />

i) SDIO, West Phaileng 15.00 L.S 1.00 L.S<br />

Sub-Total : 130.00 9.00<br />

Total of B – 8 : 2637.00 402.61<br />

Scheme No. B – 9<br />

Name of the Scheme : Common Facility Centre(CFC)<br />

(Development of Rural Industries)<br />

(Budget Head : 2851 – Village & Small Industries, 102(05) – Development of Rural<br />

Industries)<br />

This scheme has been started during 8 th Five Year Plan for setting up of<br />

Multi-disciplinary Workshop cum Training Centre for up-gradation of skills to meet the<br />

Industrial requirement. This scheme has to be continued during the 1tth Five Year Plan.<br />

There are two numbers of Common Facility Centre and RIDC already in function.<br />

Due to change in technology and introduction of modern sophisticated<br />

machines, the demand of trained technical manpower increases. In order to meet the<br />

manpower requirement these centre needs up-gradation. These centres, at present, is<br />

providing training on various Engineering Trades. The scope of training may be<br />

increased so as to develop Entrepreneurial skill.<br />

The scheme is proposed to be extended in all the new District Industries<br />

Centre for establishment of Tool-room-cum-Training Centre for which token provision<br />

is made.<br />

Draft Outlays and physical targets during 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong><br />

and Annual Plan <strong>2007</strong>-08 are as tabulated below :<br />

(Rs. In lakh )<br />

Sl<br />

No<br />

1<br />

Items of works<br />

Draft 11 th . Five Draft Annual<br />

Outlay Physical<br />

Target<br />

Outlay Physica<br />

l Target<br />

Wages of casual employees :<br />

a) RIDC Aizawl 65.00 35 nos. 13.00 26 nos.<br />

b) Common Facility Centre, Lunglei 5.00 5 Nos. 0.35 2 Nos.<br />

c) Common Facility Centre, Saiha 5.00 5 no. 0.35 1 no.<br />

Sub-Total : 75.00 13.70<br />

2 Office expenses :<br />

a) RIDC, Aizawl 15.00 L.S 3.00 L.S<br />

b) CFC, Lunglei 4.00 L.S. 1.00 L.S.<br />

c) CFC, Saiha 4.00 L.S. 1.00 L.S.<br />

Sub-Total : 23.00 7.00<br />

3 Materials & Supply :<br />

a) Procurement of Training materials for 25.00 L.S. 5.00 L.S.<br />

b) Procurement of Training materials for 15.00 L.S. 3.00 L.S.<br />

c) Procurement of Training materials for 10.00 L.S. 3.00 L.S.<br />

Sub-total : 50.00 11.00<br />

4 Minor Works/Maintenance :<br />

a) Maintenance and upgradation of 50.00 3 Nos.. 9.50 3 Nos.<br />

b) Maintenance of building under CFC, 10.00 3 Nos. 5.00 3 Nos.<br />

c) Maintenance of building under CFC, 10.00 1 No. 5.00 1 No.<br />

Sub-total : 70.00 20.00<br />

5 Scholarship/Stipend :<br />

a) Stipend & Book grant for trainees 15.00 L.S. 3.00 L.S.


- 122 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

b) Industrial Study Tour for trainees 10.00 L.S. 2.00 L.S.<br />

c) Stipend & Book grant for CFC, 1.00 L.S. 0.30 L.S.<br />

Sub-total : 26.00 5.30<br />

6 Machinery & Equipment :<br />

a) Up-gradation and maintenance of 25.00 L.S 5.00 L.S<br />

b) Up-gradation and maintenance of 11.00 L.S 2.50 L.S<br />

c) Up-gradation and maintenance of 10.00 L.S 2.50 L.S<br />

Sub-Total : 46.00 10.00<br />

7. Engagement of Expert Instructor on 10.00 7 Nos. 0.50 3 Nos.<br />

8. Token provision for establishment of 5.00 L.S 0.50 L.S<br />

9 Establishment of Multi Disciplinary<br />

a)Salary/Wages 3.00 4 Nos. 0.50 L.S<br />

b)Up-gradation of building and 10.00 L.S 1.00 L.S<br />

Sub-total : 318.00 1.50<br />

Total of B - 9 : 685.70 69.00<br />

Scheme No. B – 10<br />

Name of Scheme : Development of Electronics<br />

A. Electronics & IT Wing in Directorate :<br />

(Budget Head : 2851 – Village & Small Industries, 102(06) –Development<br />

of Electronics)<br />

Development of Electronics scheme is an on going scheme which<br />

covered Electronics & computer Technology. A recent subject matter allocation, the<br />

Industries Department has been declared as a Nodal Department for Electronics Industry<br />

and related matters vide No. A. 46011/1/94 – GAD / Loose-I dated 6 th may, 2005. With<br />

a need to upgrade Electronics Technology for solving un-employment problem, various<br />

efforts has to be taken by Electronics & IT Wing of Directorate of Industries. Identified<br />

programme for immediate execution are as listed for 11 th Five Year Plan.<br />

Proposed 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as follows:-<br />

(Rs. In lakh )<br />

Draft 11 th . Five Year Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Salary<br />

a)Engagement of 1 NO. each contact<br />

faculty @ Rs. 8,000/- p.m as ITES Trainer<br />

b)Engagement of 1 NO. each as Technical<br />

Assistant at the rank of -Skilled-I<br />

13.00 3.00<br />

2 Wages<br />

a)Wages for engagement of Muster Roll.<br />

b)Maintenance of Industries Dept. Website<br />

and 1 No. of Contract employees at Skill-I<br />

Grade is to be engaged.<br />

35.00 7.00<br />

3 Medical Re-imbursement<br />

Medical treatment of E & IT Wing<br />

employees<br />

3.00 1.50<br />

4 Traveling Expenses<br />

Traveling expenses of E & IT Wings<br />

employees.<br />

5.00 1.00<br />

5 Grant – In - Aid for 60 Nos. of Electronics<br />

Entrepreneurs.<br />

10.00 1.50<br />

6 Scholarship/Stipend : 30.00 11.00


- 123 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

a) To organize Seminar, Exhibition,<br />

Workshop Training, awareness campaign.<br />

b) To organize competition for<br />

promoting Electronics Technology amongst<br />

the student/Youth & Entrepreneurs.<br />

c) To sponsor Post Graduate, Graduate<br />

persuing Electronics Engineering course<br />

within India and Abroad.<br />

d) Up gradation of Entrepreneurship<br />

7<br />

through training within India and abroad,<br />

workshop and seminar.<br />

Office expenses<br />

15.00 7.00<br />

a) Setting up of International Call<br />

Centre/BPO.<br />

b) Introduction of Computer education<br />

through e-learning.<br />

8 Advertisement<br />

a) Support for local language Electronics<br />

book printing & Publishing.<br />

b) Publicity through papers.<br />

9 Machinery & Equipment :<br />

a) Maintenance of GRITC,<br />

Directorate of Industries and AC & EC,<br />

Lunglei.<br />

b) Maintenance of installed VSAT,<br />

EPABX, UPS Computer system, Photo<br />

Copier etc.<br />

c) Machineries, Furniture etc. for<br />

Introduction of ITES Course at GRITC<br />

Directorate of Industries and AC & EC<br />

DIC, Lunglei with replacement facilitation<br />

Centre.<br />

d) CFC for PCB Lab and Technology Park.<br />

e) CFC for animation Industry.<br />

f) Promotion of music Industry.<br />

15.00 4.00<br />

50.00 20.00<br />

10 Other Charges<br />

a)Project Proposal preparation, arrangement<br />

for setting up of Medical Electronics<br />

Equipment Service Support Centre for<br />

Health Industry. 1 No. of Technical<br />

Assistant will be engaged as Skilled-I.<br />

31.00 20.00<br />

b)Design and development of Agri<br />

Electronics for Grape and other products of<br />

farmer.<br />

c)Maintenance of LAN with Optic Fibre<br />

backbone of Directorate of Industries,<br />

DIC(A), DIC(L), DIC(S) and LAN for<br />

SDIO’s.<br />

d)Preparation of <strong>Mizoram</strong> Industrial<br />

Products Bazar Portal<br />

e) Promotion of embedded<br />

Technology based Industry.<br />

Total of B – 10 ‘A’ : 205.00 76.00


- 124 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

B. Zoram Electronics Development Corporation Ltd. (ZENICS) :<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

During the 11 th . Five Year Plan <strong>2007</strong>-12 ZENICS Ltd. proposed to<br />

take up the following projects in addition to the on-going project of<br />

Computer Academy and Consumer Electronics Training Centre :<br />

1. Human Resource Development Project to make <strong>Mizoram</strong> State IT<br />

Literate<br />

2. Setting up of Computer Hardware Training Centre<br />

3. Restructuring of the Corporation<br />

4. Assembling of Computers<br />

5. Upgradation of Computer Learning Academy<br />

6. Upgradation of Consumer Electronics Training Centre<br />

7. Purchase of Flat(s) in Millenium Centre for Sales Outlet<br />

8. Mobile Handset Slaes and Service Centre<br />

9. Dealership of Hindustan Paper Corporation<br />

10. Supply of Computers and its peripherals to Govt. Departments and<br />

private firms<br />

11. Any other projects offered or given by the Govt. of <strong>Mizoram</strong><br />

Fund requirement as projected by the Corporation during 11 th . Five<br />

Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as follows :<br />

(Rs. In lakhs)<br />

Sl.No. Particulars Draft 11 th Five Year Draft Annual<br />

Plan <strong>2007</strong>-<strong>2012</strong> Plan <strong>2007</strong>-08<br />

1 Salary 357.10 48.00<br />

2 Wages 52.24 7.20<br />

3 Administrative. Expenses 38.20 5.00<br />

4 Plant Machineries 38.20 5.00<br />

5 New Venture 38.20 5.00<br />

6 Purchase of shop in Millenium<br />

Centre & Maintenance<br />

34.00 30.00<br />

7 Maintenance of Office building 5.00 1.00<br />

8 Maintenance of vehicle 7.50 1.50<br />

9 P.O.L 10.00 2.00<br />

Sub Total : 583.44 109.70<br />

The authorized share capital of the Corporation is Rs. 5.00 crores<br />

which has been proposed to be enhanced to Rs. 20.00 crores. Out of this, the<br />

paid up capital up to 2005-06 is Rs. 547.40 lakhs<br />

Draft provision for share capital contribution to the Corporation<br />

during 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as follows<br />

:


Sl<br />

No<br />

- 125 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Items of works<br />

1 Share Capital contribution to<br />

ZENICS<br />

Scheme No. B – 11.<br />

Name of the Scheme : Textiles & Handicrafts Sectors<br />

Draft 11<br />

(Rs. in Lakh)<br />

th . Five Draft Annual Plan<br />

Year Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

Outlay<br />

Physical<br />

Target<br />

Outlay<br />

Physical<br />

Target<br />

250.00 L.S 40.00 L.S<br />

In order to accomplish the objectives of national and state level agenda<br />

announced in various policy resolutions, the following works shall be undertaken for the<br />

development of Handloom & Handicrafts sectors in the state during 2006-07.<br />

A – TEXTILES<br />

With the fast changing scenario of apparel, including hosiery industry, it is felt<br />

necessary to take up schemes in this sector to cope with the WTO regime. The following<br />

schemes are proposed to be taken up in the sector.<br />

1. Regional Institute of Fashion Technology:<br />

A Project Report involving Rs. 15 :00 crore was already submitted for funding under<br />

NLPCR during the 10 th Plan. In order to provide logistic support in terms of<br />

identification of land and other contingency expenses, it is proposed to keep a token<br />

provision of Rs.10.00 lakh from the State Plan during the 11 th Plan Period.<br />

(Rupees in lakh)<br />

11 th Sl.No Programmes of works Five Year Plan Annual Plan <strong>2007</strong>-<br />

<strong>2007</strong>-<strong>2012</strong><br />

2008<br />

1. Regional Institute of<br />

Fashion Technology.<br />

2. Apparel Training & Design Centre :<br />

Physical Financial Physical Financial<br />

150 10.00 - 1.00<br />

The Centre is proposed to be funded by NEC and to be managed by the AEPC (an<br />

organisation of Ministry of Textiles, Government of India). Land is already allotted and<br />

demarcation of the land is almost completed. For other logistic support a token provision<br />

of Rs. 10.00 lakh is provided under the State Plan during the 11 th Plan Period.<br />

(Rupees in lakh)<br />

11 th Sl.No Programmes of works Five Year Plan Annual Plan <strong>2007</strong>-<br />

<strong>2007</strong>-<strong>2012</strong><br />

2008<br />

1. Apparel Training & Design<br />

Centre (ATDC)<br />

Physical Financial Physical Financial<br />

500 10.00 - 1.00


- 126 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

3. Incentive for Apparel, Hosiery and Make-Ups Industries :<br />

The incentives provided in the New Industrial Policy of <strong>Mizoram</strong>, 2000 shall be<br />

made use of apart from incentives given by Ministry of Textiles, Government of India<br />

like TUFS etc. For providing incentives to micro-enterprises in the textile sector, it is<br />

proposed to provide various state incentives subsidies during the 11 th Plan for those who<br />

set up modern textile Industries.<br />

(Rupees in lakh)<br />

11 th Sl.No Programmes of works Five Year Plan Annual Plan <strong>2007</strong>-<br />

<strong>2007</strong>-<strong>2012</strong><br />

2008<br />

Physical Financial Physical Financial<br />

1. State Incentive to Textile<br />

Sector<br />

40 50.00 5 5.00<br />

Total of A : 70.00 7.00<br />

B – HANDLOOM<br />

1 Establishment of Textile & Handicrafts Wing :<br />

(Budget Head : 2851 – Village & Small Industries, 103(01) – Handloom Industry)<br />

With a view to augment effort from the Government for development of this sector it<br />

is proposed to establish a separate office in the name and style of ‘Textiles and<br />

Handicraft Wing’ under the Directorate of Industries having high autonomy as the issue<br />

is frequently emphasized by the Government of India.<br />

The following works shall be taken up during the 11 th Plan <strong>2007</strong> – <strong>2012</strong> and the<br />

break up of works proposed are as indicated below :-<br />

11<br />

(Rupees in lakh)<br />

th Sl. Programmes of works<br />

Five Year Plan Annual Plan <strong>2007</strong>-<br />

No<br />

<strong>2007</strong>-<strong>2012</strong><br />

2008<br />

Physical Financial Physical Financial<br />

1. Construction of Office 1 50.00 1 15.00<br />

1 30.00 1 15.00<br />

2. Construction of Multi-storeyed<br />

quarters for Officers and staff at<br />

Handloom Complex,<br />

3.<br />

Luangmual.<br />

Creation, appointment and 10 70.00 7 14.00<br />

maintenance of existing staff.<br />

4. Wages of contract and muster<br />

roll workers.<br />

8 25.00 6 5.00<br />

5. Medical Treatment L.S 20.00 L.S 4.00<br />

6. Travelling Expenses L.S. 27.00 L.S. 5.00<br />

7. Computerisation of Office L.S. 20.00 L.S. 10.00<br />

8. Office expenses L.S. 50.00 L.S. 8.00<br />

Sub-total 292.00 76.00


- 127 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

2. Human Resource Development and Technology Upgradation :<br />

(Budget Head : 2851 – Village & Small Industries, 103(02) – Pro. & Dev. Of<br />

Handloom Industry)<br />

Under this scheme, it is proposed to upgrade the existing 3 (three) training centres<br />

while integrating it with Research and Development for technology upgradation and<br />

product designs. It is also proposed to establish such integrated training and research<br />

centres in all the remaining 5 (five) districts which has not yet been provided with such<br />

centres. Programme of works during the 11 th Plan may be summarized as follows :-<br />

(Rupees in lakh)<br />

11 th Sl. Programmes of works<br />

Five Year Plan <strong>2007</strong>- Annual Plan <strong>2007</strong>-2008<br />

No<br />

<strong>2012</strong><br />

Physical Financial Physical Financial<br />

1. Construction of Integrated 5 0.10 5 0.10<br />

2.<br />

Training Centres at 5 district<br />

Construction of Multi-storeyed<br />

quarters for Officers & staff at<br />

Handloom Complex, Luangmual.<br />

1 0.10 1. 0.10<br />

3. Creation, appointment and 8 20.00 4 4.70<br />

maintenance of existing staff.<br />

4. Wages of contract and muster<br />

roll workers.<br />

10 4.70 7 1.00<br />

5. Medical treatment. L.S. 5.00 L.S 1.00<br />

6. Travelling Expenses. L.S, 10.00 L.S 4.00<br />

7. Computerisation of Integrated<br />

Training & Research Centres<br />

including CAD.<br />

L.S. 20.00 L.S 4.00<br />

8. Office expenses L.S. 20.00 L.S. 5.00<br />

9. Purchase & maintenance of L.S. 8.00 L.S 5.00<br />

improved machineries &<br />

10.<br />

equipments.<br />

Purchase of research equipments. L.S. 15.00 L.S 4.00<br />

11. Materials & supply. L.S 20.00 L.S 10.00<br />

12. Scholarship & Stipend. 1780 50.00 320 15.00<br />

13. Maintenance of Departmental L.S. 50.00 L.S 10.00<br />

buildings at various places.<br />

14. Domestic & International 20 15.00 5 2.00<br />

15.<br />

Training of Officers & staff.<br />

Study visit for Officers & staff in<br />

and outside the country.<br />

50 20.00 8 5.00<br />

16. Domestic & International study 65 15.00 12 5.00<br />

visit for entrepreneurs and<br />

17.<br />

artisans.<br />

Domestic & International 15 20.00 4 5.00<br />

Participation in workshop,<br />

18.<br />

seminar, conference etc.<br />

Reconstruction of existing 3<br />

training centres for Integrated<br />

Training & Research Centre.<br />

L.S 0.10 L.S 0.10<br />

Sub-total 293.00 81.00


- 128 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

3. Support to Societies, NGOs, Entrepreneurs and Artisans :<br />

(Budget Head : 2851 – Village & Small Industries, 103(03) – Support to<br />

Societies, NGO’s, Entrepreneurs and Artisans)<br />

Under this programme of development it is proposed to continue existing support<br />

to artisans in the form of subsidy for purchase of machineries and working capital<br />

margin. New initiatives shall be taken for development of product- specific cluster<br />

through societies, NGOs and entrepreneurs. It is also proposed to provide marketing<br />

incentives through exhibition and fairs.<br />

The following programmes are proposed to be taken during the plan period.<br />

(Rupees in lakh)<br />

11 th Sl. Programmes of works<br />

Five Year Plan <strong>2007</strong>- Annual Plan <strong>2007</strong>-2008<br />

No<br />

<strong>2012</strong><br />

Physical Financial Physical Financial<br />

1. Capital Investment support to cottage &<br />

village level artisans<br />

4200 60.00 200 10.00<br />

2. Capital Investment support for 215 50.00 55 10.00<br />

3.<br />

societies, NGOs and entrepreneurs.<br />

Support for working capital margin for<br />

obtaining credit.<br />

400 30.00 75 10.00<br />

4. Participation and organizing fairs, 335 30.00 50 10.00<br />

5.<br />

exhibition, buyer- seller meet in and<br />

outside the country.<br />

Database development, dessimination<br />

of information and publicity.<br />

L.S 20.00 L.S 5.00<br />

6. Rebate on sales of product. 4200 40.00 700 7.00<br />

7. Providing matching contribution to<br />

central schemes.<br />

L.S 80.00 L.S. 15.00<br />

8. Institution of Block Level, District<br />

Level and State Level Awards for<br />

product development and enterprise<br />

building.<br />

50 5.00 10 1.00<br />

Sub-total 315.00 68.00<br />

4. Promotional Grant to ZOHANDCO<br />

(Budget Head : 2851 – Village & Small Industries, 103(04) – Tribal Handloom Development<br />

Project)<br />

Draft 11 th . Five Year Plan Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

<strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Promotional grant to ZOHANDCO 90.00 L.S 12.00 L.S<br />

2. Tribal<br />

Project<br />

Handloom Development 147.00 L.S 23.00 L.S.<br />

237.00 35.00<br />

Sub-total<br />

Total of ‘B’ 1137.00 225.00


- 129 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

C – HANDICRAFTS :<br />

(Budget Head : 2851 – Village & Small Industries, 104(01) – Pro. & Dev. Of<br />

Handicraft Industry)<br />

With the opening of border trade between India and Myanmar and possible trade<br />

corridor via river Kaladyne to Akyab port, there is every possibility increasing trade and<br />

investment in <strong>Mizoram</strong>. Meanwhile the National Bamboo Mission is being brought in<br />

place under the Ministry of Agriculture.<br />

A cluster approach shall be induced in the handicraft sector for selected traditional<br />

items like khumbeu, faikhiat, thul, etc so that production in commercial scale could be<br />

ensured.<br />

The following are the items of works proposed during the 11 th Plan apart from<br />

continueing schemes maintained during the 1oth Plan period :<br />

11<br />

(Rupees in lakh)<br />

th Sl.No Programmes of works<br />

Five Year Plan Annual Plan <strong>2007</strong>-<br />

<strong>2007</strong>-<strong>2012</strong><br />

2008<br />

Physical Financial Physical Financial<br />

1. Salary of existing staff 3 20.00 3 3.60<br />

2. Wages to MR workers 7 18.00 7 3.00<br />

3. Medical treatment L.S 5.00 L.S. 1.00<br />

4. Travelling Expenses L.S 15.00 L.S 5.00<br />

5. Office Expenses L.S 20.00 L.S. 3.00<br />

6. Rent L.S 5.00 L.S 1.00<br />

7. GIA to trained artisans 800 Nos. 20.00 200 Nos 5.00<br />

7. Material & Supply L.S 40.00 L.S 7.00<br />

8. Purchase and maintenance of<br />

machineries & Equipments<br />

L.S. 30.00 L.S. 10.00<br />

9. Renumeration of Cluster L.S 15.00 L.S. 2. 40<br />

Development Agent (CDA)<br />

10. Establishment of Common 5 250.00 1 5.00<br />

Facility Centres with imported<br />

Technology for Bamboo &<br />

Rattan<br />

Total of C : 438.00 46.00<br />

D – ZOHANDCO<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

103(01)(31) – GIA – Share contribution to ZOHANDCO<br />

The state owned Apex Corporation is now running sick and need to be revived with<br />

additional injection of support apart from maintaining the existing set up. It is proposed<br />

to provide fund for the following


- 130 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

11<br />

(Rs. In lakh.)<br />

th Five Year Plan Annual Plan<br />

Sl.<br />

No.<br />

Items of Works<br />

<strong>2007</strong>-12<br />

Financial Physical<br />

<strong>2007</strong>-2008<br />

Outlay Target<br />

Outlay Target<br />

1. Administrative & Operational<br />

expenses (Share Capital)<br />

402.00 L.S 56.00 L.S<br />

2. Purchase of Handloom raw<br />

materials for RM Depot, Aizawl,<br />

Thenzawl, Lunglei and<br />

Khawzawl.<br />

50.00 L.S 10.00 L.S<br />

3. Purchase of Handicrafts rawmaterials<br />

for crafts development<br />

centre.<br />

43.80 L.S 8.00 L.S<br />

4. Organising Fair & Exhibition<br />

inside and outside the state.<br />

34.88 L.S 6.00 L.S<br />

5. Purchase of Handloom &<br />

Handicraft finished products for<br />

Aizawl,Lunglei,Lengpui Airport<br />

and Kolkata Emporium.<br />

53.00 L.S 10.00 L.S<br />

6. Opening of New Emporium at<br />

Millenium Centre, Aizawl.<br />

20.00 L.S 20.00 L.S<br />

7. Opening of New 15 Emporium at<br />

Baba Kharag Singh Marg,<br />

N.Delhi.<br />

15.00 L.S 15.00 L.S<br />

8. Opening of Mini Emporium in<br />

New <strong>Mizoram</strong> House at N.Delhi.<br />

8.00 L.S 8.00 L.S<br />

Sub-total 626.68 133.00<br />

The authorized share capital of the Corporation is Rs. 7.00 crores and proposed<br />

to be enhanced to Rs. 12.00 crores and the paid-up capital up to 2005-06 is Rs. 794.70<br />

lakhs. It is proposed to continue contributing share capital to the Corporation during the<br />

11 th . Five Year Plan also.<br />

As such, draft provision for 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-<br />

08 are as below :<br />

(Rs. In lakhs)<br />

Draft 11 th . Five Year Draft Annual Plan<br />

Items of works<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Share Capital contribution to<br />

ZOHANDCO<br />

497.00 L.S 50.00 L.S<br />

Sub-total 497.00 50.00<br />

Total of 11(A+B+C+D) 2142.00 328.00<br />

Sl<br />

No


- 131 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Scheme No. B – 12 :<br />

Name of the Scheme : <strong>Mizoram</strong> Khadi & Village Industries Board<br />

(Promotion & Development of Khadi & Village<br />

Indusatries)<br />

(Budget Head : 2851 – Village & Small Industries, 105(01) –Pro. & Dev. of KVI)<br />

1. During the 10 th Plan, <strong>Mizoram</strong> KVI Board has opened district offices at Lunglei<br />

and Lawngtlai with skeleton staff. The Office andTraining Centres in these 2 Districts<br />

are running on rented buildings. It is intended that the requirement of these 2 districts in<br />

respect of Office Buildings shall be implemented during the 11 th Plan.<br />

2. During the 11 th Plan, the <strong>Mizoram</strong> KVI Board shall open District Offices at<br />

Champhai, Mamit, Kolasib. The District Offices and Training Centre shall require funds<br />

for infrastructure; Salary and Wages; Furniture and Fixtures etc.etc.<br />

Fund requirement projected by the Board during 11 th . Five Year Plan <strong>2007</strong>-12<br />

and Annual Plan <strong>2007</strong>-08 are as below :<br />

(Rs. In lakh )<br />

Draft 11 th . Five Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 2 3 4 7 8<br />

1 Pay & Allowances with O.E. 1550.00 290.00<br />

2 Construction of Office 30.00 8.00<br />

3 Electric Installation 6.00 2.00<br />

4 Opening of District Offices :<br />

a) District office building & Rs.10.00<br />

per building in 5 District<br />

50.00 20.00<br />

b) Staff Quarters 3 nos. in each District<br />

@ Rs.5.00 lakhs per building<br />

75.00<br />

c)MDTC Training Centre at Lunglei<br />

for 5 disciplines with annexes<br />

50.00<br />

20.00<br />

d) Furniture & Fixture and Equipments<br />

for District Offices & Training Centre<br />

e) Land Development approach Road,<br />

36.00<br />

7.00<br />

Power supply for District Offices &<br />

Training Centre<br />

50.00<br />

10.00<br />

f) Promotional expenditures for<br />

Training / Research/ Tour/Seminar etc.<br />

36.00<br />

7.00<br />

g) Pool vehicles for 5 District @<br />

Rs.7.00 lakhs per vehicle<br />

h) State Matching contribution of<br />

27.00<br />

10.00<br />

KVIC Development grant/ rebate,<br />

subsidies<br />

50.00<br />

10.00<br />

Total : 1960.00 399.00


- 132 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Draft proposal for Establishment Grant to the Board during 11 th . Five Year Plan<br />

<strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are as follows :<br />

(Rs. In lakhs)<br />

Draft 11 th . Five Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Establishment Grant to MKVI Board 1695.00 L.S 284.00 L.S<br />

Scheme No. B – 13<br />

Name of the Scheme : Development of Bamboo Based Industries :<br />

(Budget Head : 2851 – Village & Small Industries, 800(01) –Dev. of Bamboo Industry)<br />

Development of Medium Bamboo Cluster for Primary Processing and value<br />

addition :<br />

Bamboo can be processed into various applications for revenue generation.<br />

However, bamboo, in its natural form, is routed and hollow, which leads to constraints<br />

in transport. The alternative is primary processing in an area over the sources. So,<br />

medium bamboo cluster for primary processing and value addition as a feeder to the<br />

main industry is proposed. The projected industries are paper mill, mat ply industry,<br />

floor based industry and stick making units. The unit cost of cluster is estimated at an<br />

average of Rs.40.00 lakh. It is proposed to set up such clusters during the 5-year period.<br />

Grant-in-Aid to Bamboo Development Agency : With an object of all-round<br />

bamboo sector development in the State and utilization aspects as thrust area, the<br />

Government of <strong>Mizoram</strong> has established a Society named Bamboo Development<br />

Agency. The Agency has been entrusted with various works/projects like Bamboo<br />

Technology Park, Joint Venture with <strong>Mizoram</strong> Venus Bamboo Products (P) Ltd. And<br />

Zonun Mat Ply Ltd., Industrial Complex at Bairabi, Facilitation Training cum<br />

Production Centre at Zuangtui, Bamboo Resource Area Connectivity Road at Bairabi,<br />

Nodal Agency for ASIDE Scheme in <strong>Mizoram</strong> and Chip business with NITOL Group of<br />

Bangladesh and Cachar Paper Mill, promotion and assistance to various private bamboo<br />

processing units, implementation of some portion of BAFFACOS Scheme, etc.<br />

The Agency has started generating some income from its activities, however,<br />

certain shortfalls will be there and with a prospect in growth bamboo based industries in<br />

the State, the Agency will be in need of strengthening, etc.<br />

As such, an amount of Rs.75.00 lakhs is proposed for the 11 th Five Year<br />

Plan.<br />

Other Expenses : Some expenditure will be required for entrepreneurship<br />

development, skill upgradation, publicity – information dissemination, advertisement,<br />

entertainment, etc and to cover these activities, an amount of Rs.200.00 lakhs is<br />

proposed during the 11 th Five Year Plan.


Sl<br />

No<br />

- 133 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

(Rs. In lakhs )<br />

Items of works<br />

1 Other charges :<br />

2 Development of Bamboo cluster for<br />

primary processing and value<br />

addition<br />

3 Grant in Aid to Bamboo<br />

Development Agency<br />

Draft 11 th . Five Year<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1.00 25 Nos. 0.10 5 Nos.<br />

50.00 1 No. 10.00 1 No.<br />

4 Other expenses 100.00 L.S 30.00 L.S<br />

Total : 151.00 40.10<br />

Scheme No. B - 14.<br />

Name of the Scheme : Zoram Industrial Development Corporation<br />

Ltd.(ZIDCO)<br />

(Budget Head : 4851 – Capital Outlay on Village & Small Industries)<br />

1. SHARE CAPITAL : An amount of Rs.35.00 lakhs is earmarked for ZIDCO as<br />

Share Capital contribution in the current FY and 20% increase is provided in each<br />

coming five years.<br />

All the administrative and other expenses are expected to be met from Share<br />

capital and other income.<br />

2. CONSTRUCTION OF OFFICE BUILDING : ZIDCO has been allotted new<br />

office site by the Govt. of <strong>Mizoram</strong> free of cost at New Capital Complex at Khatla. For<br />

this purpose, an amount of Rs.50.00 lakhs each may be included in the first three five<br />

years.<br />

Fund requirement projected by the Corporation during 11 th . Five Year Plan<br />

<strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 as as tabulated below :<br />

(Rs. In lakh )<br />

Draft 11 th . Five Year Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Other charges<br />

2 Share capital 310.00 L.S 42.00 L.S<br />

3 Construction of office bldg 150.00 1 no. 50.00 1 no.<br />

Total : 460.00 92.00<br />

The authorized share capital of the Corporation is Rs. 20.00 crores and the paidup<br />

capital up to 200-06 is Rs. 1542.60 lakhs. It is proposed to continue contributing<br />

share capital to the Corporation during the 11 th . Five Year Plan also.


- 134 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

As such, draft provision for 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-<br />

08 are as below :<br />

(Rs. In lakhs)<br />

Draft 11 th . Five Draft Annual Plan<br />

Sl<br />

No<br />

Items of works<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

1 Share Capital contribution to ZIDCO 150.00 L.S 30.00 L.S<br />

Total of B -15 : 150.00 30.00<br />

Scheme No. B - 15.<br />

Name of the Scheme : Consultancy & Project Formulation<br />

(Budget Head : 2851 –Village & Small Industries )<br />

One of the problems faced by the entrepreneurs in taking up industrial ventures<br />

is in drawing up projects and the Department has no expertise in this field and expert<br />

organizations are always required to be engaged on payment of consultancy fee in<br />

drawing up Project Reports for funding under State Plan, CSS, NEC and NLCPR. It is,<br />

therefore, required to make provisions for the purpose.<br />

Draft proposal for the same during 11 th . Five Year Plan <strong>2007</strong>-12 and Annual<br />

Plan <strong>2007</strong>-08 are tabulated below :<br />

Sl<br />

No<br />

Items of works<br />

1 Other charges:<br />

Consultancy Fee for projects like<br />

handloom, handicrafts, food<br />

projects, industrial infrastructure<br />

development<br />

Scheme No. B – 16<br />

Name of the Scheme : Disaster Management<br />

Draft 11 th . Five<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakhs)<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Outlay Physical<br />

Target<br />

90.00 L.S 20.00 L.S<br />

As <strong>Mizoram</strong> lies within Seismic Zone V, it is required to make provisions for<br />

compensation/rehabilitation of disaster affected industrial units. Token provisions are<br />

required to be made in case disaster happens.<br />

Draft token provisions during 11 th . Five Year Plan <strong>2007</strong>-12 and Annual Plan<br />

<strong>2007</strong>-08 are as follows :


Sl<br />

No<br />

- 135 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INDUSTRIES<br />

Items of works<br />

1 Other charges:<br />

Token provisions for<br />

rehabilitation/compensation of<br />

disaster affected industrial units.<br />

Sub-total :<br />

……..<br />

Draft 11 th . Five<br />

Year Plan <strong>2007</strong>-12<br />

Physical<br />

Outlay<br />

Target<br />

(Rs. In lakhs)<br />

Draft Annual Plan<br />

<strong>2007</strong>-08<br />

Physical<br />

Outlay<br />

Target<br />

15.00 L.S 1.00 L.S<br />

15.00 1.00


- 136 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

Introduction :<br />

SERICULTURE<br />

Sericulture Industry is family-oriented, labour intensive, ideally suited to<br />

countries in the tropical region where unemployment continues to be a serious problem.<br />

It has also been said to be a meeting place of Agriculture, Arts and Industries as it<br />

involves in cultivation of Silkworm food plants, Seed production and rearing of<br />

silkworms are an Art requiring skilled hands and the post cocoon technology upto its<br />

marketing are purely Industries.<br />

Sericulture practices can rightly fit into the Socio-economic structure of<br />

the rural areas and play significant role for reconstruction of rural economy benefiting<br />

mostly the weaker section of the society. The most important consideration is the<br />

effective utilization of family manpower, indiscriminately, the old aged, handicapped,<br />

illiterate and women folk. It is also the most important tool to fill up the gap between the<br />

rich and the poor distributing wealth among the farmers, reelers, weavers and traders<br />

where the lion share goes to the poor farmers.<br />

In fact Sericulture is practised as a viable rural Industry as it gives<br />

remunerative employment to family labour throughout the year and ensures periodic<br />

income even from small land holdin g with low financial investment. It has a ready<br />

market and is export oriented.<br />

Objectives :<br />

(i) To uplift the rural economy in the State.<br />

(ii) To generate direct and indirect gainful employment.<br />

(iii) In the context of <strong>Mizoram</strong>, it aims at weaning away the devastating Jhum<br />

Cultivation by establishing Sericulture farming in the private sector, which will<br />

be permanent and sustainable occupation for the rural poor.<br />

(iv) To produce more cocoon and raw silk for the benefit of the farmer in particular<br />

and to increase the State’s revenue in general.<br />

Uniqueness :<br />

(i) The wealth is transferred from the rich to the poor where<br />

maximum share goes to the poor.<br />

(ii) Indiscriminate utilization of family manpowers. In other words, in<br />

Sericulture activities all kinds of people can equally involved.<br />

(iii) Nothing is practically a waste in Sericulture. Mulberry twigs are<br />

used as firewood, the litters a manure, the pupae for oil extraction,<br />

poultry/fish/human feed, the Mulberry trunk for making cricket bat, hockey<br />

stick, etc.<br />

The State of <strong>Mizoram</strong> has been proved to be an ideal place for the<br />

development of Sericulture Industry. The climatic condition, rainfall and fertility of the<br />

soil are congenial for cultivation of Silkworm food plants and rearing<br />

of Silkworms of all varieties like Mulberry, Eri, Muga and Oak Tasar. A team of experts<br />

from the Central Silk Board had visited <strong>Mizoram</strong> in November, 1976 to conduct


- 137 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

feasibility survey. The team had visited many parts of the State and their finding was<br />

reproduced as follows :-<br />

The State of <strong>Mizoram</strong> has all the prerequisites for the development of all<br />

kind of Silkworm varieties.<br />

The Sericulture experts from JICA who have visited <strong>Mizoram</strong> in March,<br />

2000 have also realised with much surprise the fact that without application of<br />

fertilizer/manure for years together the Mulberry trees thrive well and put forth leaf<br />

almost throughout the year.<br />

The four sectors of Sericulture Industry which are being exploited on<br />

commercial basis are :-<br />

(a) Mulberry : Mulberry plantation can be raised easily everywhere in the<br />

State. It grows at lower altitude on sides of the hill and on top of the hills also.<br />

It has been approved that different Mulberry varieties including hybrid varieties<br />

have also been successfully propagated in many parts of the State. Since<br />

Mulberry is a fast growing perennial plants and the silk produced from<br />

silkworms, feeding on Mulberry leaf is of high quality and commonly used by<br />

people of the world, the State Govt. also has given priority for its development<br />

during the 10 th Plan period which will continue in the 11 th Plan Period also.<br />

(b) Eri : Eri silkworm is semi-wild in nature and successfully cultured in the State<br />

of <strong>Mizoram</strong>. The silk produced by the Eri Cocoons is commonly used for<br />

chuhidar (showl) and silk quilt making. Eri food plants like Castor, Kesseru,<br />

Tapioca, etc. can be grown in all parts of the State without difficulty. Therefore,<br />

step will be taken to promote Eri industry also during the 11 th Plan.<br />

(c) Muga : Muga Silkworm is found only in the the then Assam<br />

Valley including <strong>Mizoram</strong>. It produces golden silk which fetches the highest<br />

price as compared to all other variety of silk yarns. <strong>Mizoram</strong> is found to be one<br />

of the promising States for production of golden Muga cocoons which, in turn,<br />

may be a good source of income for the State.<br />

(d) Oak Tasar : It has been estimated that over 30000 hectares of<br />

natural grown Oak trees are available in the north eastern part of the State. The Oak<br />

trees are the main food plant of Oak Tasar Silkworm.<br />

In spite of all the aforesaid advantages that the State of <strong>Mizoram</strong> has for the<br />

development of Sericulture Industry, the growth of Sericulture Department in the State<br />

has been at a very slow pace and the reasons to this are attributed to lack of the required<br />

infrastructural facilities, paucity of fund, inadequate number of staff, etc.<br />

During the 11 th Plan period (<strong>2007</strong>-<strong>2012</strong>) Sericulture Department will intensify its<br />

Plan and implementation Programmes towards production of Bivoltine Mulberry Silk<br />

and also Eri and Muga Sectors shall be given importance simultaneously. To meet these<br />

ends maximum quantity of high yielding Mulberry variety, som/soalu and kesseru/castor


- 138 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

shall be introduced in the private sectors. In the meantime seed Grainages, rearing and<br />

post cocoon Technologies shall be upgraded/improved as far as practicable.<br />

Since various Catalytic Programmes under Silk Board are proposed to be<br />

implemented during the 11 th Plan Period, necessary provision as matching contributions<br />

have been provided under Promotion & Extension scheme.<br />

THE SCHEMES :<br />

During the 11 th Plan Period also the seven (7) ongoing schemes will<br />

continue to be implemented. However, a number of additional new components will be<br />

added in some of the Schemes.<br />

The followings are the major continuing schemes to be implemented in<br />

the 11 th Plan Period.<br />

1. Direction<br />

2. Administration<br />

3. Promotion and Extension<br />

4. Sericulture Marketing<br />

5. Research & Training<br />

6. Silk Processing (Post cocoon technology)<br />

7. Seed Organisation<br />

Brief description of the schemes are as follows :<br />

NO.1 : DIRECTION & ADMINISTRATION :<br />

This scheme aims at strengthening of Directorate administration,<br />

planning and implementation, monitoring of all work activities, financial control to over<br />

all control of sanction expenditures.<br />

During the 11 th Plan Period residential quarters will be constructed in the<br />

Directorate Complex. The existing buildings will be maintained and improvement shall<br />

be made as per requirement from time to time. Fencing of Sericulture Complex,<br />

Chaltlang shall be taken up too..<br />

Under Administration of District offices, the main components of the<br />

scheme are :-<br />

(i) Maintenance and upkeep of all District Offices<br />

(ii) During the 11 th Plan Period, 5 District Offices and 15 nos. of Staff quarters<br />

are proposed to be constructed at different Districts of the State.<br />

(iii) All Seed farms and centres shall be maintained which include repairs of<br />

technical buildings, offices and quarters. Production of Cocoons and raw silk<br />

will be 500 M.T. and 50 M.T. respectively.<br />

(iv) Creation of posts are also proposed as per necessity.<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Direction & Administration 803.00 207.00


- 139 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

NO. 3 : PROMOTION & EXTENSION<br />

This Scheme mainly concern with extension and promotional activities at<br />

village level benefiting the farmers. It provides technical assistance and gives<br />

subsidy/grant-in-aid to the registered farmers from time to time. Various Catalytic<br />

Development Projects sponsored by the Central Silk Board will be incorporated under<br />

this scheme for promotional upgradation of Mulberry, Eri, Muga, Oak Tasar and Post<br />

Cocoon activities.<br />

The scheme will extensively provide planting materials including fencing<br />

materials and machineries/equipments to the farmers. During 11 th Plan Period, it is<br />

proposed to cover 10000 families under Mulberry Sector, 500 families under Muga<br />

Sector, 500 families under Eri Sector and 300 families under Oak Tasar Sector. Since<br />

the existing strength of staff is far below the requirement, necessary posts from<br />

Extension Officer down to Rearer are proposed to be created to cope with the increasing<br />

work activities.<br />

Outlay for the scheme during 11 th Plan & Annual Plan <strong>2007</strong>-08 is as<br />

below :-<br />

11<br />

(Rs. in lakh)<br />

th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Promotion & Extension 741.00 35.00<br />

NO. 4 : SERICULTURE MARKETING<br />

In more advanced states/countries, so long as marketing is concerned,<br />

systematically organized marketing by-laws and procedures to be followed are framed.<br />

In such marketing system the sales and transactions are between the farmers, reelers and<br />

the weavers. The involvement of the Government is so little.<br />

In the case of <strong>Mizoram</strong> where such systems are yet to be at our reach, the<br />

marketing of the produce of the farmers has been directly handled by the Government<br />

Department. This is necessary since there is no organized silk reeler and weaver in the<br />

State. In short, the cocoons produced by the farmers are purchased by the Government<br />

at the rates fixed by the Government from time to time. To purchase the cocoons<br />

produced by the farmers the Sericulture Department fixed five places as purchasing<br />

centres. These centres are Aizawl, Serchhip, Champhai, Kolasib and Lunglei.<br />

In all the above purchasing centres, scientific cocoon godowns are<br />

required to be constructed for storage of cocoons before they are sent to the reeling<br />

factory at Zemabawk. During 11 th Plan as far as practicable marketing of Sericulture<br />

produce are propose to be privatized. Therefore, this has to be examined in-depth to see<br />

its practical feasibility carefully.<br />

Besides, all necessary equipments/machineries will be purchased.<br />

Tentative allocations for the 11 th Plan and Annual Plan <strong>2007</strong>-08 are as below<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Seri Marketin 291.00 25.00


- 140 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

NO. 5 : RESEARCH & TRAINING<br />

As already mentioned in the aforesaid para, Sericulture Industry is an<br />

Agro-based which requires wide range of scientific technologies with different financial<br />

investments. Therefore, proper studies on silkworm metamorphose, pathology,<br />

Agronomy, Arboriculture and ecology are indispensable to make Sericulture Industry<br />

flourish economically viable. The success of Sericulture Industry largely depend on the<br />

availability of required Scientific knowledge and its application in the field at the right<br />

time and at the right place.<br />

This can be achieved through realisation of the importance of Research<br />

and Training activities based on well-organized scientific lines, equipped with the most<br />

advanced scientific instruments to evolve new concepts of scientific methodology for<br />

application to field activities with minimum financial investment.<br />

At this end, the Department of Sericulture had established one Research<br />

and Training Institute at Zemabawk with the following objectives.<br />

1. To depute B.Sc. graduates for training in post Graduate Diploma in Sericulture to<br />

various Sericulture Institutes in India.<br />

2. To Impart training to matriculates for one year certificate course training.<br />

3. To impart short-term training to the in-service personnel and the private farmers<br />

in Post cocoon sector<br />

4. To conduct study tours for trainees from time to time.<br />

5. To conduct mobile training to farmers of far flung areas. It is proposed to train<br />

10000 farmers and 150 in-service persons.<br />

6. Construction/repairs of quarters.<br />

Besides above, during the 11 th Plan period the Research and Training<br />

institute, Zemabawk will be entrusted to work on plant protection and plant & animal<br />

pathology extensively so as to eradicate various dreadful disease of food plants and<br />

silkworms. Necessary post for teaching staff will be created during<br />

11 th Plan period.<br />

Targets for 11 th Plan and Annual Plan <strong>2007</strong>-08 are as below.<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Training 241.00 15.00<br />

NO.6 : SILK PROCESSING (POST COCOON TECHNOLOGY)<br />

The main theme of Sericulture Industry is to make earnings through Sales of<br />

various Sericulture products to individuals, societies in the State.<br />

Unless the cocoons so produced are processed to produce raw silk and silk<br />

fabrics, Sericulture activities are said to be incomplete. The cocoons produced are<br />

subjected to various post Cocoon technologies in order to produce quality raw silk and<br />

silk goods for sale in the market.


- 141 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SERICULTURE<br />

The cocoon processing comprises of selection of quality cocoons, stifling,<br />

cooking, degumming, reeling/spinning, twisting, weaving and so on. Cocoon processing<br />

required highly skilled hands in order to produce quality raw silk and silk fabrics to<br />

catch viable markets.<br />

At this objective, the Sericulture Department is having one Reeling Factory at<br />

Zemabawk. Apart from producing raw silk and silk fabrics these units have also been<br />

producing silk quilts in abundance which has marketing potential everywhere in the<br />

country. Since the production of reeling cocoons is increasing year after year, it has<br />

become a necessity to have one more Reeling machine like the existing ones. Under this<br />

scheme there is one silk weaving and dyeing unit at Aizawl where silk fabrics of various<br />

designs are produced.<br />

Therefore the main aim of this scheme is to create & encourage private<br />

reelers/weavers so as to sustain their livelihood through sales of their products. At least<br />

one automatic silk reeling machine will be installed in the private sector during 11 th<br />

Plan.<br />

However, to make the Department capable of increasing the revenue<br />

through Sales of Sericultural products, the reeling factory has to be strengthened by<br />

providing necessary infrastructures.<br />

Tentative allocations for 11 th Plan and Annual Plan <strong>2007</strong>-08 are as below :-<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Silk Processing 266.00 20.00<br />

NO. 7 : SEED ORGANISATION<br />

The whole gamut of seed production comprises of seed organization for<br />

systematic and methodical multiplication of basic seed and industrial seed on scientific<br />

line and its proper and efficient management of breeders stock and its multiplication for<br />

ultimate production of industrial hybrid seed which involved, in seed production, viz.<br />

breeders stock, basic seed and industrial seed. This will also include maintenance of<br />

purity, vigour and vitality.<br />

The main theme of seed organization is to produce sufficient healthy<br />

silkworm eggs to meet the requirement of the farmers.<br />

Although the department has been very much aware about how to have<br />

systematic seed organization in the past, it was unable to organize standard seed<br />

organization due to paucity of fund. Even in the 11 th Plan, if fund is not provided<br />

sufficiently, this scheme shall flop and the victims will be the poor farmers.<br />

Main activities in the 11 th Plan will be :<br />

(i) To construct 6 nos. of Seed grainages at Lunglei, Serchhip, Champhai,<br />

Thenzawl, Aizawl and Kolasib.<br />

(ii) To produce 20.00 lakh nos. industrial seeds.<br />

(iii) Necessary equipments will be purchased.<br />

Year-wise financial targets for 11 th Plan and Annual Plan <strong>2007</strong>-08 are as below :-<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong> – <strong>2012</strong> A.P. <strong>2007</strong> – 08<br />

Seed Organisation 216.00 10.00<br />

……


- 142 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINES & MINERALS<br />

MINES & MINERALS<br />

INTRODUCTION: The Geology & Mining Wing of Industries Department undertake<br />

the following Schemes during the 10 th Plan (2002-07):-<br />

1). Ground Water Investigation , development and Monitoring.<br />

2). Geotechnical Investigations and 3). Minor Mineral Investigation and Development.<br />

During this Five year Plan, the Drilling Rigs donated by N.E.C during 1988-89<br />

become unusable due to break down of the engines and much head way could not be<br />

made in the development of Ground water. In spite of the stated conditions, the<br />

department is conducting detail Ground water Investigations in 6 district Capitals , viz<br />

Aizawl, Lunglei, Champhai, Kolasib and Mamit and quarterly monitoring of the<br />

ground water conditions were conducted .<br />

The department also conducted landslide investigations and zonation in a phase<br />

manner. The department, in coordination with the Town and Country Planning wing of<br />

Local Administration Department, conducted number of House Site Investigations for<br />

issuing House Construction Approval of private parties. Besides, the department, in<br />

coordination with the Regional Research Laboratory (RRL), Jorha,. installed<br />

Seismograph during 2005-06, for monitoring earthquakes in <strong>Mizoram</strong>. Slope stability<br />

mapping and disaster monitoring has also been conducted in different parts of the state<br />

during this period<br />

The department has implemented the <strong>Mizoram</strong> Minor Mineral Concession Rules,<br />

2000 with effect from 2005-06. Number of quarrying permits have been issued in<br />

different parts of the state earning considerable amount of revenue for the state. Factory<br />

for manufacturing of stone slabs/tiles was also set up by the department during this<br />

period, with the assistance of N.E.C which will make use of the hard rock resources, and<br />

shell limestones in different parts of the state.<br />

In order to monitor the exploitation of minor minerals like sand, building<br />

materials/hard rocks, clay etc. the department proposes to open at least three (3) District<br />

Offices during the 11 th Five Year Plan. Govt of <strong>Mizoram</strong> has also approved to erect<br />

check gates for monitoring the movements of minor minerals at ten(10) locations in<br />

different parts of the state. It is also expected that the exploitation of sand deposits will<br />

go in a big way to earn revenue for the state in the coming years. As such, the<br />

department requires strengthening in man power and it is also proposes that a separate<br />

Directorate can be established during the 11 th Five Year Plan. The detail of work<br />

programme and Financial requirement during the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> are<br />

stated below:-<br />

I. DIRECTION & ADMINISTRATION: This scheme will provide administrative<br />

support for all other schemes under Geology & Mining Wing. The work programme and<br />

financial requirement for the 11 th Five Year Plan are as follows:-


- 143 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINES & MINERALS<br />

Description 11 th FiveYear<br />

Plan,<br />

(<strong>2007</strong>-12)<br />

Draft Annual<br />

Plan<br />

<strong>2007</strong> - 2008<br />

001(01) – Direction (Plan) Outlay Physical Outlay Physic<br />

al<br />

(01) Salary for the existing staff 65.00 10 nos. 14.30 10 nos.<br />

Wages-Payment of wages for muster 20.00 10 nos. 5.06 10 nos.<br />

(02) rolls<br />

(06) Medical Treatment 10.00 10 nos. 2.20 L.S.<br />

(11) Traveling expenses 10.00 10 nos. 2.64 L.S.<br />

(13) Office Expenses<br />

Stationeries, P.O.L, office furniture,<br />

Group D liveries etc.<br />

34.50 L.S. 13.20 L.S<br />

(16) Publication 0.50 L.S 0.10 L.S<br />

(26) Advertisement 5.00 L.S 1.00 L.S<br />

(27) Minor Works- Repair and<br />

79.00 4 nos. 5.50 2 nos<br />

maintenances of office/quarters, pump<br />

(Lungl<br />

shed, approach road, jungle clearance of<br />

ei &<br />

office complex, opening of Site Office<br />

Kolasi<br />

& Maintenance of Computers/ Printers<br />

etc.<br />

b)<br />

TOTAL 226.00 44.00<br />

II. GROUND WATER INVESTIGATION, DEVELOPMENT & MONITORING<br />

The department as well as the Central organization like Central Ground Water Board,<br />

has identified a number of potential ground water zone/points to construct tube wells for<br />

development of ground water in <strong>Mizoram</strong>. There are also some Geological Formations<br />

where deep tube wells can be constructed and used for irrigation purposes.<br />

Effort is on to obtain Drilling rigs with the assistance of Central Organizations<br />

like IBM, NEC etc. If the effort of the department is successful, development<br />

Organizations of ground water by constructing shallow and deep tube wells can go a<br />

long way to satisfy the needs of the public and farmers for domestic and agriculture<br />

purposes. The financial requirement during the Five Year Plan along with proposal for<br />

Draft Annual Plan <strong>2007</strong> - 2008 are as follows:<br />

Description 11 th FiveYear<br />

Plan,<br />

(<strong>2007</strong>-12)<br />

101(01) – Ground Water Investigation<br />

(P)<br />

(27) Minor Works :- It will include the<br />

following works :-<br />

a) Hydro geological<br />

Investigation<br />

b) Geophysical Investigation<br />

c) Drilling of Tube Wells along<br />

with fitting of Hand Pumps<br />

Draft Annual Plan<br />

<strong>2007</strong> - 2008<br />

Outlay Physical Outlay Physical<br />

63.00<br />

30 vills.<br />

10 nos.<br />

50 nos.<br />

30 loc.<br />

12.10<br />

6 vills.<br />

2 nos.<br />

10 nos.<br />

6 loc.


- 144 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINES & MINERALS<br />

d) Seasonal Data Collection and<br />

Monitoring<br />

e) Detail Hydro-geological<br />

Investigation of important<br />

10<br />

towns<br />

2 towns.<br />

townships.<br />

(51) Motor Vehicles 10.00 1 no. 2.20 1 no.<br />

(52) Machinery & Equipments :- It will 15.00<br />

include the following:a)<br />

Purchase of Hand Pumps<br />

b) Maint. of Geochemical Lab<br />

L.S 3.30 L.S<br />

equipments, Geological &<br />

Geophysical Instruments.<br />

TOTAL 88.00 17.60<br />

III. GEO-TECHNICAL INVESTIGATIONS: As the state of <strong>Mizoram</strong> locates in<br />

landslides and disaster prone area, this scheme will undertake landslide hazard zonations<br />

in different parts of the state, including Monsoonal Investigations in the state.<br />

Determination of various parameters of rocks’ strength in the laboratory will also be<br />

studied. Geotechnical Investigations/Foundation investigations will also be taken up as<br />

per demand of the concerned departments. The following works with financial<br />

involvement are targeted by the department during the 11 th Five Year Plan.<br />

Description 11 th FiveYear<br />

Plan,<br />

(<strong>2007</strong>-12)<br />

101(02) – Geotechnical<br />

Investigation (P)<br />

(27) Minor Works:-<br />

a) Landslide Hazard<br />

Zonation and Risk<br />

Classification<br />

b) Slope stability<br />

analyses of Aizawl city with<br />

remedial measures<br />

c) Disaster Investigations<br />

During Monsoons<br />

d) Works to be undertaken<br />

with Central organizations<br />

like G.S.I, I.B.M etc.<br />

e) Detail Geotechnical<br />

Studies of Townships<br />

Draft Annual Plan<br />

<strong>2007</strong> - 2008<br />

Outlay Physical Outlay Physical<br />

75.00<br />

-<br />

-<br />

-<br />

10 nos.<br />

1 no.<br />

Covering<br />

<strong>Mizoram</strong><br />

L.S<br />

10 Towns<br />

-<br />

12.10<br />

(52) Machineries & Equipments:<br />

a) Procurement of Spares<br />

and Accessories for core<br />

Drilling<br />

15.00 L.S 3.30 L.S<br />

b) Strengthening of<br />

Geotechnical Laboratory<br />

TOTAL 90.00 15.40<br />

-<br />

-<br />

2 nos.<br />

1 no.<br />

L.S<br />

2 Towns


- 145 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINES & MINERALS<br />

III. MINERAL INVESTIGATIONS AND DEVELOPMENT.: The department<br />

started undertaking monitoring of minor mineral development at the end of the 10 th Plan<br />

and more stress is to be given on the enhancement of exploitation and monitoring. Mean<br />

while, it will conduct investigation of hard rocks for use in the slab making industry set<br />

up by the department as well as for constructional uses. The department will also<br />

attempt to uplift the Permit Holders by giving grant/assistant in terms of maintenance of<br />

their approach road in the minor mineral developing zone. Investigations of other minor<br />

minerals like clay, sandstone for decorative purposes, sand deposits for use in<br />

construction purposes will also be taken up during the 11 th Five Year Plan. The work<br />

programmed and Financial requirements are as below:<br />

Description 11 th FiveYear Plan, Draft Annual Plan<br />

(<strong>2007</strong>-12)<br />

<strong>2007</strong> - 2008<br />

101(3) Minor Minerals Investigation Outlay Physical Outlay Physical<br />

(P)<br />

(11) T.E 15.00 L.S 3.30 L.S<br />

(13) O.E POL, hiring of vehicles, meetings,<br />

Stationeries, telephone, power rent,<br />

advertisement etc.<br />

20.00 L.S 5.50 L.S<br />

(27) Minor Works:-<br />

127.00 8 Districts 14.30 L.S<br />

a) Minor mineral<br />

Investigations like hardrocks,<br />

b)<br />

shell limestone, clay, sand and<br />

sandstones etc.<br />

Monitoring of quarries,<br />

periodic visits and safety<br />

c)<br />

inspections.<br />

Monitoring<br />

exploitation of sand<br />

the<br />

d) Mapping of new quarries<br />

e) Upgradation of Slab<br />

Factory like construction of<br />

sump, drainages and water<br />

(28)<br />

recycling system in the factory<br />

P.P/S.S 1.00 L.S 0.50 L.S<br />

(50) O.C<br />

Operational Costs of shell lime<br />

stone slab factory/Assistance to<br />

minerals developing areas.<br />

5.00 L.S 4.40 L.S<br />

(52) M&E<br />

10.00 L.S 5.00 L.S<br />

a) Purchase of satellite<br />

Imageries /toposheets<br />

b) Procurement of Survey<br />

Instruments like<br />

compasses/planetables/boards/p<br />

etrologi-cal Lab. Equipments<br />

etc<br />

TOTAL 178.00 33.00<br />

GRAND TOTAL 582.00 110.00


- 146 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MINES & MINERALS<br />

MINERALS<br />

(Rs. In lakhs)<br />

SL. No Details of Scheme 11 th Five<br />

Year Plan<br />

<strong>2007</strong>-12<br />

Annual<br />

Plan<br />

<strong>2007</strong>-08<br />

I Direction & Administration 226.00 44.00<br />

II Ground Water Investigation, Development &<br />

Monitoring<br />

88.00 17.60<br />

III Geotechnical Investigations 90.00 15.40<br />

IV Minor Mineral Investigation, Development &<br />

Monitoring<br />

178.00 33.00<br />

TOTAL 582.00 110.00<br />

…..


- 147 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

A. INTRODUCTION :-<br />

ROADS AND BRIDGES (PWD)<br />

<strong>Mizoram</strong>, located and sandwiched between Myanmar and Bangladesh in<br />

the north-eastern corner of India, covering an area of 21087 Sq. Km has a population of<br />

8,91,058 as per 2001 census.<br />

Roads construction activities in <strong>Mizoram</strong> started from the 5 th Five Year<br />

Plan and is mainly taken up by the State PWD and BRO. The total length of all types of<br />

roads in <strong>Mizoram</strong> as on 31.03.2006 is 5980.87 Km and road density is 28.36 Km per<br />

100 Sq Km.<br />

B. ACHIEVEMENT OF THE 10 TH <strong>PLAN</strong> : -<br />

During the 10 th Five Year Plan, a total outlay of Rs 46258.00 lakhs was<br />

approved for Roads & Bridges. The approved break –up is as follows :-<br />

( Rs in lakhs)<br />

1. Direction and Administration - 5490.00<br />

2. State Highways - 302.00<br />

3. Major District Roads - 1209.00<br />

4. Other District Roads - 353.00<br />

5. Village Roads - 987.00<br />

6. Satellite Towns & Villages - 416.00<br />

7. Roads within town - 990.00<br />

8. Bridges - 1209.00<br />

9. NABARD - 1183.00<br />

10. MSRP ( Counterpart Funding<br />

of World Bank Project)<br />

- 5250.00<br />

11. <strong>Mizoram</strong> State Roads Project( EAP) - 29750.00<br />

TOTAL = 46258.00<br />

The total anticipated expenditure during the 10 th Plan under this head is Rs<br />

46201.66 lakhs.<br />

The Physical Achievement of the 10 th Five Year Plan ( 2002 - 07)<br />

Scheme are as follows :-<br />

1. Formation Cutting ( FC) = 365.00 Km<br />

2. Improvement & Widening ( IW) = 170.00 Km<br />

3 Culverts ( C) = 1131 Nos<br />

4. Retaining Walls ( RW) = 10335.92 Rm<br />

5.Side drains ( SD) = 133.34 Km<br />

6. Soling, Metalling & Blacktopping ( SMBT) = 82.37 Km<br />

7. Metalling & Blacktopping ( SMBT) = 3.36 Km<br />

8. Resurfacing ( RS) = 231.37 Km<br />

C. STRATEGY FOR THE 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong><br />

1. Projects which are due for completion will be taken up during the 11 th Five Year<br />

Plan.<br />

2. Improvement and upgradation of completed schemes will be given priority.


- 148 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

3. Priority will be given to gap the missing link during the 11 th Plan.<br />

4. Provisions for maintenance / rehabilitation of completed roads is also incorporated.<br />

5. District plans have been incorporated as far as practicable.<br />

A sum of Rs. 68716.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> -<br />

<strong>2012</strong> ) under this Head of Account. The details of Sub –heads are as follows :-<br />

( in rupees lakhs)<br />

Proposed Outlay<br />

Sl No Name of Work / Scheme 11 th Plan Annual Plan<br />

<strong>2007</strong> -12 <strong>2007</strong> - 08<br />

A. Direction & Administration<br />

1. Salaries of Staff andother establishment cha 4088.00 816.00<br />

Sub – Total of D & A 4088.00 816.00<br />

B. Works<br />

1. State Highway 1208.00 300.00<br />

2. Major District Roads 2000.00 800.00<br />

3. Other District Roads 2000.00 900.00<br />

4. Village Roads 2500.00 568.00<br />

5. Bridges 200.00 2.00<br />

5 Satellite Towns & Villages 1415.00 675.00<br />

6 Roads Within Towns 2200.00 1035.00<br />

7 NABARD 1980.00 868.00<br />

9 Counterpart Funding of World Bank Aided<br />

6000.00<br />

Project<br />

1700.00<br />

10 <strong>Mizoram</strong> State Roads Project ( EAP) 44625.00 9000.00<br />

11 Machinery & Equipment 500.00 100.00<br />

Sub – Total of Works 64628.00 15948.00<br />

GRAND TOTAL OF 5054 ( P ) 68716.00 16764.00<br />

The Physical Target of the 11 th Five Year Plan ( <strong>2007</strong> - 12) Scheme are as<br />

follows :-<br />

1. Formation Cutting ( FC) = 128.00Km<br />

2. Improvement & Widening ( IW) = 220.32Km<br />

3.Culverts ( C) = 1562 Nos<br />

4. Retaining Walls ( RW) = 21117.00 Rm<br />

5.Side drains ( SD) = 897.00 Km<br />

6.Lined Side drains ( LSD) = 78.00 Km<br />

7. Soling, Metalling & Blacktopping ( SMBT) = 498.80 Km<br />

8. Metalling & Blacktopping ( SMBT) = 20.00 Km<br />

9. Resurfacing ( RS) = 1465.56 Km<br />

10. Bridges ( B) = 2 Nos<br />

The details of the Proposals for the 11 th Five Year Plan ( <strong>2007</strong>- 12 ) and for the<br />

Annual Plan <strong>2007</strong>- 08 are as follows :-<br />

A. DIRECTION AND ADMINISTRATION :-<br />

A sum of Rs. 4088.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under<br />

this Head of Account.


- 149 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 816.00 lakhs is proposed for salaries of<br />

existing staff and other establishment charges. The details of the proposals are as follows :-<br />

The break up of Direction & Administration is as below :<br />

1) Salary = Rs. 488.00 lakhs<br />

2) T.E. = Rs. 38.00 lakhs<br />

3) Office expenses = Rs. 70.00 lakhs<br />

4) Rent = Rs. 7.00 lakhs<br />

5) Advertisement = Rs. 10.00 lakhs<br />

6) Stipend = Rs. 50.00 lakhs<br />

7) Motor Vehicle = Rs. 20.00 lakhs<br />

8) Professional charge = Rs. 8.00 lakhs<br />

9) Other charges = Rs. 20.00 lakhs<br />

10) Maintenance = Rs. 105.00 lakhs<br />

Total = Rs. 816.00 lakhs<br />

B. WORKS :-<br />

A sum of Rs. 64628.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

under this Sub – head.<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 15948.00 lakhs is proposed for execution<br />

of various works as described below :-<br />

STATE HIGHWAYS :-<br />

A sum of Rs. 1208.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

under this Sub – head.<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 300.00 lakhs is proposed for execution of<br />

State Highway works as described below :-<br />

Rengtekawn – NH 154 Road (6Km).<br />

During 11 th Five Year Plan Rs.200.00 lakhs is the proposed outlay. No provision<br />

is made during <strong>2007</strong>- 2008.<br />

Champhai – Tiau Road (18.50Km).<br />

During 11 th Five Year Plan Rs.500.00 lakhs is the proposed outlay. During <strong>2007</strong><br />

- 2008, Rs 300.00 lakhs is proposed for this road .<br />

Aizawl – Thenzawl – Lunglei Road (171 Km)<br />

During 11 th Five year Plan Rs. 508.00 lakhs is proposed. No provision is made<br />

during <strong>2007</strong> – 08.<br />

Major District Roads<br />

A sum of Rs. 2000.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under this<br />

Sub – head.<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 800.00 lakhs is proposed for execution of Major<br />

District Road works as described below :-<br />

1. Lungsen – Chawngte Road (53.25 Km)


- 150 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

Rs. 230.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

made during <strong>2007</strong>-2008.<br />

2. Lawngtlai – Nalkawn – Chamdur Road (45Km).<br />

Rs. 173.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 160.00 lakhs<br />

is proposed for the road during <strong>2007</strong>-2008.<br />

3. Ngopa – Mimbung Road ( 52.73Km).<br />

Rs. 187.00 lakhs is proposed outlay during 11 th Five Year Plan.<br />

No provision is kept for this road during <strong>2007</strong>-2008.<br />

4. Kawnpui – Hortoki Road (21Km).<br />

Rs. 230.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 120.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

5. Zemabawk – Selesih Road (14Km).<br />

Rs.28.00 lakhs is proposed outlay during 11 th Five Year Plan. No<br />

provision is kept during <strong>2007</strong>-2008.<br />

6. Phairuang – Bunghmun Road (69Km).<br />

Rs.259.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 160.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

7. Kawlkulh – Ngopa Road ( 63 Km).<br />

Rs.115.00 lakhs is proposed outlay during 11 th Five Year Plan. No<br />

provision is kept during <strong>2007</strong>-2008.<br />

8. Rawpuichhip – Buarpui Road.<br />

Rs.173.00 lakhs is proposed outlay during 10 th Five Year Plan. Rs 120.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

9. Aizawl - Reiek – W. Lungdar Road.<br />

Rs.173.00 lakhs is proposed outlay during 10 th Five Year Plan. Rs 120.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

10. Serkhan – Bagha Road .<br />

Rs.288.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 120.00<br />

lakhs is proposed during <strong>2007</strong>-2008.<br />

11. Thenzawl – Bunghmun Road :-<br />

Rs. 144.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

Other District Roads<br />

A sum of Rs. 2000.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under this<br />

Sub – head.<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 900.00 lakhs is proposed for execution of Other<br />

District Road works as described below :-<br />

1. Keitum – N.Vanlaiphai Road (48Km).<br />

Rs. 98.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

2. Phullen – Suangpuilawn Road (28Km).<br />

Rs.198.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

3. Khawzawl – E.Lungdar – Biate Road (60Km).<br />

Rs. 738.00 lakhs is proposed outlay during 10 th Five Year Plan. Rs 450.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.


- 151 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

4. Bilkhawthlir – Chemphai – Saiphai Road (20Km).<br />

Rs. 98.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

5. S.Hlimen – Samtlang – Lungleng Road (4Km).<br />

Rs.100.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

6. Approach road to Kolodyne – R.Ngengpui (9Km).<br />

Rs.75.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

7. Tlabung – Borapansury Road.<br />

Rs.295.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 225.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

8. Thenzawl – Thenhlum Road.<br />

Rs.98.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

9. Khawzawl –Sinzawl - Thanlawn Road.<br />

Rs.300.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 225.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

Village Roads<br />

A sum of Rs. 2500.00 lakhs is proposed during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong>) under this<br />

Sub – head.<br />

For Annual Plan <strong>2007</strong>-08, a sum of Rs 568.00 lakhs is proposed for execution of<br />

Village Road works as described below :-<br />

1. Vairengte – Saiphai via Phainuam (16Km).<br />

Rs.132.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 56.80 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

2. E.Lungdar – Chekawn Road (8Km).<br />

Rs.66.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

3. Zobawk – Haulawng Road (31.70Km).<br />

Rs. 352.00 lakhs is proposed outlay during 10 th Five Year Plan. Rs 127.80 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

4. Tamdil approach Road (7.50Km).<br />

Rs.66.00.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

5. Lunglei – Nghasih road.<br />

Rs148.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 56.80 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

6. Champhai – Sazaiphai – Farkawn Road (20Km).<br />

Rs.220.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

provided during <strong>2007</strong>-2008.<br />

7. Approach road to Maumual (4Km).<br />

Rs.88.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

provided during <strong>2007</strong>-2008.<br />

8. Lawngtlai – Saisihchhuah – Sangau Road (45Km).<br />

Rs.88.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

9. Tuisumpui – Lungpher Road.<br />

Rs. 100.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

provided during <strong>2007</strong>-2008.


- 152 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

10. Saiha – Lawngtlai feeder Road (28Km).<br />

Rs. 220.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 42.60 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

11. Chemphai – Phainuam via Burchep Road.<br />

Rs.50.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

provided during <strong>2007</strong>-2008.<br />

12. Baktawng – Hmawngkawn – Chawilung Road (15Km).<br />

Rs.110.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

provided during <strong>2007</strong>-2008.<br />

13. Lailak – Buhban Road (5Km).<br />

Rs.45.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

14. Builum – N.Hlimen Road (14Km).<br />

Rs.110.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong>-2008.<br />

15. Sertlangpui – Serte Road (4Km).<br />

Rs.88.00 lakhs is proposed outlay during 11 th Five Year Plan. No provision is<br />

kept during <strong>2007</strong> – 2008.<br />

16. R.Mat – Lungmawi Road (12Km).<br />

Rs.212.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs<br />

136.32 lakhs is proposed for this road during <strong>2007</strong>-2008.<br />

17. Tuipuibari – W . Kawnpui Road :-<br />

Rs.185.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 34.08 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

18. Kawlchaw – Tongkolong Road :-<br />

Rs.220.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 113.60 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

Satellite Towns & Villages :<br />

A sum of Rs. 1415.00 lakhs is proposed for Improvement of Satellite Town and Village<br />

roads during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

A sum of Rs. 675.00 lakhs is proposed for this work during <strong>2007</strong>-2008 as below :-<br />

1. Improvement of Saitual internal road :-<br />

Rs.89.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 52.50 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

2. Improvement of Hnahthial internal road :-<br />

Rs.74.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 45.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

3. Improvement of Sakawrdai internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

4. Improvement of Khawzawl internal road :-<br />

Rs.90.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 52.50 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

5. Improvement of Tuidam internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

6. Improvement of Kanhmun internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.


- 153 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

7. Improvement of W.Phaileng internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

8. Improvement of Kawrthah internal road :-<br />

Rs.85.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 52.50 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

9. Improvement of Thenzawl internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

10. Improvement of Ngopa internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

11. Improvement of Sialsuk internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

12. Improvement of Bualpui (Ng) internal road :-<br />

Rs.72.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

13. Improvement of Kawnpui internal road :-<br />

Rs.85.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

14. Improvement of Vairengte internal road :-<br />

Rs.70.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

15. Improvement of Bilkhawthlir internal road :-<br />

Rs.70.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

16. Improvement of Tlabung internal road :-<br />

Rs.86.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 52.50 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

17. Improvement of Darlawn internal road :-<br />

Rs.70.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs is<br />

proposed for this road during <strong>2007</strong>-2008.<br />

18 Improvement & SMBT of Pangzawl internal road :-<br />

Rs.60.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

19 Improvement & SMBT of S. Vanlaiphai internal road :-<br />

Rs.60.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 30.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

Roads within Towns :-<br />

A sum of Rs. 2200.00 lakhs is proposed for Improvement of Roads within Towns<br />

during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

A sum of Rs. 1035.00 lakhs is proposed for this work during <strong>2007</strong>-2008 as below :-<br />

1. Construction of Ring Road at Lunglei :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

2. Improvement of Lunglei town roads :-


- 154 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

Rs.290.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

3. Improvement of Saiha town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

4. Improvement of Champhai town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

5. Improvement of Serchhip town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008<br />

6. Improvement of Mamit town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

7. Improvement of Kolasib town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

8. Improvement of Lawngtlai town roads :-<br />

Rs.190.00 lakhs is proposed outlay during 11 th Five Year Plan.Rs 94.00 lakhs<br />

is proposed for this road during <strong>2007</strong>-2008.<br />

9. Improvement of Aizawl city roads :-<br />

(i) Roads within Aizawl Road ‘N’ Division :-<br />

Rs.290.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs<br />

141. 00 lakhs is proposed during <strong>2007</strong>-2008.<br />

(ii) Roads within Aizawl Road ‘S’ Division :-<br />

Rs.290.00 lakhs is proposed outlay during 11 th Five Year Plan. Rs 142.00<br />

lakhs is proposed during <strong>2007</strong>-2008.<br />

Bridges :<br />

A sum of Rs. 200.00 lakhs is proposed for Construction of Bridge over R. Mat<br />

on Pangzawl- Chhipphir road during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

A sum of Rs. 2.00 lakhs is proposed for Site Investigation of this work during <strong>2007</strong>-<br />

2008 .<br />

NABARD :<br />

Rs. 1980.00 lakhs is proposed for Construction of NABARD Roads during the 11 th<br />

Plan (<strong>2007</strong> - <strong>2012</strong> ).A sum of Rs. 868.00 lakhs is proposed for this work during <strong>2007</strong>-<br />

2008 as below :-<br />

a. Spill – over Schemes<br />

1. Construction of Hnahthial – Tarpho road :-<br />

Rs 400.00 lakhs is proposed for completion of this road during road during<br />

the Eleventh Plan ( <strong>2007</strong> -12) . Rs 296.00 lakhs is proposed during <strong>2007</strong>-2008<br />

2. Construction of Tumtukawn – Tarpho road :-<br />

Rs 248.00 lakhs is proposed for completion of this road during the Eleventh<br />

Plan ( <strong>2007</strong> -12) . Rs 172.00 lakhs is proposed during <strong>2007</strong>-2008<br />

b. New Schemes<br />

1. Pavement works of Hnahthial – Tarpho road ( 32 Km) :-<br />

Rs 295.00 lakhs is proposed for this work during the Eleventh Plan<br />

( <strong>2007</strong> -12) . Rs 200.00 lakhs is proposed during <strong>2007</strong>-2008


- 155 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROADS & BRIDGES (PWD)<br />

2. Pavement works of Tumtukawn – Tarpho road ( 25 Km) :-<br />

Rs 295.00 lakhs is proposed proposed for this work during the Eleventh<br />

Plan ( <strong>2007</strong> -12) . Rs 200.00 lakhs is proposed during <strong>2007</strong>-2008.<br />

3. Construction of Melriat – Khumtung road ( 37.00 Km) :-<br />

Rs 450.00 lakhs is proposed for this road during the Eleventh Plan ( <strong>2007</strong> -12) .<br />

No provision is kept for works during <strong>2007</strong>-2008<br />

4. Construction of Bunghmun – Marpara road ( 25 Km) :-<br />

Rs 292.00 lakhs is proposed for construction of this road during the Eleventh Plan<br />

( <strong>2007</strong> -12) . No provision is kept for works during <strong>2007</strong>-2008.<br />

The targets are shown in a tabulated form as below :-<br />

( in rupees lakhs)<br />

Proposed Outlay<br />

Sl No Name of Work / Scheme 11 th Plan Annual Plan<br />

a. Spill – over Schemes<br />

<strong>2007</strong> -12 <strong>2007</strong> - 08<br />

1. Construction of Hnahthial – Tarpho road 400.00 296.00<br />

2. Construction of Tumtukawn – Tarpho road<br />

b. New Schemes<br />

248.00 172.00<br />

1. Pavement of Hnahthial – Tarpho road 295.00 200.00<br />

2. Pavement of Tumtukawn – Tarpho road 295.00 200.00<br />

3. Construction of Melriat – Khumtung road 450.00 0.00<br />

4. Construction of Bunghmun – Marpara road 292.00 0.00<br />

GRAND TOTAL OF NABARD 1980.00 868.00<br />

Counterpart funding of World Bank Aided Project:<br />

Rs. 6000.00 lakhs is proposed for Counterpart funding of World Bank Aided<br />

Project during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

A sum of Rs. 1700.00 lakhs is proposed for this work during <strong>2007</strong>-2008.<br />

<strong>Mizoram</strong> State Road Project ( EAP) :<br />

Rs. 44625.00 lakhs is proposed for <strong>Mizoram</strong> State Road Project ( EAP) during the<br />

11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

A sum of Rs. 9000.00 lakhs is proposed for this work during <strong>2007</strong>-2008.<br />

The Physical Targets for this work is as below :-<br />

Target<br />

Sl No. Name of Work / Scheme Unit 11 th Plan<br />

<strong>2007</strong> -12<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

1. Construction of Aizawl – Thenzaw<br />

Lunglei Road<br />

a. Culverts (C) Nos 70 40<br />

b. Retaining Walls ( RW) Rm 1800.00 1000.00<br />

c. Side drains ( SD) Km 48.00 30.00<br />

d. Pavement ( SMBT) Km 175.00 40.00<br />

……..


- 156 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

ROAD TRANSPORT<br />

Transport Department in <strong>Mizoram</strong> has been playing vital roles to<br />

facilitate movement of passengers and goods to various destinations within and outside<br />

the State. Though the Government is implementing Privatization of Government<br />

Vehicles Scheme, the MST service will continue to play active central role during 11 th<br />

Five Year Plan due to its peculiar nature of transportation service it delivers to the<br />

general public at low cost fares and freights purely in the interest of public service.<br />

Hence, most of the schemes taken up during the 10 th Plan are inevitably proposed to<br />

carry on in the 11 th Five Year Plan.<br />

Followings are the main schemes proposed to be taken up during the 11 th<br />

Five Year Plan <strong>2007</strong>-12.<br />

Re-Construction of Directorate office Building of Transport Department : As per<br />

the recommendation of the Disaster Management Committee and as a result of the<br />

findings by the Inspection Team, re-construction of Directorate Building of Transport<br />

Department is proposed..<br />

Augmentation of Buses: Most of the present fleet are overage and did not<br />

suffice the need of the existing routes. Besides, due to improvement and augmentation<br />

of roads, procurement of new Buses such as Medium Buses and A.C Coaches are<br />

automatically needed in order to meet the requirement of passengers.<br />

Upgradation of Central Workshop: As a result of Govt’s policy on privatization<br />

of vehicle, it is proposed that Transport Department be declared as Centralised Nodal<br />

Department for Govt. Vehicles repair. Therefore, upgradation of Central Workshop with<br />

special tools and machineries are proposed in addition to the existing equipments.<br />

E-Governance: To cope with the necessities of modernization, the<br />

Department proposed to introduce Computerisation of MST services, aiming to promote<br />

better performances within the department services for the interest of the public during<br />

the 11 th Five Year Plan..<br />

Promoting Public Private Partnership: The Department endorses a new initiative<br />

to promote public private partnership as far as practicable within the realms of its<br />

activities. As a pilot project, certain number of routes will be declared and notified as<br />

exclusive routes for the MST only. On these routes, Private Operators will run their<br />

passengers and goods service under the banner of MST only. Certain amount of share<br />

from the earnings of these private operators will contribute to the Department revenue<br />

collection. In return, the Department will provide necessary service for repairs of their<br />

vehicles at concession rates, maintaining the equilibrium of profits in favor of the<br />

Government. The scheme is also co-related with up-gradation of the existing two<br />

Workshops run by the Department. It will also generate self-employment opportunity for<br />

educated youth, especially in rural and semi-urban areas.<br />

All other on-going programmes and schemes which were taken up during<br />

the 10 th Five Year Plan under Road Transport Wing are also proposed to save and<br />

continue in the 11 th Five Year Plan <strong>2007</strong> – <strong>2012</strong>.


- 157 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

Abstract of the schemes for the 11 th Five Year Plan <strong>2007</strong>-12 and Annual<br />

Plan <strong>2007</strong>-08 is as follows :<br />

CODE MAJOR/MINOR<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

lakhs)<br />

NO. HEAD<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

(1) (2) (3) (4) (5)<br />

1 07 3075 00 4<br />

3055- ROAD TRANSPORT<br />

001(01) - Direction<br />

(01) Salary 100.00 50.00<br />

(02) Wages 2.00 0.50<br />

(11) Traveling Expenditure 25.00 5.00<br />

(13) Office Expenses 75.00 15.00<br />

(16) Publication 20.00 5.00<br />

(24) P.O.L. 550.00 120.00<br />

(34) Scholarship/stipend 15.00 3.00<br />

(50) Other Charges 39.00 21.50<br />

(51) Motor Vehicle 500.00 120.00<br />

(52) Machinery and Equipments 30.00 10.00<br />

Sub-Total (Direction) 1356.00 350.00<br />

800(02) - Booking Station<br />

(27) Minor Works 289.00 33.00<br />

Sub-Total (Minor Works) 289.00 33.00<br />

800(03) - Central Workshop<br />

(01) Salary 60.00 30.00<br />

(02) Wages 2.00 0.50<br />

(11) Traveling Expenditure 10.00 2.00<br />

(13) Office Expenses 25.00 5.00<br />

(50) Other Charges 20.00 3.50<br />

(52) Machinery and Equipments 209.00 20.00<br />

Sub-Total (Central Workshop) 326.00 61.00<br />

TOTAL OF 3055 1971.00 444.00


- 158 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

CODE MAJOR/MINOR<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

lakhs)<br />

NO. HEAD<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

(1) (2) (3) (4) (5)<br />

CAPITAL SECTION<br />

5055 - C.O. ON ROAD TRANSPORT<br />

103(01) - Direction<br />

(53) - Major Works 100.00 10.00<br />

103(02) - Central Workshop<br />

(53) - Major Works 239.00 20.00<br />

SUB – TOTAL (Major Works) : 339.00 30.00<br />

102(01) - Acquisition of Fleet<br />

(51) - Motor Vehicle 535.00 76.00<br />

SUB – TOTAL (5055) : 874.00 106.00<br />

GRAND TOTAL : 2845.00 550.00<br />

ITEM-WISE BREAK UP OF THE SCHEME :-<br />

CODE<br />

NO.<br />

MAJOR/M<br />

INOR<br />

HEAD<br />

NAME OF SCHEME 11 th Five Year<br />

Plan <strong>2007</strong>-12<br />

PROPOSED OUTLAY (Rs.In lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-08<br />

(1) (2) (3) (4) (5)<br />

3055 - ROAD TRANSPORT<br />

001(01) - DIRECTION<br />

(01) Entertainment of posts : In anticipation of existing<br />

37 nos. of posts which are created before 8 th Five Year Plan to<br />

convert into non-plan, entertainment of the existing posts is<br />

proposed as a token for the 11 th Five Year Plan 100.00 50.00<br />

(02) Wages: Employment of at least 2 Nos.of<br />

casual labourer will be necessary for implementation<br />

of schemes<br />

Casual Labour Skilled = 1 2.00 0.50<br />

Unskilled = 1<br />

(11) Travelling Expenses : To meet the traveling expenses<br />

of the staff, it is proposed as follows -<br />

T.E. - 25.00 5.00<br />

(13) Office Expenses : To meet office expenses<br />

such as - maintenance of 10 nos. of Light Vehicles,<br />

Stationeries & Advertisement, Purchase of uniform for<br />

uniformed staff such as Drivers, Conductors, IV Grade<br />

and Mechanics, and the normal Office expenses are<br />

proposed 75.00 15.00<br />

(16) Publication : The ongoing scheme<br />

including printing of Bus tickets and various kinds of


- 159 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

compilation forms will continue. Besides, it is also<br />

proposed to start Statistical publication on an annual<br />

basis, including publication of other related book-let. 20.00 5.00<br />

(24) P.O.L. :<br />

For smooth running of MST Bus services, at least Rs.<br />

185.00 lakhs is required annually. If these committed<br />

liabilities are not converted to Non-Plan Budget, fund<br />

for procurement of P.O.L. will be necessary as proposed<br />

thus 550.00 120.00<br />

(34) Scholarship/stipend : For imparting<br />

training of officers and staff, scholarship/stipend is<br />

estimated and proposed thus- 15.00 3.00<br />

(50) Other Charges :<br />

(a) MACT : If committed liabilities including<br />

compensation to accident victims of MST vehicles are not converted<br />

into non-plan budget, liabilities<br />

to be paid on compensation to Accident victims will continue 29.00 19.00<br />

(b) Disaster Management : As conveyed by D.O.<br />

letter A.33011/10/04-REH dt.19.9.2006 from C.S., Govt. of <strong>Mizoram</strong><br />

to include provision for prevention and mitigation of probable<br />

disaster, proposal thus included herein. 10.00 2.50<br />

SUB TOTAL: 39.00 21.50<br />

CODE MAJOR/MINO<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

NO. R HEAD<br />

lakhs)<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

(1) (2) (3) (4) (5)<br />

(51) - Motor Vehicles :<br />

(1) Maintenance of the existing fleet, if<br />

not converted into Non-Plan budget, will continue and<br />

proposed. 500.00 120.00<br />

(52) Machineries & Equipments : To cope with rapid<br />

developmental activities and modernization of<br />

services, Transport Deptt. proposed to introduce<br />

e-governance to cater to computerization of MST<br />

services which will cover the following areas - a)<br />

Vehicle detailment, b) Revenue Earning<br />

Monitoring, c) Vehicle wise spare parts<br />

monitoring, d) Vehicle daily repairing monitoring,<br />

e) Inventory, f) Tyre history, g) Batery history, h)<br />

Vehicle wise documentation, i) POL stock<br />

monitoring, j) Vehicle wise POL consumption<br />

monitoring, k) Route wise passenger statistics<br />

monitoring and, l)Driver-Conductor-wise<br />

monitoring.<br />

This scheme will include purchase of<br />

computers and accessories other related items


- 160 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

including annual maintenance of existing computers<br />

thus- 30.0010.00<br />

SUB TOTAL (DIRECTION) : 1356.00 35.00<br />

800(02) - BOOKING STATION :<br />

(27) - Minor Works:<br />

1. Construction and improvement of MST offices<br />

of various districts 164.00 12.00<br />

2. As per letters from CPO Lunglei, the following<br />

Construction, repair and renovation MST offices in Lunglei district<br />

are proposed-<br />

a) Repair of S.S. Office, Lunglei 4.50 4.50<br />

b) Repair and renovation of existing room for starting<br />

computerized Railway Ticket Reservation Office (PRS) at Lunglei 5.50 5.50<br />

c) (i) Construction of two new storey staff quarters<br />

by dismantling the existing two old storied buildingsat Lunglei 100.00 -<br />

(ii) Construction of oil storage at MST station Saiha 5<br />

(iii) Constr. of retaining Wall at MST office Saiha - 2.00<br />

(iv) Constr. of ASS quarters at Saiha - 6.00<br />

(v) Repair of Driver rest room at Saiha - 0.50<br />

(vi) Repair (roofing) of SS Quarters at Saiha -<br />

(vii) Constr. of staff quarters at Meisatla, Saiha 5.00 -<br />

(viii)Constr. of Booking office cum quarters at<br />

Zawngling and Tuipang 10.00 -<br />

800(03) - CENTRAL WORKSHOP<br />

SUB TOTAL (Minor Works) : 289.00 33.00<br />

Rs. 326.00 lakhs and Rs. 61.00 lakhs have been proposed for Central Workshop during 11 th Plan<br />

and Annual Plan <strong>2007</strong>-08 respectively.


- 161 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ROAD TRANSPORT<br />

CODE<br />

NO.<br />

MAJOR/<br />

MINOR<br />

HEAD<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY<br />

(Rs. In lakhs)<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

(1) (2) (3) (4) (5)<br />

CAPITAL SECTION<br />

5055 – C.O. ON ROAD TRANSPORT<br />

103(01) – Direction<br />

(53) - Major Works :<br />

As assurance given by Adviser, SPB,<br />

only a token is provided above the 15% increase over the<br />

10 th Five Year Plan, for construction of Directorate<br />

Building has to be transferred to PWD 100.00 10.00<br />

103(02) – Central Workshop<br />

(53) - Major Works :<br />

Upgradation of Central Workshop : For<br />

implementing the proposal of Transport<br />

Department to act as Nodal Department in<br />

repair of all Govt. vehicles, construction of<br />

Administrative building is proposed 239.00 20.00<br />

Sub-Total (Major Works): 339.00 30.00<br />

102()01 – Acquisition of Fleet<br />

(51) - Motor Vehicles:<br />

a) Acquisition and fabrication of 65 nos. of<br />

Medium Buses and 40 nos of AC Coaches<br />

(Medium @ Rs. 9.00 lakhs and Rs. 18.00 lakhs<br />

for AC Coaches) during 11 th Five Year Plan. 504.00 63.00<br />

b) Acquisition of 2(two) nos. of Mini-<br />

Truck, Truck @ Rs. 8.00 lakhs for delivery<br />

and distribution of tyres and spare parts, 16.00 8.00<br />

c) For purchase 3(three) nos. of LMV for<br />

replacement of overage Light vehicles 15.00 5.00<br />

Sub-Total (Acquisition of Fleet) 535.00 76.00<br />

TOTAL OF 5055 (CAPITAL) : 874.00 106.00<br />

GRAND TOTAL (ROAD TRANSPORT) : 2845.00 550.00<br />

…….


- 162 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INLAND WATER TRANSPORT<br />

3056 – INLAND WATER TRANSPORT<br />

In addition to the existing business of Transport Department, the Government recently<br />

transferred the subject of Inland Water Transport to the Department from the state PWD vide<br />

No. A.46011/1/98-GAD/Pt-II DT. 29 TH May, 2006. The Department has initiated preparation of<br />

Project Report for Tlawng River during the fag end of 10 th Five Year Plan. Though certain<br />

administrative cost will be required for up-gradation/strengthening of its Civil Engineering Cell,<br />

the scheme is expected to earn high revenue income for the Government. Therefore, the<br />

Department is keen to take up this new scheme during the 11 th Five Year Plan. Rs. 54.00 lakhs<br />

and Rs. 6.00 lakhs have been proposed for 11 th Plan & Annual Plan <strong>2007</strong> – 08 respectively.<br />

……


- 163 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

M.V.WING<br />

2041 – TAXES ON VEHICLES (M.V.Wing)<br />

The state of <strong>Mizoram</strong> is pacing towards all round development along with its<br />

sister states in the North East India. Increasing development of road infrastructures and<br />

commercial activities resulted in enormous increase in vehicle population in the State.<br />

As an offshoot of this positive advancement, the duties and responsibilities of the MV<br />

Wing has been considerably enhanced during the 10 th Five Year Plan. Therefore, to cope<br />

with this development and future expansion, it is considered necessary to up-grade the<br />

Wing with modernized technology, strengthening with effective infrastructure demand<br />

of the growing needs and widening its function in the newly created Districts of the<br />

State. In the scenario, enforcement of the M.V Act and Rules can be efficiently carried<br />

out only if new District Transport Offices are opened in the newly created Districts, in<br />

the interest of public service. Simultaneously, revenue collection of the Department is<br />

expected to increase to a large extent from this Wing of the Department.<br />

The existing STA Office is holding the main gear and acting as a nerve<br />

center for enforcement of MV Act and Rules in the whole state of <strong>Mizoram</strong>. They look<br />

after the MV Wing of the Department relating to all STA matters and enforcement of<br />

MV Act and Rules in letter and spirit. However, they are functioning with no fullfledged<br />

staffing patterns and essential infrastructures. Therefore, strengthening of this<br />

Wing is proposed to take up in the 11 th Five Year Plan.<br />

In the district of Aizawl, vehicle population is rapidly increased day by<br />

day thereby burdening the workload of the existing DTO Office becoming heavier than<br />

ever before in every sunrise of the day. The existing DTO and staff are inadequate to<br />

effectively enforce MV Act and Rules in the present condition. Hence, opening of<br />

another DTO Office in Aizawl District, dividing jurisdictions in North and South<br />

districts, is inevitably needed to efficiently deliver the service requirement and demand<br />

of vehicle owners and general public. The Department proposes to open a new DTO<br />

Office in the existing Aizawl District during the 11 th Five Year Plan.<br />

Opening of new DTO Offices in Mamit and Lawngtlai District<br />

Headquarters is also proposed due to pressing public demand and increasing vehicular<br />

population in these newly created districts. It is, therefore, desirable to be implemented<br />

during the 11 th Five Year Plan.<br />

Hence, the following schemes are proposed to take up during the 11 th<br />

Five Year Plan <strong>2007</strong> – <strong>2012</strong>, and Annual Plan <strong>2007</strong>-08. Abstract of the schemes are as<br />

below -


- 164 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

M.V.WING<br />

CODE MAJOR/MINOR<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

lakhs)<br />

NO. HEAD<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

(4) (5) (6) (4) (5)<br />

107 3075 00 4 2041 - Taxes on Vehicles<br />

001(01) - Direction :<br />

(01) Salary 20.00 9.25<br />

(02) Wages 10.00 2.00<br />

(11) Traveling Expenses 5.00 1.00<br />

(13) Office Expenses 40.00 15.00<br />

(16) Publication 20.00 8.00<br />

(27) Minor Works 150.00 18.00<br />

(34) Scholarship/Stipend 2.00 0.50<br />

(50) Other charges 40.00 8.00<br />

(51) Motor vehicles 5.00 2.25<br />

(52) Machinery & Equipments 63.00 16.00<br />

Sub-Total : 355.00 80.00<br />

001(02) - Administration<br />

(01) Salary 50.00 16.00<br />

(02) Wages 10.00 3.00<br />

(11) Travelling expenses 10.00 3.00<br />

(13) Office Expenses 40.00 9.00<br />

(14) Rent 3.00 1.00<br />

(51) Motor Vehicles 10.00 3.00<br />

Sub-Total : 123.00 35.00<br />

GRAND TOTAL (M.V. WING) : 478.00 115.00<br />

ITEM-WISE BREAK-UP OF THE SCHEME :<br />

CODE MAJOR/MINOR<br />

NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

lakhs)<br />

NO. HEAD<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

1.<br />

107 3075 00 4<br />

2. 3. 4. 5.<br />

2041 - Taxes on Vehicles<br />

001 (01) - DIRECTION - 95.00 35.25<br />

CODE MAJOR/MINO NAME OF SCHEME<br />

PROPOSED OUTLAY (Rs. In<br />

lakhs)<br />

NO. R HEAD<br />

11 th Five Year Annual Plan<br />

Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

1. 2. 3. 4. 5.<br />

(27) Minor Works<br />

(a) Construction of DTOs Office – 2 nos at Aizawl, 1 no.<br />

at Serchhip, Lawngtlai, Mamit and reconstruction of DTO office,<br />

Saiha (One each at Saiha, Mamit and Lunglei during <strong>2007</strong>-08)<br />

(b) Construction of Staff quarter at Lunglei, Serchhip and<br />

Saiha (Serchhip and Saiha during <strong>2007</strong>-08)<br />

50.00 12.00<br />

50.00 4.00<br />

(c) Construction of Driving school at South Hlimen 30.00 -<br />

(d) Improvement of various Checkgates (5 nos.) 20.00 2.00<br />

Total of Minor Works (27): 150.00 18.00


- 165 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

M.V.WING<br />

(34) Scholarship/Stipend :<br />

(a) For imparting training to enforcement staff<br />

(b) Expenses for officers & staff who undergo training<br />

Total of Scho/Stipend 2.00 0.50<br />

(50) Other Charges :<br />

1) Observation of Road Safety Week 30.00 6.00<br />

2) Maintenance of equipment 5.00 1.00<br />

3) Smart card and High Security plate 5.00 1.00<br />

40.00 8.00<br />

(51) Motor Vehicle : Maintenance of existing vehicles 5.00 2.25<br />

(52) Machineries and Equipments :<br />

(1) For purchase of 2 nos. of portable weighbridge 63.00 16.00<br />

(2) For purchase of 1 no. of Smoke emission test machine<br />

(3) Equipments for Driving School<br />

(4) Set up of Wide Area Network<br />

Total of M & E (52) 63.00 16.00<br />

Sub-Total (Direction) 355.00 80.00<br />

2041 – Taxes on Vehicles<br />

001(2) – Administration 123.00 35.00<br />

GRAND TOTAL (M.V WING)<br />

…..<br />

478.00 115.00


- 166 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

Science, Technology & Environment in <strong>Mizoram</strong> was started during the<br />

7th Plan Period and various schemes / Projects were initiated and taken up. As we are<br />

now embarking upon the 11th Plan Period, some new Schemes are proposed to be taken<br />

up besides the existing Schemes & Projects. Rs. 1004.00 lakhs is proposed for 11 th Five<br />

Year Plan and Rs. 159.00 lakhs is proposed for <strong>2007</strong> – 08.<br />

The proposed outlay for 11 th Five year plan is Rs. 982.00 lakhs and the<br />

proposed outlay for Annual Plan <strong>2007</strong> – 08 is Rs. 154.00 lakhs.<br />

1. DIRECTION AND ADMINISTRATION : Some new Posts for promotion are<br />

proposed to be created during the 11th plan period. The following statement indicates<br />

both physical and financial targets for 11th Plan and Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

Sl.<br />

No<br />

.<br />

Head of Expenditure<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1. Creation of new posts<br />

1) Chief Scientific<br />

Officer<br />

2) Sr.Scientific Officer<br />

1<br />

1<br />

2. SATELLITE REMOTE SENSING CENTRE : The State Satellite Remote<br />

Sensing Centre was started in 1989 and the data generated from various Projects<br />

undertaken by the Centre had been utilised by various development Departments. It is<br />

proposed that more Remote Sensing Projects will be carried out on a larger scale to<br />

provide more accurate data base.<br />

To provide more flexibility in carrying out various Remote Sensing Projects, the<br />

State Remote Sensing Centre was made an Autonomous Registered Society under<br />

Science & Technology Department during 2006-<strong>2007</strong>. The following statement<br />

indicates both physical and financial targets for 11th Five Year Plan as well as Annual<br />

Plan for <strong>2007</strong>-2008.<br />

2.00<br />

1.00<br />

1<br />

1<br />

0.20<br />

0.10<br />

2. Salary of existing staff 14 100.00 14 22.00<br />

3. Accommodation (Rental) 12.00 - 2.20<br />

4. Travelling Expenses 15.00 - 3.00<br />

5. Office Expenses 65.00 - 10.50<br />

6. Wages 25.00 - 5.00<br />

7. Maintenance of Vehicle 15.00 - 3.00<br />

Total 16 235.00 16 46.00


- 167 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

Grant to State Remote<br />

Sensing Centre<br />

100.00 10.00<br />

TOTAL 100.00 10.00<br />

3. TRAINING OF SCIENTIFIC MANPOWER : In 1988, a Post Matric Merit<br />

Scholarship Programme was introduced for students who are taking up basic Science<br />

subjects in the College and University level to solve the problem of Scientific<br />

Manpower requirement of the State. As many as 335 students had obtained their Master<br />

Degree in various branches of Science under this scheme at the close of the 10th Five<br />

Year Plan and the scheme is proposed to be continued in the 11th Plan.<br />

Further, it is felt necessary to introduce a Scientific Research Culture<br />

among the young Scientists of the State for solving the manpower need in the higher<br />

academic institution as well as to provide scientific solution to the problems specific to<br />

the State. Hence, it is proposed to introduce Research Fellowship in selected subject<br />

areas of Science. The fellowship is proposed to be awarded at par with that of CSIR.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Five Year Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure<br />

Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Post-Matric Merit Science 800 100.00 150 12.00<br />

Scholarship<br />

persons<br />

2) Research Fellowship 30 38.00 5 4.00<br />

persons<br />

TOTAL 830<br />

persons<br />

138.00 155 16.00<br />

4. ASSISTANCE TO SCIENTIFIC RESEARCH PROJECTS : Under this<br />

scheme, Scientific Research Projects which have direct relevance to the problems of the<br />

State were given financial assistance. The scheme is proposed to be continued.


- 168 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure<br />

Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

Assistance to Scientific 10 42.00 2 projects 3.00<br />

Research Projects<br />

projects<br />

TOTAL 10 42.00 2 3.00<br />

5. COMPUTER CENTRES : Being a Nodal Department for NIC, Government<br />

of India, we have established one State Unit of NIC at Aizawl and three District Units at<br />

Aizawl, Lunglei and Saiha. It is necessary to maintain the Centre. It is also proposed to<br />

establish NIC Centre in the five newly created Districts in a phase manner.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

Sl.<br />

No<br />

.<br />

Head of Expenditure<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

Maintenance of NIC Centres L.S. 35.00 L.S. 3.00<br />

TOTAL L.S 35.00 L.S 3.00<br />

6. SCIENCE POPULARISATION PROGRAMME : Under this scheme,<br />

various activities such as publication of <strong>Mizoram</strong> Science Journal and Science Vision,<br />

holding of Science Exhibition, Seminars and Science Congress are taken up in<br />

colloboration with STAM, SCERT, MSS etc. These activities are proposed to be<br />

continued during 11th Plan Period.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure<br />

Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-<br />

No<br />

2008<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Publication of Science 6000 40.00 6000 5.00<br />

Journals<br />

copies<br />

copies<br />

2) State Level Science<br />

Exhibition<br />

5 15.00 1 1.00<br />

3) Science Seminars/Congress - 10.00 - 1.00<br />

TOTAL 65.00 7.00


- 169 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

7. LOW HEAD MICROTURBINE PROJECTS : Using Crossflow Turbine<br />

designed by DST, Government of India, 50 kW Microturbine Projects were taken up at<br />

Tlawng River below AH & Vety Farm at Lunglei and at Sihmit River near Bulfek Zawl<br />

within Champhai District. The Projects at Tlawng River is nearing completion and the<br />

project at Sihmit River was started during 2006-<strong>2007</strong> and is expected to be completed<br />

within 36 months.<br />

During the 11th Plan Period two other Projects of at least 200 kW<br />

capacity is proposed to be taken up to contribute towards solving the acute power needs<br />

of the State.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Enlargement of Existing - 30.00 - 18.00<br />

Canal at Sihmit Project<br />

2) 200 kW Power Projects 2 50.00 - -<br />

TOTAL 2 80.00 - 18.00<br />

8. METEOROLOGICAL CENTRES : With the approval and Technical<br />

guidance of Regional Meteorological Centre, Guwahati,,a Class I Meteorological<br />

Observatory was established in Aizawl. IMD, Government of India had proposed for<br />

establishment of Automatic Weather Station in each of the eight Districts of the State<br />

for which adequate space will have to be provided by the State Government.<br />

The following statement indicates both Physical and Financial targets for 11 th<br />

Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

Physical Financia Physical Financial<br />

.<br />

1 2 3 4 5 6<br />

1) Maintenance of the Centres L.S 15.00 -L.S 1.00<br />

TOTAL L.S 15.00 L.S 1.00<br />

9. SCIENCE CENTRE: The <strong>Mizoram</strong> Science Centre at Beraw Tlang, Aizawl<br />

was inaugurated on 20th July, 2003, which is well appreciated by all sections of the<br />

people. However, some developmental works are still necessary to be carried out for<br />

smooth functioning of the Centre.<br />

As <strong>Mizoram</strong> Science Centre at Aizawl caters to the needs of only Aizawl<br />

and its surrounding villages, it is felt necessary that a District Science Centre be<br />

l


- 170 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

established at Lunglei during 11th Plan to solve the needs of the Southern parts of<br />

<strong>Mizoram</strong> for which Fund will be sought from NCSM<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs.In lakh<br />

11 th Sl. Head of Expenditure<br />

Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Constn. Of Office Bldg. At<br />

<strong>Mizoram</strong> Science Centre,<br />

Beraw Tlang<br />

- 47.00 - 26.00<br />

2) Constn. Of Water Tank 2000<br />

KL Capacity<br />

1 15.00 1 10.00<br />

3) Development /Repairing of<br />

Exhibits<br />

30.00 - 2.00<br />

4) Library 5.00 1.00<br />

5) Plantation 5.00 1.00<br />

6) Dev/Maint of the Centre 30.00 5.00<br />

7) Purchase of tools and<br />

machineries<br />

10.00 -<br />

8) Establishment of Science<br />

Centre at Lunglei<br />

80.00 -<br />

TOTAL 1 217.00 1 45.00<br />

10. ESTABLISHMENT OF <strong>PLAN</strong>ETARIUM : To complement with the<br />

<strong>Mizoram</strong> Science Centre, which is established at Beraw Tlang, Aizawl, it is felt<br />

necessary that a Planetarium may be establish to fullfill the aspiration of the students and<br />

the people of the State who are never exposed to such Scientific blessings. Hence, it is<br />

proposed that a versatile Planetarium having a sitting capacity of at least 100 or more<br />

may be establish during 11th Plan Period for which Fund will be sought from<br />

NCSM/Central Agencies..<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

Physical Financial Physical Financial<br />

.<br />

1 2 3 4 5 6<br />

1) Land Development L.S 5.00 L.S 5.00<br />

2) Constn of Planetarium L.S 50.00 L.S -<br />

TOTAL L.S 55.00 L.S 5.00<br />

ECOLOGY & ENVIRONMENT :<br />

The total outlay proposed for 11 th Five Year Plan is Rs. 22.00 lakhs and Rs. 5.00 lakhs<br />

is proposed for <strong>2007</strong> – 08.<br />

1) Biotechnological Research: <strong>Mizoram</strong> is rich in natural resources which are<br />

yet to be tapped for economic growth. It is known that some of the valuable medicinal


- 171 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT<br />

plants and orchids are on the brink of extinction due to deforestation through jhumming.<br />

It is proposed that extensive survey and documentation of these valuable plants be<br />

carried out. The germ-plasm of the rare-species may be conserved and propagated<br />

through tissue culture.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

Physical Financial Physical Financial<br />

.<br />

1 2 3 4 5 6<br />

1) Documentation expenses L.S 2.00 L.S 1.00<br />

2) Tissue Culture Lab. 10.00 - -<br />

TOTAL 12.00 - 1.00<br />

2) Environment Awareness: Environment issue is a global one. It is felt<br />

necessary to educate the students and public on the importance of clean & healthy<br />

environment through seminars/exhibitions in and outside the State.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure<br />

Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No<br />

.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Expenditure for<br />

Seminars/symposia,<br />

Exhibition etc.<br />

15 2.00 3 1.50<br />

TOTAL 15 2.00 3 1.50<br />

3) Plasma Pyrolysis Unit: The Institute of Plasma Research under the funding<br />

of DST, Government of India had developed Plasma Pyrolysis Technique for disposal<br />

of medical and plastic wastes in an environment friendly manner. It is proposed that at<br />

least 3 such unit may be installed in Aizawl where we now have quite a good number of<br />

Hospitals-both Government and Private who have no proper waste disposal system till<br />

today.<br />

The following statement indicates both Physical and Financial targets for<br />

11th Plan as well as Annual Plan for <strong>2007</strong>-2008.<br />

Rs. In lakh<br />

11 th Sl. Head of Expenditure Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

No.<br />

Physical Financial Physical Financial<br />

1 2 3 4 5 6<br />

1) Installation & maintenance 3 8.00 1 2.50<br />

of Plasma Pyrolysis Unit Units<br />

Units<br />

TOTAL 3 8.00 1 2.50<br />

……


- 172 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

1. Introduction:<br />

The Information and Communication Technology (ICT) Cell has been created under<br />

Planning and Programme Implementation Department for coordination, monitoring,<br />

implementation of computerization and internetworking of all the Government<br />

Departments, e-Governance and Citizen facilitation, and building State Wide Area<br />

Network (SWAN) aiming to create an e-Citizen for all transactions and for all-purpose,<br />

towards making <strong>Mizoram</strong> as the “Intelligent State” of the decade.<br />

2. Objectives:<br />

The objectives of ICT Cell are as follows:<br />

(i) To implement ICT applications and e-Governance for efficient and<br />

effective delivery of government services, improved government revenue<br />

collection, improving financial management, and better dissemination of<br />

information on government functions, through e-governance centre of excellence,<br />

information kiosk and hosting of websites.<br />

(ii) To promote Information and Communication Technology (ICT) and its<br />

applications at different layers up to the Block level of the Government<br />

Administration. Promotion and implementation of ICT and e-Governance would<br />

take into account the existing ICT infrastructure and e-Governance services and<br />

also envisages covering any other similar IT initiatives being taken up in the state<br />

of <strong>Mizoram</strong>.<br />

(iii) To streamline isolated post of Computer Operators in different<br />

Departments, Computer Technology Services may be created under a common<br />

cadre to provide Future Avenue for promotion.<br />

(iv) To ensure the availability of funds for implementation of e-Governance<br />

and its applications and to approach central government like NEC, DONER,<br />

MCIT, etc. to acquire the funds to expedite the process and implementation egovernance<br />

plan.<br />

(v) To avoid spending of huge amount of money in every Department for<br />

computerization works, ICT Wing will streamline the implementation of<br />

Computerization and e-Governance programme under centrally control by the<br />

Planning & Programme Implementation Department which will further reduce the<br />

expenses of the Government of <strong>Mizoram</strong>.<br />

(vi) To horizontal transfer and customize e-Governance software packages<br />

and back-end database applications already developed for other states by NIC for<br />

use in the Government of <strong>Mizoram</strong>.<br />

(vii) To promote all matters concerning Computer based information,<br />

communication, technology and processing including hardware and software.<br />

To promote ICT Software, ICT Products, and ICT Services in the State of <strong>Mizoram</strong>.<br />

The Scheme-wise programme of ICT Cell under the Planning Department for the<br />

development of Information and Communication Technologies in <strong>Mizoram</strong> are classifies<br />

into the following categories:


- 173 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

(i) Direction and Administration<br />

(ii) IT Infrastructure Development<br />

(iii) Special Manpower Development<br />

(iv) IT Promotional Development<br />

(v) E-Governance<br />

(vi) Community Information Centre<br />

The total proposed outlay for 11 th Five Year Plan is 639.00 lakhs and Rs. 86.00<br />

lakhs proposed for Annual Plan <strong>2007</strong>-08.<br />

1.1 Direction and Administration: The following statement indicates both<br />

physical and financial targets for Annual Plan <strong>2007</strong>-08 and 11 th Plan proposed outlay.<br />

Item of Expenditures Proposed<br />

(Rupees in Lakh)<br />

Annual Plan <strong>2007</strong>-08<br />

11 th Plan Physical Financial<br />

1<br />

Entertainment of Technical &<br />

Clerical Staff<br />

200.00 60 14.11<br />

2 Accommodation (Rental) 5.00 - 1.00<br />

3 Travel Expenses 8.00 - 2.00<br />

4 Office Expenses 30.00 - 6.00<br />

5 Wages 7.00 - 1.50<br />

6 Advertising & Publicity 5.00 - 2.00<br />

7 Other Charges 10.00 - 3.00<br />

Total 265.00 60 29.61<br />

Sl.N<br />

o<br />

2.1 IT Infrastructure Development:<br />

Industrial infrastructure is the backbone of a successful growing economy. In line with<br />

infrastructural promotion, the process of setting up a futuristic, state-of-the art<br />

infotainment industry with a view to create gainful employment and generate a<br />

substantive revenue base for the people, which will accelerate the creation and<br />

improvement of social infrastructure like education, health, civic amenities, roads,<br />

protection of environment, communication and the Quality of Life, aiming at making<br />

<strong>Mizoram</strong> as the destination of IT in the North Eastern States. The ICT Cell is committed<br />

to create and improve infrastructure for ICT Industry, ICT Software, ICT Product and<br />

ICT Services in <strong>Mizoram</strong>.<br />

The broad objectives of Infrastructure Development are:<br />

(i) To build and provide necessary state-of-the-art ICT Infrastructure for<br />

software and ITES-driven ICT industry.<br />

(ii) To accord an integrated approach that takes account of incentives,<br />

institutions and capabilities.<br />

(iii) Build access to international connectivity by setting up Software Technology<br />

Park of India.<br />

(iv) Develop and encourage new technical skills, managerial practices and<br />

organizational<br />

(v) Learning capabilities essential to effective ICT use and diffusion.


- 174 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

(vi) Focus on IT and Education and use of ICT in all walks of life.<br />

Under National e-Governance Plan, there are many IT Infrastructure projects to be taken<br />

up by the State Government for which detailed project proposal is to be submitted to<br />

Ministry of Communication & IT and Planning Commission. The Core Infrastructure<br />

Project under NeGAP Programme where the State Government is to prepare DPR are as<br />

follows:<br />

SWAN<br />

Data Centres<br />

Common Service Delivery Centres<br />

Back-end computerization to provide services through the common<br />

service delivery centres<br />

The following statement indicates the physical and financial targets for the Annual Plan<br />

<strong>2007</strong>-2008 and proposed 11 th Plan outlay :<br />

( Rupees in lakhs)<br />

Sl.N Item of Expenditures Proposed Annual Plan <strong>2007</strong>-2008<br />

o<br />

11 th Plan Physical Financial<br />

1. Establishment of OFC/Wireless<br />

Lan<br />

40.00<br />

54 4.00<br />

Total 40.00 54 4.00<br />

2.2 Special Manpower Development:<br />

The first requirement in the knowledge society is education which is central to personal,<br />

organizational and national well-being. Important strategic policy decisions on education<br />

must be taken in the next few years.<br />

These decisions must reflect the need to:<br />

(i) Upliftment of educated unemployed youths of <strong>Mizoram</strong> through IT<br />

Entrepreneurs Development Programme for sustainable self-employment<br />

generation.<br />

(ii) Change organizational structure to enable them to deliver learning efficiently in<br />

an information society, from pre-school children to senior citizens.<br />

(iii) Adapt and develop curricula to take advantage of opportunities afforded by IT to<br />

boost creativity, give greater access to information, and improve learning<br />

capability.<br />

(iv) Retain the best parts of our current educational culture in the quest for high<br />

standards of scholastic attainment, with optional use of IT as a learning and<br />

educational aid.<br />

(v) Sponsoring students opted for regular classes in MCA, MSc (IT), BE/B.Tech<br />

(Computer/IT), M.Tech/MS/M.Phil (Computer/IT), Ph.D (Computer/IT).<br />

(vi) Training of Government Employees/Public Sectors from the level of LDC to<br />

Secretaries and all MLAs.<br />

(vii) IT Professional training programme for educated unemployed youths of<br />

<strong>Mizoram</strong> with special focus on Networking, Database, Internet Technologies,<br />

eGovernance and e-security.<br />

During 11th Five Year Plan, it is proposed to set up <strong>Mizoram</strong> Institute of Information<br />

Technology (MIIT) to development Entrepreneurs in the fields of Communication & IT.<br />

This Institute may not only conduct Entrepreneurs Programme but also to conduct


- 175 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

special IT training programme for all the Government’s employees of the Government<br />

of <strong>Mizoram</strong>. Later, this Institute will become Software Standardization, Testing and<br />

Quality Control Centre for performing software audit & evaluation, software product<br />

certification, software testing & evaluation, software quality assurance, and software<br />

planning and control.<br />

The following statement indicates the physical and financial targets for the Annual Plan<br />

<strong>2007</strong>-2008 and proposed 11 th Plan, <strong>2007</strong> – <strong>2012</strong>.<br />

( Rupees in lakhs)<br />

Sl.N Item of Expenditures Proposed Annual Plan <strong>2007</strong>-2008<br />

o<br />

11 th Plan Physical Financial<br />

1. I.T Professional<br />

Programme<br />

Training 25.00<br />

10 2.00<br />

2. e-Governance Manpower<br />

Development Training<br />

25.00<br />

5 1.71<br />

Total 50.00 15 3.71<br />

2.3 IT Promotional Development<br />

Another important area that needs to be deliberated on is, evolving a suitable and<br />

effective mechanism for launching mass IT awareness campaign. IT awareness is one of<br />

the effective mechanisms for IT promotion in the state of <strong>Mizoram</strong>. The common man in<br />

the state is largely unaware of the benefits and potential of IT in his or her day-to-day<br />

life. A massive awareness campaign is therefore required to be launched, to educate<br />

people about what IT can mean for improving their quality of life. Information regarding<br />

government rules, regulations, programmes and services is an essential aspect of<br />

empowering the people. Launching of IT Yatras (journeys) and other forms of<br />

awareness campaign across the state in collaboration with NGOs, educational<br />

institutions, corporate sector and others are available options to this end.<br />

Workshop and Seminar are also one of the important factors for governing IT Promotion<br />

in the State. IT Entrepreneurs Development programme will also be organized to<br />

promote IT Industry, IT Software and IT Services in the state of <strong>Mizoram</strong>.<br />

Under this scheme, various activities such as publication of <strong>Mizoram</strong> IT Journal, holding<br />

of Exhibitions, Seminars, IT Mela, and IT Yatra (Journey) will be taken up in<br />

association with <strong>Mizoram</strong> IT Teachers Association, Computer Associated Industries,<br />

and <strong>Mizoram</strong> IT Promoters’ Association. Top tens of Class X & XII students in<br />

Computer & IT subject at the MBSE examination will be given one Desktop Computer<br />

each every year for promoting IT among the students.<br />

The following statement indicates the physical and financial targets for the Annual Plan<br />

<strong>2007</strong>-08 and the proposed 11 th Plan.<br />

(Rupees in Lakh)<br />

Item of Expenditures Proposed Annual Plan <strong>2007</strong>-08<br />

Sl.No<br />

1.<br />

2.<br />

Publication of IT Journal<br />

IT Exhibitions, Seminars, IT melas, IT<br />

Journey<br />

11 th Plan Physical Financial<br />

30.00<br />

3000<br />

copies<br />

5.00<br />

10.00 6 2.00


- 176 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

3.<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

Desktop Computer System for top tens in<br />

Computer & IT subject in MBSE Class<br />

X & XII examination<br />

40.00 20 8.00<br />

Total 80.00 3026 15.00<br />

2.4 E-Governance<br />

E-Governance:<br />

The e-Governance vision for the state of <strong>Mizoram</strong> is “To use Information and<br />

Communication Technology to make available Information and Government services<br />

related to basic needs of the common man accessible to him near his locality throughout<br />

his life through minimum procedural formalities”.<br />

Keeping in mind the above mentioned Vision, the objectives for the e-Governance<br />

initiatives can be grouped by the customer segment served:<br />

Government to Citizen (G2C): The e-governance must achieve the following for the<br />

citizens:<br />

1. Provide one-stop, easier access to information and services to individuals<br />

2. Reduce the average waiting for the citizens to avail the services.<br />

3. Provide the citizens with a transparent view of the government processes and<br />

timely response to applications<br />

Government to Business (G2B). The e-governance must achieve the following for the<br />

businesses:<br />

1. Reduce burden on business, provide one-stop access to information on rules<br />

and regulations and clearances<br />

2. Reduce the cost of compliance by reducing the instance on the business to<br />

report the same data, multiple times to multiple agencies.<br />

3. Providing facility for online reporting and self-certification<br />

Government to Government (G2G): The e-governance must achieve the following for<br />

the internal functioning amongst the departments / its interactions with its employees:<br />

1. Assist the state and local governments to more easily work together to better<br />

serve citizens within key lines of business.<br />

2. Provide administrative savings for the government departments<br />

3. Improving the way that information is shared among all levels of government<br />

4. Reduce the non-value added work for the workers in the government<br />

department<br />

5. Providing enhanced access to high quality training and competency<br />

development for state employees through capacity building across<br />

departments<br />

In order to achieve the above objectives, the Government has made the following<br />

institutional framework:<br />

− <strong>Mizoram</strong> State e-Governance Council headed by Chief Minister. This council is<br />

to provide leadership and advice on ICT strategic and governance issues, to the State<br />

at a programme level.<br />

− <strong>Mizoram</strong> State e-Governance Apex Committee headed by Chief Secretary. This<br />

committee is to provide direction to the implementation team and supervise the<br />

ongoing activities in line with the NeGP guidelines.


- 177 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

− <strong>Mizoram</strong> State e-Governance Mission Team (SeMT) headed by Secretary (IT)<br />

supported by dedicated programme coordination and monitoring unit for the State e-<br />

Governance Council in implementing the envisaged initiatives.<br />

− Project e-Governance Mission Team (PeMT) headed by the Secretary of the<br />

concerned Department. This team is to work with SeMT in the design of the project<br />

proposals for approval and funding, in case such capacities do not exist within the<br />

departments.<br />

During the 11 th Five Year Plan, we have identified 40 projects to be taken up with 14<br />

Departments under Core Project of National e-Governance Plan and 4 major projects<br />

under Core infrastructure project.<br />

Under Core Project:<br />

(1) Agriculture Department<br />

(2) Commercial Taxes Department<br />

(3) Finance and Planning Department<br />

(4) Food, Civil Supplies Department<br />

(5) General Administration Department<br />

(6) Health & Family Welfare Department<br />

(7) Home Department<br />

(8) Information & Public Relations Department<br />

(9) Labour & Employment Department<br />

(10) Local Administration Department<br />

(11) Rural Development Department<br />

(12) Finance & Account Department<br />

(13) Transport Department<br />

(14) Power & Electricity Department<br />

Under Core Infrastructure Project:<br />

(1) State Wide Area Network<br />

(2) State Data Centre<br />

(3) Common Service Delivery Centre<br />

(4) Back-end Office Computerization<br />

The following statement indicates the physical and financial targets for the Annual Plan<br />

<strong>2007</strong>-08 and the proposed 11 th plan.<br />

(Rupees in Lakh)<br />

Sl. Item of Expenditures Proposed 11 Annual Plan <strong>2007</strong>-08<br />

th<br />

No<br />

1. Annual Maintenance of Network<br />

Operating Centre (NOC) and Data<br />

Centre which consist of 13 servers,<br />

29 switches, 4 routers, 2 pix<br />

firewall, 1 SAN, 1 Autoloader.<br />

Plan Physical Financial<br />

80.00 50 15.00<br />

2. Annual Maintenance of 360<br />

Desktop Computer Systems, 365<br />

UPS, 25 Printers, 50 Wireless<br />

Equipments, etc.<br />

56.00 800 7.00<br />

Total 136.00 850 22.00


- 178 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & COMMUNICATION TECHNOLOGY<br />

2.5 Community Information Centre (CIC):<br />

We have established Community Information Centre (CIC) in all the District<br />

Headquarters and all RD Block Headquarters with the appointment of 2 Computer<br />

Operators in each CIC for maintenance and monitoring of the CIC. This project is<br />

funded by Ministry of Communication & IT and will continue to support till February,<br />

<strong>2007</strong> against maintenance of the equipments and salary of 52 Computer Operators @<br />

Rs. 5500/- per Computer Operator. The role of state Government is to coordinate and<br />

monitor the progress of all CICs in <strong>Mizoram</strong> and recurring expenditure against<br />

telephone, water bill, electric bill, papers, and maintenance of the Building and<br />

Furniture. As per the Memorandum of Understanding signed between the Government<br />

of <strong>Mizoram</strong> and the Government of India, Department of IT on 5 th February, 2002, these<br />

centres will be handed over to the State Government by February, <strong>2007</strong> including all the<br />

infrastructure and CIC Operators. Apart from these 26 CICs, the Government of India,<br />

Department of IT has recently sanctioned for establishment of 10 new additional CICs in<br />

<strong>Mizoram</strong> in the following locations:<br />

1. Thenzawl 2. Zokhawthar<br />

3. Kawnpui 4. Bilkhawthlir<br />

5. Vairengte 6. Tlabung<br />

7. Tawipui (South) 8. Zobawk<br />

9. Bairabi 10. Kanhmun<br />

In order to maintain all the VSAT Equipments, Computing Infrastructure Equipments<br />

and the Salary of CIC Operators, and Repair & Maintenance Charges of 36 CICs within<br />

the State of <strong>Mizoram</strong>, we would require a budgetary support from the State owned<br />

resource for the benefit of the Public.<br />

The following statement indicates the physical and financial targets for the Annual Plan<br />

<strong>2007</strong>-08 and proposed 11 th Plan.<br />

(Rupees in Lakh)<br />

Sl.N<br />

Item of Expenditures Proposed Annual Plan <strong>2007</strong>-08<br />

o<br />

1. Maintenance and renovation of<br />

Community Information Centre (CIC)<br />

……..<br />

11 th Plan Physical Financial<br />

68.00<br />

Total 68.00<br />

36 11.68<br />

36<br />

11.68


- 179 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

ENVIRONMENT & FORESTS DEPARTMENT<br />

The approach for the 11 th Five Year Plan incorporates the following main<br />

elements:<br />

- Resource mobilization – harvest and sale of bamboos in view of gregarious<br />

flowering.<br />

- Increasing forest productivity. The per hectare growing stock of <strong>Mizoram</strong>’s<br />

forest is only 35 cum as against the national average of 65 cum/ha. A<br />

massive programme for increasing productivity through people’s centric<br />

approach in afforestation is required in order to meet the growing demand<br />

for timber and fuelwood.<br />

- Rehabilitation of jhumlands through promotion of agro-forestry/farm<br />

forestry.<br />

- A special focus on Biological Conservation in view of North Eastern<br />

Region’s unique position as biological highway between India and the<br />

Malayan region. This will include development and conservation of<br />

medicinal plants, orchids and bamboos.<br />

- To preserve, protect and manage the State’s forest and wildlife resources,<br />

infrastructural improvements, capacity and management interventions are<br />

also proposed which include suitable mechanisms for protection, preparation<br />

of Working Plans and strengthening of human resource planning and<br />

management, including mutation of fertile riverine forests with hill forests.<br />

- Provision of quality planting materials through improved and innovative<br />

technologies in nursery and plantation. This will be part of the Green<br />

<strong>Mizoram</strong> Programme launched since 1999 which is a people’s movement in<br />

the State.<br />

- Strengthening of Institutional framework for World Bank Project Cell,<br />

Bamboo Cell, State Biodiversity Board and Pollution Control Board. The<br />

JFM network will also be further strengthened for greater involvement of<br />

people and sustaining such programmes.<br />

- Strengthening of monitoring mechanism through establishment of IT<br />

network to the Divisional/Range levels is also envisaged.<br />

- Maintenance of forest under Finance Commission.


- 180 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

INTRODUCTORY NOTES ON THE STATEMENT OF XI th <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong><br />

<strong>2007</strong>-<strong>2012</strong> OF ENVIRONMENT & FOREST DEPARTMENT<br />

The XI th Plan Strategy of the Environment & Forests Department is to meet dayto<br />

day needs of local population for food, water, fuel, fodder, timber, non-wood forest<br />

products and for long term environment stability, ecological balance and economic<br />

development of the state.<br />

The actual Forest cover in the country is monitored every two years by Forest<br />

Survey of India based on studies of Satellite imageries. The geographical area of<br />

<strong>Mizoram</strong> has dense forests and the major portions are open forests and the rest is<br />

scrub/non-forest areas. As per National Forest Policy 1988, in the hills and in<br />

mountainous regions like <strong>Mizoram</strong>, the aim should be to maintain two-third of the area<br />

under forest or tree cover in order to prevent erosion and land degradation and to ensure<br />

the stability of the fragile eco-system. As against this goal; at present notified forests<br />

(reserved/protected forests) constitute about 38% of the geographical area and even<br />

most of these are open, degraded and subject to pressure of shifting cultivation,<br />

encroachments, grazing fire, illicit felling etc.<br />

However, Bamboo resources are abundant in the state and efforts have been<br />

made to establish tissue, culture, laboratory and bamboo sectors. Further, bamboo<br />

plantation development works shall also be taken with active participation of farmers<br />

interested in growing bamboo in farm sector.<br />

The practice of shifting cultivation had contributed to a large scale deforestation<br />

in disturbing ecological balance considerably i.e. destruction of wild animals and their<br />

habitats, elimination of source of water and so on. It also converted vast area<br />

comprising valuable timber trees into degraded or barren land.<br />

The survey, demarcation, mapping and settlement of land including forests lands<br />

is pre-requisite for evolving proper integrated land use system. This is yet to be<br />

completed. Hence for proper control and scientific management of forests on a<br />

sustainable basis consolidation of notified forests/reserved forests will be necessary.<br />

More attention will be given in the productivity of forests most of which is very<br />

low. There has been very little silvicultural research to evolve technologies and<br />

practices suiting to local conditions to increase productivity.<br />

Damages to forests by illicit fellings and removal of forests produce, fireencroachments,<br />

grazing are common. Protection of forests from such factors would be<br />

necessary by strengthening the organizational set up and equipping the staff with<br />

vehicles/boats, Arms and communication facilities to be effective in preventing such<br />

damages. At present organization is ill-equipped to deal with above.<br />

There is wide gap between sustainable supplies from existing forest resources<br />

and the demands to be met from them. Hence to increase production of wood and nontimber<br />

forest produce to meet local needs and to reduce the gap between supply and<br />

demand, taking up massive forest regeneration programme (both plantation and aided<br />

natural regeneration) would be necessary.Plantation created need periodic tendings in<br />

the nature of thinning, opening fire lines to prevent fire damage etc. to optimize the<br />

final yield. However, no funds could be made available after formation years of such<br />

plantations in the past with the result that for want of subsequent tendings, growth and<br />

development of plantations have been affected adversely. It would be necessary to<br />

provide sufficient funds for periodic tendings and protection of forest area already<br />

regenerated to optimize the yield from forest lands.


- 181 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

<strong>Mizoram</strong> is quite rich in bio-diversity and genetic resources. To conserve,<br />

protect and develop the bio-diversity and genetic resources, protected area net-work<br />

(National Parks, Sanctuaries) will need to be further expanded and those already<br />

declared consolidated for future to latest report.<br />

To meet increasing demand of forest produce and at the same time reduce<br />

pressure on existing shrinking forest resources, extension of tree cover beyond<br />

conventional forest areas would be necessary. For the purpose, tree growing and<br />

protecting forests with active involvement and participation of private individuals and<br />

communities will need to be promoted on massive scale through appropriate extension<br />

programmes.<br />

To cope up with increased work programmes envisages to be undertaken as<br />

above for preservation, development and sustainable management of forests through<br />

Working Plan/Scheme and wildlife, strengthening of the forests organizations with<br />

respect to man-power and the Human resource development through training,<br />

equipments and facilities would also be necessary during the plan period.<br />

The total proposed outlay for the XI th Five Year Plan (<strong>2007</strong>-<strong>2012</strong>) and Annual<br />

Plan (<strong>2007</strong>-2008) is as follows (Rs. in lakh) :<br />

XI th Plan Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-2008<br />

1. Direction & Administration 1275.00 350.00<br />

2. Resources Survey & Silviculture 150.00 30.00<br />

Research<br />

3. Consolidation of Forest & Working 40.00 8.00<br />

Plan<br />

4. Communication and Buildings 84.00 17.00<br />

5. Forest Conservation & 820.00 45.00<br />

Development (Forest Protection)<br />

6. Afforestation 100.00 20.00<br />

7. Forest utilization 50.00 10.00<br />

8. Extension & Training<br />

(i) Training 39.00 9.00<br />

(ii) Extension 75.00 17.00<br />

9. MPCB 75.00 15.00<br />

10. Preservation of Wildlife 465.00 107.00<br />

11. Other Expenditure 25.00 5.00<br />

12. State Share for IFPS 150.00 40.00<br />

13. Maintenance of Forest (FC) 2175.00 725.00<br />

TOTAL : 5523.00 1398.00


- 182 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

ITEM WISE DESCRIPTION<br />

1. DIRECTION AND ADMINISTRATION<br />

(1) DIRECTION : The Organisational set up of Environment & Forest<br />

Department is required to be strengthened and expanded with a view to shoulder the<br />

challenges in protection of open forest wealth, wildlife, planning, execution,<br />

supervision, co-ordination, monitoring of development programmes, utilization of forest<br />

awareness and seeking participation of people in protection and development of forests,<br />

administration and enforcement of Laws on forests, wildlife and environment, research,<br />

training of personnel etc.<br />

The present administrative set up is not considered adequate for an efficient<br />

management of forests. To bring better control and management of forest resources on<br />

scientific basis, it is necessary to have an efficient administrative organization with<br />

sufficient officers at management level and adequate staff at execution level.<br />

Financial outlay proposed for maintenance of existing staff of 59 Nos. and<br />

establishment cost of PCCF Office and 5 Circle Offices during the XI th Five Year Plan<br />

(<strong>2007</strong> – <strong>2012</strong>) is Rs 625.00 lakhs and Annual Plan (<strong>2007</strong> – 2008) is Rs 170.00 lakhs.<br />

(2) ADMINISTRATION: This scheme is to provide expenditure towards<br />

salary/allowances towards the salary/allowances of the existing 101 nos. staff of the<br />

establishment of 11 existing Territorial Divisions besides the normal expenses to run<br />

these establishments. Financial outlay proposed during XIth Five Year Plan (<strong>2007</strong> –<br />

<strong>2012</strong>) is Rs 650.00 lakhs and Annual Plan (<strong>2007</strong> – 2008) is Rs 180.00 lakhs<br />

2. SURVEY OF FOREST RESOURCES<br />

The main objective of the scheme is Forestry Research and Consolidation of<br />

Forests including preparation of management plans (working plans) for forest resources.<br />

Under this scheme the following 2 programmes are proposed to be taken up.<br />

(i) Forestry Research<br />

(ii) Consolidation of Forests & Working Plans.<br />

3. FORESTRY RESEARCH<br />

In spite of the fact that Forestry Research is the very foundation for forestry<br />

development, till recently the same has not been taken up seriously in <strong>Mizoram</strong>. With a<br />

view to give impetus to the forestry research, the existing Forest Resources Survey<br />

Division was created during 1986-1987. Moreover, there is very poor database on<br />

Silvicultural practices to grow various trees species in <strong>Mizoram</strong>. The growth and volume<br />

data of various species found/ grown in the State are not available. No scientific<br />

management of forest resources is possible in absence of scientific data & practices<br />

derived after proper research and application. In State like <strong>Mizoram</strong> which has a<br />

diversified vegetational cover and where a massive afforestation programme is going on,<br />

forestry research to evolve technologies and practices to increase productivity from<br />

forest areas is very small. Therefore the need has been felt to conduct forestry research<br />

on various aspects as below:


- 183 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

(i) Tree improvement & development of seeds through seed production areas, seed<br />

Orchards, etc.<br />

(ii) Phenological studies of important local tree species.<br />

(iii) Maintenance of sample plots, preservation plots, orchid sanctuaries etc.<br />

(iv) Standardization of nursery techniques of important indigenous species to be used<br />

for afforestation programmes.<br />

(v) Undertaking experimental plantation of new species ( local as well as exotic) to<br />

standardize their silvicultural practice for adoption in our programmes.<br />

(vi) Survey of Minor Forest Produce like bamboo, cane, orchids, Medicinal plants,<br />

etc, and their development for better utility.<br />

Present staff strength is 25 Nos. During XIth Five Year Plan, it is proposed to<br />

continue with the above research works, with the main objective of increasing<br />

productivity on forest lands. The proposed expenditure for the XIth Five Year Plan is Rs<br />

150.00 lakhs and Annual Plan for <strong>2007</strong>-2008 is Rs 30.00 lakh.<br />

3. CONSOLIDATION OF FORESTS & WORKING <strong>PLAN</strong><br />

For proper scientific management of forests, survey, demarcation, consolidation<br />

of forests, collection, compilation & analysis of various data on resources are required to<br />

be taken up before management plans for managing forest on scientific lines could be<br />

prepared. In absence of proper survey, demarcation and consolidation of reserve, forest<br />

encroachments & disputes about land ownership are very common because of which<br />

preparing & managing the forest land properly is not possible. The works will include<br />

survey, demarcation and consolidation of reserve forest boundaries with pucca boundary<br />

pillars, compartment and sub-compartment boundaries, marking of sample plots and<br />

preservation plots, their maintenance, enumeration in compartments & subcompartments,<br />

preparing of management/working plan etc.<br />

Proposed outlay during the XIth Plan is Rs 40.00 lakhs and Annual Plan <strong>2007</strong>-<br />

2008 is Rs 8.00 lakh.<br />

5. COMMUNICATION AND BUILDINGS<br />

The objectives of this scheme are to provide accommodation (both for offices &<br />

residences) to officers & staff and construction of approach roads/paths to forest<br />

colonies and plantations/forest areas for their access. This also provides for the<br />

maintenance of above assets created so far. There are at present 73 ranges/200<br />

Beats/Checkposts which are mostly in the remote forest areas lacking normal civic<br />

amenities. It is necessary that appropriate accommodation with proper access to the<br />

same is made available to the staff so that they can discharge their functions effectively.<br />

Under this scheme, 2 sub-schemes as below are proposed to be taken up during the XIth<br />

plan.<br />

COMMUNICATION<br />

Roads/paths are very important for proper management, protection and<br />

harvesting of forests in <strong>Mizoram</strong>. Rugged terrain, steep slopes, fragile geology,<br />

preference of Mizo people for habitation on hill ranges through which generally most of<br />

roads passes are factors which make accessibility in the forest areas difficult and<br />

expensive. Further the long period of insurgency also hampered the development of<br />

infrastructure in the past. In absence of roads, cost of harvesting forest produce is quite<br />

high and their protection and management also becomes difficult. Therefore under this<br />

scheme, it is proposed to construct approach roads/paths to various field offices in


- 184 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

remote places, important plantation and natural forest areas to facilitate their protection,<br />

management and harvesting including 200 km semi-permanent bamboo extraction link<br />

roads. Besides this, existing roads/paths totaling about 110 KM in all will also required<br />

to be maintained and improved. The proposed expenditure under the sub-scheme for<br />

XIth Five Year Plan is Rs 20.00 lakhs and Annual Plan <strong>2007</strong> – 2008 is Rs 4.00 lakhs.<br />

BUILDINGS<br />

The objectives of this sub-scheme is to make provision for accommodation (both<br />

office & residential) to officers & staff. Besides this it will provide for maintenance of<br />

existing assets which are about 900 buildings including 51 nos. of Forest Rest Houses.<br />

The provision of amenities to staff & labour like drinking water, pit latrines,<br />

electrification, etc are also being provided under this scheme. The proposed expenditure<br />

under the sub-scheme for XI th Five Year Plan is Rs 64.00 lakhs and Annual Plan for<br />

<strong>2007</strong> – 2008 is Rs 13.00 lakhs.<br />

The proposed expenditure under the entire scheme for XIth Five Year Plan is Rs<br />

84.00 lakhs and Annual Plan for <strong>2007</strong> – 2008 is Rs 17.00 lakhs.<br />

5. FOREST CONSERVATION AND DEVELOPMENT (FOREST<br />

PROTECTION)<br />

Forest is a biological entity and a renewable resource subject to damages from<br />

various factors namely fire, encroachment, illicit cutting/removal of forest produce,<br />

faulty land use practices (shifting cultivation).etc. These factors are prevalent in the<br />

State with significant extent thereby degrading and depleting the forest resources much<br />

to the detriment to its fragile geology, environmental stability and ecological balance<br />

ultimately reducing the productivity of land. With the increasing population both human<br />

& livestock and demand for wood and other forest produce which is far beyond the<br />

sustainable supplies of the shrinking forest cover, protection of forest becoming more<br />

challenging. The organisation & staff is not adequately equipped at present and is<br />

proposed to be strengthened during the plan period so that they can protect effectively<br />

the open forest wealth in the State from such damages.<br />

During the XIth Five Year Plan, it is proposed to have at least one mobile squad<br />

to be constituted out of available staff equipped with transport and communication in<br />

each circle to check and prevent illegal activities in the forest areas. It is also proposed<br />

to equip all division headquarters, important Range headquarters and forest check<br />

gates/beat staff with wireless sets so that they can communicate with each other in case<br />

of need/emergency arising out of any illegal activity in the forest. Beside this the<br />

existing forest checkgates will be strengthened, new checkgates at strategic locations<br />

will be established and 1 storage depot for storing harvested/seized forest produce in<br />

each Division will be established. Boats and out board motor engines will also be<br />

provided wheresoever required. It should be appreciated that open wealth like forests<br />

worth crores of rupees will not be safe unless forest protection staffs are well equipped<br />

to discharge their duties effectively.<br />

Proposed outlay for XIth Five Year Plan is Rs 820.00 lakhs and Annual Plan for<br />

<strong>2007</strong>-2008 is Rs 45.00 lakh.<br />

6. AFFORESTATION<br />

The main objectives of the scheme is to augment the available supply of<br />

fuelwood, timber, non-timber forest produces like canes, fruit, oil seeds, etc. Due to<br />

increasing population of both human and livestock demand and pressure on the existing<br />

forests for wood and wood products is increasing day by day, which at present is beyond<br />

sustainable supplies available from the existing poor forests. As per the Forest Survey of


- 185 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

India, ‘The State of Forest Report 1995’ the forests in the State have an estimated<br />

Woodstock of 35m 3 per ha. which is the lowest among the all North-Eastern States.<br />

Thus there is considerable potential for increasing the productivity (economic yield)<br />

from the degraded forests.<br />

Hence, to augment wood resources by undertaking rehabilitation and regeneration<br />

programme over wasteland and degraded areas, a three pronged afforestation<br />

programme is proposed for the XIth plan. The following three sub-schemes are proposed<br />

to be taken up which would also include bamboo plantation of commercial species :<br />

(i) Regeneration of degraded Forest<br />

(ii) Rehabilitation of Jhumlands<br />

(iii) Green <strong>Mizoram</strong> Programme<br />

The proposed outlay during the XIth plan is Rs 100.00 lakhs and Annual Plan for<br />

<strong>2007</strong>-2008 is Rs. 20.00 lakhs.<br />

7. FOREST UTILIZATION<br />

The objective of the scheme is to provide for marking, removal/sale of<br />

dead/dying/thinning yields from plantation areas or from areas diverted fro non-forestry<br />

purposes (development projects).<br />

National Forest Policy 1988 clearly says that forests should not be looked upon<br />

as a source of revenue. They are National asset to be protected and enhanced for the well<br />

being of the people and the Nation considering their contribution in maintaining<br />

essential ecological processes and life support systems.<br />

There is very limited scope for commercial felling of trees in <strong>Mizoram</strong> because<br />

of very poor stock in its forests. However, bamboos whose stock is sufficient are already<br />

being harvested contributing revenue to the state exchequer. The demand of Forest<br />

produce is mainly for domestic consumption and will be regulated keeping the<br />

Silvicultural consideration in view. However silvicultural thinning’s in old plantation<br />

areas is envisaged to be done by the Departmental which will also earn some revenue to<br />

the state. If such Silvicultural operations in forest crops are not done timely, it will result<br />

in poor growth and value from the final yield from the area. The main activities under<br />

the scheme will include thinning of older plantations, provision of motorized boats for<br />

supervision of harvesting works and felling necessitated because of diversion of forest<br />

areas to non-forest purposes for development projects (road, hydel projects etc.) and<br />

procurement of logging tools and equipment.<br />

The proposed outlay for the XIth Plan is Rs.50.00 lakh and for Annual Plan<br />

<strong>2007</strong>-08 is Rs.10.00 lakh.<br />

8. EXTENSION & TRAINING<br />

Forestry is a technical subject, and hence a Forester has to be properly trained<br />

to be able to do his job well. He has also to be a good public relation man to<br />

communicate with common people to educate and make them aware about the<br />

importance of preserving, protecting and developing forests and wildlife and their role in<br />

caring for the same for maintaining the environmental equilibrium. Therefore training<br />

and extension activities assume great significance to protect and develop an open and<br />

living wealth like forests.<br />

FORESTRY TRAINING (HUMAN RESOURCES DEVELOPMENT)<br />

The objectives of the scheme is to provide induction training in Forestry, a<br />

technical subject, to Forest Guards, Foresters, Forest Rangers and Assistant Conservator<br />

of Forests and to hold refresher courses/periodic training both in the State and in


- 186 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

institutes outside the State so as to update their skills/knowledge and thus enable them to<br />

discharge their responsibilities more effectively. To impart induction training to<br />

Foresters& Forest Guards a Forestry Training School was established during 5 th Five<br />

Year Plan at Bethlehem Aizawl. The following programmes are proposed for the XI th<br />

Plan :-<br />

(i) Induction training of Forest Guards & Foresters in the State.<br />

(ii) Induction training of Forest Rangers & ACFs outside the State.<br />

(iii) Holding refresher courses/periodic trainings in as well as outside the<br />

State.<br />

(iv) Improvement & Strengthening of the Forest Training School.<br />

Proposed outlay for XIth Five Year Plan is Rs.39.00 lakh and Annual Plan<br />

<strong>2007</strong>-08 is Rs.9.00 lakh.<br />

EXTENSION<br />

The objective of the scheme is to promote motivate and seek co-operation of<br />

the public to protect existing forests, wildlife and plant more trees to meet their day to<br />

day requirements of food, fuel, fodder, timber as well as to maintain the quality of<br />

environment. Their attention is focused on above through suitable Audio Visual Media,<br />

by publication of posters/pamphlets book etc., display of boards, organizing exhibitions<br />

essay and drawing competitions, talks, films, establishment and maintenance of<br />

recreational parks, observation of important days like Vanamahotsava, Wildlife week,<br />

distribution of free seedlings for planting like individuals and organization on their<br />

lands, etc. thereby seeking their participation in various afforestation and protection<br />

programmes of the department. Proposed outlay for the XIth Plan is Rs.75.00 lakh and<br />

Annual Plan <strong>2007</strong>-08 is Rs.17.00 lakh.<br />

9. ASSISTANCE TO POLLUTION CONTROL BOARD<br />

With the transfer of <strong>Mizoram</strong> State Pollution control Board to the Environment<br />

& Forests Department, adequate funds are not being provided by Planning Department<br />

by way of Grant-in-aid to the Board. Even their establishment liabilities are not covered<br />

by the meager amount. To make this an effective body for control and monitoring of<br />

pollution & environmental degradation, a sum of Rs.75.00 lakh is proposed as Grand-inaid<br />

to MSPCB during XIth Five Year Plan and Rs.15.00 lakh during the Annual Plan<br />

<strong>2007</strong>-08.<br />

10. PRESERVATION OF WILDLIFE<br />

For the conservation and management of wildlife & bio-diversity in the State,<br />

following protected areas as below have so far been constituted.<br />

(Sq.Km)<br />

1) Murlen National Park 200<br />

2) Phawngpui National Park 50<br />

3) Ngengpui Wildlife Sanctuary 110<br />

4) Khawnglung Wildlife Sanctuary 35<br />

5) Dampa Tiger Reserve 500<br />

6) Palak Lake Sanctuary 15.50<br />

7) Lengteng Wildlife Sanctuary 120<br />

8) Thorangtlang Sanctuary 50<br />

9) Tawi Wildlife Sanctuary 103<br />

TOTAL AREA:- 1183.50<br />

Besides this, a Mini Zoo at Aizawl and a small Deer Park at Thenzawl are also<br />

being maintained.


- 187 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ENVIRONMENT & FOREST<br />

Chief Wildlife Warden is the overall incharge of the State’s Wildlife assisted<br />

by Wildlife Warden in the protected areas and Divisional Forest Officers in the<br />

Territorial Divisions.<br />

The importance of conserving wildlife and bio-diversity is increasing all over<br />

realizing this, to oversee the management of wildlife in the State, the post of Chief<br />

Wildlife Warden in the rank of Conservator of Forests was created during 1994-1995<br />

and its office was created during 1996-1997 without any supporting staff. At present the<br />

Wildlife Organisation is inadequate in respect of trained man-power, equipments and<br />

facilities. Hence, to manage the protected areas properly in the line of scientific<br />

management, Wildlife Wing organizational set up will need strengthening adequately.<br />

The protected areas mentioned above will be maintained and provisions of<br />

Wildlife (Protection) Act, 1972 enforced more seriously in the State. Protection and<br />

Development works namely patrol paths, water holes, trace paths, etc. will be further<br />

taken up and old one maintained.<br />

The proposed outlay for XIth Five Year Plan is Rs.465.00 lakh and Annual<br />

Plan <strong>2007</strong>-08 is Rs. 107.00 lakh.<br />

11. OTHER EXPENDITURE<br />

Environment & Forests Department has more than 800 staff of uniform cadre.<br />

Due to fund constraint uniforms were not provided to staff regularly. The situation has<br />

led to serious erosion in discipline as well as morale of the staff as wearing of proper<br />

uniform is essential for enforcement of rules and regulations. Proposed provision during<br />

XIth Five Year Plan is Rs.25.00 lakh and Annual Plan for <strong>2007</strong>-08 is Rs.5.00 lakh.<br />

12. STATE MATCHING SHARE FOR IFPS<br />

The Ministry of Environment & Forests has formulated a new scheme titled<br />

“Integrated Forest Protection Scheme” for implementation during the 10 th Plan and<br />

likely to be continued during the 11 th Plan. The scheme has since been approved by the<br />

Cabinet Committee on Economic Affairs. The main components of the scheme are:<br />

Forest Fire Control Management<br />

Infrastructure development which has two sub-components as<br />

Working Plan Preparation/Survey Demarcation<br />

Strengthening of infrastructure for Forest Protection.<br />

The scheme is based on 90:10 sharing basis. Although the scheme was started<br />

during the 10 th Plan, the State matching share under Plan shall be construed as New<br />

Scheme for the XIth Five year Plan.<br />

Proposed provision during XIth Five Year Plan is Rs.150.00 lakh and Annual<br />

Plan for <strong>2007</strong>-08 is Rs.40.00 lakh.<br />

13. MAINTENANCE OF FOREST (FC) : More emphasis will be given on<br />

Maintenance of Forest during 11 th Five Year plan. The Department proposed Rs.<br />

2175.00 lakhs during 11 th Five Year Plan and Rs. 725.00 lakhs for the yuear <strong>2007</strong>-08<br />

under Finance Commission.<br />

…...


- 188 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

<strong>PLAN</strong>NING<br />

<strong>PLAN</strong>NING DEPARTMENT<br />

Planning Department is a coordinating and also Nodal Department for<br />

all the Development Departments in the State. The main functions of the Department are<br />

as follows :-<br />

1. Formulation of Five Year Plan & Annual Plan<br />

2. Monitoring & Evaluation of Plan Schemes<br />

3. District Planning Machinery at the State Level<br />

4. Monitoring & Evaluation of CSS & NEC schemes.<br />

Due to inadequacy of Technical Manpower in the Department only<br />

Plan Formulation has been taken up satisfactorily whereas monitoring and Evaluation<br />

could not be taken up satisfactorily during 9 th Plan period and during the 10 th Five Year<br />

Plan [2002-07] more emphasis will be given on District Planning Machinery and<br />

Centrally Sponsored Schemes at the state level as well as in the District level and also<br />

on Evaluation & Monitoring. The proposed outlay for the 11 th Five Year Plan is Rs<br />

11,294.00 lakhs and the proposed Annual Plan during <strong>2007</strong>-08 is Rs 3454.00 lakhs.<br />

<strong>PLAN</strong>NING BOARD [STATE <strong>PLAN</strong>NING COMMISSION]<br />

I. Plan Formulation : This is the main function of the State Planning<br />

Board] owing to inadequacy of Technical Manpower in the Department, Formulation of<br />

Annual Plan is being done by Manual up to the end of 10 th Plan period. During the 11 th<br />

Five Year Plan formulation of Annual Plan will be computerized and 10 nos. of<br />

Computers and its accessories will be procured.<br />

Detailed Financial Provisions under Plan Formulation is given below:-<br />

S/no. Head Amount proposed Proposed Annual<br />

During 11 th Five Plan <strong>2007</strong>-08<br />

Year Plan <strong>2007</strong>-12<br />

1. Salary Rs 46.00 Rs 6.50<br />

2. Wages Rs 27.00 Rs 10.00<br />

3. Medical Rs 4.00 Rs 0.50<br />

4. TA/DA Rs 23.00 Rs 4.00<br />

5 O.E Rs 205.00 Rs 45.00<br />

6. O.C Rs 115.00 Rs 1.00<br />

7. Maintenance Rs 10.00 Rs 0.00<br />

Total Rs 430.00 Rs 67.00<br />

II. A. EVALUATION & MONITORING: More emphasis will be given<br />

to monitoring and Evaluation during 11 th Five Year Plan. A monitoring Team under the<br />

Chairmanship of Vice Chairman, State Planning Commission had already been set up by<br />

the State Government with four Members representing all the 8 Districts to make on the<br />

spot verification of all important schemes implemented in the State. Besides, four<br />

Monitoring teams of officials have been engaged for physical verification of the projects<br />

being implemented and they submit the reports to the govt. of India as well as Minister<br />

i/c Planning and all Heads of Department concerned for follow-up action where<br />

necessary.


- 189 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

<strong>PLAN</strong>NING<br />

Detailed financial provisions during 11 th Five Year Plan <strong>2007</strong>-12 and<br />

Annual Plan <strong>2007</strong>-08 is given below:-<br />

Amount proposed Proposed Annual<br />

For 11 th Five Year Plan <strong>2007</strong>-08<br />

Plan 2008-12<br />

1. Salary and wages Rs 150.00 Rs 24.00<br />

2. TA/DA Rs 28.00 Rs 5.00<br />

3. O.E Rs 500.00 Rs 100.00<br />

4. O.C. Rs 9894.00 Rs 3213.00<br />

5. Medical Rs 5.00 Rs 2.00<br />

TOTAL Rs 10,577.00 Rs 3344.00<br />

B. ESTABLISHMENT OF MONITORING & EVALUATION CELL: Special<br />

emphasis will be given on Monitoring & Evaluation of all Plan Schemes/ CSS/ NLCPR /<br />

BAFFACOS during the 11 th Five Year Plan period. But due to inadequacy of Technical<br />

Manpower the Department is unable to do Monitoring & Evaluation fruitfully Such<br />

being the case, it is felt necessary to setting up a Monitoring & Evaluation Cell in the<br />

State Planning Board to do monitoring of all schemes, projects and programmes being<br />

implemented in the State. In order to strengthening the Monitoring and Evaluation, the<br />

Department is proposed for creation of the following bare minimum posts to Man<br />

Monitoring & Evaluation Cell in the State Planning Board and for this a token provision<br />

of Rs 20.00 lakh is earmarked during Eleventh Five Year Plan <strong>2007</strong>-<strong>2012</strong> and Rs 1.00<br />

lakh during <strong>2007</strong>-08.<br />

Sl.no. Name of post Scale of pay No. of post<br />

1. Deputy Adviser, [M] Rs 12000-16500/- 1 no.<br />

2. Sr. Research Officer [M] Rs 10000-15200/- 1 no.<br />

3. Research Officer [M] Rs 8000-13500/- 2 no.<br />

Detailed financial provisions during 11 th Five Year Plan [<strong>2007</strong>-12] and<br />

Annual Plan <strong>2007</strong>-08 is given below:-<br />

Amount proposed Proposed Annual Plan<br />

For 11 th Five Year <strong>2007</strong>-2008<br />

<strong>2007</strong>-<strong>2012</strong><br />

1. Salary Rs 10.00 Rs 0.20<br />

2. Wages Rs 5.00 Rs 0.20<br />

3. Medical Rs 0.50 Rs 0.20<br />

4. O.E Rs 2.50 Rs 0.20<br />

5. O.C Rs 2.00 Rs 0.20<br />

TOTAL Rs 20.00 Rs 1.00<br />

TOTAL OF ‘A’ Rs 10577.00 Rs 3344.00<br />

TOTAL OF ‘B’ Rs 20.00 Rs 1.00<br />

GRAND TOTAL Rs 10597.00 Rs 3345.00<br />

III. DISTRICT <strong>PLAN</strong>NING MACHINERY : District Planning Machinery<br />

had been set up at the State level since the early part of 7 th Plan period. During the 10 th<br />

Five Year Plan, District Planning Machinery will be set up at the District level for which<br />

the following posts have already been approved by Planning Commission [MLD] Govt.<br />

of India, Vide No.PC[P] 35/Mizo/97-MLP dt. 28..1.1998 for the three Districts viz<br />

Aizawl/ Lunglei/ Chhimtuipui as shown against each.


- 190 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

<strong>PLAN</strong>NING<br />

1. Chief District Planning Officer 3 posts<br />

2. Project Expert/ Research Officer 3 posts<br />

3. Assistant Research Officer 3 posts<br />

4. L.D.C 3 posts<br />

5. Grade IV staff 3 posts<br />

The Govt. of <strong>Mizoram</strong> has opened 5 [five] more new Districts viz<br />

Lawngtlai, Serchhip, Champhai, Kolasib and Mamit during 2000. As such, the following<br />

posts will be created to implement the scheme of District Planning Machinery at Aizawl/<br />

Champhai/ Kolasib/ Mamit and Serchhip during the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>.<br />

S/no Name of post No. of post<br />

1. Chief Dist. Planning Officer for 5 Dist. 5<br />

2. Project Expert/ Research Officer for 5 Dist 5<br />

3. Inspectors of Statistics for 5 Dist. 10<br />

4. L.D.C. for 5 District 10<br />

5. Grade IV Staff for 5 District 15<br />

Detailed financial provisions for creation of New posts is given here<br />

under:-<br />

Sl.no. Items Amount proposed during Proposed Annual Plan<br />

11 th Five Year Plan <strong>2007</strong>-12 <strong>2007</strong>-08<br />

1. Salary 51.00 5.00<br />

2. TA/DA 14.00 2.00<br />

3. O.E 70.00 10.00<br />

4. O.C 14.00 5.00<br />

5. Medical 7.00 0.50<br />

6. Wages 28.00 2.50<br />

TOTAL 184.00 25.00<br />

IV. PILOT PROJECT : The State Government has made proposal for<br />

establishment of District Planning Machinery in Lunglei District as a Pilot Project of the<br />

above proposal for which a token provision of Rs 10.00 lakh is provided for creation and<br />

maintenance of one post each of Chief District Planning Officer and Project Expert/<br />

Research Assistant/LDC and IV Grade staff during <strong>2007</strong>-08 as follows:<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

1 Salary 20.00 4.00<br />

2. Wages 20.00 4.00<br />

3. T.E 5.00 1.00<br />

4. O.E 25.00 5.00<br />

5. Rent/ Taxes 5.00 1.00<br />

6. O.C 5.00 1.50<br />

7. Medical 3.00 0.50<br />

TOTAL 83.00 17.00<br />

…….


- 191 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOURISM<br />

TOURISM DEPARTMENT<br />

Tourism Department is one of the fastest growing department in <strong>Mizoram</strong>. The<br />

Department has proposed Rs. 1597.00 lakhs during Eleventh Five year plan <strong>2007</strong>-<strong>2012</strong>.<br />

An amount of Rs. 313.00 lakhs is proposed during <strong>2007</strong>-2008.<br />

1. TOURIST CENTER<br />

‘A’ REIEK TOURIST RECREATIONAL CENTRE and TAMDIL LAKE :<br />

Reiek is a small village in the western part of Aizawl is being developed as<br />

Tourist Recreational Centre. A Cafetaria and 6 (six) nos.of Tourist Cottages has already<br />

been constructed andis now functioning. Besides this, Typical Mizo village and Mizo<br />

modern village has also been established in the adjacent area by constructing various<br />

types of typical mizo houses. In addition, it is proposed to establish an open arena for<br />

cultural events etc.<br />

Tamdil is a natural beautiful lake at 87 kms. east of Aizawl near Saitual Villages.<br />

It has been developed as a lake resort, providing water sports facilities, Cafetaria and 6<br />

(six) nos. of Tourist Cottages. This has already been commissioned. The Department<br />

proposes further improvement and maintenance of the compound and internal roads<br />

repairing of the above two centres.<br />

To meet this expenditure, the Deptt. proposed Rs.32.00 lakhs during the year<br />

<strong>2007</strong>-<strong>2012</strong>. An amount of Rs. 2.50 lakhs is proposed during <strong>2007</strong>-2008.<br />

‘B’ CHALFILH RESORT :<br />

Chalfilh is a Tourist Resort 100 kms. east of Aizawl near Sesawng Villages is<br />

being developed as a Tourist resort providing accomodation as well as conference<br />

facilities, even to the extend of accomodating conferences such as Regional as well as<br />

State level conference etc. The resort has been financially supported by the Ministry of<br />

Tourism, Govt. of India under CSS (Centrally Sponsored Scheme) the state Government<br />

has to meet 20% of all expenditure on site preparation, external water and electric<br />

connection, approach road, and also to provide manpower for management of the<br />

completed schemes. The Deptt. Proposed Rs. 31.00 lakhs during the year <strong>2007</strong>-<strong>2012</strong>.<br />

‘C’ HMUIFANG RESORT :<br />

A Tourist Resort 50 kms. south of Aizawl is being developed as a Tourist Centre.<br />

Due to its natural beauty and pleasant climatic conditions it attracts tourists from outside<br />

the state as well from abroad. This resort will cater to Tourists travelling to <strong>Mizoram</strong> as<br />

well as the locals. The resort will have Cafetaria and some cottages for lodging. This<br />

project has been sanctioned by the Ministry of Tourism, Govt. of India under CSS<br />

(Centrally Sponsored Scheme). The Ministry gives financial support only for the basic<br />

infrastructure of the building upto 80% of the project cost, the state Government has to<br />

meet 20% of all expenditure on site preparation, external water and electric connection,<br />

approach road, and also to provide manpower for management of the completed scheme.<br />

All other expenditure has to be born by the state Government. For further improvement<br />

and maintenance of the compound and internal road etc, the Deptt. earmarked Rs.31.00<br />

lakhs during the year <strong>2007</strong>-<strong>2012</strong>.


- 192 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOURISM<br />

2. TOURIST ACCOMODATION :<br />

MAINTENANCE OF EXISTING STAFF :<br />

For the continuation and maintenance of existing staff’s (31 nos.) Salary and<br />

other expenditure under Tourist Lodges at Chaltlang, Berawtlang, Kolasib, Vairengte,<br />

Lunglei, Saiha, Bairabi, Thenzawl, Champhai, Chhiahtlang, Mamit, Lawngtlai,<br />

Hnahthial, Thingdawl, Kawlkulh and Luangmual and an amount of Rs. 460.00 lakhs is<br />

proposed for 11th five Year Plan. An amount of Rs.155.00 lakhs is proposed during<br />

2006-<strong>2007</strong>.<br />

Detailed financial provisions are as follow :<br />

Proposed during Proposed<br />

Eleventh Five Year Plan Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

1) Salary Rs.148.92 lakhs Rs.31.00 lakhs<br />

2) Wages for MR Rs.132.25 lakhs Rs.45.00 lakhs<br />

3) T.E Rs. 17.25 lakhs Rs. 3.00 lakhs<br />

4) O.E Rs. 23.00 lakhs Rs.30.00 lakhs<br />

5) Mats.&Supply Rs. 28.75 lakhs Rs. 11.00 lakhs<br />

6) Minor works Rs. 28.75 lakhs Rs. 2.00 lakhs<br />

6) O.C Rs. 81.08 lakhs Rs. 33.00 lakhs<br />

TOTAL : Rs.460.00 lakhs Rs. 155.00 lakhs<br />

3. OTHER EXPENDITURE (TOURSIM & REST HOUSE) :<br />

‘A’ MAINTENANCE OF EXISTING STAFF :<br />

For maintenance and continuation of the existing staff’s (12nos.) salary and<br />

medical re-imbursement.The department proposed Rs. 96.00 lakhs for the year <strong>2007</strong>-<br />

<strong>2012</strong> and Rs. 11.00 lakhs is proposed for Annual Plan <strong>2007</strong>-2008 as follows :-<br />

‘B’. STATE SHARE:<br />

1. CENTRALLY SPONSORED SCHEMES (CSS):<br />

The Govt.of India, Ministry of Tourism with a view to develop Tourism in<br />

<strong>Mizoram</strong> has been liberally sanctioning fund under C.S.S for construction of various<br />

tourist infrastructures of Rs. 3094.46 lakhs viz. Zokhawthar, Sakawrdai, Khamrang,<br />

Hmuifang, Illumination of Tourist Centre, Saichho, Kanhmun, Tlabung, Tourist<br />

Recreation Centre Berawtlang, Eco-Tourism Reiek, Destination of Tourism<br />

Development <strong>Mizoram</strong>, Tourist Circuit, Destination of Reiek & Berawtlang, Tourist<br />

Circuit in Northern <strong>Mizoram</strong>. The Govt.of India sanctioned each projects to meet full<br />

expenditures of the building cost only. As a part of state share, the State Government has<br />

to meet 20% all expenditures on site preparation, external water and electric connection,<br />

approach road, and also to provide manpower for management of the completed<br />

schemes. Revenue earned/income and the tourist facilities are fully benefitted by the<br />

public and the Government.<br />

To meet expenditure for the above, as the state share Rs. 60.00 lakhs is proposed<br />

during <strong>2007</strong>-<strong>2012</strong>.


- 193 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOURISM<br />

2. BUDGET HOTELS:<br />

The need for budget accommodation has been felt acutely by the state<br />

Government for a very long time. With the increase of tourist flow every year, the need<br />

for better and more luxurious accomodation has been felt by the Government. The<br />

participation from private sector has been almost nil, even though there are quite a few<br />

Private owned Hotels. These Hotels are not up to the mark and need improvement. The<br />

Government felt that financial assistance may be given to those promoters who wish to<br />

establish Hotels within the State. This assistance may be provided by way of electricity<br />

and water subsidy. In addition, the initial recurring expenditure, for the first 5 years, may<br />

be given as financial assistance. A token provision of Rs 20.00 lakhs has been set aside<br />

during 11 th Five Year Plan.<br />

‘C’. CREATION OF NEW POST :<br />

During 10th plan period Tourist infrastructures of 7 nos. were constructed in the<br />

interior places of the state under C.S.S. Due to ban on creation of posts during the period<br />

Lodges/Highway Restaurant/ Cottages establishment were manned with M.R.<br />

Employees. It is therefore, necessary to create essential posts of the following during<br />

11th Five Year Plan <strong>2007</strong>-<strong>2012</strong>, Rs.137.00 lakhs is proposed for financial requirement.<br />

Sl. Name of posts No.of<br />

No. posts<br />

1. Asst.Receptionist 6<br />

2. Room Attendant 13<br />

3. Cook 9<br />

4. Chowkidar 5<br />

5. UDC 2<br />

6. LDC 4<br />

4. DIRECTION AND ADMINISTRATION :<br />

MAINTENANCE OF EXISTING STAFF :<br />

For maintenance and salary of 6 nos. of officers and 24 nos. of existing staff<br />

under the head of direction and Administration, an amount of Rs.434.00 lakhs only is<br />

proposed during <strong>2007</strong>-<strong>2012</strong> as under. This would be converted to Non-Plan. And the<br />

proposed outlay for <strong>2007</strong>-2008 is Rs. 118.50 lakhs.<br />

Proposed during Proposed<br />

11th Five Year Plan Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-2008<br />

Salary Rs. 247.25 lakhs Rs. 50.00 lakhs<br />

T.E Rs. 23.00 lakhs Rs. 4.00 lakhs<br />

O.E Rs. 73.00 lakhs Rs. 31.00 lakhs<br />

Minor works Rs. 17.25 lakhs Rs. 2.00 lakhs<br />

Other Charges Rs. 73.00 lakhs Rs. 31.00 lakhs<br />

TOTAL RECURRING Rs.434.00 lakhs Rs. 118.50 lakhs


- 194 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOURISM<br />

5. TRAINING :<br />

A. The Department has been sending trainees to undergo training in various Travel<br />

Management, Hotel Management and Food Craft in various National Institutes. The<br />

need for skillful manpower has been felt in the service sector. To cater to this need<br />

students has been sent to various Catering Institutes, to meet the demand of skilled<br />

manpower. To meet this demand, an amount of Rs. 61.00 lakhs is proposed for stipend,<br />

book grant etc. during <strong>2007</strong>-<strong>2012</strong> and Rs.2.00 lakhs is proposed for Annual Plan <strong>2007</strong>-<br />

2008.<br />

B. SETTING UP OF HOTEL MANAGEMENT INSTITUTE:<br />

The Tourism sector has been developing in the recent past. The flow of Tourist in<br />

the state and the interest that has been generated in the North East, has brought its share<br />

of visitors to the state. With this increase in tourist flow the hotel and restaurant business<br />

has felt the urgent need for skilled manpower in this sector. So far, skill manpower has<br />

been imported from neighbouring states, such as Assam, Shillong and even as far as<br />

Kolkata. This import of manpower has been very expensive to the Hotel and Restaurant<br />

trade. To meet this demand, it its felt that a Catering Institute may be setup in the State.<br />

This will be setup under Public Private Partnership (PPP). For setting of this Institute a<br />

token provision of Rs 20.00 lakhs has been proposed as State share during 11 th five year<br />

plan.<br />

6. PROMOTION AND PUBLICITY :<br />

‘A’ PROMOTION OF FAIRS AND FESTIVALS :<br />

Celebration of Chapchar Kut (Spring Festival), Thalfavang Kut, Anthurium<br />

Festival and Christmas, etc. will continued to be celebrated regularly to attract tourists.<br />

The Department will also participate in National and International Travel & Tourism<br />

Fairs and Festivals. This participation by the Department in these various Fairs and<br />

Festival will help promote Tourism in the State. The Department has been participating<br />

by way of distribution of tourist literature and giving out information for prospective<br />

tourist and also meeting Tour Operators and selling the State as the Tourist Destination<br />

for the next millennium. For participation at these Fairs & Festivals an amount of Rs.<br />

76.00 lakhs is earmarked during <strong>2007</strong>-<strong>2012</strong> and Rs.17.00 lakhs is proposed during<br />

Annual Plan <strong>2007</strong>-2008.<br />

‘B’ PUBLICATION OF TOURIST INFORMATION & LITERATURE :<br />

The need to promote the Tourism potential of the State has been felt acutely.<br />

This will be done through publications in travel magazines, which has wide publicity,<br />

such as ‘In Flight Magazines’ and other National published magazines, in addition to<br />

publication of brochures and Information leaflets. Publication of advertisement in these<br />

magazines, go along in promoting tourism for the State. The Department proposed an<br />

amount of Rs.76.00 lakhs for publication of Tourist Information & Literature and<br />

advertisement of <strong>Mizoram</strong> during <strong>2007</strong>-<strong>2012</strong> and Rs.5.00 lakhs is proposed for annual<br />

Plan <strong>2007</strong>-2008.<br />

7. SURVEY & STATISTICS (OTHER EXPENDITURE) :<br />

For maintenance of one staff Salary and expenditure an amount of Rs.63.00<br />

lakhs is proposed during the year <strong>2007</strong>-<strong>2012</strong> and Rs.2.00 lakhs is proposed during <strong>2007</strong>-<br />

2008.<br />

…….


- 195 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

ECONOMIC & STATISTICS<br />

The main function of Economics & Statistics Department is to under take various<br />

kinds of Census and Surveys, collect up-to-date reliable Statistical data, and further to<br />

analyses, tabulate, published and disseminate them for use by Government planners,<br />

researchers, etc.<br />

Economics and Statistics Department has not been well equipped even today in<br />

terms of personnel and modern scientific equipments. Meanwhile the scope and<br />

coverage activity has been considerably increasing. In the coming Annual Plan, the<br />

Department is planning to streamline and re-vitalize the Statistical system to generate a<br />

more comprehensive data pertaining to every aspects of the economy of the State so as<br />

to facilitate all other Departments to formulate a sound data-base planning in the years to<br />

come. An amount of Rs.784.00 lakhs is proposed during Eleventh Five Year Plan <strong>2007</strong>-<br />

<strong>2012</strong> and Rs. 171.00 lakhs is proposed during Annual Plan <strong>2007</strong>-08 for Economics and<br />

Statistics Department.<br />

Sl<br />

No.<br />

PROPOSED FINANCIAL OUTLAY<br />

Name of Scheme / Major Head /<br />

Minor Head<br />

Outlay 11 th Five<br />

Year Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

(Rs. In lakhs)<br />

Outlay Annual<br />

Plan <strong>2007</strong>-08<br />

1 2 3 4<br />

1 Direction 92.00 18.39<br />

2 Administration 186.83 36.73<br />

3 Vital Statistics 194.42 49.37<br />

4 National Sample Survey (NSS) 48.87 15.40<br />

5 Estimation of State Income 5.00 2.00<br />

6 Data Bank 14.00 2.00<br />

7 Publication 22.00 5.00<br />

8 Crop cutting experiment 11.00 1.50<br />

9 Price & Marketing 10.00 1.25<br />

10 Computer Service 82.88 4.75<br />

11 Other Expenditure : Mini Press 18.00 3.61<br />

12 Training of Statistical Personnel 14.00 1.00<br />

13 Building 85.00 30.00<br />

Total : 784.00 171.00<br />

The Scheme-wise description are as follows:<br />

1. DIRECTION : The existing staff in the office of Economics & Statistics which<br />

are created during 7th Five Year Plan and 8th Five Year Plan are maintained under<br />

direction. The expenditure for maintenance of the existing staff are still to be continued<br />

during 11th Five Year Plan if the same are not transfered to Non-plan. Computer is<br />

utilised for official work for maintenance of record of source Book and Pay etc. A sum<br />

of Rs. 92.00 lakhs is proposed during 11th Five Year Plan <strong>2007</strong>-12 and Rs. 18.39 lakhs<br />

is proposed for continuing scheme during Annual Plan <strong>2007</strong>-08.


- 196 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

2. ADMINISTRATION : At present the Department has only three District Offices<br />

at Aizawl, Lunglei and Saiha. Creation of District Offices at Champhai, Kolasib and<br />

Mamit has been approved during Annual Plan 2006-<strong>2007</strong> but not yet created till date.<br />

The existing staff in three districts of Aizawl, Lunglei and Saiha are maintained under<br />

Plan and are still to be continued during 11th Five Year Plan. It is proposed to create 5<br />

District Offices at Champhai, Serchhip, Kolasib, Mamit, Lawngtlai with minimum<br />

essential staff. A sum of Rs 186.83 lakhs is proposed during 11th Five Year Plan.<br />

(1) Existing Staff at Aizawl, Lunglei and Saiha.<br />

3. VITAL STATISTICS : Under this scheme, data of vital events births and deaths<br />

are collected through 700 local Registrars in Urban and Rural areas. As per 2001<br />

Census, there are707 inhabited villages and 159 urban wards. While 707 inhabited<br />

villages fall under 543 registration centres, 159 urban wards fall under 155 wards<br />

including Hospitals. Therefore 168 localities without separate Registrar of Births and<br />

Deaths. Births and Deaths (RBD) Wing in the office of Directorate of Economics &<br />

Statistics is functioning under this scheme with a minimum staff. To strengthen this<br />

wing and to achieve 100% registration as desired by Registrar General of India,<br />

Government of India. It is intended to widen the coverage by creating more units, to<br />

undertake more affective inspection, conducting annual training for Registrars and<br />

monitoring, to ensure regular flow of reports and returns and to check irregularities in<br />

the registration system. Honorarium, expenses for training materials, TA/DA for annual<br />

training will automatically increase to achieve 100% registration.<br />

The importance of statistics an cause of deaths well recognised and these data<br />

are in demand by healh planners, administrators and medicl professionals. The scheme<br />

on medical certification of cause death MCCD formulated by the Registrar General,<br />

India is a big step forward towards establishment of a system in the country for data or<br />

cause of death. The scheme an Medical Certification of cause of death has been starting<br />

in <strong>Mizoram</strong>. It success depends upon adequate and trained personnels with coding<br />

appropriate diseases of cause of death as per International Statistical Classification of<br />

Diseases (ICD). In this respect Government of India may sanction grant-in-aid for<br />

creation of nosologist (Medical practitioner) under CSS.<br />

The records and data on Civil Registration as well as Medical Certification of<br />

cause of deaths are Computerizedd as per the softwares supplied by Registrar General<br />

India.To have effective Registration and to achieve 100% registration during 11th Five<br />

Year Plan, additional posts are proposed to be created. An outlay of Rs 194.42 lakhs is<br />

proposed during 11th Five Years Plan and Rs. 49.37lakhs is proposed for continuing<br />

schemes during Annual Plan <strong>2007</strong>-08 for Vital Statistics.<br />

4. NSS WING : National Sample Survey is conducted in the form of rounds every<br />

year and the survey are designed and conducted by NSSO. <strong>Mizoram</strong> is participating in<br />

the Socio-Economic Survey of NSS since 1978 on matching sample basis. Hundred<br />

percent of expenditure on Central Sample is borne by Central Government and fifty<br />

percent of expenditure on State Sample in the form of grant-in-aid, that is, seventy five<br />

percent of total expenditure incurred on NSS is re-imbursed by Government of<br />

<strong>Mizoram</strong>. Survey is a continous process and no new works are proposed.


- 197 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

Though the field works of NSS State Sample are completed regularly, the data so<br />

collected was not analysed and tabulated for severeal rounds due to non availability of<br />

adequate material and manpower resources. A wealth of valuable information on various<br />

topics is collected through NSS every year and not processing collected data is sheer<br />

wastage of resources. The infrastructure at NSS Wing may be strengthened with<br />

computer personnel to meet the requirement. The need for NSS Wing in terms of<br />

hardware and software requirement and related user-level training requires no emphasis.<br />

A sum of Rs. 48.87 lakhs is proposed during 11th Five Year Plan for<br />

maintenance of existing staff and creation of new posts. A sum of Rs. 15.40 lakhs is<br />

proposed for continuing schemes during Annual Plan <strong>2007</strong>-08.<br />

5. ESTIMATION OF STATE INCOME : Under this Scheme, the department is<br />

estimating Gross State Domestic Product (GSDP) and Net State Domestic Product<br />

(NSDP) of <strong>Mizoram</strong> as per methodologies given by National Account Division, Central<br />

Statistical Organisation (CSO). Besides collecting necessary data from different<br />

agencies various baseline surveys are undertaken to arrive at the aggregated data for<br />

estimating State Income.<br />

Apart from the on-going surveys, estimation of State Income necessarily<br />

involves incorporating of all the newly emerging economic activities which are<br />

considered to have significant contribution to the State’s economy. Fresh and new<br />

surveys will also have to be conducted to update the data of new activities. Such surveys<br />

necessary to provide data for estimating State income is proposed to be continued during<br />

the 11th Five Year Plan for which an amount of Rs. 5.00 lakhs is provided.<br />

Although estimation of State Domestic product is an important indicator of<br />

economic growth highlighting the performance of 13 sectors of the economy every year<br />

it is sad to mention that no separate post have been created till today under this scheme.<br />

It is therefore porpose to create one post of Research Officer two post of Inspector of<br />

Statistics and one post of Sub-Inspector of Statistics to be continously engaged under<br />

this scheme. The financial implication is Rs. 5.00 lakhs during the 11th Five Year Plan.<br />

A sum of Rs. 2.00 lakhs is proposed for survey during Annual Plan <strong>2007</strong>-08.<br />

6. DATA BANK : This Department being the apex body in the state<br />

statistical system and the nodal agency for collecting various types of data the role of the<br />

Department in terms of keeping a series of data, disseminating and bridging data gaps<br />

have increase tremendously.<br />

This department has been involved in various surveys and census, and collects<br />

different types of data even from the village level through statistical agencies available<br />

at every Rural Development Block Headquarters. However till doday, there is no<br />

efficient system and procedure by which these data are maintained with proper record.<br />

Statistical data is a vital input for decission making and timely availability of<br />

Statistics is the essence of efficiency in the State Statistical System. Hence, to provide<br />

easy and timely of statistical data to the administrators, enonomist and other users it is<br />

proposed to set up a comprehensive data bank / database at the Directorate Office and<br />

extended to district office in due course. Under this scheme different types of data or<br />

official statistics will be maintained, necessary surveys and censuses will be conducted<br />

to fill the data gaps.


- 198 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

A sum of Rs. 14.00 lakhs is proposed during Five Year Plan <strong>2007</strong>-12 and Rs.<br />

2.00 lakhs is proposed for conducting surveys and Census during Annual Plan <strong>2007</strong>-08.<br />

7. PUBLICATION : The Department being non-developmental department,<br />

publication is the major indicator of achievement. Owing to limited fund under<br />

Publication head, only few publications are brought out in a limited copy. The following<br />

are the Publications proposed to be continued during 11th Plan.<br />

(Rs in lakhs)<br />

Sl<br />

Eleventh Five Year Annual<br />

No. Scheme<br />

Plan <strong>2007</strong>-<strong>2012</strong> Plan<br />

1 yr 5 yrs<br />

1 2 3 4 5<br />

1 Publication of Statistical Handbook 3.00 1.00<br />

2 Publication of Hospital Statistics 1.60 0.30<br />

3 Publication of Employment Statistics 1.60 0.30<br />

4 Publication of Socio Economic Review 1.80 0.30<br />

5 Publication<br />

Commodities<br />

of Imported Essential<br />

1.60 0.30<br />

6 Publication of Rainfall Statistics 1.60 0.30<br />

7 Publication of Block Statistics 1.60 0.40<br />

8 Publication of Census of Govt. Employees 1.50 0.30<br />

9 Publication of SDP & Related Aggregates 1.60 0.30<br />

10 Publication of Statistical Abstract <strong>Mizoram</strong><br />

at a Glance / District<br />

1.70 1.00<br />

11 Annual Statistical Report of RBD 3.00 0.50<br />

Total : 22.00 5.00<br />

A sum of Rs. 22.00 lakhs is proposed during Eleventh Five Year Plan <strong>2007</strong>-12<br />

and Rs. 5.00 lakhs is proposed during Annual Plan <strong>2007</strong>-08.<br />

8. CROP CUTTING EXPERIMENT :<br />

For the purpose of estimating crop production within the State, it is felt that<br />

conduct of Crop Cutting experiment in the State is of utmost importance as the present<br />

system of collecting crop production have some loophole which results in over or<br />

underestimation of the parameters. This is turn have direct effect on our State Income.<br />

We proposed that crop cutting experiment should at least be conducted on five Principal<br />

Crops during the 11th Plan period in phase manner. A sum of Rs. 11.00 lakhs is<br />

proposed during 11th Five Year Plan <strong>2007</strong>-12 and Rs. 1.50 lakhs is proposed during<br />

Annual Plan <strong>2007</strong>-08.<br />

9. PRICE AND MARKETING INTELLIGENCE :<br />

Collection of Wholesale Prices and Retail Prices on Essential Commodities on<br />

Weekly, Monthly and Quarterly basis and compilation, publication of the same and<br />

submission to Government of India has been under taken by assigning certain staff in the<br />

Directorate and District Offices has been under taken since long time back. But till now<br />

this Department is unable to construct Consumer Price Index for Industrial Workers<br />

(CPI-IW), Consumer Price Index for Agricultural Labourer (CPI-AL), Consumer Price


- 199 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

Index for Agricultural Labourers (CPI-RL) and Consumer Price Index for urban non<br />

manual employees (CPI-UNME) as desired by Government of India. So there seems to a<br />

lot of tasks ahead of us to be fulfilled in the years to come. This draft plan aims at<br />

achieving the target or during away with the long during the next Five Year Plan.<br />

To be able to tackle the challenge this department will be required to have an<br />

ambitious plan with human and administration infrastructure with a vision be achieved<br />

at the close of the 11th Five Year Plan.<br />

The Price and Market Intelligence Wing at the Directorate needs to be<br />

strengthened by adding the present staff one Inspector of Statistics and one Sub-<br />

Inspector of Statistics by 1 more Inspector of Statistics and 2 more Sub-Inspector of<br />

Statistics to the present strength. Moreover, it is very much necessary to have one<br />

Research Officer in the wing to cope with technical and methodoliged approaches and<br />

aspects of the system and to supervise the over all works of the field enumerators. At the<br />

same time, with the consequence of the inception of 5 new Revenue Districts in<br />

<strong>Mizoram</strong>. This Department is required to have 5 more districts and in these new districts<br />

there needs to be sufficient staff 1 (one) Inspector and 2 Sub-Inspector each for Price<br />

and Market Intelligence tasks alone so new posts of 1 Inspector of Statistics and 2 posts<br />

of Sub-Inspector of Statistics and proposed again. So, a sum of Rs. 10.00 lakhs is<br />

proposed for the Five Year Plan <strong>2007</strong>-<strong>2012</strong> and Rs. 1.25 lakhs is proposed for<br />

continuing scheme during Annual Plan <strong>2007</strong>-08.<br />

10. COMPUTER SERVICES / INFORMATION TECHNOLOGY:<br />

As this Department is dealing with all kinds of statistical data, full<br />

Computerization of work is necessary. Manual tabulation and processing of data could<br />

no longer sustain the workload, as such, it is emphasized to strengthen the Computer<br />

Wing. At present, there is only one post of Computer Operator, It is therefore, proposed<br />

to create more posts of Computer Operators during 11th Five Year Plan. It is also<br />

proposed to purchase Software and Hardware, Computer of complete set for district<br />

offices, UPS, Lap Top, Computer, Projector, Duplo Printer. A sum of Rs. 82.88 lakhs is<br />

proposed during 11th Five Year Plan. A sum of Rs. 4.75 lakhs is proposed for<br />

continuing scheme and for purchase of Computer and ascesories during Annual Plan<br />

<strong>2007</strong>-08.<br />

11. MINI PRESS :<br />

The Department is running a small Printing Press for printing Booklets,<br />

leaflets, Births and Deaths Certificates, various type of Forms Covers of different<br />

publications. The existing Press is now outdated and cannot afford the demand and need<br />

modern equipped equipped technology. The existing staff are inadequate and require<br />

more staff. It is proposed to purchase Mini Offset during 11th Five Year Plan and a sum<br />

of Rs. 18.00 lakhs is proposed under Mini Press. A sum of Rs. 3.61 lakhs is proposed for<br />

continuing scheme during Annual Plan <strong>2007</strong>-08.<br />

12. TRAINING OF STATISTICAL PERSONNEL :<br />

The Scheme mainly emphasizes to improve and to augment the skill of statistical<br />

personnel through training, especially primary and Intermediate level of functionaries<br />

which is essential from time to time to affect improvement in their field of works.


- 200 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ECONOMIC & STATISTICS<br />

Statistical work, survey etc. cannot be done without proper training. It is<br />

necessary to organise training in and outside <strong>Mizoram</strong> for primary and intermediate<br />

level that will aim at widening their horizon by providing them with some useful<br />

statistical tools and familiarize them with the latest development in various statistical<br />

methodolody. A sum of Rs. 14.00 lakhs is proposed during 11th Five Year Plan for<br />

conducting of training of 125 personnels of Primary level and 125 of Intermediate level.<br />

A sum of Rs. 1.00 lakhs is proposed for 25 personnels each of Primary and Intermediate<br />

level during Annual Plan <strong>2007</strong>-08.<br />

13. BUILDING : Economics and Statistics Department is not self-sufficient<br />

in office buildings and quarters. Even the Directorate office accomodates in a rented<br />

house. At present District Offices at Aizawl accomodates its own building, Saiha DRO<br />

Office is likely to be completed during 2006-<strong>2007</strong>, Lunglei DRO Office is to start<br />

during Annual Plan 2006-<strong>2007</strong> with a provision of Rs. 10.00 lakhs during Annual Plan<br />

2006-07. Other District Office like Mamit, Kolasib, Serchhip, Champhai and Lawngtlai<br />

are proposed to be created during 11th Five Year Plan and automatically requires office<br />

buildings and quarters. Directorate office building is also proposed to be constructed<br />

during 11th Five Year Plan. A sum of Rs. 85.00 lakhs is proposed for construction of<br />

Directorate office building and District office buildings during 11th Five Year Plan<br />

<strong>2007</strong>-12. A sum of Rs. 10.00 lakhs is proposed for construction of Directorate Building<br />

at Aizawl and Rs. 20.00 lakhs for continuing scheme and District Research Office<br />

building construction at Lunglei during Annual Plan <strong>2007</strong>-08.<br />

(Rs in lakhs)<br />

Sl Scheme/Items Eleventh Five Year Plan Annual Plan <strong>2007</strong>-08<br />

No<br />

<strong>2007</strong>-<strong>2012</strong><br />

.<br />

Physical<br />

Existin New<br />

g<br />

Physical<br />

Financi<br />

al<br />

Existin New<br />

g<br />

Financi<br />

al<br />

1 2 3 4 5 6 7 8<br />

1 Directorate Office Building 1 1 10.00 1 10.00<br />

2 DRO Office, Lunglei 50.00 1 20.00<br />

3 DRO Office, Mamit 1 5.00<br />

4 DRO Office, Kolasib 1 5.00<br />

5 DRO Office, Serchhip 1 5.00<br />

6 DRO Office, Champhai 1 5.00<br />

7 DRO Office, Lawngtlai 1 5.00<br />

Total : 1 6 85.00 1 1 30.00<br />

……


- 201 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

The main task of the Department of Food, Civil Supplies & Consumer<br />

Affairs is to ensure food security in <strong>Mizoram</strong> through efficient Public Distribution<br />

System. The Department procures foodstuff from FCI Depot and despatch them to<br />

various supply centres for equitable distribution to the public by Fair Price Shop retailer<br />

through Ration Cards. The Department is now functioning with 6 (six) DCSO’s, 4 (four)<br />

SDF&CSO, 9 (nine) PDC’s, 18 (eighteen) SDC’s and 94 (ninety four) Sypply Centres.<br />

Thus the Department is having one of the largest networks of operation among the<br />

various department of <strong>Mizoram</strong>.<br />

The Government of <strong>Mizoram</strong> vide Order No. dt. 17.11.2004 has allocated<br />

the subject of Consumer Protection, Management of State Commission and District<br />

Forum to the Department of Food, Civil Supplies & Consumer Affairs. The approved<br />

outlay for the 10 th Five Year Plan 2002 – <strong>2007</strong> in respect of Food, Civil Supplies &<br />

Consumer Affairs Department is Rs. 929.86 lacs and this includes plan outlay of Rs.<br />

826.00 lacs for Food & Civil Supplies Department and Rs. 103.86 lacs for Consumer<br />

Affairs Department.<br />

The Department of Food, Civil Supplies & Consumer Affairs therefore,<br />

proposes outlay for 11th five year plan <strong>2007</strong> - <strong>2012</strong> to the tune of Rs. 2025.00 lacs,<br />

and Rs.616.00 lacs for the Annual Plan <strong>2007</strong> – 2008. This will be utilised for<br />

maintenance of existing 38 posts of various categories of officers and staff under Plan,<br />

Maintenance of 10 heavy vehicles and 4 nos. of light vehicles under Plan Scheme.<br />

Besides providing fund for construction of approach roads and maintenance of 188 nos<br />

of Godown and 250 nos of Staff Quarters in various Supply Centres. The Department<br />

also proposes purchase of Computer with Printer for Computerization of Directorate<br />

Offices, DCSO’s, SDF&CSO’s and Principal Distribution Centres to devise a system<br />

for more effective and efficient monitoring and regulating movement of essential<br />

commodities from Despatch Centres to the Fed Centres. The Department also proposes<br />

the following major works under Capital Project during 11th Five Year Plan :-<br />

1. Installation of Electronic Digital Weighbrigde in all the 9 PDC’s<br />

2. Brick walled fencing of the 9 PDCS’ Complex<br />

3. Construction of newly upgraded District Offices.<br />

4. Construction of Area Inspector Office cum quarter.<br />

The break up of total proposed outlay for Rs. 20250.00 lacs in the 11th<br />

Five Year Plan and the amount of Rs. 616.00 lacs in the Annual Plan <strong>2007</strong> - 2008 is as<br />

follows :-<br />

1. CIVIL SUPPLIES<br />

A. Direction : The Department proposes Rs. 748.00 lakhs during the 11 th Five<br />

Year Plan <strong>2007</strong> – <strong>2012</strong> and also proposes Rs. 187.00 lakhs during the Annual Plan<br />

<strong>2007</strong> – 2008 for maintenance of existing staff, maintenance of vehicles, OE, M & S, TE<br />

etc. as detailed below :-


- 202 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

Sl<br />

No<br />

Particulars<br />

11 th Five Year Plan<br />

<strong>2007</strong> – <strong>2012</strong><br />

Annual Plan<br />

<strong>2007</strong> – 2008<br />

1. 2. 3. 4.<br />

1. Salary of existing 14 staff Rs. 143.00 Rs. 23.50<br />

2. Domestic TE Rs. 17.50 Rs. 3.50<br />

3. Office Expenses Rs. 90.00 Rs. 15.00<br />

4. Supplies & Materials Rs. 300.00 Rs. 60.00<br />

5. Advertisement & Publicity Rs. 20.00 Rs. 3.00<br />

6. Other charges Rs. 15.00 Rs. 2.00<br />

7. Motor vehicles Rs. 162.50 Rs. 80.00<br />

TOTAL Rs. 748.00 Rs. 187.00<br />

2. STORAGE AND WAREHOUSING<br />

DIRECTION AND ADMINISTRATION<br />

ADMINISTRATION:- The Departmental proposes an amount of Rs.<br />

94.40 lacs during the 11 th Five Year Plan <strong>2007</strong> – <strong>2012</strong> and also proposes Rs. 23.60 lacs<br />

during Annual Plan <strong>2007</strong> – 2008 for maintenance of 13 existing staff OE, TE. :-<br />

Sl<br />

No<br />

Particulars<br />

11 th Five Year<br />

Plan <strong>2007</strong> – <strong>2012</strong><br />

Annual Plan <strong>2007</strong> –<br />

2008<br />

1. 2. 3. 4.<br />

1. Salary of existing 13 staff Rs. 80.50 Rs. 14.60<br />

2. Domestic TE Rs. 10.00 Rs. 2.00<br />

3. OE Rs. 3.50 Rs. 7.00<br />

TOTAL Rs. 94.00 Rs. 23.60<br />

3. CONSUMER AFFAIRS :- Government of <strong>Mizoram</strong> Notification No.A.<br />

46013/1/95-GAD/Loose dt. 17.11.2004, has allocated to this Dept.,Consumer Affairs<br />

which includes District Forum and State Commission and the Department is re-named as<br />

Food, Civil Supplies & Consumer Affairs. Under this Scheme there are 7 (seven)<br />

District Fora with 2 members each and Deputy Commissioner of the concern District are<br />

functioning as the President of the Forum, while members are entitled consolidated<br />

Honorarium on every sitting.<br />

A. STATE COMMISSION : An amount of Rs. 70.80 in the 11 th Five Year Plan<br />

and Rs. 17.70 lacs in the Annual Plan <strong>2007</strong> – 2008 are proposed for maintenance of the<br />

above with maintenance of 6 staff etc.<br />

Sl<br />

No<br />

Particulars<br />

11 th Five Year<br />

Plan <strong>2007</strong> – <strong>2012</strong><br />

Annual Plan <strong>2007</strong> –<br />

2008<br />

1. 2. 3. 4.<br />

1. Salary of existing 6 staff Rs. 60.50 Rs. 10.40<br />

2. Wages of M/R Rs. 2.50 Rs. 0.45<br />

3. Domestic TE Rs. 4.00 Rs. 4.00<br />

4. OE Rs. 2.00 Rs. 2.00<br />

5. Other charges Rs. 1.80 Rs. 0.85<br />

TOTAL Rs. 70.80 Rs. 17.70


- 203 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

B. DISTRICT FORUM : An amount of Rs. 106.80 in the 11 th Five Year Plan and<br />

Rs. 26.70 lacs in the Annual Plan <strong>2007</strong> – 2008 are proposed for maintenance of the<br />

above with 5 officers and staff under District Forum :-<br />

Sl<br />

No<br />

Particulars<br />

11 th Five Year Plan<br />

<strong>2007</strong> – <strong>2012</strong><br />

Annual Plan<br />

<strong>2007</strong> – 2008<br />

1. 2. 3. 4.<br />

1. Salary of existing 5 staff Rs. 80.80 Rs. 18.20<br />

2. Wages of 1 M/R Rs. 2.50 Rs. 0.45<br />

3. Domestic TE Rs. 8.00 Rs. 1.50<br />

4. OE Rs. 5.00 Rs. 3.55<br />

5. Other charges Rs. 10.50 Rs. 3.00<br />

TOTAL Rs. 106.80 Rs. 26.70<br />

4. FOOD SUBSIDIES :- The Department proposes an amount of Rs.<br />

1005.40 lacs during the 11 th Five Year Plan and Rs. 20.00 lacs for the Annual Plan <strong>2007</strong><br />

– 2008 for maintenance and renovation of the existing 188 Supply Godowns and 250<br />

Staff Quarters.<br />

STORAGE AND WAREHOUSING : RURAL GODOWN PROGRAMMES<br />

Major Works : The Department proposes Rs. 310.00 lacs during the Annual Plan<br />

<strong>2007</strong> – 2008 for the followings:-<br />

1) Installation of Digital Weighbridge to the following main centres with an<br />

amount of Rs. 75.00 lacs @ Rs. 15 lacs per unit, at namely:- (i) Aibawk<br />

(ii) Saitual (iii) Champhai (iv) Lunglei (v) Lawngtlai<br />

2) Construction of newly upgraded District Offices at the following centres with<br />

an amount of Rs. 45.00 lacs @ Rs. 15.00 lacs each at:- (i) Lawngtlai (ii)<br />

Mamit (iii) Kolasib<br />

3) Construction of Brick Walled fencing at the following main centres with an<br />

amount of Rs. 70.00 lacs @ Rs. 10.00 lacs each at:- (i) GMG Zuangtui (ii)<br />

Khawzawl (iii) Kawlkulh (iv) Zawlnuam (v) Aibawk (vi) Lunglei (vii)<br />

Lawngtlai<br />

4) Construction of Area Inspector Office cum-Quarter at the following centres<br />

with an amount of Rs. 60.00 lacs @ Rs. 5.00 lacs each at:- (i) Lungdai (ii)<br />

Marpara (iii) Thenzawl (iv) Ngopa (v) Khawzawl (vi) Saiha (vii) Hnahthial<br />

(viii) Kawlchaw (ix) Thenhlum (x) Serchhip (xi) Sangau (xii) Bungtlang ‘S’<br />

5) The Department also proposes purchase of Computer with Printer for<br />

networking of all DCSO’s and Principal Distribution Centres with<br />

Directorate Office in order to have more effective monitoring of Supply<br />

Accounts, it is therefore proposed that purchase 15 (fifteen) computers with<br />

printer with an amount of Rs. 15.00 lacs during the Annual Plan <strong>2007</strong> –<br />

2008.


- 204 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS<br />

6) During the year 2005 – 2006 a grant of Rs.50.00 lacs was received by the<br />

Department from Government of India for construction of office buildings of<br />

District Forum of Champhai, Kolasib, Serchhip, Mamit, Lawngtlai and the<br />

fund has already been transfered to PWD during the year 2006 – <strong>2007</strong>. The<br />

allocated fund for construction of District Offices is not adequate to meet the<br />

total estimate cost and the Department proposed another Rs. 30.00 lacs for<br />

completion of the proposed work under State Plan Fund.<br />

7) The Department proposes Rs. 5.00 lacs during the year <strong>2007</strong> – 2008 for<br />

maintenance of District Offices of District Forum in the eight Districts.<br />

8) An amount of Rs. 10.00 lacs is also proposed to meet expenditure for<br />

Disaster Risk Management Framework for prevention and mitigation of the<br />

programmes.<br />

5. ANNAPURNA : Under this Scheme 2587 beneficiaries are now identified from<br />

destitute Senior Citizens above 65 years of age. Each beneficiaries are given 10 kg of<br />

rice per month free of cost. It is therefore proposed Rs. 31.00 lacs for purchase of rice<br />

and payment of carriage charge.<br />

…..


- 205 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

INTRODUCTION :-<br />

The Lai Autonomous District Council is one of the three Autonomous District Councils<br />

in <strong>Mizoram</strong> and is situated in the southern-most past of the State. It is the largest District<br />

Council in area among the three Autonomous District Councils of <strong>Mizoram</strong> covering an<br />

area of 1870.75sq kilometers with a population of 61461. It is surrounded in the east by<br />

Myanmar and Mara Autonomous District Council, in the south by Myanmar in the west<br />

by Chakma Autonomous District Council and in the north by Lunglei administrative<br />

District. Its headquarter is located at Lawngtlai which is also the headquarter of<br />

Lawngtlai administrative District.<br />

The entire population of the Lai Autonomous District Council belongs to Scheduled<br />

Tribe and the main language is Lai dialect, which is akin to commonly spoken Mizo<br />

language of <strong>Mizoram</strong>. Most of the District Council area is covered by green forest. As<br />

such, the climate is pleasant and the temperature ranges from 10°C in Winter to 30°C in<br />

Summer with an average annual rainfall of 2555 mm.<br />

The mainstay of the people of Lai Autonomous District Council is agriculture and rice is<br />

the staple food. Other cash crops like ginger, sesame, cotton, banana, chilies, pineapple,<br />

orange, etc. are also grown. The Council also possesses vast natural resources of selfgenerating<br />

bamboo forest as well as thick tropical forest.<br />

The Lai Autonomous District Council was constituted on 29 th April, 1972 under the<br />

Sixth Schedule to the Constitution of India. The Councils is a replication of the State<br />

Legislative Assembly. As such, the Council exercises executive powers over specifically<br />

allocated subjects (i.e. 18 subjects). The Councils has a separate set of Laws governing<br />

the area. The people of Lai Autonomous District Council also enjoys special safeguard<br />

granted by Article 371- G of the Constitution of India.<br />

The Lai Autonomous District Council has 23 Elected and 4 Nominated Members in the<br />

Council. The Council has a Chairman to conduct Session of the Council and the Chief<br />

Executive Member (C.E.M.) and Executive Members (EMs) to exercise executive<br />

functions. The Council’s Secretariat is located at Lawngtlai, the headquarter of the<br />

District.<br />

The Approach of the Eleventh Five Year Plan and Annual Plan <strong>2007</strong>-2008 show some<br />

change or new introduction i.e. provision for Disaster Management @ 5% from the total<br />

outlay of both Annual Plan and Eleventh Five Year Plan. This is done as per<br />

recommendation of the 12 th Finance Commission.<br />

Sectoral allocation of Eleventh Five Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 are<br />

shown in the table as follows :-


Sl.No.<br />

- 206 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

Name of Sectors<br />

SECTORAL ALLOCATION<br />

Approved<br />

Tenth Five<br />

Year Plan<br />

2002-07<br />

Draft<br />

outlays for<br />

11 th Five<br />

Year Plan<br />

<strong>2007</strong>-12<br />

Approved<br />

Annual Plan<br />

2006-07<br />

( Rs. in Lakh )<br />

Draft<br />

outlay<br />

for<br />

Annual<br />

Plan<br />

<strong>2007</strong>-08<br />

1 2 3 4 5 6<br />

I Agriculture &<br />

Horticulture Department 260.00 350.00 49.00 56.00<br />

II Fishery Department<br />

Public Health Engineering<br />

40.00 100.00 19.00 20.90<br />

III Department<br />

120.00 181.00 32.00 35.20<br />

IV Industry Department 62.00 115.00 27.00 36.00<br />

V Sericulture Department<br />

Animal Husbandry &<br />

38.00 86.00 9.00 10.50<br />

VI Veterinary Department 50.00 110.00 16.00 17.60<br />

VII Art & Culture Department<br />

Social Welfare<br />

130.00 199.00 35.00 40.50<br />

VIII Department<br />

Soil & Water<br />

100.00 158.00 30.00 33.00<br />

IX Conservation Department<br />

Local Administration<br />

70.00 121.00 20.00 21.00<br />

X Department<br />

240.00 313.00 52.00 55.20<br />

XI Environment & Forest<br />

Department<br />

190.00 262.00 38.00 41.80<br />

XII Transport Department<br />

Sports & Youth Services<br />

40.00 88.00 24.00 26.40<br />

XIII Department<br />

74.00 128.00 22.00 24.20<br />

XIV Co-operation Department 30.00 76.00 10.00 11.00<br />

XV Public Works Department 730.00 873.00 145.00 155.50<br />

XVI Education Department<br />

Rural Development<br />

952.00 1137.00 285.00 309.50<br />

XVII Department<br />

180.00 251.00 55.00 61.00<br />

XVIII Water way Department 30.00 78.00 7.00 7.70<br />

Total 3,336.00 4626.00 875.00 963.00


- 207 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

Brief description of various Sectors/Departments:<br />

I. AGRICULTUE & HORTICULTURE DEPTT:<br />

‘A’ AGRICULTURE : Rice is the staple food of the people of Lai Autonomous<br />

District Council, the main objective of this department is to attain self-sufficiency in<br />

foodgrain by way of providing the needs of the farmers with construction of Link Road<br />

to easily accessible to their farmlands.<br />

‘B’ HORTICULTURE : For promotion and development of horticulture plantation,<br />

People are advised to promote cultivation of cash crop like oranges, mangoes, bananas,<br />

etc. to have sustain economy. Matching share for counter-part of CSS fund is also<br />

provided.<br />

II. FISHERIES DEPARTMENT: With the intension of meeting the daily<br />

demand of fish, this department provides financial assistance to Pisiculturists for<br />

construction of fish ponds. The department also distribute fingerlings, polythine pipe,<br />

polygon, fish net, etc. to the pisiculturists.<br />

III. PHE DEPTT : This department aims to provide sufficient and safe<br />

drinking water to the public. Thus, it provides harvesting of rain water, construction of<br />

water tank with maintenance of existing fountains.<br />

IV. INDUSTRY DEPTT: The main objective of the department is to encourage<br />

small-scale and ancillary industries by providing financial assistance, etc. The<br />

department also is runs Production-cum Training Centre to demonstrate the people for<br />

faster progress in the field.<br />

V. SERICULTURE DEPTT: As per experiment of the Lai Autonomous District<br />

Council, the river bank of Kolodyne and its surrounding area are best suited for silkwarm<br />

rearing. People perform rearing in these areas for which the department provide<br />

financial assistance and fund for the purchase of the cocoon from the rearers. The<br />

department also have a demonstration farm at Saikah.<br />

VI. AH & VETY DEPTT: Being the supplier of human needs in all aspects,<br />

rearing of animals is very common among the people of Lai Autonomous District<br />

Council also. Rearers are provided medicine, chicks, utensils, etc. with free of cost.<br />

Financial assistance is also given to the rearers which may be continued for the coming<br />

11 th Plan also.<br />

VII. ART & CULTURE DEPTT:<br />

‘A’ PROMOTION OF ART & CULTURE: To preserve and promote the cultural and<br />

traditional practices of the Lai people. Collection of cultural materials, research<br />

materials, holding of cultural meets, printing of valuable books, etc. are provided in this<br />

sector.


- 208 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

‘B’ INFORMATION: As the name suggests, this department is the main source<br />

of information for the Council by publishing a news bulletin called ‘Council Aw’.<br />

Besides, printing of Calendar, advertisement charges, hospitality fund, subscription of<br />

newspapers are also provided and provision for an outreach programme for journalists is<br />

also included.<br />

VIII. SOCIAL WELFARE DEPTT: The aim of the department is to upgrade the<br />

living standard of the people as well as to promote /help weaker sections of the society<br />

like women, children, physically handicapped, motherless babies, leprosy, drug-abuses,<br />

AIDS infected patients etc. Thus, funds in this department is set aside for the well-<br />

being of the above and reward to the three best social workers are also provided.<br />

IX. SOIL & WATER CONSERVATION DEPTT: The aim of the department is<br />

to conserve soil and prevents soil erosion by means of hill terracing, ghully ghat control,<br />

fire-line cutting, etc. The department have good departmental co-ordination with<br />

Environment & Forest department which is also the line department for conservation of<br />

soil and preservation of forest.<br />

X. LOCAL ADMINISTRATION DEPTT: The department is divided into three<br />

sectors viz, Urban Development, Minor Works and Sanitation. A brief explanation of<br />

each sector is as follows:-<br />

‘A’ URBAN DEVELOPMENT: In this sector, only financial assistance to<br />

Low Income Group for construction of houses and maintenance of market shed are<br />

provided.<br />

‘B’ MINOR WORKS: As the name suggests, minor works like<br />

construction of M/Step, S/Drain, R/Wall, pavement, Culvert, etc. have been carried out.<br />

‘C’ SANITATION : As the proverbs says “ Cleanliness is next to Godliness”<br />

the aim of this sector is purely for cleanliness. Thus, provisions are also made to achieve<br />

the targets.<br />

XI. ENVIRONMENT & FOREST DEPTT: Fortunately, the Lai<br />

Autonomous District Council is blessed with vast natural forest resources. The thickness<br />

wildlife sanctuary in <strong>Mizoram</strong> called ‘ Ngengpui Wildlife Sanctuary’ and ‘ Phawngpui<br />

National Park’ ( named after the highest mountain in <strong>Mizoram</strong>) are located within the<br />

Lai Autonomous District Council area. As preservation of those are to be handed over<br />

back shortly to the Council’s authority, emphasis have been given to take all necessary<br />

steps for preservation of the two important places. Moreover, on-going schemes like<br />

creation of seed farm, plantation, etc. are still to continue for afforestation of the area.<br />

XII. TRANSPORTATION DEPTT: Maintenance of Vehicles is the main task<br />

performed by this department. Minor works like construction of Bus waiting shed,<br />

maintenance of garrage, store room, etc. are also covered.<br />

XIII. SPORTS & YOUTH SERVICES DEPTT: To promote sports of different<br />

disciplines the department have been taken all necessary steps in the past. This may,<br />

therefore, be continued on in this coming 11 th Plan and Annual Plan <strong>2007</strong>-2008. Most of<br />

the funds are therefore set aside for the purposes.


- 209 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAI AUTONOMOUS DISTRICT COUNCIL<br />

XIV. CO-OPERATION DEPTT: Being one of the economic lifelines of the area,<br />

this department plays a vital role for the progress and development of the region. As<br />

such, most of the funds are set aside for financial assistance to various Co-operative<br />

Societies.<br />

XV. PUBLIC WORKS DEPARTMENT: This sector is the major head of the<br />

development department in the Council. It carried out major works like construction of<br />

Official Buildings, roads, small bridges, quarters, etc. This department constructed<br />

infrastructures like main Office Building, Dokulha Hall, Lai House, Aizawl, Rest House,<br />

etc. This department is also constructing District Council Session Hall. Mention may be<br />

made in construction of roads for different linkages also. Accordingly, the approach of<br />

Eleventh Five Year Plan is also to create important infrastructures like construction of<br />

CEM’s, Chairman’s, E.M.s’ etc. Quarters; extension or major renovation of Lai House<br />

Aizawl, Provision for House Rent of Lai Students’/Lai House in New Delhi and other<br />

minor works are set aside.<br />

XVI. EDUCATON DEPTT: Education upto Middle School standard ( i.e.CL-<br />

VII ) falls under the control of the District Council. As the aim of education is all round<br />

development, emphasis needs to be given in this sector. However, as the requirement of<br />

salary of teaching staff is very high there is no chance for creation of infrastructures like<br />

buildings, furniture, etc. Thus, only administrative cost can be provided from the Plan<br />

Fund and Funds for creation of those infrastructures may be expected out of any<br />

available funds Central pool.<br />

XVII. RURAL DEVELOPMENT DEPARMENT: The aim of this department is to<br />

uplift the people of rural areas. As the people of Lai Autonomous District Council are<br />

far behind educationally, socially and economically in comparison with other parts of<br />

the State, funds under this department is spent for the well- being of Rural poor people<br />

providing Housing scheme, Community Halls, Inter- Village Path, etc. Moreover,<br />

provision for upgradation/installation of Information Technology is alao incorporated.<br />

XVIII. WATER WAY DEPARTMENT: Unlike the previous Five Year Plan,<br />

emphasis is given for navigability of Tuichawng river in the western part of the Council.<br />

Which will create employment facility and also uplift the economy of the region.<br />

……


- 210 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

INTRODUCTION:<br />

By the provisions of paragraph 20-B of the Sixth Schedule to the<br />

CONSTITUTION OF INDIA, LAKHER REGIONAL COUNCIL along with PAWI<br />

AND CHAKMA REGIONAL COUNCIL were elevated to the status of District Council<br />

with effect from the 29 th April, 1972 under the MIZORAM DISTRICT COUNCIL<br />

(miscellaneous Provision) Order 1972. Thus, the LAKHER AUTONOMOUS DISTRICT<br />

COUNCIL came into existence and was re-named as the MARA AUTONOMOUS<br />

DISTRICT COUNCIL from 1 st May 1989. The area of the Council is 1445 Sq. Kms. with<br />

a population of 66,911 as per latest Census. It is lying on the South-eastern corner of<br />

<strong>Mizoram</strong>, contiguous by MYANMAR on the east and south and Lai District Council on<br />

the west.<br />

There are many rivers in the District, but only a few of them are worth<br />

mentioning. The most important and useful rivers are the KOLODYNE (Chhimtuipui),<br />

SALYU, TISI and PALA. There is one of the largest Lake in <strong>Mizoram</strong> called PALA<br />

LAKE in the District. This Lake has now being developed fund from the Centrally<br />

Sponsored Schemes.<br />

Agriculture is the main stay in this District. The people of this area live<br />

on jhuming and wet rice cultivation. They also grow cash crops like cotton, millet, maize,<br />

potatoes, groundnut, coffee, pepper, ginger, etc. in their jhum lands. They also reared all<br />

kinds of domestics’ animals.<br />

(Rs. in lakh)<br />

11 th Plan <strong>2007</strong>- <strong>2012</strong> Annual Plan <strong>2007</strong> – 08<br />

Proposed Outlay<br />

3968.00 820.00<br />

BRIEF SECTOR-WISE DESCRIPTION:<br />

1. ENVIRONMENT & FOREST : The proposed outlay for this sector is Rs. 174.00<br />

lakhs & 37.00 lakhs only during 11 th Five Year Plan <strong>2007</strong> – <strong>2012</strong> and Annual<br />

Plan <strong>2007</strong>-08 respectively.. The scheme includes, O.E, TA/DA Training<br />

Expenses, M.V, Uniform, Maintenance of rest House at Kaochao and Phura,<br />

Purchase of Arm and Ammunitions, collection of Seeds, maintenance of<br />

previous year plantation, construction of Building at Saiha, Nursery Bed at<br />

Kaochao, Plantation at Siaha & Tipa, fresh construction of jeep road from BRTF<br />

road to Kolodyne river for collection of good quality of sand, procurement of<br />

tools, road side plantation including clearance, fencing, survey & demarcation of<br />

Forest reserved and establishment of office.<br />

2. ARTS & CULTURE : The proposed outlay for this sector is Rs. 92.00 lakhs and<br />

Rs. 21.00 lakhs during the 11 th Five Year Plan (<strong>2007</strong> – <strong>2012</strong>) and Annual Plan<br />

<strong>2007</strong>-08 respectively. The scheme include O.E, TA/DA, Research Investigation,<br />

Maintenance of Museum, organization of cultural Meet at Siaha, Purchase of<br />

Cultural Dress. Procurement of Musical Instruments, Maintenance of Video and<br />

still Camera. Assistance to Local Artist, organization of Drama / essay<br />

competition at Siaha, Excursion of Cultural troupe, maintenance of Archives,<br />

construction of Typical Mara Thatch House and construction of Museum<br />

Building.


- 211 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

3. <strong>PLAN</strong>NING & RURAL DEVELOPMENT DEPARTMENT : The proposed<br />

outlay during the 11 th Five Year Plan for this sector is Rs. 654.00 lakhs and Rs<br />

134.00 lakh for Annual Plan <strong>2007</strong>-08 respectively. The scheme includes O.E,<br />

TA/DA, M.V, Purchase of Office Furniture, maintenance of Mara House at<br />

Aizawl, payment of outstanding liabilities, preparation of Maraland Gospel<br />

Centenary, overhead expenditure for Administrative Office at Tipa ‘V’ and<br />

Phura, Rent for R.O Office at Phura, purchase of Computer Sets and its<br />

peripherals and Office networking, clearance of Inter Village Link road,<br />

construction of Seasonal Bridges at I.V.P road, construction of suspension rope<br />

Bridges over River, provision LPG Gas connection alongwith Stove and<br />

Cylinders in free cost for BPL families, construction of Public Latrine, medical<br />

assistance to BPL families.<br />

4. AGRI & HORTICULTURE : The proposed outlay for this sector sharing<br />

the 11 th Five Year Plan (<strong>2007</strong> – <strong>2012</strong>) is Rs. 259.00 lakhs and Rs. 53.00 lakhs for<br />

A.P. <strong>2007</strong>-08 respectively. The Scheme includes OE, TA/DA Maintenance of<br />

Vehicle , demonstration farm, Construction of Link Roads, Land development by<br />

manual, Plough Animal / Power tiller, construction of Agriculture farm<br />

Quarters at Lohry, Agriculture extension service programme, training expenses,<br />

tea, maize, oil seed plantation, Agriculture & Horticulture product transportation<br />

subsidy, citrus and Horticulture crop plantation, garden terracing, medicinal,<br />

ornamental plant, vegetable development, minor irrigation, pipe irrigation,<br />

construction of water tank and reservation.<br />

5. SOIL & WATER CONSERVATION :- The proposed outlay for this sector<br />

during the 11 th Five Year Plan is Rs 119.00 lakhs and Rs. 26.00 lakhs for A.P.<br />

<strong>2007</strong>-08 respectively. The Scheme includes OE, TA/DA vehicles, coffee<br />

plantation, maintenance of previous year plantation, creation of nursery, seed<br />

collection, purchase of pipe, rubber plantation, previous year rubber plantation<br />

maintenance, seed collection, purchase of rubber pipe for nursery, plantation of<br />

jatropha and maintenance, nursery, seed collection, construction of check dam<br />

and uniform.<br />

6. SOCIAL WELFARE :- The proposed outlay for this sector during the 11 th<br />

Five Year Plan (<strong>2007</strong> – <strong>2012</strong>) is Rs. 114.00 lakhs and Rs. 21.00 lakhs for A.P.<br />

<strong>2007</strong>-08 respectively. The scheme include OE, TA/DA, assistance to motherless<br />

babies for nutrition, handicapped person, medical treatment for poor patience,<br />

old age pensioners, NGO’s, MTP, socially needed materials, awareness<br />

campaign on drugs elimination programme ,seminar and training.<br />

7. A.H & VETY : - The proposed outlay for this sector is Rs. 141.00 lakhs and<br />

Rs. 25.00 lakhs during the 11 th Five Year Plan (<strong>2007</strong> – <strong>2012</strong>) and A.P. <strong>2007</strong>-08<br />

respectively. The Scheme include OE, TA/DA, purchase of fodder, construction<br />

of cowshed at Vety farm Siaha, purchase of firewood, construction of poultry<br />

farm, purchase of concentrated feed, electrification, purchase of medicine and<br />

vaccination articles, purchase of poultry, assistance to individual farmers,<br />

piggery farming, construction of dispensary building and OT, purchase of<br />

instrument for dispensary / OT, and purchase of vehicle.


- 212 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

8. INDUSTRY :- The proposed outlay for this sector is Rs79.00 lakhs and Rs. 18.00<br />

lakhs during 11 th Five Year Plan and A.P. <strong>2007</strong>-08 respectively. The scheme<br />

include fencing of industrial centre, extension of site for industrial land cost,<br />

construction of staff quarter at Siaha, maintenance of handloom and its building,<br />

purchase of vehicle, construction of approached road form BRTF to industrial<br />

site, construction of production centre, removal wastage expenses, electrification<br />

at industrial building, establishment of weaving, tailoring, company training<br />

centre, promotion of cottage industry, bag industry, site, building and machinery,<br />

raw- materials, equipment and transportation, consultant fee, printing and dying,<br />

construction of weaving centre, OE and TA/DA.<br />

9. FISHERY : - The propose outlay for this sector is Rs. 64.00 lakhs and Rs. 14.00<br />

lakhs during the 11 th Five Year Plan of <strong>2007</strong> – <strong>2012</strong> and A.P. <strong>2007</strong>-08<br />

respectively. The scheme include creation of department fish pond, purchase of<br />

bike, cost breeding materials, purchase fish food, purchase of G.I / rubber pipe<br />

for distribution to fish farmers, cost of medicine for fish pond cleaning, purchase<br />

of fingerlings for pala lake, TA/DA and OE.<br />

10. PHE :- The proposed outlay for this sector is Rs. 94.00 lakhs and Rs. 21.00<br />

lakhs during 11 th Five Year Plan of <strong>2007</strong> – <strong>2012</strong> and A.P. <strong>2007</strong>-08 respectively.<br />

The scheme include construction of retaining wall, construction of water tank /<br />

points at Tipa and Siaha, supply of G.I pipe to rural villages, construction of<br />

intake chamber, construction of water pipe lines to rural villages, construction of<br />

RCC water tank / water points, water reservoir, purchase of bleaching powder,<br />

plumbing tools and implement, water connection charges at water, maintenance<br />

of vehicles, OE and TA/DA.<br />

11. SERICULTURE:- The proposed outlay for this sector is Rs. 59.00 lakhs and Rs.<br />

14.00 lakhs during the year <strong>2007</strong> – <strong>2012</strong> and A.P. <strong>2007</strong>-08 respectively. The<br />

scheme include like construction quarters, purchase and maintenance of<br />

generators, purchase of grainage equipment, construction of grainage house,<br />

creation and maintenance of demonstration farm, purchase of two wheeler for<br />

supervision, maintenance of farm house, purchase of computer, construction or<br />

rearing house, construction of approached road to farm house, assistance to<br />

private rearers, purchase of equipments, TA/DA and OE.<br />

12. LOCAL ADMINISTRATION DEPTT : The proposed outlay for this sector<br />

is Rs. 294.00 lakhs and Rs. 60.00 lakhs during the 11 th Five Year Plan of <strong>2007</strong> –<br />

<strong>2012</strong> and A.P. <strong>2007</strong>-08 respectively. The scheme includes OE, TA/DA, purchase<br />

of computer, Xerox machine, purchase of tripper, construction of dumping,<br />

construction of urinal set, latrine at Siaha and Tipa ‘ V’ , construction and<br />

maintenance of drainage, purchase of sweeping materials, extension of town<br />

road, repairing and clearance of stone step, construction of slaughter house/<br />

dustbin, construction of approached road to graveyard, clearance of graveyards,<br />

construction of retaining wall, construction of community bathroom,<br />

construction of pedestrial pavement, construction of bazaar set, purchase of land,<br />

construction of super market, construction of L.A.D office ( RCC Building on<br />

going) construction of garage, construction of market office, removal of cabbage<br />

at market, supply of stationery to V/C’s election to village councils expenditure<br />

and bye- election, organization awareness campaign on sanitation.


- 213 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

13. ROAD TRANSPORT:- The proposed outlay for this sector during the 11 th<br />

Five Year Plan of <strong>2007</strong> – <strong>2012</strong> is Rs. 79.00 lakhs and Rs. 16.00 lakhs for A.P.<br />

<strong>2007</strong>-08 respectively. The scheme includes OE, TA/DA, maintenance of vehicles<br />

including liabilities, construction of garage, purchase of vehicles, purchase of<br />

drivers uniform, purchase of trippers, and purchase of Bus.<br />

14. SPORT & YOUTH SERVICES : - The proposed outlay for this sector is Rs.<br />

84.00 lakhs and Rs. 18.00 lakhs during the 11 th Five Year Plan and A.P. <strong>2007</strong>-08<br />

respectively. The scheme includes construction of indoor stadium, construction<br />

of Lawn Tennis court, construction of pavilion, construction of playground,<br />

expenditure of training and coaching, incentive to talented individuals, assistance<br />

to sporting clubs, organization of district level sports competition and purchase<br />

of sport materials.<br />

15. CO-OPERATION :- The proposed outlay for this sector is Rs. 28.00<br />

lakhs and Rs. 8.00 lakhs during the 11 th Five Year Plan of <strong>2007</strong> – <strong>2012</strong> and A.P.<br />

<strong>2007</strong>-08 respectively. The scheme includes OE, TA/DA, assistance to cooperative<br />

societies, training and seminar expenses, supply of materials and<br />

instruments, construction of Godown for storage for vegetables, purchase of bike<br />

for supervision, supply of chicken , calf etc. supply of seeds and plants,<br />

improvements of society store, assistance to milk producer, construction of fish<br />

pond.<br />

16. PUBLIC WORK DEPARTMENT : - The proposed outlay for this sector is Rs.<br />

528.00 lakhs and Rs. 108.00 lakhs during the 11 th Five Year Plan of <strong>2007</strong> – <strong>2012</strong><br />

and A.P. <strong>2007</strong>-08 respectively. The scheme include OE, TA/DA, training<br />

expenses, maintenance of vehicles, purchase of blasting materials, purchase of<br />

vehicles, purchase of JCB, purchase of Tripper, construction of EE Office,<br />

construction of MADC quarter, construction of administrative office at Tipa ‘ V’<br />

and Phura, construction of Godown, construction of inspection of Bungalow,<br />

repairing of quarter, repairing of MADC Office, construction of fresh Jeepable<br />

Road, extension of Jeep Road, construction of Drainage, construction of<br />

Retaining Wall, construction of RCC Culvert, repairing of Stone Step, extension<br />

of Town Road, Soling and Metalling.<br />

17. INLAND WATERWAYS :- The proposed outlay for this sector is Rs. 48.00<br />

lakhs and Rs. 11.00 lakhs during the 11 th Five Year Plan and A.P. <strong>2007</strong>-08<br />

respectively. The scheme include OE, TA/DA, training expenses, purchase of<br />

Engine Fiber Boat, maintenance of existing Boat, Blasting of River water<br />

course, construction of approached road to Kolodyne River at Ferry with Air<br />

Compressor, purchase of Jack Hammer with Drill bit and hose pipe, purchase of<br />

Tripper, construction of Marboat at Lomasu, Ferry and, construction of<br />

suspension Bridge.<br />

18. EDUCATION DEPARTMENT : - The proposed outlay for this sector is Rs.<br />

1058.00 lakhs and Rs. 215.00 lakhs during the 11 th Five Year Plan of <strong>2007</strong> –<br />

<strong>2012</strong> A.P. <strong>2007</strong>-08 respectively. The scheme includes like OE, TA/DA,<br />

stationeries for schools, purchase of computers, purchase of Xerox machines,<br />

purchase of vehicles, purchase of generators for primary school, direction and<br />

administration department.


- 214 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

MARA AUTONOMOUS DISTRICT COUNCIL<br />

a) OE, TA/DA, training TA/DA, upgradation of private schools, construction of<br />

primary schools, repairing building, furniture of P/Schools, qualitative<br />

improvement, purchase of vehicles, incentive awards / scholarship, printing<br />

of Text Books, organization of seminars, supply of teaching materials, supply<br />

of computer to schools, purchase of Xerox machine for primary school<br />

teaching staff, medical assistance @ Rs. 500/- per teacher per year and<br />

organization of Zonal Sport under.<br />

b) OE, TA/DA, Stationeries, purchase of computers, purchase of Xerox<br />

machines, purchase of vehicles and maintenance of vehicles for M/Schools,<br />

direction and administration department.<br />

c) OE, TA/DA, Training, upgradation of M/Schools, construction of middle<br />

schools building, repairing of middle schools buildings, furniture for middle<br />

schools, qualitative improvement, purchase of vehicles, incentive/<br />

scholarship, printing of text books, education training, supply of computers<br />

to middle schools, purchase of Xerox machines, medical assistance @<br />

Rs.500/- per teacher per year, supply of teaching / learning materials and<br />

encashment of Leave Salary to teachers.<br />

d) OE, TA/DA, printing of text books, conduct of school examination expenses,<br />

purchase of computers, purchase of Xerox machines, purchase of printers,<br />

purchase of vehicles, organization of seminar, honorarium to translators /<br />

proof readers, incentive awards to topper in examination, promotion of Mara<br />

Languages, Library, construction of building for Board of School Education.<br />

e) OE, TA/DA, Literacy campaign, supply of teaching / learning materials to 70<br />

AECS, Honorarium to animators, observance of international literacy day<br />

expenses, purchase and maintenance of vehicles, purchase of computers and<br />

printers, training of eminators, incentive award to village of total literacy<br />

achieved, supply of books to Neo- Literates and CEAO’S, Libraries, and<br />

construction of DAEO’S Office building<br />

Hence, Total Proposed Outlay for 18 departments during the year <strong>2007</strong> -<br />

<strong>2012</strong> is Rs. 3,968.00 Lakhs and Rs. 820.00 lakhs for <strong>2007</strong> – 08 Annual Plan.<br />

……


- 215 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

BRIEF INTRODUCTION OF CHAKMA AUTONOMOUS DISTRICT<br />

COUNCIL: The Chakma Autonomous District Council was created in 1972<br />

comprising of a portion of Chakma inhabited areas of the erstwhile PL-Regional<br />

Council. It has an area of 1500 sq. Kms (approx.) with a population of 34528 souls, as<br />

per 2001 census. The literacy rate of the area is 57% against the states literacy 88 %.<br />

The Chakma Community is a civilized community of Indian<br />

origin having a long historical background and rich cultural heritage. They are honest,<br />

hardworking, peace loving and unpretentious.<br />

The topography and the quality of soil of the area is suitable for<br />

wet-rice cultivation and other cash-crops like oil-seeds, gingers, chilies, sesamum,<br />

turmeric, black pepper, jatropa and various other horticultural plants. The area is also<br />

endowed with numerious water bodies which is considered highly potential for<br />

Fisciculture. Inspite of such high potentiality and Conducive conditions the area<br />

remained tragically backward till date as road communication facilities is still not built<br />

up and hardly any well-planned schemes/projects has so far been implemented in the<br />

area. Amidst such innumerable inconveniences, considering the pitiable condition of the<br />

people, the Chakma Autonomous District Council has been striving hard to bring about<br />

a change in the lots of its people.<br />

1. Estimate of resources for the 11 th Five Year Plan: It is indeed true that in<br />

every planning the most vital factor is pre-estimation of the available resources. In<br />

making planning for development of Chakma Autonomous District Council area for any<br />

given period the main hindrance for the Council is very limited resource of its own as so<br />

far hardly any infrastructure has been built up in the area for resource mobilization.<br />

Hence, the Council is still dependent on financial support in the form of grant-in-aid. It<br />

is equally true that once the infrastructure such as, Road Communication, Land<br />

development, Irrigation, Forestry, Horticulture, Pisciculture, Food processing and other<br />

Small Scale Industries, proper Survey of land and introduction of Border Trades, etc are<br />

well developed, there will not be any dearth of Council’s own resource. Whatsoever the<br />

limited resource of the Council may be, it is estimated that during the whole 11 th Five<br />

Year Plan period, the Council will be able to generate a sum of Rs. 1,50,00,000/- as its<br />

own resource/Revenue. The rest fund is to be made available in the form of grant-in-aid.<br />

Autonomous District Council could complete the following infrastructures which<br />

is considered for transfer under Non-Plan sector. Those are Chakma Autonomous<br />

District Council Guest House at Kamalanagar, (2) Chakma House at Aizawl, (3) Bazar<br />

Building at Kamalanagar, (4) Schools buildings, (5) ARO Office at Barapansury and<br />

Longpuighat, (6) Teachers Inn at Kamalanagar and (7) Children Park at Kamalanagar.<br />

2. Prioritization of resources : As stated in the introductory note, the most<br />

abundant and valuable resource of the Council is development of its land, for cultivation<br />

of food stuff and other cash crops, creation of forest in the de-graded land, development<br />

of human resources by providing quality education, skill improvement , and opening of<br />

scopesfor the youths in the field of sports and other Youth Welfare programmes,social<br />

welfare and women welfare. It is note- worthy for implementing such development<br />

programmes, building of infrastructures like office building, quarters, procurement of<br />

necessary equipments and accessories, and above all creation of road connectivity is a<br />

must.


- 216 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

3. Integration into global economy & power to private enterprises:<br />

To cope up with the trends of globalization of economy and also more power to private<br />

enterprises, development of road connectivity in the area should be considered as a top<br />

agenda. At the same time, there should be concentrated effort for successful<br />

implementation of programmes for increasing production of agro-based produces and<br />

their value edition. At the same time necessary measures should be taken by introduction<br />

of Border Trade with the neighboring countries, which will certainly open scope for<br />

private enterprenures.<br />

5. Grassroots level Planning : The Autonomous District Council itself is a grass<br />

root level Local body. So this 11 th 5 year Plan, <strong>2007</strong>-<strong>2012</strong>, if approved in to to shall<br />

address the very vision of the constitution as endowed in the 73 rd and 74 th amendments.<br />

However, to ensure addressing the very vision the Village Councils of the area are also<br />

involved in preparation of this 5 year Plan.<br />

6. Welfare of the SC’s & ST’s : It is a matter of great satisfaction that the<br />

Planning Commission of India has given much stress for the Welfare of SC’s & ST’s.<br />

The Tribal Sub-Plan for the ST’s had always been appreciated and fruitful. During 70s it<br />

was known to all that there exist a Tribal Sub-Plan which meant solely for the undivided<br />

Chhimtuipui District in the State of <strong>Mizoram</strong>. But it is unfortunate that during early 80s<br />

the Tribal Sub-Plan in the state was stopped for reason not known to us. The State of<br />

<strong>Mizoram</strong> although almost 100% ST state but the micro-minority ST’s who are mainly<br />

concentrated in the three ADC areas and along the Indo-Bangla Border of Lunglei and<br />

Mammit Districts, are still legging far behind from the majority Scheduled Tribes of the<br />

Mizos. This was proved beyond doubts from the 2001 Census report where the<br />

Lawngtlai District and the Saiha Districts was declared the most backward Districts in<br />

the State. For the very reason a Special Development scheme under the banner of RSVY<br />

is launched in Lawngtlai District and National Food for work Programme was launched<br />

in Saiha District.<br />

The guidelines for the formulation of 11 th 5 Year Plan which gave stress for the<br />

Welfare of Scheduled Tribes in the way of introducing Tribal Sub-Plan is really<br />

heartening for the people of the Chakma Autonomous District Council area and it<br />

brought a ray of hopes towards our aspirations to get developed at par with the<br />

mainstream population of <strong>Mizoram</strong>.<br />

In our endeavor for the repaid development of the area during the 11 th Five year<br />

Plan priority is given to Road, communication infrastructure, building and development<br />

of Human Resources, Agriculture, Rural Development, Forest, Water supply and other<br />

development Schemes are also in corporated on preference.<br />

The Sector wise allocation on priority basis for the 11 th Five Year Plan <strong>2007</strong>-<br />

<strong>2012</strong> and Draft Annual Plan <strong>2007</strong>-2008 is as under: -


- 217 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

CHAKMA AUTONOMOUS DISTRICT COUNCIL<br />

Sl.<br />

No.<br />

(Rs. In Lakhs)<br />

Name of Sector Drafth 11 th<br />

Five Year<br />

Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Draft<br />

Annual<br />

Plan <strong>2007</strong>-<br />

2008<br />

1. Agriculture & Horticulture 77.40 7.40<br />

2. Fishery 5.30 0.30<br />

3. Public Health Engineering 15.00 6.00<br />

4. Industry 2.00 -<br />

5. Sericulture - -<br />

6. Animal Husbandry & Vety 50.10 30.10<br />

7. Arts & Culture 27.70 1.70<br />

8. Social Welfare 20.50 6.50<br />

9. Soil Conservation 16.00 6.00<br />

10. Local Administrative Department 65.60 29.95<br />

11. Environment & Forest 40.50 11.30<br />

12. Road Transport - -<br />

13. Sports & Youth Service 26.00 6.00<br />

14. Co-operation - -<br />

15. Public Works Department 80.00 11.00<br />

16. Education 51.50 10.00<br />

17. District School Education Board 37.00 7.00<br />

18. Rural Development 30.00 6.00<br />

19. Water Ways - -<br />

20. Planning & Development Department 2317.96 453.20<br />

21. Information & Public Relation 41.44 6.55<br />

G. TOTAL:: 2904.00 599.00<br />

…….


- 218 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LEGAL METROLOGY<br />

LEGAL METROLOGY<br />

Proposed Outlay for 11 th Five Year Plan - Rs. 418.00 lakhs<br />

Proposed Outlay for AnnualPlan - Rs. 88.00 lakhs<br />

1. DIRECTION AND ADMINISTRATION :<br />

Since its inception, legal metrology (Weights & Measures ) organisation<br />

has been function as a separate wings under Directorate of Food, Civil<br />

Supplies & Consumer Affairs Department, the Director having acted Ex-officio<br />

Controller of legal Metrology. With the attainment of full-fledged State,<br />

<strong>Mizoram</strong> has developed in various fields especially in trabe and Business<br />

Circles. The rapid growth and development in the fields of trades and business<br />

have automatically enhanced the duties of Legal Metrology by way of<br />

enforcement of Weights and Measures Act and Rules to ensure Protection of<br />

Consumers right and interest. It is Therefore already proposed to the<br />

Government for creation of Legal Metrology as separate and independent<br />

Directorate. The proposal was under active consideration and it is hope that<br />

Legal Metrology will be in separate Directorate under a full time head of<br />

department during the 11 th Five Year Plan. The proposed outlay isw Rs. 353.00<br />

lakhs and Rs. 74.00 lakhs for 11 th Five Year Plan and Annual Plan <strong>2007</strong>-08<br />

respectively.<br />

2. MATERIAL AND SUPPLY :<br />

As per provisions of weights & Measures Act & Rules all weighing and<br />

measuring instruments are to be verified and stamped annually. It is proposed<br />

to purchase 160 sets of Verification Date Stamps and plugs from India Govt.<br />

Mint.<br />

The Enforcement Staff are now checking the quantity of POL products<br />

imported to <strong>Mizoram</strong> and the quality of Cements are checked and inspected in<br />

the interest of Public Service and Consumers. LPG and other essential<br />

commodities are also checked constantly under Essential Commodities Act<br />

and Rules.<br />

3) MINOR WORKS :<br />

The Department has got no Office building at District capital of Aizawl,<br />

Lunglei, Saiha, Lawngtlai, Serchhip and Mamit. Private building are now hired<br />

for Offices and it is therefore, proposed to construct office buildings at District<br />

Headquarters and also proposed to construct Inspector Officer cum-Laboratory<br />

at Tlabung, Hnahthial and Chawngte. It may further be mentioned the Legal<br />

metrology Department has now started registration of importers and packers<br />

so that foreign goods may be imported legally through the IEC Holders. For<br />

this purpose the Department will required to open new office at Zokhawthar<br />

(Champhai District) to regulate the packaged commodities Act & Rules on the<br />

border trade with Myanmar.<br />

Besides this, the State of MIzoram have no calibration centres for Tank<br />

Lorries and calibration have to be done at Assam State for which the State<br />

Government loses much revenues. It is also therefore, proposed to construct<br />

calibration centre for Tank Lorries during the 11 th Five Year Plan. The total<br />

11 th Five Year Plan under other expenditure is Rs. 65.00 lakhs and Rs. 14.00<br />

lakhs is propose for Annual Plan (<strong>2007</strong>-08).<br />

……


- 219 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAW & JUDICIAL<br />

LAW & JUDICIAL<br />

i) Development of Infrastructure facilities for the Judiciary:-<br />

For the development of infrastructural facilities of the Judiciary,<br />

construction of District Court buildings and Residential Quarters for Judicial Officers in<br />

all the District headquarters have been taken up under Centrally sponsored Scheme on<br />

50:50 sharing basis between the Central Govt. and the State Govt. Construction of High<br />

Court Administrative building-cum-Advocate General’s Office, District Court building<br />

at Aizawl, Lunglei, Saiha and Champhai, Judicial Officer’s Quarters at Lunglei and<br />

Saiaha and purchase of land for construction of District Court building and residential<br />

quarters for Judicial Officer’s at Mamit have been completed till 2005 – 2006.<br />

The ongoing construction of District Court building at Kolasib, construction of<br />

District Judges Bungalow, Senior Judges quarters and Junior Judges quarters at Aizawl<br />

were taken up during the Annual Plan 2006-07.<br />

During the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>, the Department proposed to take up<br />

the following projects:<br />

(Rs. in lakhs)<br />

1. Construction of District Court building at Mamit 45.00<br />

2. Constn. of Residential quarters for Judicial Officer’s at Mamit 35.00<br />

3. Purchase of Land & Constn. of District Court bldg. at Lawngtlai 50.00<br />

4. Purchase of Land & constn. of Residential qtrs. for Judicial<br />

Officer’s at Lawngtlai 50.00<br />

5. Purchase of Land & constn. of Dist. Court building at Serchhip 40.00<br />

6. Purchase of Land & constn. of residential qtrs. for Judicial<br />

Officer’s at Serchhip 40.00<br />

7. Constn. of Lai Auto. Dist. Council Court bldg. at Lawngtlai 34.50<br />

8. Constn. of Mara Auto. Dist. Council court bldg. at Saiha 34.50<br />

9. Constn. of Chakma Auto.Dist.Council court bldg.at Kamalanagar 33.00<br />

TOTAL Rs 362.00<br />

ii) Information Technology in Courts:<br />

Law and Judicial Department have taken up computerization of Courts on<br />

50:50 sharing basis between the Central Government and State Government since 2000-<br />

2001 and all Courts are partly computerized. At present computerization of Courts is<br />

being taken up by the Govt. of India, Department of Justice in consultation with NIC.<br />

For the maintenance of computerization of Courts etc., Rs 40.00 lakhs<br />

is proposed for the Eleventh Five Year Plan (<strong>2007</strong>-<strong>2012</strong>) and Rs 3.30 lakhs is proposed<br />

for the Annual Plan (<strong>2007</strong>-08).<br />

iii) Publication of Mizo Customary & <strong>Mizoram</strong> Code:<br />

As directed by the Supreme Court, it is mandatory to print all the Rules and<br />

Acts from 1972 to 2000 in book form viz. “The <strong>Mizoram</strong> Code”. The Cost of printing<br />

one book is Rs 565.00 and it is proposed to be published in volume I to IV.


- 220 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LAW & JUDICIAL<br />

For the printing of <strong>Mizoram</strong> Code Rs 75.00 lakhs is proposed for the 11 th<br />

Five Year Plan (<strong>2007</strong>-<strong>2012</strong>) and Rs 15.00 lakhs is proposed for the Annual Plan (<strong>2007</strong>-<br />

08).<br />

iv) Prevention and Mitigation for reducing Vulnerable disaster:<br />

The State of <strong>Mizoram</strong> is vulnerable to disaster like cyclonic storm, landslide, hailstorm<br />

fire etc. and it is essential for the State Government to remain alert and well papered to<br />

face such eventualities at any point of time.<br />

For the prevention and mitigation of vulnerable disasters the<br />

Department has proposed Rs 35.00 lakhs for the Eleventh Five Year Plan (<strong>2007</strong>-<strong>2012</strong>)<br />

and Rs 5.00 lakhs is proposed for the Annual Plan (<strong>2007</strong>-08).<br />

v) Abstract of the Eleventh Five Year Plan (<strong>2007</strong>-<strong>2012</strong>)<br />

(Rs. in lakhs)<br />

11 th Five Year Annual<br />

Plan (<strong>2007</strong>-<strong>2012</strong>) Plan (<strong>2007</strong>-08)<br />

a) Judiciary building 362.00 62.70<br />

b) Information Technology in Courts 40.00 3.30<br />

c) Publication of Mizo Customary Law and<br />

<strong>Mizoram</strong> Code 75.00 15.00<br />

d) Prevention & Mitigation for reducing<br />

vulnerable disaster 35.00 5.00<br />

TOTAL 512.00 86.00<br />

……


- 221 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCHOOL EDUCATION<br />

SCHOOL EDUCATION<br />

During the 10 th Five Year Plan the Department had undergone a lot of financial<br />

hardships due to severe fund constraints faced by the state Government. However, for<br />

the coming 11 th Five Year Plan, the Department looked forward with great hope that<br />

sufficient funds may be allocated to the department for smooth functioning.<br />

Programmes to be continued under 11 th Five Year Plan :<br />

1. Sarva Shiksha Abiyan (SSA) :- SSA was launched during early 10 th Plan<br />

Period in which the pattern of State Share was 75:25. In the coming five year<br />

Plan the share is likely to be in the ratio of 50:50 for which adequate fund is to be<br />

provided for successful implementation in the State.<br />

2. Continuing Education :- A Continuing Education Scheme meant for post<br />

literacy under Adult Education was implemented with Central Assistance under<br />

C.S.S during late 9 th Five Year Plan, carried over in the 10 th Five Year Plan is to<br />

be taken over by State Government from 11 th Plan. Therefore, fund for the<br />

purpose may be allocated.<br />

At the same time, a massive Special Literacy Drive towards Western Belt<br />

of the State bordering Bangladesh launched in the name of “Eradication of<br />

Residual Illiteracy Project” (ERIP) needs to be continued for which additional<br />

fund will be required.<br />

3. Vocationalisation of Secondary Education :- In order to enhance<br />

employability to the youths and promote job opportunity skill oriented<br />

Vocational Education was introduced with Central Assistance. This scheme<br />

needs to be continued with adequate provision of funds.<br />

4. Absorption of C.S.S to State Sector :- There are a good number of incumbents<br />

employed under Centrally Sponsored Scheme (CSS). These employees will be<br />

needed to be carried over to new Five Year Plan, to be absorbed as State<br />

liabilities.<br />

5. Development in Infrastructure :- It is understood that the Department is having<br />

no fund to bridge the urgently needed infrastructural gaps especially for<br />

Secondary and Higher Secondary Schools for which at least a certain amount if<br />

not adequate be provided.<br />

New Schemes proposed during 11 th Five Year Plan :-<br />

1) Establishment of Sainik School :- The Department intends to establish a<br />

new Sainik School in the state as was already done by neighboring States, so as<br />

to pave ways for youngsters for easier entrance in the field of defence corridors.<br />

Land is readily available at Chhingchhip. A Detail Project Report (DPR)<br />

amounting Rs. 70.00 Crores for infrastructural development had been prepared.<br />

2) Establishment of Schools under need based such as Service Oriented<br />

Schools, Technical Oriented School and Establishment of Physical Training<br />

Centre for the Department is felt imperative for which a huge amount of funds<br />

will be required.


- 222 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SCHOOL EDUCATION<br />

Draft Annual Plan <strong>2007</strong> – 2008 :-<br />

The main thrust of the Department during the Annual Plan <strong>2007</strong>-2008 will be<br />

qualitative progress within and outside education system as well as capacity buildings.<br />

Therefore, the programmes are set to achieve this goal as far as possible.<br />

Due to inadequacy of fund in the past, proper training could not be imparted to<br />

teachers particularly in secondary and above. It is observed that this affects the<br />

efficiency as well as quality development. Therefore, it is decided to provide adequate<br />

fund for the purpose so as to train the teachers to enhance their growth towards quality<br />

education. This will in turn require engagement of substitute teachers for those who<br />

underwent training.<br />

Despite the fund received from DoNER Ministry for construction of a number of<br />

school buildings, the condition of many school buildings which are out of touch by the<br />

DoNER Ministry is far from satisfactory as the buildings are too old, crumpled and<br />

dilapidated. Therefore, these schools are proposed to be constructed during this Annual<br />

Plan in a phase manner.<br />

The new perspective will be in favour of preparing students for self employment<br />

and an organised sector of work force. It is expected to meet the sub-professional need<br />

of various professions at secondary levels and above.<br />

The proposed amount to be allocated to the department for the coming 11 th Five<br />

Year Plan <strong>2007</strong>-12 and Annual Plan <strong>2007</strong>-08 is as below :-<br />

Rs. in lakh<br />

Sl. Major Head1 11<br />

No.<br />

th Five Year Plan Annual Plan<br />

<strong>2007</strong>-12<br />

<strong>2007</strong> – 08<br />

1. Elementary 18559.00 4502.50<br />

2. Secondary 15980.00 3511.50<br />

3. Adult Education 1695.00 76.50<br />

4. Language Development 1513.00 160.50<br />

5. General 2434.00 252.00<br />

Total 40181.00 8503.00<br />

……


- 223 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

2202 – HIGHER EDUCATION :<br />

HIGHER & TECHNICAL EDUCATION<br />

Abstract of<br />

<strong>DRAFT</strong> <strong>11TH</strong> <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> (<strong>2007</strong>-<strong>2012</strong>)<br />

<strong>DRAFT</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> (<strong>2007</strong>-2008)<br />

11 th Plan <strong>2007</strong>-<br />

12<br />

(Rs. in lakh)<br />

Annual Plan<br />

<strong>2007</strong>-08<br />

Directiron & Administration 70.00 20.00<br />

Govt. Colleges & Institutions 4333.00 295.00<br />

Asst. to Non Govt. Colleges 3680.00 1126.00<br />

Scho. Board 550.00 13.00<br />

Hindi Training College 600.00 33.00<br />

TOTAL 9233.00 1487.00<br />

2203 –TECHNICAL EDUCATION<br />

11 th Plan <strong>2007</strong>-<br />

12<br />

(Rs. In lakh)<br />

Annual Plan<br />

<strong>2007</strong>-08<br />

Direction & Administration 2223.00 22.00<br />

Polytechnic 2215.00 171.00<br />

MSCTE (OE etc.) 20.00 5.00<br />

EAP Counterpart funding 66.00 66.00<br />

TOTAL 4584.00 264.00<br />

(Rs. In lakh)<br />

X.1(d) – HIGHER EDUCATION<br />

Scheme 1- Direction of Administration<br />

11th Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-2008<br />

proposed outlay<br />

proposed outlay<br />

a) Salary, administrative<br />

costs etc.<br />

70.00<br />

20.00<br />

Total of Scheme 1 70.00 20.00<br />

Scheme.11 – Govt. Colleges<br />

There of 7(seven) Govt. Colleges under this head. The College buildings are very poor.<br />

They all need construction of new buildings so as to strengthen and expand their capacity<br />

in terms of enrolment, opening of new subjects and also to ensure quality promotion and<br />

to install academic environment.<br />

The on-going policy of the State Govt. is to provincialise 12 Deficit Grant-in-Aid<br />

Colleges, in order to ensure better governance, quality assurance and sustenance. To meet<br />

the standard and quality laid by UGC, the best option for the Govt. is to provincialise all


- 224 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

Deficit Grant-in-Aid colleges and govern directly by the State Govt instead of Governing<br />

Body.<br />

During 11 th Five year Plan (<strong>2007</strong>-<strong>2012</strong>) the following scheme may be taken up :-<br />

a) Salary,<br />

administrative<br />

costs etc.<br />

b) Construction of<br />

college buildings<br />

c) Provincialisation<br />

Total of Scheme 11<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

1793.00<br />

600.00<br />

280.00<br />

2673.00<br />

Scheme III – College of Teacher Education<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

168.00<br />

-<br />

10.00<br />

178.00<br />

The College of Teacher Education is functioning in a rented building<br />

since establishment 1975. For the construction of CTE building at<br />

Republic veng, Aizawl Govt. of India had sanction Rest.60.50 lakhs<br />

during 1997 and 2003-2004. However, due to increasing enrolment and<br />

need based the existing building requires vertical extension to<br />

accommodate W.E. Room, Language Laboratory, Remote Classroom,<br />

Social Science Laboratory Class room etc.<br />

a) Salary,<br />

Administrative<br />

costs etc.<br />

b) Construction of<br />

buildings<br />

Total of Scheme III<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

185.00<br />

75.00<br />

260.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

17.00<br />

-<br />

17.00


- 225 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

Scheme IV – Hostel for Post Matric Students.<br />

The Department is running 5 collegiate Hostels, 3 hostels at Shillong,<br />

Meghalaya and 2 hostels at Aizawl. Out of these, 4 hostels are<br />

functioning in a rented buildings. Now the Department has to pay rent<br />

every month. The Department is facing problems which related to<br />

students who have come to Shillong, Meghalay for the sake of better<br />

facilities, environments, experiences, scope etc. Parents send them to<br />

Shillong with their meagre income. When they come to Shillong the first<br />

problem they encounter is accommodation. To overcome this problem<br />

Boys hostel is proposed to construct where the Department is having<br />

land at Shillong.<br />

In the meantime, in Aizawl, students coming from rural areas are facing<br />

the accommodation problems as above. Girls Hostel is proposed to<br />

construct during 11 th plan (<strong>2007</strong>-<strong>2012</strong>)<br />

a) Salary,<br />

Administrative<br />

costs etc.<br />

b) Construction of<br />

boys hostel at<br />

Shillong<br />

c) Construction of<br />

Girls hostel at<br />

Aizawl<br />

Total of Scheme IV<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

120.00<br />

190.00<br />

190.00<br />

500.00<br />

Scheme V – Assistance to Non-Govt. Colleges<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

22.00<br />

-<br />

-<br />

22.00<br />

There are 13 Deficit Grant-in-Aid colleges and 1(one) private college in<br />

<strong>Mizoram</strong>. The lone private college is situated at Chakma Autonomous<br />

District Council, the highest institution in the area. In view of the Govt. of<br />

India programmes in regard to development of backward areas, the<br />

Department have proposed upgradation of this private college into Deficit<br />

Grant-in-Aid college.


- 226 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

a)Salary,<br />

administrative costs<br />

etc.<br />

b)upgradation to<br />

deficit GIA colege<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

3620.00<br />

60.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

1066.00<br />

60.00<br />

Total of Scheme V 3680.00 1126.00<br />

Scheme VI – Govt. Zirtiri Residential Science College<br />

The only Residential Science College in <strong>Mizoram</strong> where only Science and<br />

it related subjects are touch. Due to financial problems the College is not<br />

able to function as the name implied. The present building does not<br />

afford for full-fledged residential institution. Therefore, during 11 th Plan<br />

the construction work may be taken up at the permanent site, Mualpui,<br />

Aizawl.<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

a) Salary,<br />

administrative<br />

costs etc.<br />

600.00<br />

78.00<br />

b) Construction of<br />

Zirtiri<br />

Residential<br />

Science college<br />

buildig building<br />

at Mualpui<br />

300.00<br />

-<br />

Total of Scheme VI 900.00 78.00<br />

Scheme VII- <strong>Mizoram</strong> Scholarship Board<br />

The <strong>Mizoram</strong> Scholarship Board, functioning in the Directorate of Higher<br />

& Technical Education is looking after PMS (CSS) and other incentive<br />

cash award, to students including fellowship for Research Scholars etc.


- 227 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

a)Salary,<br />

administrative costs<br />

etc.<br />

315.00<br />

6.00<br />

b) Stipend/Book<br />

grant/ fellowship<br />

235.00<br />

7.00<br />

Total of Scheme VII 550.00 13.00<br />

Scheme VIII- <strong>Mizoram</strong> Hindi Training College<br />

<strong>Mizoram</strong> Hindi Training College is the only Institution of its kind for<br />

propagation of Hindi education in <strong>Mizoram</strong>. It has also imparted training<br />

for Hindi teachers in <strong>Mizoram</strong>. The Institution has its own complex at<br />

Durtlang, Aizawl. The institution has been facing a cute problems in<br />

regards to water and electrification. The problems on water and power<br />

supply may be solved during 11 th Plan as need based.<br />

11 th Plan <strong>2007</strong>-<br />

<strong>2012</strong> proposed<br />

outlay<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

a)Salary, administrative<br />

costs etc.<br />

580.00<br />

33.00<br />

b)Construction of rain<br />

water harvesting<br />

10.00<br />

-<br />

c) Construction of power<br />

supply installation<br />

10.00<br />

-<br />

Total of Scheme VIII 600.00 33.00<br />

Grand Total of X.1(d)<br />

Higher Edn.<br />

X.2-TECHNICAL EDUCATION<br />

9233.00 1487.00<br />

Scheme A-Direction and Administration<br />

Under Technical Education the Department is looking after <strong>Mizoram</strong><br />

Polytechnic, Lunglei, Women Polytechnic, Aizawl, <strong>Mizoram</strong> state Council<br />

for Technical Education , students of NERIST in the form of giving<br />

Stipend & Book Grant, entrance examination for various technical<br />

courses in and outside <strong>Mizoram</strong>, conduct of semester examination for<br />

Polytechnics, RIPANs.


- 228 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

In <strong>Mizoram</strong> there are two Polytechnics viz <strong>Mizoram</strong> Polytechnic,<br />

Lunglei & Women Polytechnic, Aizawl. The existing Polytechnics are not<br />

adequate to meet the present demand and requirements. As per the<br />

recommendations of the Task Force constituted by Planning Commission,<br />

Govt. of India vide No.M-12-16/11/2006-SP-NE dt. 9.5.2006 under<br />

chapter 1(L) and chapter III (VI) ‘an ITI should be set up in every district<br />

and the number of Polytechnics doubled’ In pursuance of the above and<br />

requirement of the people in regard to skill upgradation, Industrial needs,<br />

etc establishment of 6(six) nos. of Polytechnics institutions are proposed<br />

to be taken up in the districts where the said institutes are not yet<br />

established such as Champhai District, Kolasib District, Saiha District,<br />

Serchhip District, Lawngtlai District and Mamit District.<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

a) Salary,<br />

Administrative<br />

costs etc.<br />

1191.00<br />

18.00<br />

b) Stipend/Book<br />

grant to NERIST<br />

130.00<br />

4.00<br />

c) Establishment of<br />

Polytechnics in 6<br />

(six) districts<br />

962.00<br />

-<br />

Total of Scheme A 2283.00 22.00<br />

Scheme B-<strong>Mizoram</strong> State Council for Technical Education<br />

a) administrative<br />

costs etc.<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

20.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

5.00<br />

Total of Scheme B 20.00 5.00


- 229 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

a) Salary<br />

administrative<br />

costs etc.<br />

b) Stipend/Book<br />

Grant<br />

Scheme C-<strong>Mizoram</strong> Polytechnic, Lunglei<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

425.00<br />

235.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

27.00<br />

43.00<br />

Total of Scheme C 660.00 70.00<br />

a)Salary<br />

administrative costs<br />

etc.<br />

b)Stipend/Book<br />

Grant<br />

Scheme D-Women Polytechnic, Aizawl<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

770.00<br />

280.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

67.00<br />

34.00<br />

Total of Scheme D 1050.00 101.00<br />

Scheme E – <strong>Mizoram</strong> Engineering College<br />

<strong>Mizoram</strong>, though high in literacy is much lagging behind in technical<br />

education. Now there is a high demand for technical education among<br />

the students, but only few of them have chance to get admission in the<br />

institutions of other states through quotas. Majority of students were<br />

denied due to the limited quota seats. During 11 th Five year Plan<br />

establishment of Engineering College at Aizawl is proposed and the plight<br />

of those students could be mitigated. The site for the college is already<br />

available at Maumual, Aizawl. A token Provision is earmarked as below :-


- 230 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

a)Salary administrative costs<br />

etc.<br />

11 th Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

proposed<br />

outlay<br />

505.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

Total of Scheme D 505.00 -<br />

Grand Total of X.2-Tech. Edn 4518.00 198.00<br />

EXTERNAL AIDED PROJECT ( World Bank Assistance)<br />

Higher & Technical Education Department is implementing EAP with effect from 2001<br />

and the project is to be concluded on June <strong>2007</strong>. The project cost of Rs. 45 Crore is<br />

utilized for construction of <strong>Mizoram</strong> Polytechnic, Lunglei, Women Polytechnic, Aizawl ,<br />

procurement of machines, teaching learning equipment etc.<br />

Scheme E-Establishment of SPIU (EAP)<br />

a)Salary<br />

administrative costs<br />

11th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

17.00<br />

Total of Scheme E 17.00 17.00<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

17.00<br />

-


- 231 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HIGHER & TECHNICAL EDUCATION<br />

Scheme F-<strong>Mizoram</strong> Polytechnic, Lunglei (EAP)<br />

a)Salary<br />

administrative costs<br />

etc.<br />

11th Plan <strong>2007</strong>-<strong>2012</strong><br />

proposed outlay<br />

23.50<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

23.50<br />

Total of Scheme F 23.50 23.50<br />

Scheme G- Women Polytechnic, Aizawl (EAP)<br />

11 th Plan <strong>2007</strong>-<strong>2012</strong><br />

a)Salary<br />

administrative costs<br />

etc.<br />

proposed outlay<br />

25.50<br />

Annual Plan <strong>2007</strong>-<br />

2008 proposed outlay<br />

25.50<br />

Total of Scheme G 25.50 25.50<br />

Grand Total of EAP 66.00 66.00<br />

……


- 232 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

SPORTS & YOUTH SERVICES<br />

The Department of Sports & Youth Services, <strong>Mizoram</strong> was established and<br />

bifurcated from Education Department on 8th December 1986 into a full-fledged<br />

Department with the sole purpose of promoting Sports of different disciplines<br />

and youth activities including Adventure Sports, Scouts & Guides, National<br />

Cadet Corp and National Service Scheme amongst the youths in <strong>Mizoram</strong>. Now<br />

<strong>Mizoram</strong> State has a great achievement in various Sports disciplines, it may be<br />

pointed out that the very recently such achievement i.e. Ms Lalremliani won<br />

Gold in the 4th World Women Boxing Championship in New Delhi during 18th<br />

to 23rd November, 2006 and also may be said that the result of State Hockey<br />

Academy, Thenzawl run by Sports & Youth Services Department since 2005-06,<br />

the Mizo girls who has got Training from this State Hockey Academy, Thenzawl<br />

participated and won champion in the 4 Nations Junior Under-18 Women Hockey<br />

Kakamigahara International Cup, Gifu, Japan held during 12th - 16th July, 2006.<br />

Besides promotional of various Sports disciplines and other Youth activities<br />

programmes, construction of Sports infrastructures like Indoor Stadia, Open Stadia,<br />

Playground at city and towns is an important feature of the Department programme.<br />

Inspite of limited Officers and Ministerial staff as well as a handful of<br />

Coaches and other Field Staff of the Department, the Department within a short<br />

span of two decades, achieved a commendable records. The name <strong>Mizoram</strong> has<br />

been brought to the Notice of the Sports arena not only at the National Level but<br />

also at the International Level. The Department proposed to upgrade the existing<br />

Schemes and new establishment of NCC Units/Company and District<br />

Administrations - District Sports & Youth Offices, Kolasib and Champhai etc.<br />

Hence the Department proposed the total Outlay for the following :-<br />

Eleventh Five Year Plan, <strong>2007</strong>-12 = Rs. 5386.00.00 lakhs<br />

Annual Plan, <strong>2007</strong>-08 = Rs. 1647.00 lakhs.<br />

The Scheme-wise financial break-up of the proposed Outlay are given<br />

below :<br />

(A) DIRECTION : During the Eleventh Five Year Plan, <strong>2007</strong>-12, it is proposed<br />

Rs.270.00 lakhs under the direction head and proposed Rs. 70.00 lakhs for the Annual<br />

Plan, <strong>2007</strong>-08 so as to implement various departmental activities/schemes. The proposed<br />

Outlay under the direction in item-wise expenditure during <strong>2007</strong>-08 is as enumerated under :<br />

-<br />

(a) Salaries - 29.00 lakhs.<br />

(b) Wages - 10.00 lakhs<br />

(c) Medical Treatment - 1.50 lakhs<br />

(d) Foreign Travel Expenses - 1.70 lakhs<br />

(e) Domestic Travel expenses - 3.60 lakhs<br />

(f) Office expenses - 2.00 lakhs<br />

(g) Rents, Rates, Taxes - 2.70 lakhs<br />

(h) Supplies & Materials/Office Equipments<br />

(UPS) - 6.00 lakhs<br />

(i) Advertising & Publicity - 1.50 lakhs<br />

(j) Minor Works/Maintenance/Purchase of Mini-Bus-1no. 9.00 lakhs<br />

(k) Other Charges/Celebration of Imp. Days.. - 3.00 lakhs<br />

TOTAL : - 70.00 lakhs


- 233 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

(B) DISTRICT ADMINISTRATION :<br />

There are 3 (three) District Offices under Sports & Youth Services Department at<br />

present (i) District Sports & Youth Office,Lunglei (ii) District Sports & Youth Office,<br />

Kolasib and (iii) District Sports & Youth Office Champhai.<br />

During 11th Five Year Plan, <strong>2007</strong>-12 the Department proposed for outlay of<br />

Rs.210.00 lakhs = Lunglei,<br />

Rs.70.00 lakhs = Kolasib and<br />

Rs.70.00 lakhs = Champhai<br />

to upgrade the District Sports & Youth Offices and by posting staff and by constructing<br />

the Office building and providing more facilities like Training Centre with Hostels and other<br />

facilities like Youth Activities for the general and Students also.<br />

The Department proposed for outlay to the Districts administration for Annual Plan,<br />

<strong>2007</strong>-08 with financial break-up of the following :-<br />

(1) District Sports & Youth Office, Lunglei :<br />

(a) Salaries - 15.00 lakhs<br />

(b) Medical treatment - 1.00 lakhs<br />

(c) Domestic Travel Expenses - 1.70 lakhs<br />

(d) Office expenses - 2.00 lakhs<br />

(e) Supplies and materials - 3.50 lakhs<br />

(f) Advertising and Publicity - 1.80 lakhs<br />

(g) Minor works - Construction of Office Building - 7.00 lakhs<br />

(h) Development of Sports Trg. Centre at Zobawk - 8.00 lakhs<br />

(i) Other Charges/Participations/coaching etc. - 5.00 lakhs<br />

(2) District Sports & Youth Office, Kolasib :<br />

Since the District Sports & Youth Office, Kolasib is opened, the ministerial staff have<br />

not been filled up and posted to this District till date the requirement of fund have been<br />

proposed for filling the vacant posts for promotion of Sports.<br />

During 11th Plan, <strong>2007</strong>-12 Department proposed for outlay Rs.70.00 lakhs, and the<br />

proposed expenditure during Annual Plan of <strong>2007</strong>-08 is Rs.16.00 lakhs as break-up<br />

b e l o w : -<br />

(a) Salaries - 3.50 lakhs<br />

(b) Wages - 1.80 lakhs<br />

(c) Office expenses - 2.00 lakhs<br />

(d) Rents, Rates, Taxes - 0.90 lakhs<br />

(e) Supplies & materials - 3.30 lakhs<br />

(f) Other charges/Participations/Tournaments/ - 4.50 lakhs<br />

coaching etc:-<br />

(3) District Sports & Youth Office, Champhai :<br />

Since the Government created this District Office, the posts for this District Office has<br />

not been created till date due to ban on creation under the State Government of <strong>Mizoram</strong>. It is<br />

proposed to establish and to function in full-fledged District Office during the Eleventh Five<br />

Year Plan, <strong>2007</strong>-12 and to contruct the Office Building at District Headquarter at Champhai.


- 234 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

The requirement of fund has to be incorporated in the Eleventh Five Year Plan, <strong>2007</strong>-12 is<br />

Rs.70.00 lakhs and proposed outlay for the Annual Plan Scheme during <strong>2007</strong>-08 is Rs.15 .00<br />

as break-up below :-<br />

(a) Wages - 1.90 lakhs<br />

(b) Office expenses - 2.50 lakhs<br />

(c) Rents,Rates,Taxes - 0.90 lakhs<br />

(d) Supplies & materials - 5.50 lakhs<br />

(f) Other Charges/Participation/Tourmnts/ - 4.20 lakhs<br />

coaching, etc<br />

(C) N.C.C :<br />

Besides the existing NCC Units/Company (i.e. 20-MZ Indep Coy NCC and 1-MZ<br />

Bn.NCC/Girl Cadet Coy ), the High Level NCC Meeting held recently in New Delhi on<br />

15.09.2005, the <strong>Mizoram</strong> State is advised to establish the two other Unit, Air Wing NCC<br />

and Navy Wing NCC. Hence the Department of Sports & Youth Services, <strong>Mizoram</strong> proposed<br />

to establish Air Wing & Navy Wing of NCC during <strong>2007</strong>-08. It is proposed for outlay<br />

during 11th Five Year Plan :-<br />

Rs.105.00 lakhs = NCC-20 Indep Coy.;<br />

Rs.70.00 lakhs = I MZ-Bn.NCC;<br />

Rs.5.00 lakhs = Girls Cadet NCC;<br />

Rs.70.00 lakhs = Air Wing NCC; and<br />

Rs.5.00 lakhs = Navy Wing NCC<br />

The Annual Plan, <strong>2007</strong>-08 proposed with the finance break-up are enumerated as<br />

below :-<br />

(1) 20- <strong>Mizoram</strong> NCC Indep Coy. :<br />

(a) Salaries - 4.00 lakhs<br />

(b) Wages - 1.50 lakhs<br />

(c) Medical Treatment - 0.50 lakhs<br />

(d) Domestic Travel expenses - 2.80 lakhs<br />

(e) Office expenses - 2.00 lakhs<br />

(f) Supplies & materials - 2.50 lakhs<br />

(g) Maintenance - 7.00 lakhs<br />

(h) House Rent - 2.50 lakhs<br />

(h) Conduct Training Camps/Participation etc - 5.20 lakhs<br />

(2) 1 <strong>Mizoram</strong> NCC Bn.<br />

(a) Wages - 4.00 lakhs<br />

(b) Domestic Travel Expenses - 1.00 lakhs<br />

(c) Office expenses - 2.80 lakhs<br />

(d) Rent - 2.70 lakhs<br />

(d) Supplies & Materials - 1.00 lakhs<br />

(e) Training, Participations/Other charges, etc.- 15.50 lakhs<br />

Total 27.00 lakhs<br />

(3) NCC Girls Cadet Coy. : Proposed for outlay of Rs.5.00 lakhs during <strong>2007</strong>-12<br />

and for Annual Plan, <strong>2007</strong>-08 as break-up below :-<br />

(a) Office expenses - 0.50 lakhs<br />

(b) Training/participations etc. - 0.50 lakhs<br />

TOTAL : - 1.00 lakhs


- 235 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

(4) NCC Air Wing : Proposed for outlay of Rs.70.00 lakhs during <strong>2007</strong>-12 and<br />

for<br />

Annual Plan, <strong>2007</strong>-08 as break-up below :-<br />

(a) Office Expenses - 4.00 lakhs<br />

(b) Training/Participation/Other Charges - 5.00 lakhs<br />

(c) Construction of Aircraft Hanger - 26.00 Lakhs<br />

TOTAL :- - 35.00 lakhs<br />

(5) NCC Navy Wing : Proposed for outlay of Rs.5.0 lakhs during <strong>2007</strong>-12 and<br />

for Annual Plan, <strong>2007</strong>-08 as break-up below :-<br />

(a) Office Expenses: - 0.50 lakhs<br />

(b) Training/Participation/Other charges - 0.50 lakhs<br />

TOTAL :- - 1.00 lakhs<br />

(F) NATIONAL SERVICE SCHEMES (NSS) :<br />

The movement of NSS is based on the Central Grants-in-Aid Scheme under the<br />

Ministry of Youth Affairs & Sports, Govt.of India since so far in the College level of<br />

Educational Institutions co-ordinated by the Sports & Youth Services Department as a Nodal<br />

Department. The approved funding pattern of such Scheme is 75:25. Out of the total estimate<br />

for 11th Five Year Plan, <strong>2007</strong>-12 i.e. Rs. 166.00 lakhs and the 25% for State Share is<br />

Rs.110.00 lakhs and the proposed for Annual Plan outlay is Rs.32.00 lakhs.<br />

Grants-in-Aid/Matching Share. - 32.00 lakhs<br />

Total :- 32.00 ~do~<br />

(G) STATE TRAINING CENTRE, TANHRIL :<br />

Development of State Training Centre, Tanhril is necessary as the old Building of at<br />

the S.T.C., Tanhril are very old and need repair and renovation. It is an important Training<br />

centre and hence the Departament proposed Rs.64.00 lakhs for 11th Five Year Plan, <strong>2007</strong>-<br />

12 and proposed Rs.20.00 lakhs for the Annual Plan, <strong>2007</strong>-08 as financial brerak-up below :-<br />

1) Office expenses 2.00 lakhs<br />

2) Supplies and Materials 5.00 lakhs<br />

3) Minor Works- 8.00 lakhs<br />

4) Other charges/ Training/Meeting/conference etc. 5.00 lakhs.<br />

Total :- 20.00 lakhs<br />

(H) YOUTH WELFARE ACTIVITIES (GENERAL YOUTH) :<br />

Youth Welfare activities basically covered all the activities of the programmes under<br />

Youth Hostel Assocition of India and general Youth programmes such as conduct of Blood<br />

Donation Camp, Tree Planting includes Seminar/Workshop and participation at various<br />

YHAI-National Trekking programmes like Himalayan Trekking, Desert Trekking and other<br />

National and International Programmes. The Department proposed Rs.80.00 lakhs during<br />

11th Five Year Plan, <strong>2007</strong>-12 and for Annual Plan, <strong>2007</strong>-08 is Rs.20.00 lakhs with the<br />

break-up as below :-<br />

(a) Office expenses - 2.00 lakhs<br />

(b) Supplies & Materials - 2.00 lakhs<br />

(c) Maintenance of Youth Hostel, Luangmual etc. - 2.00 lakhs<br />

(d) Other Charges/Implementation of the following<br />

different YHAI National & State Programmes :- - 2.00 lakhs<br />

i) National Western Ghats & Goa Hill Trekking Expedition - 2.00 lakhs


- 236 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

ii) National Desert Safari - Rajasthan Trekking Expedition - 2.00 lakhs<br />

iii) National Executive Meeting, New Delhi, etc. - 2.00 lakhs<br />

iv) Adventure Promotion Committee/Meeting - 1.00 lakhs<br />

v) National Himalayan Trekking Expedition, Shimla - 1.00 lakhs<br />

vi) Youth Leaders Training - 2.00 lakhs<br />

vii) Reiek Trekking Expedition, <strong>2007</strong> - 1.00 lakhs<br />

viii) Observance of YHAI State Tree Planting Prog. - 1.00 lakh<br />

ix) Observance/Celebration of Founder’s Day - 1.00 lakh<br />

x) Blood Donation Camp. - 1.00 lakh<br />

TOTAL : - 20.00 lakhs<br />

(I) SPORTS & GAMES :<br />

(1) Sports & Games :<br />

The Coaching Wing of Sports & Youth Services Department is responsible for<br />

conduct of various Sports Coaching and participations at National Level, International Level<br />

Tournament. The <strong>Mizoram</strong> Team u-14, U-17 and NCC participated annually and won<br />

Championship always. The Department of Sports & Youth Services has a great achievements<br />

in defferent disciplines and may be pointed out that very recently the <strong>Mizoram</strong> Women Boxer<br />

namely Ms.Lalremliani won Champion (Gold) in the 4th World Women Boxing<br />

Championship in New Delhi during 18th - 23rd November, 2006.The Department proposed<br />

to purchase 2 nos. of Mini-Bus for dropping/lifting the players where they participated<br />

Tournaments/Trainings. Hence it is proposed for outlay Rs.486.00 during 11th Five Year<br />

Plan, <strong>2007</strong>-12 and Rs. 99.00 for <strong>2007</strong>-08.<br />

(2) <strong>Mizoram</strong> State Sports Council :<br />

<strong>Mizoram</strong> State Sports Council is responsible for promotion of<br />

different disciplines through State Level Association and development of Sports<br />

Infrastructures in the State. It is also responsible for creation of Sports<br />

Infrastructure in the State. Less than the 50% of State Matching Share under Plan<br />

Fund was utilized during 2005-06 as per norms of the Govt. of India against their<br />

approved Schemes for construction of Sports Complex at Aizawl and other<br />

Districts, i.e, Mamit, Saiha, Lunglei, Champhai, Kolasib, Lawngtlai. It is<br />

proposed Rs.860.00 lakhs for State Matching Share during 11th Five Year<br />

Plan, <strong>2007</strong>-12. The proposed Outlay for <strong>2007</strong>-08 in Scheme-wise is as follows :-<br />

(a) State Matching Share of CSS - 98.00 lakhs<br />

(b) Promotional of Sport/Coaching/Participation etc. - 100.00 lakhs<br />

(c) Maintenance of Stadiums/Infrastructures. - 232.00 lakhs<br />

TOTAL : - 430.00 lakhs<br />

(3) <strong>Mizoram</strong> Olympic Association :- The <strong>Mizoram</strong> Olympic Association is<br />

formed and affiliated by Indian Olympic Association since so far, the disciplines approved by<br />

them will have to see and controlled under the <strong>Mizoram</strong> Olympic Assn.with coordinating<br />

Sports & Youth Services Department. It is rquired to provided grant to this MOA so as to<br />

promote the various Sports disciplines approved by the Indian Olympic Assn. coordinating<br />

with the Sports & Youth services Department, Govt. of <strong>Mizoram</strong> and proposed Rs.275.00<br />

during 11th Plan, <strong>2007</strong>-12 and Rs.50.00 for Annual Plan, <strong>2007</strong>-08 as below :<br />

(4) State Hockey Academy, Thenzawl :<br />

The Department eastablished Women Residential Hockey Training<br />

Centre at Thenzawl in 2004. During 2004-05 <strong>Mizoram</strong> Women Hockey Team<br />

participated in the Eastern Zone Senior Women Hockey Championship and stood<br />

Runner-up. <strong>Mizoram</strong> Women Team now qualified for National Senior Women


- 237 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SPORTS & YOUTH SERVICES<br />

Hockey Championship and participated during 2005-06. This is the immediate<br />

result of the Women Residential Hockey Training at Thenzawl which the won<br />

Championship at 4 Nations Junior Under-18 Women Hockey Kakamigahara<br />

International Cup, GIFU, Japan during 12th - 16th July, 2006 it is now opened<br />

for Boys Hockey Academy at Thenzawl by provided their Hostel. The<br />

Department proposed Rs.350.00 lakhs for 11th Five Year Plan, <strong>2007</strong>-12 and for<br />

Annual Plan, <strong>2007</strong>-08 it is proposed Rs. 73.00 lakhs.<br />

(5) State Sports Coaching Centre, Luangmual : During Eleventh Plan, <strong>2007</strong>-12 it is<br />

proposed Outlay Rs. 275.00 lakhs and Rs.45.00 lakhs for Annual Plan, <strong>2007</strong>-08 as breakup<br />

below :-<br />

(6) Sports Museum :<br />

To boost up the morale of the Youth and to preserve their pictures,<br />

uniforms and their old sports gears it is proposed to establish Sports Museum in<br />

the Department by hiring a private building at the initial stage. It is proposed<br />

outlay Rs.75.00 lakhs during Eleventh Five Year Plan, <strong>2007</strong>-12 and for<br />

Annual Plan, <strong>2007</strong>-08 as per break-up below :-<br />

(a) Office Expenses - 2.00 lakhs<br />

(b) Supplies & Materials/Equipments. - 5.00 lakhs<br />

(c) House Rent - 2.50 lakhs<br />

(d) Other charges/Collection of old sports gears/ - 5.50 lakhs<br />

photographs/Materials.<br />

TOTAL : - 15.00 lakhs<br />

(7) Aizawl Sports Complex under 12 th Finance Commission :<br />

The 12 th Finance Commission provided Rs.25.00 Crores for<br />

construction of Aizawl Sports Complex (AR.Ground) for the period from 2006-<br />

07 to 2009-2010 in Rs.625 Lakhs each for four years. The High Level<br />

Monitoring Committee, <strong>Mizoram</strong> in its meeting the Department of Sports &<br />

Youth Services, <strong>Mizoram</strong> is entrusted the initiative and to utilise Rs.625 lakhs<br />

during 2006-07 and to obtain the required amount for preparation of the Detailed<br />

Project Reports which started from the year of 2006-07.<br />

1) Major Works – Contruction of - Rs. 625.00 lakhs<br />

full-fledged Sports Complex, Aizawl<br />

(Now A.R.Ground)<br />

TOTAL :- - Rs. 625.00 lakhs<br />

Grand Total for Eleventh Five Year Plan : - Rs. 5,386.00 lakhs<br />

For Annual Plan(<strong>2007</strong>-08) : - Rs. 1,647.00 lakhs<br />

….


- 238 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

ART & CULTURE<br />

The Government of <strong>Mizoram</strong> established Directorate of Art & Culture in 3 rd May,<br />

1988 after trifurcation of Education Department into three Directorates. The Department of<br />

Art & Culture, Govt. of <strong>Mizoram</strong> consists of various establishments and units such as<br />

Direction and Administration and Supervision, Institute of Music & Fine Arts, Promotion of<br />

Art & Culture including Cultural Programme, Improvement of Vanapa Hall, Archaeology and<br />

archaeological survey, Tribal Research Institute, <strong>Mizoram</strong> State Museum, <strong>Mizoram</strong> State<br />

Archives, State Library and District Libraries, Anthropological Survey and District Gazetteers.<br />

The Department of Art & Culture is undertaking the task of Promotion and<br />

preservation of Mizo Culture. Preservation and restoration of Cultural heritage, historical<br />

monument and Archaeological sites are very important function of the Department.<br />

Promotion of Traditional Music, Dances Literature, Research, Arts and documentation are<br />

also important functions of the Department. The Department maintained a high standard of<br />

progress and achievement during 10 th Five Year Plan. The Department of Art & Culture are<br />

very much in need of creating Administrative infrastructure with additional manpower and<br />

modern equipments for the Development in various establishment and sections during 11 th<br />

Five Year Plan <strong>2007</strong> – <strong>2012</strong>.<br />

During 11 th Five Year Plan the main aim and objectives of various offices under the<br />

Department may be stated as follows :<br />

1. Direction & Administration:<br />

(a) Supervision : Direction and Supervision of all activities under the Department is<br />

under directorate. Various activities pertaining to Mizo culture have been undertaken through<br />

the Directorate. The Directorate itself consists of various units of establishments such as<br />

cultural centre which aims at preservation of Cultural heritage and protection of vanishing<br />

arts, the <strong>Mizoram</strong> Publication Board has been functioning through provision of fund in the<br />

form of Grants-in-aids. District Administration is also established for promotion of culture at<br />

Lunglei to cover the southern part of <strong>Mizoram</strong>. It is necessary to provide more funds during<br />

11 th Five Year Plan for Promotion of Culture and Protection of historical monuments and<br />

vanishing arts. It is desired that State level awards in Mizo literature and culture be instituted<br />

for the encouragement and patronization of Mizo literature and culture special committee will<br />

be formed for selection of the persons for the awards. Rs. 427.00 lakhs may be allocated<br />

during 11 th Five Year Plan <strong>2007</strong> – <strong>2012</strong> and Rs. 77.00 lakhs during Annual Plan <strong>2007</strong> - 2008<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 6.35 1.27<br />

2. Wages : 26.65 5.31<br />

3. Traveling Expenses : 20.00 4.00<br />

4. Office Expenses : 60.00 12.00<br />

5. Prof. & Special Services Awards<br />

(State Awards ) : 20.00 2.00<br />

6. Advertisement : 6.00 1.00<br />

7. Publication : 10.00 2.00<br />

8. Purchase & maintenance of vehicle : 20.00 3.00<br />

9. Participation of Inter State<br />

Cultural Programme : 50.00 10.00<br />

10. Grant-in-aid : 80.00 10.00<br />

11. Scholarship & Stipend : 18.00 4.42<br />

12. Minor Works : 10.00 2.00


- 239 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

13. Other Charges / Celebration of<br />

Important days/ Competition etc. : 100.00 20.00<br />

Total : 427.00 77.00<br />

(b) Administration: Cultural Centre at Falkawn : Due to the increase of development<br />

in <strong>Mizoram</strong> there are rapid social changes in the standard of living which results in the leaving<br />

of traditional way of life among the people. For conservation and dissemination of our<br />

Cultural Heritage the department established a model of traditional Mizo Village at Falkawn.<br />

It is necessary to maintain Mizo Traditional Houses of different types for young generations.<br />

More funds may be provided for this purpose during eleventh Five Year Plan. Besides there<br />

are more than hundreds of non-renewable Cultural heritage of historical monuments to be<br />

preserved by Art & Culture Department in <strong>Mizoram</strong> with construction of approach roads for<br />

tourist and visitors during this Five Year Plan.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Wages : 27.00 5.83<br />

2. Office Expenses : 30.00 6.00<br />

3. Minor Works : 40.00 2.00<br />

4. Other Charges : 60.00 19.00<br />

Total : 157.00 32.83<br />

(c) <strong>Mizoram</strong> Publication Board: The <strong>Mizoram</strong> Publication has been functioning under Art<br />

& Culture Department though the provision of fund in the form of Grants-in-aid. The aim<br />

and objective of <strong>Mizoram</strong> Publication Board is Promotion of Literature and publication of<br />

good books for Researchers and Writers in <strong>Mizoram</strong>. <strong>Mizoram</strong> publication Board Act of<br />

1993 was passed the <strong>Mizoram</strong> Legislative Assembly. It is necessary to function as full fledged<br />

Board during 11 th Five Year Plan by providing more fund and strengthening manpower.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> – 2008<br />

1. Salary : 2.00 -<br />

2. Wages : 2.00 0.50<br />

3. Traveling Expenses : 2.00 0.50<br />

4. Office Expenses : 4.00 0.80<br />

(a) Grant-in-aid for<br />

(b) Publication Board<br />

b) Mizo Academy of Letters : 75.00 12.00<br />

Total : 85.00 16.80<br />

(d) District Office: In order to undertake effective works for Promotion and Development<br />

of Culture and Arts in <strong>Mizoram</strong>. It is essential to develop District Office at Lunglei by<br />

creating posts of officers and staff and clerical staff to cover three Districts of southern region<br />

of <strong>Mizoram</strong>. More posts are created during 11 th Five Year Plan period for District Office.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> – 2008<br />

1. Salary : 7.00 1.50<br />

2. Wages : 4.00 0.80<br />

3. Traveling Expenses : 3.00 0.60<br />

4. Office Expenses : 10.00 2.00<br />

5. Rent : 6.00 1.20


- 240 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

6. Purchase& Maintenance of vehicle : 10.00 2.00<br />

7. Other Charges : 15.00 3.00<br />

Total : 55.00 11.10<br />

Total of Direction & Administration 724.00 137.00<br />

2. Institute of Music & Fine Arts: It consists of mainly four trades like Tradition<br />

Music and Dances, Modern Music, Drama and Fine Arts. The Institutes imparts training in<br />

folk dances and music and modern music to young boys and girls in the state. Due to the<br />

Financial constrains theatre and fine arts cannot be developed. It is felt necessary to establish<br />

3 months certificate course in fine arts and drama during 11 th five Year Plan under Institute of<br />

Music & Fine Arts, Art & Culture Department.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 20.00 4.00<br />

2. Wages : 10.00 2.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 10.00 2.00<br />

5. Publication of Books : 5.00 -<br />

6. Codification of dances : 2.00 -<br />

7. Purchase of costume/Instrument : 10.00 2.00<br />

8. Other Charges : 15.00 2.00<br />

Total : 77.00 13.00<br />

3. Promotion of Art & Culture :<br />

(a) Cultural Programme : Under Cultural Programme, the department organized<br />

various Cultural activities by way of competitions, festivals, seminars, workshops etc.<br />

Celebration of Local festival and Inter State Cultural activities and Cultural Programme for<br />

various official functions is taken under this head. Sending of more Cultural troupe outside<br />

<strong>Mizoram</strong> and receiving of more cultural troupe from other State of Indian Union is very<br />

important for National unity. More funds be provided during 11 th Five Year Plan under this<br />

programme.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Wages : 4.00 1.00<br />

2. Traveling Expenses : 2.00 0.50<br />

3. Other Charges ( Workshop,<br />

Drama etc. ) : 170.00 7.50<br />

Total : 176.00 9.00<br />

(b) Improvement of Vanapa Hall: Vanapa Hall is the only Public Hall available in<br />

Aizawl City. The Hall remained engaged throughout the year for various functions and<br />

programmes. The Hall is not a new one and needed repair. The seats also need to be<br />

replaces by new seats. Stage lighting system and sound system also be replaced and improved<br />

during Eleventh Five Year Plan.Rs. 175.00 lakhs and Rs. 23.00 lakhs is provided for 11 th Five<br />

Year Plan and Annual Plan <strong>2007</strong>-08 respectively.<br />

(c) Tribal Research Institute : The main functions of Tribal Research are to Research<br />

on Socio-Economic and political condition of <strong>Mizoram</strong> with publication of books and<br />

reprinting of rare and out of printed books. Some funds may be provided for reprinting of<br />

rare books and documentation of different tribal group of Art & Culture in <strong>Mizoram</strong>.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 1.00 -


- 241 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

2. Wages : 2.00 0.40<br />

3. Traveling Expenses : 2.00 0.40<br />

4. Office Expenses : 5.00 1.00<br />

5. Publication : 45.00 2.00<br />

6. Advertisement : 2.00 0.40<br />

7. Other Charges : 45.00 1.50<br />

Total : 102.00 5.70<br />

4. Archaeology : <strong>Mizoram</strong> is developing in the field of Archaeological investigation.<br />

Some survey and investigation has been done by small unit of Archaeological wing. But the<br />

potentiality of <strong>Mizoram</strong> in respect of Archaeology cannot be really being determined. It is<br />

necessary to strengthen Archaeology unit by providing more fund and staff to function<br />

properly in <strong>Mizoram</strong> during Eleventh Five Year Plan.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 7.00 1.20<br />

2. Wages : 2.00 0.40<br />

3. Traveling Expenses : 2.00 0.40<br />

4. Office Expenses : 5.00 1.00<br />

5. Purchase of stores & Equipments : 10.00 2.00<br />

6. Excavation & Restoration : 10.00 2.00<br />

Total : 36.00 7.00<br />

5. Archaeological Survey : The Archaeological Survey is mainly meant for Survey of<br />

Archaeological wealth of <strong>Mizoram</strong>. Due to the financial constraint and inadequate of the staff<br />

investigation and survey of Archaeological sites cannot be taken up much during 10 th Five<br />

Year Plan. It is very important to survey various Archaeological remains and landmarks in<br />

<strong>Mizoram</strong> during eleventh Five Year Plan.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Traveling Expenses : 3.00 0.75<br />

2. Office Expenses : 10.00 3.00<br />

3. Other Charges : 10.00 3.00<br />

Total : 23.00 6.75<br />

6. <strong>Mizoram</strong> State Archives : The <strong>Mizoram</strong> State Archives been preserving a good<br />

number of non-current records of public and private of administrative value and historical<br />

important records on scientific line. The units have to go a long way to attain full-fledged<br />

State Archives. It is necessary to purchase modern technique like microfilm camera, reader<br />

printer, fumigation chamber, and laminating machine during Eleventh Five Year Plan. Our<br />

precious records and Cultural Heritage has been deteriorated and faded up. Archival<br />

Institutions be developed for preservation of documents and records.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 2.00 -<br />

2. Wages : 5.00 1.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 10.00 3.00<br />

5. Publication : 5.00 2.00<br />

6. Minor Works : 5.00 1.00<br />

7. Grant-in-aid : 5.00 1.00


- 242 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

8. Other Charges ( Matching share<br />

For Central Assistance ) : 15.00 5.00<br />

Total : 52.00 14.00<br />

7. Public Library :<br />

(A) <strong>Mizoram</strong> State Library : At the fag end of Tenth Five Plan Construction of State<br />

Library building is being started at New Capital Complex, Aizawl with the help of Raja Ram<br />

Mohun Roy Library Foundation, Kolkata. The importance of Public Library in <strong>Mizoram</strong> is a<br />

well known fact. But the Govt. of <strong>Mizoram</strong> is not yet in a position to implement the<br />

<strong>Mizoram</strong> Public Libraries Act 1993 due to the Fund constraint. With the creation of new<br />

Districts, it is necessary to open District Libraries in all the eight Districts of <strong>Mizoram</strong>.<br />

Besides there are 425 recognized Rural Libraries run by voluntary organizations in the rural<br />

areas, it is also felt necessary to recognize some more Rural Libraries to cover all the villages<br />

during Eleventh Five Year Plan. For up gradation of Public Libraries in <strong>Mizoram</strong> some rural<br />

Library building may also be constructed.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 5.00 2.00<br />

2. Wages : 3.00 1.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 10.00 3.00<br />

5. Rents : 10.00 3.00<br />

6. Matching contribution of RRRLF : 40.00 5.00<br />

7. Minor Works : 15.00 1.00<br />

8. Other Charges (Purchase of Books) : 90.00 2.00<br />

Total : 178.00 18.00<br />

(B) District Libraries : There are five District Libraries in the whole of <strong>Mizoram</strong> with<br />

the creation of New Districts. The District headquarters of Mamit and Serchhip are without<br />

Libraries. It is necessary to establish two New District Libraries during 11 th five year plan.<br />

The financial implication for existing 5 District Libraries and creation of two District Libraries<br />

are as follows.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 10.00 2.00<br />

2. Wages : 5.00 1.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 10.00 3.00<br />

5. Rents : 10.00 2.00<br />

6. Construction of Buildings : 20.00 12.00<br />

7. Minor Works : 7.00 -<br />

8. Other Charges (Purchase of books) : 220.00 4.00<br />

Total : 287.00 25.00<br />

7. Museum Services :<br />

<strong>Mizoram</strong> State Museum: <strong>Mizoram</strong> State Museum has been started functioning in 1977 and<br />

is now accommodated in its own building at Mc. Donald Hill, Aizawl. The existing building<br />

had developed and modernized all galleries like History, anthropology, Zoology, Ethnology,<br />

Textile and Archaeology by Ministry of Tourism and Culture, Govt. of India through Indian<br />

Museum, Kolkata. Now the State Museum is the Centre of non-formal Education and the<br />

source of wisdom of the Nation. At the fag end of 10 th Five Year Plan, Ministry of Tourism


- 243 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

and Culture, Govt. of India provided fund for the construction of Museum extension building<br />

at Berawtlang, Aizawl. The main hindrance for improvement and development of State<br />

Museum lies in lack of man power and fund. It is very important to increase man power and<br />

fund for the collection of museum objects and preservation in the new building during<br />

Eleventh Five Year Plan.<br />

Appointment Salary<br />

a) Museum Guide 1<br />

b) Checker 1<br />

c) Receptionist 1<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> – 2008<br />

1. Salary : 10.00 5.00<br />

2. Wages : 10.00 3.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 15.00 3.00<br />

5. Publication : 5.00 1.00<br />

6. Advertisement : 2.00 0.50<br />

7. Minor Works : 10.00 4.00<br />

8. Other Charges (purchase of<br />

Museum Objects ) : 80.00 6.00<br />

Total : 137.00 23.00<br />

8. District Museum : During 10 th Five Year Plan. One District Museum is established<br />

at Lunglei without staff. It is urgently required man power and Museum objects for this New<br />

District Museum. To function District Museum properly creation of different posts and<br />

purchase of articles etc. be done during Eleventh Five Year Plan. It is also desirable to<br />

establish another District Museum at Champhai, Mamit, Serchhip, Saiha, Lawngtlai during<br />

Eleventh Five Year Plan.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 10.00 3.77<br />

2. Wages : 10.00 3.00<br />

3. Traveling Expenses : 5.00 1.00<br />

4. Office Expenses : 5.00 1.00<br />

5. Publication : 1.00 0.02<br />

6. Advertisement : 1.00 0.02<br />

7. Other Charges ( purchase of<br />

Objects etc. ) : 40.00 2.00<br />

Total : 72.00 10.81<br />

9. Anthropological Survey : The anthropological Survey has been a part an parcel of<br />

Art & Culture. The extreme south and south eastern belt of <strong>Mizoram</strong> have to be surveyed<br />

where there are various ethnic groups of tribal people dwelt. Material Culture of these subtribes<br />

will have to be studied and keep on records. The scheme has been carried out with the<br />

existing staff of Tribal Research Institute but no substantial progress could be made due to<br />

the current works. It is imperative to recruit some qualified persons to execute the works<br />

during Eleventh Five Year Plan.<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008


- 244 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ART & CULTURE DEPARTMENT<br />

1. Traveling Expenses : 3.00 0.60<br />

2. Office Expenses : 8.00 2.01<br />

3. Other Charges ( purchase of<br />

Equipments etc.) : 10.00 3.00<br />

Total : 21.00 5.61<br />

10. District Gazetteers: The scheme of revision of District Gazetteers have been taken<br />

up by the Govt. of <strong>Mizoram</strong> with one special officer and two supporting staff. The<br />

Department has been completed and published one <strong>Mizoram</strong> District Gazetteers as a whole.<br />

Now there are eight districts in the State of <strong>Mizoram</strong>. The Gazetteers of eight districts would<br />

be prepared and taken up as per the guide lines of Govt. of India with engagement of Casual<br />

Employees during Eleventh Five year Plan<br />

11 th Plan Annual Plan<br />

<strong>2007</strong> – <strong>2012</strong> <strong>2007</strong> - 2008<br />

1. Salary : 1.00 -<br />

2. Wages : 2.00 0.40<br />

3. Office Expenses : 8.00 2.00<br />

4. Publication : 7.00 -<br />

5. Other Charges : 8.00 2.00<br />

Total : 26.00 4.40<br />

Grand Total : 2086.00 303.00<br />

……


- 245 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

MEDICAL & PUBLIC HEALTH<br />

SECTORAL APPROACH TO ELEVENTH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong>-<strong>2012</strong> AND<br />

<strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008 IN RESPECT OF MEDICAL & PUBLIC HEALTH<br />

INTRODUCTION<br />

<strong>Mizoram</strong> is a far flung area of the country with limited access to the rest<br />

of the country. It is sandwiched between Myanmar in the east and Bangladesh in the<br />

west. Its population growth is one of the most favourable in India though there is lots<br />

of influx of population from the east and west across the borders. The primary health<br />

care facilities in the State are fairly good and it may be one of the best in the country,<br />

but it still need lots of improvement.<br />

APPROACH<br />

Health is a fundamental and integral part of productive life,<br />

development, quality of life and a major social investment. It is inter-sectoral and<br />

involves individuals, families, communities, states and nation. It is a wide world social<br />

goal.<br />

With increasing of population, bad communications, infrastructure<br />

requirements, the existing health care facilities in the State are not adequate to meet<br />

the health care of the people especially to rural areas. Moreover, patients who require<br />

surgical intervention, whether it is general surgery, gynae and obstetric, surgery, eye,<br />

ENT including emergency life saving operation are sent mostly to Civil Hospital,<br />

Aizawl the State Capital at a great distance from many villages in the interior.<br />

Therefore, to provide health care facilities improvement of primary health care is<br />

imperative. At present there are 351 Sub-Centres, 57 PHCs and 9 CHCs in the State<br />

of <strong>Mizoram</strong>. Out of this only 11 PHCs and 6 CHCs the basic requirement like X-Ray<br />

machine can be provided from the State Plan Budget. However, the minimum<br />

requirement is proposed during 11 th Five Year Plan to function all the institutions as a<br />

full fledge institutions.<br />

MAIN HINDRANCES/DEFICIENCIES :<br />

As nearly 65% of the Annual Plan Budget has to spent for salaries;<br />

procurement of equipments which is the minimal requirement for functioning of PHCs<br />

and CHCs could not be done from the State Plan Budget. This created a lots of<br />

problem to the people in rural areas as they have to travel a great distances from<br />

their early diagnoses.<br />

Over and above, it may be reiterated that most of the staff quarters and<br />

institutional building are voluntarily constructed by the villages ten year back, there<br />

is hardly provision for reconstruction and renovation even for repairs. Thus, the<br />

Department is really handicapped in providing fund even on emergency.<br />

PROPOSAL<br />

To provide the minimal requirement of the State in Health Care the<br />

following proposal amounting Rs. 22,333.00 lakhs during 11th Five Year Plan and Rs.<br />

2665.00 lakhs in the Annual Plan <strong>2007</strong> – 08.


- 246 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

ABSTRACT OF 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong>-<strong>2012</strong> AND <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-08 IN<br />

RESPECT OF MEDICAL & PUBLIC HEALTH<br />

Sl.<br />

No.<br />

Head of Development 11 th Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Annual Plan<br />

<strong>2007</strong>-08<br />

A Urban Health Services – Allopathy<br />

1. Direction 3695.00 165.30<br />

2. Administration 4166.00 281.00<br />

3. Medical Store Depots 625.00 160.00<br />

4. School Health Schemes 38.00 -<br />

B. Hospital & Dispensaries<br />

1. Hospital & Dispensaries 4586.00 389.00<br />

2. Pharmacy & Nursing Council 15.00 9.00<br />

C. Other Health Schemes<br />

1. Cobalt Therapy 15.00 7.20<br />

2. Cancer Research & Training Prog. 10.00 4.00<br />

3. Disaster Management 8.00 -<br />

D. Other System of Medicines<br />

1. Homeopathy (Ayush) 35.00 3.50<br />

E. Rural Health Services – Allopathy<br />

1. Priamary Health Care 6226.00 998.70<br />

F. MET & R :<br />

1. Training 1217.00 10.00<br />

G. Prevention & Control of Diseases<br />

1. National Leprosy Control Prog. (NLCP) 289.00 62.00<br />

2. National Prog. For control of Blindness(NPCB) 70.00 9.50<br />

3. National T.B.Control Programme 117.00 30.50<br />

4. Control of Epidemic 55.00 7.10<br />

5. Sexually Transmitted Diseases (STD) 33.00 4.10<br />

6. National Goitre Control Prog. (NGCP) 30.00 3.50<br />

7. National Malaria Control Prog. (NMEP) 573.00 276.50<br />

8. Blood Transfusion Council 10.00 2.00<br />

9. IDSP(Matching Share) 10.00 6.30<br />

H. Public Health :<br />

1. Drug Control Programme 162.00 75.00<br />

2. Public Health Laboratories 5.00 7.00<br />

3. Public Health Education 44.00 25.00<br />

4. Prevention of Food Adulteration 5.00 -<br />

I. Family Welfare Services :<br />

1. Rural Family Welfare Services 110.00 68.80<br />

2. P.P. Unit (Sub-Division) 118.00 37.00<br />

3. P.P.Unit (Disrict) 66.00 23.00<br />

TOTAL 22,333.00 2665.00


- 247 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

2210.00 A. MEDICAL & PUBLIC HEALTH<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 001 - Direction & Administration<br />

Sub-Head: (01) - Direction<br />

Object Head: (01) - Salaries 3061.00 35.00<br />

(02) - Wages 10.00 1.00<br />

(06) - Medical Treatment 17.00 3.00<br />

(11) - Domestic Travel<br />

Expenses<br />

120.00 20.00<br />

(13) - Office Expenses 150.00 35.00<br />

(20) - Other Administrative<br />

Expenses<br />

27.00 5.00<br />

(27) - Minor works 100.00 20.00<br />

(50) - Other Charges 210.00 46.30<br />

TOTAL OF 001(01) 3695.00 165.30<br />

Posts already created are to be continued during 11 th five Year Plan and Annual Plan <strong>2007</strong> – 08.<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 001 - Direction & Administration<br />

Sub-Head: (02) - Administration<br />

Object Head: (01) - Salaries 3263.00 110.00<br />

(06) - Medical Treatment 28.00 16.00<br />

(11) - Domestic Travel Expenses 75.00 15.00<br />

(13) - Office Expenses 250.00 60.00<br />

(27) - Minor works 450.00 30.00<br />

(50) - Other Charges 100.00 50.00<br />

TOTAL OF 001(02) 4166.00 281.00<br />

New Schemes: Construction of CMO Offices 9 nos. at District for targetted and for which Rs. 450.00<br />

lakhs is earmarked in the 11th Five Year Plan and Rs. 40.00 lakhs is provided for starting the work<br />

during <strong>2007</strong>-08.<br />

Posts already created are to be continued during 11 th five Year Plan and Annual Plan <strong>2007</strong> – 08.


- 248 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account 11th Five Year Plan <strong>2007</strong>-<br />

(Rs. in lakhs)<br />

Annual Plan<br />

Minor Head: 104 - Medical Store Depots<br />

Sub-Head: (01) - Medical Store Depots<br />

<strong>2012</strong><br />

<strong>2007</strong>-08<br />

Object Head: (01) - Salaries 135.00 25.00<br />

(06) - Medical Treatment 20.00 3.00<br />

(11) - Domestic Travel Expenses 50.00 5.00<br />

(13) - Office Expenses 80.00 5.00<br />

(21) - Supplies & Materials 150.00 67.00<br />

(27) - Minor works 50.00 20.00<br />

(50) - Other Charges 50.00 5.00<br />

(52) - Machinery & Equipments 90.00 30.00<br />

TOTAL OF 104(01) 625.00 160.00<br />

Posts already created are to be continued during 11 th five Year Plan and Annual Plan <strong>2007</strong> – 08.<br />

Head of Account 11th Five Year Plan <strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 109 - School Health Schemes<br />

Sub-Head: (01) - School Health Schemes<br />

Object Head: (01) - Salaries 20.00<br />

(11) - Domestic Travel Expenses 6.00<br />

(13) - Office Expenses 5.00<br />

(21) - Supplies & Materials 5.00<br />

(52) - Machinery & Equipments 2.00<br />

TOTAL OF 109(01) 38.00<br />

Posts already created are to be continued during 11 th five Year Plan and Annual Plan <strong>2007</strong> – 08.<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 110 - Hospital & Dispensaries<br />

Sub-Head: (01) - Hospital & Dispensaries<br />

Object Head: (01) - Salaries 3036.00 335.00<br />

(02) - Wages 20.00 1.00<br />

(06) - Medical Treatment 80.00 20.00<br />

(11) - Domestic Travel Expenses 60.00 8.00<br />

(13) - Office Expenses 1200.00 20.00<br />

(20) - Other Administrative Expenses 20.00 -<br />

(50) - Other Charges 170.00 5.00<br />

TOTAL OF 110(01) 4586.00 389.00<br />

Staff:- Post already created and other essential posts to be created during 11th Five Year Plan and<br />

Annual Plan <strong>2007</strong>-08 are 533 and 81 respectively.


- 249 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 110 - Hospital & Dispensaries<br />

Sub-Head: (03) - Pharmacy & Nursing Council<br />

Object Head:<br />

(31) - Grant-in-aid 15.00 9.00<br />

TOTAL OF 110(03) 15.00 9.00<br />

Head of Account 11<br />

(Rs. in lakhs)<br />

th Minor Head: 200 – Other Health Schemes<br />

Sub-Head: (01) – Cobalt Therapy Unit<br />

Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Object Head: (01) – Salaries 15.00 2.10<br />

(02) – Wages - 0.02<br />

(06) – Medical Treatment - 5.00<br />

(11) – Domestic Travel Expenses - 0.02<br />

(13) – Office Expenses - 0.02<br />

(21) – Supplies & Materials - 0.02<br />

(52) – Machinery & Equipments - 0.02<br />

TOTAL OF 200(01) 15.00 7.20<br />

15 posts are proposed to be maintained during <strong>2007</strong> – 08 and 11 th Plan.<br />

Head of Account 11<br />

(Rs. in lakhs)<br />

th Minor Head: 200 – Other Health Schemes<br />

Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Sub-Head: (02) – Cancer Research & Treatment Programme<br />

Object Head: (01) – Salaries 8.00 1.00<br />

(06) – Medical Treatment 2.00 2.00<br />

(11) – Domestic Travel Expenses - 1.00<br />

(13) – Office Expenses - -<br />

(21) – Supplies & Materials - -<br />

(50) – Other Charges - -<br />

(52) – Machinery & Equipments - -<br />

TOTAL OF 200(02) 10.00 4.00<br />

23 posts already created are to be maintained during <strong>2007</strong> – 08 and 11 th Plan.<br />

Head of Account<br />

Minor Head: 102 - Homeopathy<br />

Sub-Head: (01) - Homeopathy<br />

11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Object Head: (01) - Salaries 13.00 1.50<br />

(11) - Domestic Travel Expenses 7.00<br />

(13) - Office Expenses 7.00 1.00<br />

(21) - Supplies & Materials 8.00 1.00<br />

TOTAL OF 102(01) 35.00 3.50


- 250 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account<br />

Minor Head: 103 - Primary Health Centre<br />

Sub-Head: (01) - Primary Health Centre<br />

11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Object Head: (01) - Salaries 3600.00 703.50<br />

(02) - Wages 15.00 -<br />

(06) - Medical Treatment 110.00 40.00<br />

(11) - Domestic Travel Expenses 160.00 26.20<br />

(13) - Office Expenses 220.00 40.00<br />

(21) - Supplies & Materials 850.00 60.00<br />

(27) - Minor works 400.00 40.00<br />

(50) - Other Charges 200.00 35.00<br />

(52) - Machinery & Equipments 400.00 30.00<br />

(53) - Major Works 271.00 24.00<br />

TOTAL OF 103(01) 6226.00 998.70<br />

I. New Schemes:<br />

i) Establishment of 10 new Sub-Centre @9 lakhs with quarters - Rs. 90.00 lakhs<br />

ii) Establishment of 1 new CHC @Rs. 135 lakhs (PWD) - Rs. 135.00 lakhs<br />

II. Continuing Schemes:<br />

i) Providing Staff Quarters and improvement of the existing<br />

CHC/PHC/Sub-Centre and Staff Quarters]<br />

- Rs. 47.00 lakhs<br />

ii) a) Reconstruction of PHC 2 nos. @Rs. 40.00 lakhs (PWD) - Rs. 80.00 lakhs<br />

b) Reconstruction of CHC 2 nos. @Rs. 28 lakhs (PWD) - Rs. 56.00 lakhs<br />

c) Reconstruction of S/C with quarter 5 nos. @Rs. 9 lakhs - Rs. 45.00 lakhs<br />

iii) Reconstruction of Staff Quarters<br />

a) M.O. Qtrs. IV Type 5 nos. @ Rs. 10 lakhs - Rs. 50.00 lakhs<br />

b) Twin MO Qtrs. For PHC 4 nos. @ Rs. 20 lakhs - Rs. 80.00 lakhs<br />

c) Type III Qtrs. For S/N, Pharmacist etc. 5 nos. @ Rs. 7 lakhs - Rs. 35.00 lakhs<br />

d) Type III Qtrs. For PHC 5 nos. @ Rs. 7 lakhs - Rs. 35.00 lakhs<br />

e) Type I Qtrs. For Grade D Staff 6 nos. @ Rs. 3 lakhs - Rs. 18.00 lakhs<br />

Total - Rs. 671.00 lakhs<br />

2) Staff: Entertainment of 742 posta already created and creation of other essential 19 posts are to be<br />

maintained during <strong>2007</strong>-08 Annual Plan and 11 th Plan.<br />

Head of Account<br />

Minor Head: 105 - Allopathy<br />

Sub-Head: (02) - Training<br />

Object Head:<br />

11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

(11) - Domestic Travel Expenses 600.00 5.00<br />

(13) - Office Expenses 617.00 5.00<br />

TOTAL OF 105(02) 1217.00 10.00


- 251 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (01) - National Leprosy Control Programme<br />

Object Head: (01) - Salaries 171.00 50.00<br />

(06) - Medical Treatment 88.00 6.00<br />

(11) - Domestic Travel Expenses 15.00 2.00<br />

(13) - Office Expenses 15.00 4.00<br />

TOTAL OF 101(01) 289.00 62.00<br />

46 posts created are to be maintained during <strong>2007</strong> – 08 and 11 th Plan.<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (02) - National Programme for Control of Blindness<br />

Object Head: (01) - Salaries 50.00 7.50<br />

(11) - Domestic Travel Expenses 10.00 1.00<br />

(13) - Office Expenses 10.00 1.00<br />

TOTAL OF 101(02) 70.00 9.50<br />

7 posts are to be maintained during <strong>2007</strong> –08 and 11 th Plan.<br />

Head of Account 11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

(Rs. in lakhs)<br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (03) - National T.B. Control Prog.<br />

Object Head: (01) - Salaries 70.00 25.00<br />

(06) - Medical Treatment 16.50 3.00<br />

(11) - Domestic Travel Expenses 10.00 0.50<br />

(13) - Office Expenses 10.00 1.00<br />

(21) - Supplies & Materials 10.50 1.00<br />

TOTAL OF 101(03) 117.00 30.50<br />

As per letter of understanding maintenance for the State TB Cell with staffing and resources as per the<br />

guidelines issued by the Govt. of India and assigned an officer of State Health System in the rank of Joint<br />

Director or above as full time State TB Officer to head of the State TB Cell.<br />

Therefore, to ensure that adequate staffing support in the State TB Cell, creation of various posts are<br />

proposed. Sufficient funds are to be made available in the Plan. 30 posts already created are to be<br />

maintained during <strong>2007</strong>-08 and 11 th Plan.


- 252 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (04) - Control of Epidemic<br />

Object Head: (01) - Salaries 10.00 0.10<br />

(11) - Domestic Travel Expenses 15.00 -<br />

(13) - Office Expenses 15.00 5.00<br />

(21) - Supplies & Materials 15.00 2.00<br />

TOTAL OF 101(04) 55.00 7.10<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (06) - Sexually Transmitted Disease<br />

Object Head: (01) - Salaries 15.00 2.10<br />

(11) - Domestic Travel Expenses 8.00 1.00<br />

(13) - Office Expenses 5.00 0.50<br />

(50) - Other Charges 5.00 0.50<br />

TOTAL OF 101(06) 33.00 4.10<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (07) - National Goitre Control Programme<br />

Object Head: (01) - Salaries 5.00 0.01<br />

(11) - Domestic Travel Expenses 10.00 1.49<br />

(13) - Office Expenses 15.00 2.00<br />

TOTAL OF 101(07) 30.00 3.50<br />

Entertainment of one post of Laboratory Technician already created is to be continued.<br />

(Rs. in lakhs)<br />

Head of Account 11th Five Year Plan Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (08) - National Malaria Eradication Programme<br />

Object Head: (01) - Salaries 328.00 242.00<br />

(02) - Wages 15.00 0.01<br />

(06) - Medical Treatment - 8.70<br />

(11) - Domestic Travel Expenses 120.00 5.60<br />

(13) - Office Expenses 70.00 20.00<br />

(21) - Supplies & Materials 20.00 0.10<br />

(52) - Machinery & Equipments 20.00 0.09<br />

TOTAL OF 101(08) 573.00 276.50


- 253 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Rs. 328.00 lakhs is provided during 11th Five Year Plan for function of 5 post of Special Officer<br />

and to continue the post already created. However, Rs. 242.00 lakhs is proviced for salary of the<br />

post already created during Annual Plan <strong>2007</strong>-'08.<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (09) - Blood Transfusion Council<br />

Object Head: (31) - Grants-in-aid 10.00 2.00<br />

TOTAL OF 101(09) 10.00 2.00<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub-Head: (16) - Matching for IDSP<br />

Object Head:<br />

(50) - Other Charges 10.00 6.30<br />

TOTAL OF 101(16) 10.00 6.30<br />

Head of Account 11<br />

(Rs. in lakhs)<br />

th Five Year Plan Annual Plan<br />

Minor Head: 104 – Drug Control<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Sub-Head: (01) – Drug Control Programme<br />

Object Head: (01) – Salaries 122.00 35.00<br />

(06) – Medical Treatment 10.00 10.00<br />

(11) – Domestic Travel Expenses 10.00 5.00<br />

(13) – Office Expenses 10.00 14.00<br />

(50) – Other Charges 10.00 11.00<br />

TOTAL OF 104(01) 162.00 75.00<br />

12 posts created are to be maintained during <strong>2007</strong> – 08 Annual Plan and 11 th Plan.<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 107 - Public Health Laboratories<br />

Sub-Head: (01) - Public Health Laboratories<br />

Object Head:<br />

(13) - Office Expenses 2.00 3.50<br />

(50) - Other Charges 3.00 3.50<br />

TOTAL OF 107(01) 5.00 7.00


- 254 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

Head of Account 11<br />

(Rs. in lakhs)<br />

th Five Year Plan Annual Plan<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

Minor Head: 112 – Public Health Education<br />

Sub-Head: (01) – Public Health Education<br />

Object Head: (01) – Salaries 20.00 8.00<br />

(06) – Medical Treatment - 0.50<br />

(11) – Domestic Travel Expenses 5.00 3.00<br />

(13) – Office Expenses 5.00 3.00<br />

(16) – Publication 4.00 5.00<br />

(26) – Advertising & Publicity 5.00 4.50<br />

(52) – Machinery & Equipments 5.00 1.00<br />

TOTAL OF 112(01) 44.00 25.00<br />

8 posts are proposed to be maintained during <strong>2007</strong> – 08 Annual Plan and 11 th Plan.<br />

Head of Account 11th Five Year Plan<br />

(Rs. in lakhs)<br />

Annual Plan<br />

Minor Head: - Disaster Management<br />

Sub-Head: - Disaster Management<br />

Object Head:<br />

<strong>2007</strong>-<strong>2012</strong> <strong>2007</strong>-08<br />

(11) - Domestic Travel Expenses 2.00 -<br />

(13) - Office Expenses 2.00 -<br />

(21) - Supplies & Materials 2.00 -<br />

(52) - Machinery & Equipments 2.00 -<br />

TOTAL OF 8.00 -<br />

(Rs. in lakhs)<br />

Head of Account 11th Five Year Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 101 - Rural Family Welfare Services<br />

Sub-Head: (01) - Rural Family Welfare Services<br />

Object Head: (01) - Salaries 80.00 52.00<br />

(06) - Medical Treatment 10.00 5.00<br />

(11) - Domestic Travel Expenses 10.00 7.80<br />

(13) - Office Expenses 10.00 4.00<br />

TOTAL OF 101(01) 110.00 68.80<br />

This programmes has been taken up under Central Sponsored Scheme (C.S.S.) and discontinued by the<br />

Government of India wherefore it was directed that the following programmes should be taken up by State<br />

Government. As such amount of Rs. 68.80 lakhs is approved for continuation under Plan. 70 posts are to<br />

be maintained.


- 255 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HEALTH & FAMILY WELFARE<br />

(Rs. in lakhs)<br />

Head of Account 11th Five Year Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 101 - Rural Family Welfare Services<br />

Sub-Head: (02) - P.P. Unit at Sub-Div level<br />

Object Head: (01) - Salaries 99.00 27.00<br />

(06) - Medical Treatment 2.00 4.00<br />

(11) - Domestic Travel Expenses 2.00 2.00<br />

(13) - Office Expenses 15.00 4.00<br />

TOTAL OF 101(02) 118.00 37.00<br />

27 posts are proposed to be continued during <strong>2007</strong> – 08 Annual Plan and 11 th Plan.<br />

(Rs. in lakhs)<br />

Head of Account 11th Five Year Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Annual Plan <strong>2007</strong>-08<br />

Minor Head: 102 - Urban Family Welfare Services<br />

Sub-Head: (01) -District Post Partum Unit<br />

Object Head: (01) - Salaries 40.00 15.00<br />

(06) - Medical Treatment 6.00 2.00<br />

(11) - Domestic Travel Expenses 10.00 3.00<br />

(13) - Office Expenses 10.00 3.00<br />

TOTAL OF 102(01) 66.00 23.00<br />

12 posts are proposed to be maintained during <strong>2007</strong> – 08 Annual Plan and 11 th Plan.<br />

…..


- 256 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

HOSPITAL & MEDICAL EDUCATION<br />

Introduction<br />

Recently Government of <strong>Mizoram</strong> has approved bifurcation of Health &<br />

Family Welfare into two Directorate viz. Hospital & Medical Education and Health<br />

Services where all the district Hospitals including T.B. Hospital, College of Nursing<br />

and School of Nursing are placed under the purview of Directorate of Hospital &<br />

Medical Education. A separate budget is provided for the two Directorates.<br />

Approach<br />

Health is a fundamental and integral part of productive life, development,<br />

quality of life and a major social investment. It is inter-sectoral and involves<br />

individual, families, communities, state and nation. It is world wide social goal.<br />

As Directorate of Hospital & Medical Education is a newly bifurcated<br />

establishment, it requires a lot of infrastructures in providing quarters to all the staff<br />

working in the District Hospitals. However, to facilitate the Hospitals into a full<br />

fledged Hospital, adequate supply of equipment and machinery is essential to<br />

provide Health Care to the patients who required surgical intervention, whether it is<br />

general surgery, gynaecological surgery, eye, ENT including emergency life saving<br />

operation. Therefore, to improve the Health Care facilities in all the District<br />

Hospitals such as Civil Hospital Lunglei, Saiha, Kolasib, Champhai, Serchhip,<br />

Mamit and Lawngtlai, sufficient provision is ear marked during 11 th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong> as well as Annual Plan <strong>2007</strong>-2008 for procurement of Hospital<br />

equipments, medicines and creation of various disciplines of new posts so as to<br />

avoid many patients who were referred outside the State for treatment as the<br />

Government incurred financial loss for their medical treatment outside the State.<br />

Moreover, on the basis of the inspection conducted by the Indian Nursing<br />

Council, the existing School of Nursing is permitted for B.Sc. Nursing Programme<br />

with intake of 30 seats where the Government of <strong>Mizoram</strong> has also approved the<br />

proposal for upgrading the existing School of Nursing into College of Nursing.<br />

Therefore, with a view to establish a full fledged College of Nursing, certain posts<br />

are proposed during 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> for engagement of qualified<br />

teachers in a new established College of Nursing.<br />

Therefore, to function this new established Directorate, it is expected to<br />

provide adequate fund during 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> so that functioning of<br />

all District Hospitals will be effective.


- 257 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

<strong>DRAFT</strong> <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-08 & <strong>DRAFT</strong> 11th <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong>-<strong>2012</strong><br />

HOSPITAL & MEDICAL EDUCATION.<br />

(Rupees in lakhs)<br />

Head of Development<br />

Annual Plan<br />

<strong>2007</strong>-2008<br />

Proposed Outlays for 11th<br />

Five Year Plan <strong>2007</strong>-<strong>2012</strong><br />

A. Hospital & Dispensary<br />

(1) Direction 38.00 233.00<br />

(2) Administration 59.90 266.00<br />

(3) Medical Store Depots 157.00 2952.00<br />

(4) Hospital & Dispensary 676.00 6021.00<br />

(5) State Hospital 0.10 3538.00<br />

(6) Tele-Medicine 1.20 25.00<br />

(7) Cobalt Therapy Unit 30.00 233.00<br />

(8) Cancer Research & Treatment Prog. 62.00 418.00<br />

(9) Homeopathy - ISM 4.01 95.00<br />

(10) National Mental Health Prog. 0.09 53.00<br />

(11) Primary Health Center 377.60 1127.00<br />

(12) National Leprosy Control Prog. 9.00 55.00<br />

(13) National Prog. For Control of Blindness 6.00 60.00<br />

(14) National T.B. Control Prog. 9.00 60.00<br />

(15) Control of Epidemic 182.00<br />

(16) Sexually Transmitted Diseases 8.00 53.00<br />

(17) National Malaria Eradication Prog. 11.00 67.00<br />

(18) Non Communicable Diseases 1.00 10.00<br />

(19) Disaster Management 1.00 10.00<br />

(20) Bio-Medical Wastage 3.00 26.00<br />

(21) Rural Family Welfare Services 42.00 242.00<br />

(22) District Post Partum Unit 25.00 133.00<br />

(23) Post Partum Unit at Sub-division level 24.00 138.00<br />

Sub. Total<br />

B. Medical Education Research & Training<br />

1544.90 15997.00<br />

(1) Medical Education 147.00 1008.00<br />

(2) Training 2.00 95.00<br />

(3) Research 5.00 58.00<br />

(4) Nursing School, Lunglei 60.10 300.00<br />

(5) College of Nursing 1.00 535.00<br />

Sub. Total 215.10 1996.00<br />

GRAND TOTAL 1760.00 17993.00


- 258 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

A : HOSPITAL & DISPENSARY<br />

(1) Direction : Government of <strong>Mizoram</strong> approved bifurcation of Health &<br />

Family Welfare into two Directorates viz. Hospital & Medical Education and<br />

Health Services. Therefore, to run Directorate of Hospital & Medical<br />

Education, Rs. 233.00 lakhs is proposed for maintenance of 21 nos of posts.<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Minor<br />

Head: 001 - Direction & Administration<br />

Sub Head : (01) - Direction<br />

Object<br />

Head : (01) - Salaries 15.40 80.00<br />

(02) - Wages 0.50 3.00<br />

(06) - Medical Treatment<br />

(11) - Domestic Travel Expenses 4.00 25.00<br />

(13) - Office Expenses 14.00 75.00<br />

(20) - Other Administrative Expenses 5.00<br />

(26) - Advertising & Publicity 10.00<br />

(27) - Minor Works 2.50 24.00<br />

(50) - Other Charges 1.60 11.00<br />

Total of<br />

001(01) 38.00 233.00<br />

(2) Administration :<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Sub Head : (02) - Administration<br />

Object Head : (01) - Salaries 15.60 78.00<br />

(06) - Medical Treatment 7.30 38.00<br />

(11) - Domestic Travel<br />

Expenses 2.00 15.00<br />

(13) - Office Expenses 20.00 60.00<br />

(27) - Minor Works 10.00 40.00<br />

(50) - Other Charges 5.00 35.00<br />

Total of 001(02) 59.90 266.00


- 259 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(3) Medical Store Depots : As it is a newly bifurcated Department, separate<br />

Medical Store is essential to provide the requirement of the Hospitals. Rs. 2952 is<br />

proposed as follows -<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 104 - Medical Store Depots<br />

Sub Head : (01) - Medical Store Depots<br />

Object Head : (01) - Salaries 1.00 90.00<br />

(06) - Medical Treatment 0.50 3.00<br />

(11) - Domestic Travel Expenses 0.50 5.00<br />

(13) - Office Expenses 1.00 6.00<br />

(21) - Supplies & Materials 133.00 1875.00<br />

(50) - Other Charges 1.00 8.00<br />

(51) - Motor Vehicle 2.00 15.00<br />

(52) - Machinery & Equipments 18.00 950.00<br />

Total of 104(01) 157.00 2952.00<br />

Existing two posts will be maintained during <strong>2007</strong>-08 Annual Plan.<br />

(4) Hospital & Dispensary : This Programme includes all District Hospitals such as<br />

Civil Hospital – Lunglei, Saiha, District Hospitals – Kolasib, Champhai, Serchhip,<br />

Mamit, Lawngtlai and Referral Hospital, Falkawn. Therefore, to run these institutions,<br />

fund is proposed as follows -<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 110 - Hospital & Dispensary<br />

Sub Head : (01) - Hospital & Dispensary<br />

Object Head : (01) - Salaries 382.00 2050.00<br />

(02) - Wages 12.00 75.00<br />

(06) - Medical Treatment 30.00 220.00<br />

(11) - Domestic Travel Expenses 20.00 120.00<br />

(13) - Office Expenses 50.00 287.00<br />

(16) - Publications 5.00 35.00<br />

(20) - Other Administrative Expenses 1.00 12.00<br />

(21) - Supplies & Materials 41.00 230.00<br />

(26) - Advertising & Publicity 0.56 5.00<br />

(27) - Minor Works 32.44 166.00<br />

(31) - Grants-in-Aid<br />

(50) - Other Charges 70.00 470.00<br />

(51) - Motor Vehicle 2.00 15.00<br />

(52) - Machinery & Equipments 30.00 220.00<br />

(53) – Major Works 2116.00<br />

Total of 110(01) 676.00 6021.00<br />

Maintenance of 432 posts of various category will be maintained during <strong>2007</strong> –08


- 260 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(5) State Hospital : Aizawl Civil Hospital is proposed to be upgraded into 500 beds<br />

during 11 th Five Year Plan and shall be re-designated as State Hospital. The existing<br />

staff shall manned the Hospital and the additional posts which is the minimal<br />

requirement are proposed to be created. Therefore, Rs. 3538.00 lakhs is proposed<br />

under this programme for the following :-<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (06) - State Hospital<br />

Object Head : (01) - Salaries 0.02 2493.00<br />

(02) - Wages 0.01 75.00<br />

(11) - Domestic Travel<br />

Expenses 0.01 145.00<br />

(13) - Office Expenses 0.02 125.00<br />

(21) - Supplies & Materials 0.01 150.00<br />

(27) - Minor Works 0.01 40.00<br />

(50) - Other Charges 0.01 180.00<br />

(52) - Machinery &<br />

Equipments 0.01 250.00<br />

(53) – Major Works 80.00<br />

Total of 110(06) 0.10 3538.00<br />

(6) Tele-medicine :<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (07) - Tele Medicine<br />

Object Head : (13) - Office Expenses 1.20 25.00<br />

Total of 110(07) 1.20 25.00<br />

(7) Cobalt Therapy Unit :<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 200 - Other Health Schemes<br />

Sub Head : (01) - Cobalt Therapy Unit<br />

Object Head : (01) - Salaries 15.00 95.00<br />

(02) - Wages 1.00 8.00<br />

(06) - Medical Treatment 5.00 35.00<br />

(11) - Domestic Travel<br />

Expenses 1.00 15.00<br />

(13) - Office Expenses 1.00 15.00<br />

(21) - Supplies & Materials 5.00 35.00<br />

(27) - Minor Works 1.00 15.00<br />

(52) - Machinery &<br />

Equipments 1.00 15.00<br />

Total of 200(01) 30.00 233.00<br />

Maintenance of existing 6 posts will be maintained during <strong>2007</strong>-08 Annual Plan.


- 261 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(8) Cancer Research & Treatment Prog. :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (02) - Cancer Research & Treatment Prog.<br />

Object Head : (01) - Salaries 30.00 180.00<br />

(06) - Medical Treatment 5.00 35.00<br />

(11) - Domestic Travel Expenses 1.00 8.00<br />

(13) - Office Expenses 2.00 15.00<br />

(21) - Supplies & Materials 5.00 35.00<br />

(27) - Minor Works 1.00 25.00<br />

(52) - Machinery & Equipments 18.00 120.00<br />

Total of 200(02) 62.00 418.00<br />

Existing 11 posts will be maintained during <strong>2007</strong>-08 Annual Plan.<br />

(9) Homeopathy/Ayush :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 102 – Homeopathy/AYUSH<br />

Sub Head : (01) - Homeopathy – ISM/Ayush<br />

Object Head : (01) - Salaries 4.00 80.00<br />

(53) – Major Works 0.01 15.00<br />

Total of 102(01) 4.01 95.00<br />

Existing 1 no medical officer will be maintained during <strong>2007</strong>-08 Annual Plan.<br />

(10) National Mental Health Prog. : For implementation of Mental Health Prog.,<br />

establishment of Institute of Human Behavior and Allied Sciences (INHUBUS) is<br />

proposed during 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>.<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed Outlay for<br />

11th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 200 - Other Systems<br />

Sub Head : (01) National Mental Health Prog.<br />

Object Head : (01) - Salaries 0.01 20.00<br />

(11) - Domestic Travel Expenses 0.01 2.00<br />

(13) - Office Expenses 0.01 3.00<br />

(14) - Rents, Rates, Taxes 0.01 1.00<br />

(21) - Supplies & Materials 0.01 6.00<br />

(50) - Other Charges 0.01 5.00<br />

(51) - Motor Vehicle 0.01 5.00<br />

(52) - Machinery & Equipments 0.01 6.00<br />

(53) – Major Works 0.01 5.00<br />

Total of<br />

200(01) 0.09 53.00


- 262 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(11) Primary Health Center :<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed Outlay<br />

for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 103 - Primary Health Center<br />

Sub Head : (01) - Primary Health Center<br />

Object Head : (01) – Salaries 312.00 954.00<br />

(02) - Wages 0.60 3.00<br />

(06) - Medical Treatment 25.00 60.00<br />

(11) - Domestic Travel Expenses 10.00 30.00<br />

(13) - Office Expenses 10.00 30.00<br />

(50) - Other Charges 20.00 50.00<br />

Total of 103(01) 377.60 1127.00<br />

Existing 165 Nos. of posts will be maintained during <strong>2007</strong> – 08 Annual Plan.<br />

(12) National Leprosy Control Prog. :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed Outlay<br />

for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Minor Head:<br />

101 - Prevention & Control of<br />

Diseases<br />

(01) - National Leprosy Control<br />

Sub Head : Prog.<br />

Object Head : (01) - Salaries 6.00 35.00<br />

(02) - Wages 2.00<br />

(06) - Medical Treatment 1.00 6.00<br />

(11) - Domestic Travel Expenses 1.00 6.00<br />

(13) - Office Expenses 1.00 6.00<br />

Total of 101(01) 9.00 55.00<br />

Maintenance of 6 posts is proposed during <strong>2007</strong>-08 Annual Plan.<br />

(13) National Prog. For Control of Blindness :<br />

Sub Head :<br />

Head of Account<br />

(02) - National Prog. For Control<br />

of Blindness<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed Outlay<br />

for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Object Head : (01) - Salaries 4.00 50.00<br />

(06) - Medical Treatment 1.00 6.00<br />

(11) - Domestic Travel Expenses 0.50 2.00<br />

(13) - Office Expenses 0.50 2.00<br />

Total of 101(02) 6.00 60.00<br />

Entertainment of posts already created proposed to be continue are –<br />

Sl. No. Name of post Scale of pay No. of post<br />

1 Ophth. Asstt. 4500-7000 2<br />

Total 2


- 263 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(14) National T.B. Control Prog. :<br />

Head of Account<br />

Annual Plan<br />

<strong>2007</strong> - 08<br />

Proposed Outlay<br />

for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Minor Head:<br />

101 - Prevention & Control of<br />

Diseases<br />

(03) - National T.B. Control<br />

Sub Head : Prog.<br />

Object Head : (01) - Salaries 6.00 35.00<br />

(06) - Medical Treatment<br />

(11) - Domestic Travel<br />

2.00 15.00<br />

Expenses 0.50 5.00<br />

(13) - Office Expenses 0.50 5.00<br />

Total of 101(03) 9.00 60.00<br />

Maintenance of 8 posts is proposed during <strong>2007</strong>-08 Annual Plan.<br />

(15) Control of Epidemic : Establishment of Epidemiology cell during 11 th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong> is proposed as follows -<br />

Head of Account<br />

Sub Head : (04) - Control of Epidemic<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Object Head : (01) - Salaries - 150.00<br />

(06) - Medical Treatment - 3.00<br />

(11) - Domestic Travel Expenses - 9.00<br />

(13) - Office Expenses - 20.00<br />

Total of 101(04) - 182.00<br />

(16) Sexually Transmitted Diseases :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (06) - Sexually Transmitted Diseases<br />

Object Head : (01) - Salaries 5.00 35.00<br />

(06) - Medical Treatment 1.00 6.00<br />

(11) - Domestic Travel Expenses 1.00 6.00<br />

(13) - Office Expenses 1.00 6.00<br />

Total of 101(06) 8.00 53.00<br />

Existing 3 posts will be maintained during <strong>2007</strong> – 08 Annual Plan.<br />

(17) National Malaria Eradication Prog. :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (08) - National Malaria Eradication Prog.<br />

Object Head : (01) - Salaries 9.00 55.00<br />

(11) - Domestic Travel Expenses 1.00 6.00<br />

(13) - Office Expenses 1.00 6.00<br />

Total of 101(08) 11.00 67.00<br />

Existing 6 posts will be maintained during <strong>2007</strong> – 08 Annual Plan.


- 264 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(18) Non-communicable Diseases :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (10) - Non Communicable Disease<br />

Object Head : (13) - Office Expenses 0.50 5.00<br />

(50) - Other Charges 0.50 5.00<br />

Total of 101(10) 1.00 10.00<br />

(19) Disaster Management :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (11) - Disaster Management<br />

Object Head : (50) - Other Charges 0.50 5.00<br />

(52) - Machinery & Equipment 0.50 5.00<br />

Total of 101(11) 1.00 10.00<br />

(20) Bio-medical Wastage :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 101 - Prevention & Control of Diseases<br />

Sub Head : (12) - Bio-Medical Wastage<br />

Object Head : (50) - Other Charges 1.00 6.00<br />

(52) - Machinery & Equipment 2.00 20.00<br />

Total of 101(12) 3.00 26.00<br />

The following Programmes (Sl. No. 21,22 & 23) has been taken up under<br />

Centrally Sponsored Schemes and discontinued by Govt. of India. Therefore, it was directed<br />

that these Programmes should be taken up by the State Govt. As such, fund is proposed as<br />

follows –<br />

(21) Rural Family Welfare Services :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 101 - Rural Family Welfare Services<br />

Sub Head : (01) - Rural Family Welfare Services<br />

Object Head : (01) - Salaries 35.00 195.00<br />

(06) - Medical Treatment 5.00 35.00<br />

(11) - Domestic Travel Expenses 1.00 6.00<br />

(13) - Office Expenses 1.00 6.00<br />

Total of 101(01) 42.00 242.00<br />

Existing 8 posts will be maintained during <strong>2007</strong> – 08.


- 265 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(22) District Post Partum Unit :<br />

Minor Head:<br />

Head of Account<br />

102 - Urban Family Welfare<br />

Services<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five Year<br />

Plan <strong>2007</strong>-<br />

<strong>2012</strong><br />

Sub Head : (01) - District Post Partum Unit<br />

Object Head : (01) - Salaries 23.00 120.00<br />

(06) - Medical Treatment 1.00 6.00<br />

(11) - Domestic Travel Expenses 0.50 3.00<br />

(13) - Office Expenses 0.50 4.00<br />

Total of 102(01) 25.00 133.00<br />

Existing 6 nos of posts will be maintained during <strong>2007</strong>-08 Annual Plan.<br />

(23) Post Partum Unit at Sub-division level :<br />

Sub Head :<br />

Head of Account<br />

(02) - Post Partum Unit at Subdivision<br />

level<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Object Head : (01) - Salaries 22.00 125.00<br />

(06) - Medical Treatment 1.00 6.00<br />

(11) - Domestic Travel Expenses 0.50 3.00<br />

(13) - Office Expenses 0.50 4.00<br />

Total of 103(02) 24.00 138.00<br />

Existing 6 nos of posts will be maintained during <strong>2007</strong>-08 Annual Plan.<br />

B : MEDICAL EDUCATION, RESEARCH & TRAINING :<br />

(1) Medical Education :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 105 - Allopathy<br />

Sub Head : (01) - Medical Education<br />

Object Head : (01) - Salaries<br />

(06) - Medical Treatment<br />

(11) - Domestic Travel Expenses<br />

(13) - Office Expenses 1.00 15.00<br />

(14) - Rent, Rates, Taxes<br />

(26) - Advertising & Publicity<br />

(34) - Scholarship/Stipend 145.00 978.00<br />

(50) - Other Charges 1.00 15.00<br />

(51) - Motor Vehicle<br />

(52) - Machinery & Equipments<br />

Total of 105(01) 147.00 1008.00


- 266 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(2) Training :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (02) - Training<br />

Object Head : (11) - Domestic Travel Expenses 1.00 85.00<br />

(50) - Other Charges 1.00 10.00<br />

Total of 105(02) 2.00 95.00<br />

(3) Research :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (03) - Research<br />

Object Head : (11) - Domestic Travel Expenses 1.00 20.50<br />

(13) - Office Expenses 1.00 19.25<br />

(50) - Other Charges 0.50 3.25<br />

(51) - Motor Vehicle 2.50 15.00<br />

Total of 105(02) 5.00 58.00<br />

(4) Nursing School, Lunglei :<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Minor Head: 003 - Training<br />

Sub Head : (01) - Nursing School, Lunglei<br />

Object Head : (01) - Salaries 32.00 137.00<br />

(06) - Medical Treatment 5.00 26.00<br />

(11) - Domestic Travel Expenses 3.00 16.00<br />

(13) - Office Expenses 5.00 26.00<br />

(14) - Rent, Rates, Taxes 2.60 15.00<br />

(34) - Scholarship/Stipend 9.00 55.00<br />

(50) - Other Charges 2.00 13.00<br />

(52) - Machinery & Equipments 1.00 6.00<br />

(53) – Major Works 0.50 5.00<br />

Total of 003(01) 60.10 300.00<br />

Existing 24 posts will be maintained during <strong>2007</strong>-08 Annual Plan.


- 267 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOSPITAL & MEDICAL EDUCATION (HEALTH)<br />

(5) College of Nursing : The Ministry, Govt. of India approved up-gradation of<br />

School of Nursing, Aizawl into College of Nursing with intake of 30 seats where the<br />

Govt. of <strong>Mizoram</strong> also approved the proposal for up-grading the existing School of<br />

Nursing into College of Nursing. Therefore, to upgrade the existing posts during 11 th<br />

Five Year Plan <strong>2007</strong>-<strong>2012</strong>, Rs. 535.00 lakhs is proposed as follows:-<br />

Head of Account<br />

Annual<br />

Plan<br />

<strong>2007</strong> - 08<br />

Proposed<br />

Outlay for<br />

11th Five<br />

Year Plan<br />

<strong>2007</strong>-<strong>2012</strong><br />

Sub Head : (02) - College of Nursing<br />

Object Head : (01) - Salaries 0.20 400.00<br />

(13) - Office Expenses 0.30 130.00<br />

(34) - Scholarship/Stipend 0.50 5.00<br />

Total of 003(02) 1.00 535.00<br />

……


- 268 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

WATER SUPPLY & SANITATION (PHE)<br />

Introduction:<br />

The Public Health Engineering Department is dealing with Water<br />

Supply and Sanitation in Rural and Urban areas. During the 10 th Five Year Plan, the main<br />

activities of PHE Department were in the Water Supply sector with very limited activities<br />

in Sanitation Sector. The outlay of 10 th Five Year Plan under State Plan was Rs. 12,333.00<br />

lakh out of which Rs. 7,772.00 lakh was for Rural Sector, Rs. 3,373.00 lakh for Urban<br />

Sector and Rs. 1,188.00 lakh for Other Sector. In the meantime, the outlay under CSS was<br />

Rs. 40,940.00 lakh out of which Rs. 8,840.00 lakh was for Rural Sector; Rs.32,000.00 lakh<br />

was for Urban Sector.<br />

In the Rural Sector the Govt. of India has launched new initiatives<br />

called BHARAT NIRMAN PROGRAMME in which all the Non-Covered (NC) and<br />

Partially Covered (PC) habitations are to be provided with Water Supply fully by the year<br />

2008-09. Provision of Low Cost Sanitation facilities in rural areas as per TOTAL<br />

SANITATION CAMPAIGN PROGRAMME launched by Government of India is also one of the<br />

major components.<br />

In respect of Urban Sector, Urban Water Supply, Sewerages and<br />

Sanitation and Solid Waste Management are the main components, which will be<br />

implemented under various newly introduced Programmes like Jawaharlal Nehru National<br />

Urban Renewal Mission(JNNURM), Urban Infrastructure Development Scheme for Small<br />

and Medium Towns(UIDSSMT), Non-Lapsable Central Pool Resources(NLCPR) etc.<br />

Over and above, it is also aimed at strengthening the existing<br />

infrastructure of Public Health Engineering Department by creation of some new key<br />

establishments.<br />

Operation and Maintenance of Urban Water Supply is one of the<br />

formidable task and fund-consuming programme. Public Health Engineering Department<br />

has to invest about Rs 36.00 crore per annum for this purpose. During the 11 th Five Year<br />

Plan period, feasibility study for Public Private Partnership (PPP) or Privatisation on O&M<br />

shall be conducted and attempt shall be made to enter into PPP in some of our Urban<br />

Water Supply Maintenance.<br />

With all these aim in view, 11 th Five Year Plan is formulated on<br />

Need-Based with due consideration on the volume of work that the Department will be<br />

able to handle within a span of Five Years time. The total proposed outlay for the 11 th Five<br />

Year Plan is therefore, Rs 38,046.00 lakh under State Sector.<br />

The Annual Plan <strong>2007</strong>-2008 is also incorporated in the 11 th Five<br />

Year Plan. The anticipated expenditure during 2006-<strong>2007</strong> under PHE Department is Rs.<br />

7219.00 lakh. The proposed outlay of the Department for Annual Plan <strong>2007</strong>-08 is Rs.<br />

9997.00 lakhs.


- 269 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

A. RURAL SECTOR:<br />

1. Rural Water Supply:<br />

a) Water Supply: Rural Water Supply comes under Bharat Nirman<br />

Programme launched by Government of India. As per the Bharat Nirman<br />

Programme, all the Non-Covered (NC) and Partially Covered (PC) habitations as per<br />

2003 Habitation Survey are proposed to be put under Fully Covered (FC) status by<br />

the year 2008-2009. The status of Rural Water Supply as per 2003 Habitation<br />

Survey pertaining to <strong>Mizoram</strong> is as shown in the Table given below :<br />

NC PC FC Total<br />

297 430 159 886<br />

Public Health Engineering Department prepared Action Plan as per<br />

the requirement of the Bharat Nirman Programme in which the fund requirement for<br />

coverage of Partially Covered and Non-Covered Habitations during 11 th Five Year<br />

Plan period worked out to be Rs. 43,700.00 lakh. In the current funding pattern of<br />

Rural Water Supply, the Government of India contribution is 50% under ARWSP<br />

and 20% of ARWSP allocation for Swajaldhara Scheme, which is also funded by<br />

Government of India. The State Government has to provide equal amount of<br />

ARWSP allocation as a matching share.<br />

However, the State Government will not be able to achieve the Bharat<br />

Nirman Action Plan unless the funding pattern is revised to 25:75 between State<br />

Government & Central Government for which proposal have been initiated from<br />

North East States and Others hilly States of India.<br />

Note : Swajaldhara is a reform initiative formulated by Government of India where<br />

emphasis is made for public involvement in selection, planning and design,<br />

implementation and partial capital cost contribution by villagers. Presently<br />

90% of the capital cost is provided by Government of India and 10% by<br />

Villagers in cash/kind/labour.<br />

b) Water Quality Monitoring and Surveillance: Water Quality Monitoring and<br />

Surveillance is of the support services under Rajiv Gandhi National Drinking Water<br />

Mission (RGNDWM). The National Workshop held on 7-9 August, 1999 on Water<br />

Quality Monitoring and Surveillance had recommended institutionalisation of<br />

Drinking Water Quality and Surveillance System in the country a catchment area<br />

approach which will be adopted by involving various grass root level, Educational<br />

and Technical institutions. Under this scheme, training on the use of Field Testing<br />

Kit will be given to the villagers and some educational and technical institutions so<br />

that the public themselves will be able to test their water quality. A three-tier<br />

structure of laboratory facilities namely Level-I (Village Level), Level-II (District<br />

Level) and Level-III (State Level) will be set-up.<br />

For implementation of this Programme, the Department has prepared Project<br />

Report amounting to Rs.398.00 lakh and Government of India had allocated an<br />

amount of Rs. 73.40 lakh during 2006-07. Fund needs to be provided from the State<br />

Plan for upgrading the existing State Laboratory into State Referral Institute which<br />

will serve as the training centre apart from water testing activities.


- 270 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

c) Sustainability and Development of Catchments Area: Most of the water supply<br />

sources yields very low discharge due to the geographical as well as geological<br />

conditions. In order to make our water sources sustainable, sustainability measures<br />

by way of recharging water sources by construction of Water retaining structures or<br />

catchments area development has become one of the most important activities due to<br />

which Government of India also included this programme under Sub-mission.<br />

Programme.<br />

d) Operation and Maintenance: In respect of maintenance of rural water supply,<br />

attempt is being made for entrusting the Operation and Maintenance activities to the<br />

Community. However, it is still practically not possible to entrust 100% Operation<br />

and Maintenance activities to the community due to various reasons like 1) Problem<br />

in raising O&M fund 2) Lack of capable and technically qualified man–power. 3)<br />

Lack of effective institutionalisation for effective O&M activities etc. The Public<br />

Health Engineering Department therefore has to take active role in maintenance of<br />

water supply asset by way of procurement of spare parts, arrangement of skill<br />

personnel etc. The Department has therefore, to invest huge amount of fund towards<br />

Operation and Maintenance.<br />

Usually, 15% of ARWSP fund released by Government of India is<br />

utilised for O&M of Rural Water Supply which amounts to approximately Rs 200<br />

lakh per year.<br />

e) Communication and Capacity Development through IEC activities:<br />

Awareness creation among the masses on the impact of save drinking water supply<br />

and save sanitation practices has become one of the priority sectors for successful<br />

implementation of water supply and sanitation programme. In many cases water<br />

supply and sanitation facilities are being provided but the consumers do not<br />

appreciate and not utilise properly making the ultimate goal not fulfilled. It is<br />

therefore, felt necessary that the public should be first educated to accept and<br />

recognised the importance of having potable drinking water and safe sanitation<br />

practices for up-liftment of their general health.<br />

With this in view, a small cell called ‘Communication and<br />

Capacity Development Unit’ in PHE Department was created under the assistance of<br />

Govt of India where 100 % financial assistance will be provided for Three years, i.e<br />

2006-07 to 2008-09 beyond which the expenditure will be shared between Central<br />

and State at 75 : 25 respectively.<br />

B. Rural Sanitation Programme (Total Sanitation Campaign):<br />

1. Construction of Sanitary Unit in Educational institutions and providing<br />

incentive to BPL families including Mass Awareness Campaign: Under Rural<br />

Sanitation Programme, the Government of India had launched a reform initiative<br />

called Total Sanitation Campaign (TSC) in which public involvement is the main<br />

theme.<br />

Detailed Project Report of Total Sanitation Campaign in all eight<br />

Districts in <strong>Mizoram</strong> has been approved and implementation is in good progress.<br />

However, the Project will be spilled over to 11 th Plan period. Moreover, due to the<br />

revision to Unit Cost of sanitary latrine and inclusion of Solid and Liquid waste<br />

management under the scope of the programme, the Project needs to be revised. The<br />

total Project cost is to be shared between Government of India, State Government<br />

and beneficiaries.


- 271 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

2. URBAN SECTOR<br />

1) Urban Water Supply: There are 1 City and 21 Census Towns in <strong>Mizoram</strong>.<br />

Lawngtlai, the Capital of Lawngtlai District, having a population of 14600 souls as<br />

per 2001 census, which is not yet declared as Census Town by Census of India, is<br />

considered as Town by PHE Department resulting in the Number of towns to become<br />

23 Towns as per PHE Department’s record.<br />

<strong>Mizoram</strong> is still having long way ahead in achieving the National Norm<br />

of Water Supply Level in Urban Water Supply Programme. Detail status of Urban<br />

Water Supply in <strong>Mizoram</strong> is as shown below:<br />

STATUS OF URBAN WATER SUPPLY IN MIZORAM<br />

Sl.No. Name of<br />

Town<br />

Populati<br />

on<br />

Water<br />

Supply<br />

level (in<br />

lpcd)<br />

Project in hand Remarks<br />

1 N. Kawnpui 6472 70 On-going project under<br />

State Plan. Commissioned<br />

Sept, 2006.<br />

2 Champhai 25465 - On-going project funded<br />

under NLCPR<br />

3 Khawhai 2403<br />

4 Biate<br />

2227<br />

5 N. Vanlaiphai 3275<br />

6 Mamit 5110 70 On-going project under<br />

NLCPR. Commissioned in<br />

Oct, 2006.<br />

7 Aizawl 228280 45 GAWSS Ph-II is in<br />

progress under NLCPR<br />

funding<br />

8 Saitual 10966 60<br />

9 Zawlnuam 3120 40<br />

10 Bairabi 3304 40<br />

11 Khawzawl 10954 60<br />

12 Tlabung 3681 35 Proposal for Tlabung WSS<br />

is under consideration by<br />

DONER<br />

13 Hnahthial 7138 30<br />

14 Saiha 19826 20<br />

15 Lawngtlai 14600 20<br />

16 Thenzawl 5507 60<br />

17 Darlawn 3865 70<br />

18 Lengpui 2423 70<br />

19 Kolasib 19008 70<br />

20 Vairengte 7715 70<br />

21 Serchhip 17096 70<br />

22 Lunglei 47137 70<br />

23 Sairang 5034 70<br />

Non-<br />

Covered<br />

(NC)<br />

Partially<br />

Covered<br />

(PC)<br />

Fully<br />

Covered<br />

(FC)


- 272 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

During the 11 th Five Year Plan, all the On-going/Spilled over<br />

Projects will be completed and all partially covered and non-covered towns will also be<br />

put under fully covered with Water Supply from various Programmes of Urban<br />

Development Ministry, Government of India.<br />

a) On-going Projects:<br />

(i) Greater Aizawl Water Supply Scheme Phase-II: The Greater Aizawl<br />

Water Supply Scheme Phase-II with a revised Project cost of Rs.113.47 crore is in<br />

progress. From the whole Project, prioritised item amounting to Rs.96.08 crore only<br />

will be taken up at present. Government of India, Ministry of DoNER will provide<br />

Rs.69.12 crore out of which Rs.58.00 crore had so far been released leaving a<br />

balance of Rs.11.12 crore yet to be released. The total State Government<br />

contribution is Rs.18.98 crore out of which<br />

Rs. 17.95 crore had so far been released leaving a balance of Rs.1.03 crore yet to be<br />

released.<br />

ii) Greater Champhai Water Supply Scheme: The Greater Champhai Water Supply<br />

Scheme with an estimated cost of Rs.30.00 crore was submitted to Government of<br />

India. However, the Project got finally, without technical justification, approved at<br />

13.71 crore which would be funded from NLCPR. The Project is in progress and the<br />

Government of India, through Ministry of DoNER funded Rs.13.53 crore which has<br />

been fully released. As the approved Project cost is not able to complete the full<br />

project, The State Government released Rs.2.00 crore and the project has been<br />

commissioned with Raw Water in December 2006<br />

As all the distribution systems are yet to be implemented, separate<br />

Project Report needs to be prepared and got approved as Phase-II Project which will<br />

be roughly Rs.7.00 crore. An amount of Rs 6.30 crore is provided under Central<br />

Sector and Rs 0.70 crore is provided under State sector<br />

2) New Projects:<br />

During the 11 th Five Year Plan period all the remaining non-covered and partially<br />

covered towns will be covered under various Government of India Programme like<br />

JNNURM, UDISSMT, NLCPR etc. The followings are the towns to be covered during<br />

11 th Five Year Plan.<br />

Non-Covered Partially Covered<br />

1) Khawhai 1) Saitual<br />

2) Biate 2) Zawlnuam<br />

3) N.Vanlaiphai 3) Bairabi<br />

4) Khawzawl<br />

5) Tlabung<br />

6) Hnahthial<br />

7) Saiha<br />

8) Lawngtlai<br />

9) Thenzawl<br />

A combined Project covering the above non-covered towns viz., Khawhai, Biate<br />

and N.Vanlaiphai has been surveyed and the Detail Project Report is under preparation.<br />

The total Project cost will be roughly Rs.40.00 crore. Considering the funding pattern<br />

under JNNURM, UIDSSMT etc. where the cost sharing is usually 90:10 between<br />

Government of India – State Government. A sum of Rs.36.00 crore is provided under<br />

Central Sector and Rs. 4.00 crore under State Sector in the 11 th Five Year Plan.


- 273 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

Regarding the above, 9 Nos. of partially covered towns rough survey and<br />

investigations have been carried out in 8 towns excluding Lawngtlai for which Detailed<br />

Project Report amounting to Rs.38.86 crore have already been submitted to DoNER,<br />

Government of India. Detail Survey and preparation of Detail Project Report in 8 towns<br />

are yet to be done. The approximate fund requirement for water supply to these 9 town<br />

will be roughly Rs.108.72 crore.<br />

Besides these, Improvement and up-gradation of existing Aizawl Water Supply<br />

Scheme Phase – I is very much required. The Scheme was commissioned in the year 1988<br />

with the designed capacity of 10.2 mld. The Pumping Machineries are all out-lived and<br />

require replacement, and even the distribution system requires extension as the Aizawl<br />

City itself has now spread over a large areas. As this Aizawl Water Supply Scheme Phase<br />

– I shall also run simultaneously even after commissioning of Aizawl Water Supply<br />

Scheme PH – II, Detail Project Report for improvement amounting to Rs 48.28 crore was<br />

prepared. It is now under consideration.<br />

In addition, 4 Nos. of fully covered towns i.e Serchhip, Lunglei, Darlawn<br />

and Sairang up gradation / renovation/improvement of the existing water supply scheme<br />

i.e distribution system, pumping machineries, water sources etc are necessary and a token<br />

provision is made during 11 th Five Year Plan under State Plan.<br />

b) Operation and Maintenance:- <strong>Mizoram</strong> is wholly mountainous region with<br />

almost all towns and cities situated on the top and hill slopes. As such, the entire major<br />

water supply scheme is of pumping scheme with very high static head. As power supply is<br />

not usually not very reliable most of our pumping schemes are operated with Diesel<br />

Engines. Due to the above reason the O&M cost in <strong>Mizoram</strong> is comparably high as<br />

compared to O&M cost in plain areas. Presently the annual O&M fund requirement for<br />

maintenance of urban water supply scheme including wages and salaries, fuel cost, repair<br />

of machineries etc. is Rs. 30.00 crore. The no. Of pumping scheme is growing further due<br />

to commissioning of new projects, which result in increase in O&M fund requirement.<br />

In order to make the urban water supply scheme self sustainable or at least reduce<br />

the O&M cost feasibility study for privatisation/public private partnership (PPP) is being<br />

under process within the Department. However, due to limitation of financial expert and<br />

legal experts concrete decision could not yet be made.<br />

In order to sort out this problem the Department require the assistance of Planning<br />

Commission, Government of India to provide legal and financial expert in our feasibility<br />

study.<br />

B. URBAN SANITATION :<br />

1. Sewerage and Sanitation:- There are no Sewerage facilities in all the Cities<br />

and Towns of <strong>Mizoram</strong>. City Development Plan of Rs. 225.00 crore for Sewerage Scheme<br />

in Aizawl City was prepared recently to be implemented under JNNURM during 11 th Five<br />

Year Plan period.<br />

It is also proposed to implement Sewerage System at Lunglei Town, which is<br />

2 nd Capital of <strong>Mizoram</strong>. Detail survey and investigation and preparation of Detailed<br />

Project Report are yet to be done as such a token provision under Central Sector and under<br />

State Sector are provided during 11 th Plan.


- 274 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

2. Storm Drainage and Land-slip Protection:- <strong>Mizoram</strong> has heavy rainfall with an<br />

average annual rainfall of 2500 mm which is mainly distributed during May to August.<br />

Due to this intense rainfall compounded with steep hill slope and loose topsoil, natural<br />

disaster due to landslide frequently occurs during monsoon period. Strom water<br />

management and land-slip protection is one of the vital projects for <strong>Mizoram</strong>. City<br />

Development Plan on Storm Water Drainage and landslip protection for an amount of Rs.<br />

17,500 lakh have been prepared for Aizawl City which will be funded under JNNURM<br />

during 11 th Five Year Plan in which 90% shall be the Government of India share and and<br />

10% will be raised by State Government.<br />

During the 11 th Plan period Storm Water Drainage and Landslip Protection<br />

will also be taken up in other 7 Districts Headquarters viz. Lunglei, Lawngtlai, Saiha,<br />

Serchhip, Champhai, Kolasib and Mamit.<br />

3. Solid Waste Management: There is no systematic Solid Waste Management<br />

System in all the city and towns of <strong>Mizoram</strong>, the present practice now adopted for Aizawl<br />

City is only shifting of Solid Waste without any safe or scientific disposal system.<br />

A City Development Plan on Solid Waste Management for Aizawl City was<br />

formulated at an estimated cost of Rs. 65.00 crore to be taken up under JNNURM during<br />

11 th Five Year Plan period.<br />

It is also proposed to implement Solid Waste Management System in other 7<br />

District Headquarters viz. Lunglei, Lawngtlai, Saiha, Serchhip, Champhai, Kolasib and<br />

Mamit for which detail project report are yet be prepared.<br />

C. OTHER SECTOR:<br />

Direction and Administration:<br />

Presently, the Department is headed by Chief Engineer, who is assisted by one<br />

Additional Chief Engineer and one Superintending Engineer (Monitoring). There are four<br />

Working Circle and thirteen Divisions. To cope up with the ever increasing work loads<br />

due to rapid growth of population and increased in the demand, the Department is badly in<br />

need of strengthening and up gradation.<br />

Monitoring and Investigation Units: –<br />

For effective Planning, Monitoring, Investigation and implementation of Projects,<br />

accurate survey and investigation is a must especially in water supply works. For<br />

achieving accurate results of investigation, scientific source finding techniques has to be<br />

deployed using sophisticated instruments for studying and investigation of rainfall<br />

characteristics, soil structures, ground water potential etc. Even with the availability of<br />

accurate results of investigation, effective planning and implementation of any project<br />

largely depends on the quality of monitoring. Realising this aspects, Government of India<br />

insisted upon creation of Monitoring and Investigation unit in Public Health Engineering<br />

Department.<br />

Training :- Technology is developing very fast due to which Engineers and Scientist have<br />

to continuously update their technical knowledge to keep themselves abreast of new<br />

development.


- 275 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

WATER SUPPLY & SANITATION<br />

Researched & Development: Fund for Research and Development is provided to the<br />

State by the Rajiv Gandhi National Drinking Water Mission in order to give support to the<br />

programmes implemented under ARWSP . The policy guidelines on Research and<br />

Development for Rural Water Supply and Sanitation Sector focussed on priority areas<br />

which are-<br />

i) Water sources exploration, assessment and exploitation related technology<br />

development.<br />

ii) Technology Development for improvement in water extraction techniques.<br />

iii) Water scarcity reduction and related technology Development.<br />

iv) Technology for water quality enhancement for rural areas.<br />

v) Watershed management to optimise drinking water supply.<br />

vi) Water Health interaction in the socio economic cultural setup<br />

vii) Development of approximate rural sanitation technology.<br />

…….


- 276 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOUSING (LAD)<br />

SUBJECT: HOUSING (LAD)<br />

Proposed Eleventh Five Year Plan outlay <strong>2007</strong> - <strong>2012</strong> : Rs.<br />

22819.00 lacs<br />

Proposed Annual Plan outlay <strong>2007</strong> - 2008 : Rs. 3796.00 lacs<br />

Following schemes are proposed to be taken up during the 11 th Five<br />

Year Plan <strong>2007</strong> - <strong>2012</strong> and the Annual Plan <strong>2007</strong> - 2008.<br />

A. 02 - URBAN HOUSING:<br />

190 INVESTMENT<br />

1. LIG Housing Loan<br />

2. MIG Housing Loan<br />

3. Composite cash loan to Govt. Servant (HBA)<br />

TOTAL<br />

050 - LAND<br />

4. Site & Services<br />

5. Land Acquisition & Development<br />

6. Improvement of Cemetery<br />

800 - OTHER EXPENDITURE<br />

7. EWS Housing<br />

8. Departmental Housing<br />

03 - RURAL HOUSING<br />

TOTAL<br />

TOTAL<br />

800 - OTHER EXPENDITURE<br />

9. Internal Improvement of Town & Village<br />

10. Establishment of Co-operative society for PRI<br />

TOTAL<br />

80 - GENERAL<br />

11. Building Technology & Research Centre<br />

12. Direction & Administration<br />

<strong>FIVE</strong> <strong>YEAR</strong><br />

<strong>PLAN</strong><br />

<strong>2007</strong>-<strong>2012</strong><br />

(In lakhs of Rupees)<br />

460.00<br />

690.00<br />

18135.00<br />

19285.00<br />

67.00<br />

1250.00<br />

100.00<br />

1417.00<br />

50.00<br />

100.00<br />

150.00<br />

900.00<br />

360.00<br />

1260.00<br />

360.00<br />

347.00<br />

<strong>ANNUAL</strong><br />

<strong>PLAN</strong><br />

<strong>2007</strong>-2008<br />

88.00<br />

132.00<br />

3359.00<br />

3579.00<br />

5.00<br />

5.00<br />

5.00<br />

8.00<br />

13.00<br />

100.00<br />

32.00<br />

132.00<br />

9.00<br />

58.00<br />

TOTAL: 22819.00 3796.00


- 277 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOUSING (LAD)<br />

BRIEF DISCRIPTION OF THE SCHEME<br />

1. LOW INCOME GROUP HOUSING:<br />

During the 10 th five year plan many household were given LIGH loan at the rate<br />

of 0.50 lakhs. This is an important scheme for developing dwelling houses in<br />

urban centre and is proposed to be continued in the 11 th plan at the same rate.<br />

Each and every annual plan target has to be taken up as new items while the<br />

scheme itself is a continuing one. The 11 th five year plan scheme is to grant<br />

LIGH to 920 household each at the rate of Rs. 50,000/- within an outlay of Rs<br />

460.00 lacs and the annual plan <strong>2007</strong> - 2008 is to benefit 140 household within<br />

an outlay of Rs 70.00 lakhs, as shown below.<br />

<strong>2007</strong>-2008 Rs. 70.00 lakhs for 140 household<br />

2008-2009 Rs. 80.00 lakhs for 160 household<br />

2009-2010 Rs. 90.00 lakhs for 180 household<br />

2010-2011 Rs. 100.00 lakhs for 200 household<br />

2011-<strong>2012</strong> Rs. 120.00 lakhs for 240 household<br />

TOTAL Rs. 460.00 lakhs for 920 household<br />

2. MIDDLE INCOME GROUP HOUSING:<br />

The 11 th five year Plan scheme is to benefit 862 household at the rate of Rs<br />

80,000/- per household within an outlay of Rs 690.00 lakhs and the target of the<br />

Annual Plan <strong>2007</strong> - 2008 is to benefit 125 household within Rs 100.00 lakhs as<br />

follows:<br />

<strong>2007</strong>-2008 Rs. 100.00 lakhs for 125 household<br />

2008-2009 Rs. 120.00 lakhs for 150 household<br />

2009-2010 Rs. 128.00 lakhs for 160 household<br />

2010-2011 Rs. 144.00 lakhs for 180 household<br />

2011-<strong>2012</strong> Rs. 198.00 lakhs for 247 household<br />

TOTAL Rs. 690.00 lakhs for 862 household<br />

3. COMPOSITE CASH LOAN (HBA) TO GOVT. EMPLOYEES:<br />

During the 10 th Plan Rs 15062.00 lakhs was utilised for giving loans to 10829<br />

government employees in the form of HBA for house Construction under this<br />

composite cash loan scheme. Loan recoveries and interest payments are affected<br />

from pay bills through treasuries. The scheme has been formed to be very<br />

beneficial and fruitful and a proposal is made to continue the scheme during the<br />

11 th plan <strong>2007</strong> - <strong>2012</strong> as under.<br />

<strong>2007</strong>-2008 Rs. 3100.00 lakhs for 2583<br />

2008-2009 Rs. 3200.00 lakhs for 2666<br />

2009-2010 Rs. 3400.00 lakhs for 2833<br />

2010-2011 Rs. 4020.00 lakhs for 3350<br />

2011-<strong>2012</strong> Rs. 4415.00 lakhs for 3679<br />

TOTAL Rs. 18135.00 lakhs for 15111<br />

4. SITE AND SERVICES:<br />

The scheme is meant for developing House Site in the expanding portions of the towns<br />

by constructing initial link road and house site plan at a nominal rate of Rs. 1000/- per<br />

house. It is proposed to allocate fund amounting to Rs 67.00 lakhs for 12400-house site<br />

during the 11 th five year plan.


- 278 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOUSING (LAD)<br />

5. LAND AQUISITION AND DEVELOPMENT:<br />

It becomes imperative to develop lands for human settlement in the towns and sub<br />

towns with a view to checking further mass migration and reduce the growth rate of<br />

urbanisation in the state capital i.e. Aizawl. The programme is mainly for land<br />

development to make plan for house site, roads, steps as well as for direct land<br />

acquisition. So as to make land available for infrastructure development in Aizawl,<br />

Lunglei, Champhai, Kolasib, Mamit and Serchhip. Rs 1250.00 lakhs is proposed for<br />

developing 625 hectares of land during the 11 th five year plan .<br />

6. IMPROVEMENT OF CEMETERY<br />

This is a new scheme to be introduced during the 11th plan period. The system of<br />

burial is the tradition of Mizo people permanently. So every locality had their own<br />

cemetery separately or shared one cemetery by two/three localities. Construction for<br />

improvement of existing cemeteries like terracing, tree planting, fencing etc. is very<br />

important programme. Besides, dispute cases on sharing of cemetery between the<br />

localities always occurred. So, the scheme is badly required and it is proposed a sum of<br />

Rs 100.00 lakhs during period of 11 th five year plan and Rs 5.00 lakhs during <strong>2007</strong>-08.<br />

7. EWS HOUSING:<br />

During the 9 th Plan, EWS was introduced in the form of grant for giving construction<br />

assistance @ Rs. 2500/- per family in urban areas as has been done in rural areas under<br />

the scheme of construction assistance. The scheme has been continued in the 10 th plan<br />

period. During the 11 th plan, it will be continued as a new scheme to benefit 2400<br />

families Rs. 50.00 lakhs.<br />

<strong>2007</strong>-2008 Rs. 5.00 lakhs 200 families<br />

2008-2009 Rs. 10.00 lakhs 400 families<br />

2009-2010 Rs. 10.00 lakhs 400 families<br />

2010-<strong>2012</strong> Rs. 10.00 lakhs 400 families<br />

2011-2013 Rs. 15.00 lakhs 600 families<br />

TOTAL Rs. 50.00 lakhs 2000 families<br />

8. DEPARTMENTAL HOUSING:<br />

The scheme is proposed as a new item for construction and maintenance of<br />

Departmental Building. During the last five year plan (10 th plan) Rs 200.00 lakhs is<br />

made available for ‘Housing for staff’ from the LIC fund for this purpose with the<br />

permission of the Government as well as State Planning Board. The Department<br />

requires a no of staff quarters for accommodating staffs who are newly transferred to<br />

the District offices. Rs 100.00 lakhs is proposed here during the 11 th five year plan.<br />

<strong>2007</strong>-2008 Rs. 8.00 lakhs<br />

2008-2009 Rs. 30.00 lakhs<br />

2009-2010 Rs. 25.00 lakhs<br />

2010-2011 Rs. 20.00 lakhs<br />

2011-<strong>2012</strong> Rs. 17.00 lakhs<br />

TOTAL Rs. 100.00 lakhs


- 279 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOUSING (LAD)<br />

9. INTERNAL IMPROVEMENT OF TOWNS & VILLAGES:<br />

The scheme is proposed as new scheme for the construction of roads to approach some<br />

important public places like Community Hall, Water Point etc. within the towns and<br />

villages. During the 11 th five year plan Rs 900.00 lakhs is proposed for with a physical<br />

target of 500 km for extension of roads, widening of existing roads etc. to approach the<br />

important places at towns and villages.<br />

<strong>2007</strong>-2008 Rs. 100.00 lakhs<br />

2008-2009 Rs. 200.00 lakhs<br />

2009-2010 Rs. 200.00 lakhs<br />

2010-2011 Rs. 200.00 lakhs<br />

2011-<strong>2012</strong> Rs. 200.00 lakhs<br />

TOTAL Rs. 900.00 lakhs<br />

10. ESTABLISHMENT OF COOPERATIVE STORE:<br />

This is purely a fresh proposal. It is proposed to establish the cooperative stores for<br />

selling variety items in each 13 Sub-Division Hqrs., and 23 Block Hqrs. to be ran by<br />

the Village Council to make their own resource to actualize the vision as envisage by<br />

the 73 rd Constitution Amendment. A lump sum grant of Rs 10.00 lakhs each for<br />

construction of building will be given to the society formed by V/Cs. Rs 360.00 lakhs<br />

is proposed during the 11 th period to establish the said 36 nos. of stores.<br />

<strong>2007</strong>-2008 Rs. 32.00 lakhs<br />

2008-2009 Rs. 82.00 lakhs<br />

2009-2010 Rs. 82.00 lakhs<br />

2010-2011 Rs. 82.00 lakhs<br />

2011-<strong>2012</strong> Rs. 82.00 lakhs<br />

TOTAL Rs. 360.00 lakhs<br />

11. BUILDING TECHNOLOGY EXTENSION AND RESEARCH CENTRE<br />

EXTENSION:<br />

The scheme is taken up during the 10 th plan as ‘Building Technology Extension’. It is<br />

being taken up for identification of materials, which are locally available and<br />

technologically and economically sound for construction of building to reduce<br />

materials coming from other States as well as to reduce the cost of construction. The<br />

name of the scheme is proposed to be changed as ‘Building Technology and<br />

Research Centre’ so as to extend the scope and field of activity to serve the actual<br />

demands. The scheme would be extended for imparting training on building<br />

construction, carpentry, masonry. It would also create self-employment opportunity for<br />

the unemployment youth it is proposed to construct hostel building to accommodate<br />

trainees and It is proposed to out-source the center into Public Private Partnership<br />

(PPP) from the third year of 11 th plan. Rs. 360.00 lakhs is proposed to be earmarked<br />

for the whole period in a diminishing manner.


- 280 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

HOUSING (LAD)<br />

<strong>2007</strong>-2008 Rs. 9.00 lakhs<br />

2008-2009 Rs. 200.00 lakhs<br />

2009-2010 Rs. 100.00 lakhs<br />

2010-2011 Rs. 26.00 lakhs<br />

2011-<strong>2012</strong> Rs. 25.00 lakhs<br />

TOTAL Rs. 360.00 lakhs<br />

12. DIRECTION AND ADMINISTRATION:<br />

It is proposed to allocate fund amounting to Rs 347.00 lakhs during the 10 th Plan<br />

period, the fund is to utilised for the expenditure of Staffs’ Salary, Wages, Medical<br />

Treatment, Travelling Expenses, and Office Expenses, Motor Vehicles, Publications<br />

and Advertising. Retention of the existing posts are imperative for the smooth<br />

functioning of the Department and provision for meeting salary etc is required.<br />

The year wise outlay will be as under:<br />

<strong>2007</strong>-2008 Rs. 58.00 lakhs<br />

2008-2009 Rs. 60.00 lakhs<br />

2009-2010 Rs. 70.00 lakhs<br />

2010-2011 Rs. 75.00 lakhs<br />

2011-<strong>2012</strong> Rs. 84.00 lakhs<br />

TOTAL Rs. 347.00 lakhs<br />

……


- 281 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

GOVT. HOUSING (PWD)<br />

GOVERNMENT HOUSING (PWD)<br />

INTRODUCTION :-<br />

The works falling under this Head of Account are mainly Construction<br />

and Improvement of Government residential quarters at various places in and outside<br />

<strong>Mizoram</strong>. Due to wear and tear of various existing buildings and the unavailability of<br />

sufficient funds for construction of new buildings, greater emphasis will be given for<br />

Renovation and Improvement of existing residential buildings in the coming years.<br />

ACHIEVEMENT OF THE 10 TH <strong>PLAN</strong> : -<br />

A provision of Rs 211.00 lakhs was approved for Direction and Administration during<br />

the 10 th Plan ( 2002 -<strong>2007</strong>) under this Head of Account.<br />

During the 10 th Plan, Construction and Improvement works of Government<br />

residential quarters at various places in and outside <strong>Mizoram</strong> were taken up .<br />

The total anticipated expenditure during the 10 th Plan under this head is Rs<br />

1346.68 lakhs.<br />

TARGET FOR THE 11 TH <strong>PLAN</strong> : -<br />

A . DIRECTION & ADMINISTRATION :<br />

A sum of Rs 733.00 lakhs is proposed for Direction and Administration during the<br />

11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under this Head of Account.<br />

B . WORKS : -<br />

Rs. 1280.00 lakhs is proposed for works during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

under this Head of Account.<br />

Spill over Schemes<br />

1. Constn. of functional quarters for Engineer – in –Chief , PWD Office :<br />

Rs. 190.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

2. Constn. of RCC staff quarters Type – III – 4 units 1 No & Type –II - 4 units<br />

– 2 nos at Serchhip. :<br />

Rs. 400.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

New Schemes<br />

1. Renovation of IE of various Govt. residential Buildings :<br />

Rs. 150.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

2. Construction of additional staff qtrs at Lawngtlai :<br />

Rs. 90.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

3. Improvement and Renovation of Govt. quarters at Lunglei :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

4. Improvement and Renovation of Govt. quarters at Saiha :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

5. Improvement and Renovation of Govt. quarters at Kolasib :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).


- 282 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

GOVT. HOUSING (PWD)<br />

6. Improvement and Renovation of Govt. quarters at Champhai :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

7. Improvement and Renovation of Govt. quarters at Mamit :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

8. Improvement and Renovation of Govt. quarters at Serchhip :<br />

Rs. 50.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

9. Improvement, renovation of various quarters, Septic tanks, Furnishing of<br />

VIP Bungalows under Aizawl Building Division, Aizawl :<br />

Rs. 150.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ).<br />

TARGET FOR THE <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> - 08 : -<br />

A. DIRECTION & ADMINISTRATION :<br />

A sum of Rs 98.00 lakhs is proposed for Direction and Administration during<br />

<strong>2007</strong> – 08 under this Head of Account.<br />

The break-up of Direction & Administration is as below :<br />

i) Salary - Rs. 89.00 lakhs<br />

ii) T.E - Rs. 3.00 lakhs<br />

iii) Office Expenses - Rs. 5.00 lakhs<br />

iv) Motor vehicles - Rs. 1.00 lakhs<br />

Total - Rs. 98.00 lakhs<br />

B . WORKS : -<br />

Account.<br />

Rs. 265.00 lakhs is proposed for works during <strong>2007</strong> – 2008 under this Head of<br />

Spill over Schemes<br />

1. Constn. of functional quarters for Engineer – in –Chief , PWD Office :<br />

Rs. 15.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

2. Constn. of RCC staff quarters Type – III – 4 units 1 No & Type –II - 4 units<br />

– 2 nos at Serchhip.for Engineer – in –Chief , PWD Office :<br />

Rs. 70.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

New Schemes<br />

1. Renovation of IE of various Govt. Buildings :<br />

Rs. 50.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

2. Construction of additional staff qtrs at Lawngtlai :<br />

Rs. 20.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

3. Improvement and Renovation of Govt. quarters at Lunglei :<br />

Rs. 10.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

4. Improvement and Renovation of Govt. quarters at Saiha :<br />

Rs. 10.00 lakhs is proposed for this work during 2008 – 2008 .<br />

5. Improvement and Renovation of Govt. quarters at Kolasib :<br />

Rs. 10.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .


- 283 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

GOVT. HOUSING (PWD)<br />

6. Improvement and Renovation of Govt. quarters at Champhai :<br />

Rs. 10.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

7. Improvement and Renovation of Govt. quarters at Mamit :<br />

Rs. 10.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

8. Improvement and Renovation of Govt. quarters at Serchhip :<br />

Rs. 10.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .<br />

9. Improvement, renovation of various quarters, Septic tanks, Furnishing of<br />

VIP Bungalows under Aizawl Building Division, Aizawl :<br />

Rs. 50.00 lakhs is proposed for this work during <strong>2007</strong> – 2008 .The proposals could be<br />

thus summed up as :-<br />

( in rupees lakhs)<br />

Proposed Outlay<br />

Sl No Name of Work / Scheme 11 th Plan Annual Plan<br />

<strong>2007</strong> -12 <strong>2007</strong> - 08<br />

A. Direction & Administration 733.00 98.00<br />

B. Works<br />

(a) Spill-over Schemes.<br />

1. Constn. of functional quarters for Engineer<br />

190.00<br />

–Chief , PWD Office<br />

15.00<br />

2. Constn. of RCC staff quarters Type – III –<br />

units 1 No & Type –II - 4 units – 2 nos at<br />

Serchhip<br />

400.00 70.00<br />

(b) New Schemes.<br />

1. Renovation of IE of various Govt. Building 150.00 50.00<br />

2. Construction of additional staff qtrs at<br />

90.00<br />

Lawngtlai<br />

20.00<br />

3. Improvement and Renovation of Govt.<br />

quarters at at Lunglei<br />

50.00 10.00<br />

4. Improvement and Renovation of Govt.<br />

quarters at at Saiha<br />

50.00 10.00<br />

5. Improvement and Renovation of Govt.<br />

quarters at at Kolasib<br />

50.00 10.00<br />

6. Improvement and Renovation of Govt.<br />

quarters at at Champhai<br />

50.00 10.00<br />

7. Improvement and Renovation of Govt.<br />

quarters at at Mamit<br />

50.00 10.00<br />

8. Improvement and Renovation of Govt.<br />

quarters at at Serchhip<br />

50.00 10.00<br />

9. Improvement, renovation of various quarter<br />

Septic tanks, Furnishing of VIP Bungalows 150.00<br />

under Aizawl Building Division, Aizawl<br />

50.00<br />

TOTAL 2013.00 363.00<br />

…..


- 284 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

POLICE HOUSING<br />

The Eleventh Five Year Plan <strong>2007</strong> – <strong>2012</strong> : Police Department, <strong>Mizoram</strong>.<br />

Introduction :<br />

1. It may be mentioned that no proper sources of financial aid except Police Housing<br />

Plan existed for construction of Residential & Administrative buildings of <strong>Mizoram</strong> Police.<br />

Under Plan (Police Housing) a small amount of fund approximately amounting to Rs. 401.00<br />

lakhs had yearly been provided for the last 10 Five Year Plans. Prior to this, lesser amount of<br />

fund far below the above mentioned fund had been provided. With the help of the above said<br />

grants, residential & administrative buildings had been constructed for upgradation of<br />

<strong>Mizoram</strong> Police Housing.<br />

2. It may further be stated that the Govt. of India, Ministry of Home Affairs, Bureau<br />

of Police Research & Development (BPR&D) had fixed the target of satisfaction level for<br />

providing of residential accommodation to Police all over India as follows :-<br />

Target<br />

1. Lower subordinate level 60% of total strength<br />

2. Upper subordinate level 70% of total strength<br />

3. Supervisory level 100% of total strength<br />

3. It is regretted to mention that the total residential quarters provided so far to<br />

<strong>Mizoram</strong> Police as on 1.8.2006 is very less in comparison with the prescribed scale of<br />

BPR&D as indicated below :-<br />

Detail Satisfaction level Present<br />

Position<br />

Shortfall<br />

Lower subordinate level 70% 15.75% 54.25%<br />

Upper subordinate level 60% 17.68% 42.32%<br />

Supervisory level 100% 43.35% 56.65%<br />

4. Since the total residential accommodation so far provided is far below the<br />

prescribed satisfaction level of Govt. of India, it is proposed to take up construction of more<br />

residential buildings during the next 11 th Five Year Plan. Some of the administrative<br />

buildings such as office buildings and buildings for Police Stations and Out Posts are also in<br />

need of new construction.<br />

The Draft 11 th Five Year Plan <strong>2007</strong>-12 and the Annual Plan <strong>2007</strong>-08 is formulated<br />

in such away as to achieve the prescribed satisfaction level by proposing an outlay of Rs.<br />

1078.00 lakhs and Rs. 600.00 lakhs respectively.


- 285 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

POLICE HOUSING<br />

Items-wise of works proposed to be taken along with fund proposed during <strong>2007</strong>-08<br />

are given below :-<br />

Sl/No Name of buildings Location Qnty. Rate Amount<br />

1 Type-II, 4 units MPRO Complex 1 Token provision 1000000.00<br />

2 Type-II, 4 units PTC Lungverh 2 Token provision 2000000.00<br />

3 Type-II, 4 units Armed Veng 2 Token provision 2000000.00<br />

4 Type-II (RCC) Mualpui 7 641000.00 4487000.00<br />

5 Type-II (RCC) PTC Lungverh 6 641000.00 3846000.00<br />

6 15 Men Barrack Damparengpui 1 712470.00 712470.00<br />

7 SCRB Office building CID Complex, Aizawl 1 Token provision 1000000.00<br />

8 Type-III (Semi) for MPRO Serchhip 1 716000.00 716000.00<br />

9<br />

Protection wall of SP Qtrs.<br />

Approach road<br />

Lunglei 1 140000.00 140000.00<br />

10 Type-III (RCC) Armed Veng 3 771000.00 2313000.00<br />

11 Type-III (RCC) Mualpui 2 771000.00 1542000.00<br />

12 SDPO Office building Hnahthial 1 Token provision 1000000.00<br />

13 SDPO Residence Lunglei 1 600000.00 600000.00<br />

14<br />

Renovation & Extension of<br />

Lunglei PS building<br />

Lunglei 1 1000000.00 1000000.00<br />

15 Type-III (RCC) Champhai 1 771000.00 771000.00<br />

16 Type-II (RCC) Champhai 3 641000.00 1923000.00<br />

17 15 Men Barrack Champhai 1 712470.00 712470.00<br />

18 Kitchen Champhai 1 270000.00 270000.00<br />

19 Renovation 2157746.00<br />

5% for House water<br />

connection<br />

On going works<br />

1141397.00<br />

20 SP Office at Kolasib Kolasib 3000000.00<br />

21 SP Office at Mamit Mamit 3000000.00<br />

22 SP Office at Lawngtlai Lawngtlai 3000000.00<br />

COs Office at 2nd MAP<br />

23<br />

Lunglei<br />

2nd MAP Lunglei 3000000.00<br />

COs Office at 2nd IR Bn.<br />

24<br />

Khawzawl<br />

2nd IR Khawzawl 3000000.00<br />

25 FSL Office building Aizawl 2000000.00<br />

……..


- 286 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV. (STATE CAPITAL PROJECT)<br />

INTRODUCTION :-<br />

URBAN DEVELOPMENT (PWD)<br />

The works taken up under Urban Development mainly consist of Improvement of<br />

drainage systems in Aizawl, Lunglei, Saiha, Kolasib etc. During the 10 th Plan period various<br />

works like (i) Construction of New Capital Project at Khatla (ii) Construction of Raj Bhavan<br />

at Khatla were also undertaken under this head of Account.<br />

The main emphasis during the 11 th Plan will be Improvement of drainages within<br />

Aizawl and various towns in <strong>Mizoram</strong><br />

ACHIEVEMENT OF THE 10 TH <strong>PLAN</strong> : -<br />

A provision of Rs 230.00 lakhs was approved for Direction and<br />

Administration during the 10 th Plan ( 2002 -<strong>2007</strong>) under this Head of Account.<br />

During the 10 th Plan, under Urban Development combined with Upgradation of<br />

Standard of Administration , State Capital Project - Rs 8885.00 lakhs was approved for (a)<br />

Improvement of drainage system within Aizawl city and various towns like Lunglei, Saiha<br />

and Kolasib (ii) Upgradation of Aizawl city roads including land acquisition (iii)<br />

Construction of New Capital Complex at Khatla and (iv) Construction of Raj Bhavan at<br />

Khatla.<br />

The total anticipated expenditure during the 10 th Plan under this head is Rs<br />

8985.20 lakhs.<br />

TARGET FOR THE 11 TH <strong>PLAN</strong> : -<br />

A. DIRECTION & ADMINISTRATION :<br />

A sum of Rs 496.00 lakhs is proposed for Direction and Administration during the<br />

11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under this Head of Account.<br />

B. WORKS :<br />

No provision is made for 11 th Five year plan <strong>2007</strong> – <strong>2012</strong>.<br />

TARGET FOR THE <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> - 08 : -<br />

A. DIRECTION & ADMINISTRATION :<br />

A sum of Rs 105.00 lakhs is proposed for Direction and Administration<br />

during <strong>2007</strong> – 08 under this Head of Account.<br />

The break-up of Direction & Administration is as below :<br />

i) Salary - Rs. 96.00 lakhs<br />

ii) T.E - Rs. 3.00 lakhs<br />

iii) Office Expenses - Rs. 5.00 lakhs<br />

iv) Motor vehicles - Rs. 1.00 lakhs<br />

Total - Rs. 105.00 lakhs


- 287 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV. (STATE CAPITAL PROJECT)<br />

B. WORKS :<br />

No provision is made for Annual Plan <strong>2007</strong>-08.<br />

( in rupees lakhs)<br />

Proposed Outlay<br />

Sl No Name of Work / Scheme 11 th Plan Annual Plan<br />

<strong>2007</strong> -12 <strong>2007</strong> - 08<br />

A. Direction & Administration 496.00 105.00<br />

Sub – Total of D & A 496.00 105.00<br />

B. Works<br />

1. Construction of drains under Aizawl Road North<br />

Division<br />

- -<br />

2. Construction of drains under Aizawl Road South<br />

Division<br />

- -<br />

3. Construction of drains under Lunglei Division - -<br />

4. Construction of drains under Saiha Division - -<br />

5. Construction of drains under Kolasib Division - -<br />

6. Construction of drains under Lawngtlai Division - -<br />

7. Construction of drains under Serchhip Division - -<br />

8. Construction of drains under Mamit Division - -<br />

9. Construction of drains under Champhai - -<br />

Sub – Total of Works - -<br />

TOTAL 496.00 105.00<br />

……


- 288 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV & POVERTY ALLEVIATION<br />

SUBJECT : URBAN DEVELOPMENT<br />

Urban Development & Poverty Alleviation Department<br />

Proposed Eleventh Five Year Plan outlay <strong>2007</strong> – <strong>2012</strong> : Rs. 5500.00 Lakhs<br />

Proposed Annual Plan outlay <strong>2007</strong> - 2008 : Rs. 1049.00 Lakhs<br />

The following schemes are proposed to be taken up during the 11 th Five Year Plan<br />

<strong>2007</strong> - <strong>2012</strong> and the Annual Plan <strong>2007</strong> - 2008.<br />

Sl.No Name of Schemes 11<br />

(Rupees in lakhs)<br />

th . Five Annual<br />

year Plan Plan <strong>2007</strong> -<br />

<strong>2007</strong> – <strong>2012</strong> 2008<br />

1. Construction and maintenance of link roads<br />

within Urban area<br />

70.00 -<br />

2. Construction and maintenance of Parks &<br />

Recreation centre within Urban area<br />

45.00 -<br />

3. Construction of Steps, R/Wall, Footpath & Fly<br />

Over within Urban area<br />

47.00 -<br />

4. Urban Transport & Parking Lot System 234.00 -<br />

5. Solid Waste management 700.00 -<br />

6. Provision for Urban Forestry within Urban area 200.00 200.00<br />

7. Domestic Waste Disposal Line within Urban area 125.00 -<br />

8. Public Utility at Urban area 150.00 74.00<br />

9. Beautification of City and Towns 130.00 -<br />

10. Disaster Management 50.00 -<br />

11. Information, Educational and Communication<br />

(IEC)<br />

65.00 -<br />

12. Matching share of SJSRY 140.00 -<br />

13. Matching share of JN-NURM, UIDSSMT &<br />

IHSDP<br />

3000.00 675.00<br />

14. Sanitation 44.00 -<br />

15. Direction & administration 500.00 100.00<br />

TOTAL 5500.00 1049.00<br />

BRIEF DESCRIPTION OF THE SCHEME<br />

As the Department (Urban Development & Poverty Alleviation) was created by the<br />

Government of <strong>Mizoram</strong> during the last part of 2006 – <strong>2007</strong>. Hence there was no actual<br />

expenditure for the last five years plan i.e. 10th. Plan. Then, the preparation of 11 th . Five<br />

years plan cannot be based on the previous five years plan as well as the annual plan for the<br />

year <strong>2007</strong> – 2008 has no base and merely proposed as per the present requirement.<br />

There are 22 census towns in <strong>Mizoram</strong> which are likely to be felt under the umbrella<br />

of Urban Development & Poverty Alleviation Department, and most of the proposed schemes<br />

below other than MATCHING SHARE OF SJSRY and MATCHING SHARE OF JN-<br />

NURM will dealt with those urban areas.


- 289 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV & POVERTY ALLEVIATION<br />

1. CONSTRUCTION AND MAINTENANCE OF LINK ROAD WITHIN URBAN<br />

AREA:<br />

This is proposed as a new item. The scheme is to be utilised for construction as well as<br />

maintenance of link roads within urban area including approach to Departmental land like,<br />

Garbage Dumping Ground, Solid Waste Management Centre, Site offices, District offices<br />

and staff quarters. Rs. 70.00 is proposed for construction of 70 kilometres of roads during the<br />

11 th five year plan.<br />

2. CONSTRUCTION AND MAINTENANCE OF PARKS AND RECREATION<br />

CENTRE WITHIN URBAN AREA:<br />

Aizawl city and other district headquarters had their own respective local parks under the<br />

maintenance of concerned NGO at their locality without financial assistance from the<br />

Government. It is, therefore, proposed to promote such parks as far as possible by giving<br />

financial helps as and where necessary. Also every wards (locality) within urban area needs<br />

some recreation places like small playfield, children play station etc. Such recreational places<br />

may be required to construct in new or to maintain the existing one. Hence, Rs 45.00 lakhs is<br />

proposed during the whole period of 11 th five plans for this Scheme. It is to be applied the<br />

Public Private Partnership (PPP) method in this scheme, as such the requirement had also<br />

decrease in year by year.<br />

3<br />

3. CONSTRUCTION OF STEPS, RETAINING WALL, FOOTPATH and fly over<br />

WITHIN URBAN AREA :<br />

City and towns in <strong>Mizoram</strong> are situated on spur of Hills which steep down to the gorges of<br />

stream below / between the spurs. Roads and residential line go on the spurs in horizontal<br />

lines. It is required to construct Steps and Footpath for vertical link between the adjacent<br />

rows like staircases in multi-storied buildings. As the inhabitant areas are spur hills,<br />

construction of Retaining wall is badly required to prevent some disaster like landslide etc. as<br />

the landslide is phenomenon especially during the rainy season as it is known that the<br />

<strong>Mizoram</strong> lies in the Monsoon region. So it is proposed to earmark Rs 47.00 lakhs for<br />

construction during the 11 th five year plan<br />

4. URBAN TRANSPORT AND PARKING LOT SYSTEM:<br />

Traffic congestion is now a serious problem in the state capital. This is mainly due to<br />

lack of Urban Transport Management and Parking Lot within the city. It is proposed to make<br />

land available by means of direct land acquisition. Extension of road at every suitable<br />

locations, projection of RCC slab over culverts will be taken up for purpose of parking. Rs<br />

234.00 lakhs is earmark for the whole period of 11 th five year plan.<br />

5. SOLID WASTE MANAGEMENT<br />

The Department had taken a new step to follow a modern method of waste<br />

management technology and being constructed Solid Waste management Centre at Aizawl<br />

with the help of grants under 12 th Finance Commission (ULB). As initiative, the Department<br />

had installed a number of Garbage Trailers in various places within a city, collecting of<br />

garbage from this trailer is being taken up with a system of privatisation basis. The detailed<br />

process is in progress. A part from this, the Public Private Partnership (PPP) system is being<br />

considered to be adopted within the middle part of 11 th plan period. Hence the expenditure<br />

under this scheme should be considered as diminishing and proposed Rs 700.00 lakhs for the<br />

whole period of 11 th five year plan.<br />

6. PROVISION FOR URBAN FORESTRY:<br />

this scheme is to be introduced in the 11 th plan. It is a well known perception that tree<br />

planting in urban areas and protection of trees in and around the city is a long felt need. The


- 290 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV & POVERTY ALLEVIATION<br />

GREEN MIZORAM programme under the auspices and brain child of the Hon’ble Chief<br />

Minister of <strong>Mizoram</strong>, tree planting at road sides, Govt. Complex, School compounds are now<br />

became an important state level programmes every year. The programme has diverse<br />

importance for environmental protection, Pollution control, water conservation, protection of<br />

land slides, beautification and wild life protection. It is proposed to make financial support to<br />

this valuable programme. NGOs will be associated in the activities for planting of more trees,<br />

up keep and protection of trees. The system of Public Private Partnership (PPP) may be<br />

applied with cost effective. Rs 200.00 lakhs is proposed to be earmarked for the 11 th five<br />

year plan and Rs 200.00 lakhs is earmark for the year <strong>2007</strong> – 2008 annual plan.<br />

7. DOMESTIC WASTE DISPOSAL LINE:<br />

The problem of drainage system is enormous. In the past experiences, landslides were cause<br />

due to the absence of domestic waste disposal line. While allotting the house sites, there<br />

might be no plan for providing perfect small drain for disposal of waste matter to be shared<br />

by the householders. Normally, all the households disposed their wastewater from their<br />

respective buildings to a short distance thereby dispersing and saturating the soil nearby. The<br />

most effective way to prevent the problem will be to provide small drains to be shared by<br />

four or five household to link the nearest big drain / side drain. During the 11 th five year plan,<br />

it is proposed to construct 125 nos. of such small drain with allocation of Rs 125.00 lakhs.<br />

8. PUBLIC UTILITY AT URBAN AREA:<br />

The ideas is to create public assets and utilities like bus waiting shed, Shed for viewing<br />

gallery, pay and use toilet, drinking water point at public places etc within the Aizawl City.<br />

The system of Public Private Partnership (PPP) will be adopted and management of assets<br />

will be handed over to Private/NGOs by sharing revenue earned from the assets and provide a<br />

tiny amount for maintenances. Rs 150.00 lakhs is proposed at a diminishing rate for targeting<br />

creation of 26 public utilities during the 11 th five year plan. Rs 74.00 is proposed for the year<br />

<strong>2007</strong> - 2008<br />

9. BEAUTIFICATION OF CITIES AND TOWNS:<br />

‘Cleanliness Week’ was always taken up during the past year especially for the purpose of<br />

meeting all expenditure in connection with ‘Observance of Cleanliness Week’ every year.<br />

With a formation of a separate of CLEAN MIZORAM SOCIETY, to pursue cleanliness<br />

work, a need is felt to concentrate on beautification programme by the Department at urban<br />

area. It is a fact that, no separate programme for beautification activities has been taken up<br />

during the previous five year plans. Hence, to make the city and towns more attractive,<br />

relaxing and decorating, it is proposed to take up various beautification works at important<br />

public places and Rs 130.00 lakhs is earmarked for the whole period of 11 th five year plan.<br />

10. DISASTER MANAGEMENT:<br />

There is a policy to incorporate ‘Disaster Management Programme’ in the plan in every<br />

Department under the State Government. In case there is any kind of disaster, the<br />

Government Department is expected to make funds available in any form. It is difficult to<br />

project specific requirements. It is proposed to spend funds for upkeep and maintenance of<br />

machineries & equipments held by the Department like vehicles, etc. Rs 50.00 lakhs is<br />

proposed during the whole period of 11 th five year plan to be in readiness when deployment<br />

are required in tunes of disaster.<br />

11. INFORMATION, EDUCATION AND COMMUNICATION:<br />

It has been experienced that without having a proper information, education and<br />

communication, most of the schemes and programmes cannot be implemented effectively.<br />

Most of the scheme requires detailed examination, verification, education and communication<br />

at various levels. This programme will help in the progress monitoring, evaluation etc. Not<br />

only that, the Right to Information has been introduced in the state Government, which will


- 291 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV & POVERTY ALLEVIATION<br />

require preparation information to be supplied to the requestors. In order to furnish those<br />

information, a separate cell for RTI is required to establish in the Department. During the<br />

period of 11 th five year plan, Rs 65.00 lakhs is proposed for the purposes mentioned above.<br />

12. MATCHING SHARE OF SJSRY<br />

This can be treated as a new scheme to continue various programme under SJSRY for the<br />

purpose of poverty eradication. The norm of the matching the CSS of SJSRY by the state<br />

plan fund is 75:25 ratio. At present the scheme cover only the three district capitals viz.<br />

Aizawl, Lunglei and Saiha. It is desirable to extend the programme even in the remaining five<br />

district capitals. Therefore expecting to receive more grants annually, hence Rs 140.00 lakhs<br />

is proposed for the 11 th . plan period.<br />

13. MATCHING SHARE OF JN-NURM<br />

This is a fresh scheme launched by the Govt. of India, Ministry of Urban<br />

Development in the last part of the 2005 – 2006. The programme covers the whole of India.<br />

Urban perspective framework for a period of 20 – 25 years indicating policies, programmes<br />

and strategy of meeting fund requirements would be prepared by identified city. The mission<br />

contains four programmes like: (1) Urban Infrastructure and Governance (2) Basic<br />

Services to Urban Poor (3) Integrated housing and Slum Development Programme (4)<br />

Urban Infrastructure Development Schemes for Small and Medium Towns. Aizawl is<br />

one of the identified city and the first two programmes (1&2) are to be taken within the<br />

Aizawl city. The other two programmes (3&4) are to be taken within the seven district<br />

capitals. Admissible components under these missions can be seen in the guidelines. As<br />

insisted by the mission, various high level committees have been constituted. City<br />

Development Plan (CDP) for Aizawl city had also prepared by the approved consultants and<br />

being accepted by the Government of India. The sharing pattern of fund for Central Govt. and<br />

State Govt. will be 90:10 ratios. It is assumed that the central on the basis of Detail Project<br />

Report (DPR) and not on annual plan basis will release funds.<br />

However, a matching share has to be made available by State govt. Then, Rs 12000.00<br />

lakhs (Rs 2400X 5 years) is required according to the City Development Plan being accepted<br />

by the Central Government during the period of 11 th . five year plan for matching the Central<br />

fund. The amount of Rs 675.00 lakhs is earmark for the annual plan of <strong>2007</strong> – 2008 and Rs<br />

5500.00 lakhs is provided for 11 th Five year Plan.<br />

12. SANITATION :<br />

The scheme is proposed to continue as new scheme under the UD&PA Department in<br />

the 11 th . plan. Fund under this scheme is utilised for meeting all expenditure on Garbage<br />

Vehicles, Sanitation implements, Safety devices, Maintenance of Public Urinals. A need has<br />

been felt to adopt the system of Privatisation in the collection of garbage in some places,<br />

where the department cannot do the normal collection of garbage. Rs 44.00 lakhs is proposed<br />

for the whole period of 11 th . five year plan.<br />

15. DIRECTION AND ADMINISTRATION: Rs. 100.00 lakhs is provided for <strong>2007</strong>-08<br />

Annual Plan. Rs 500.00 lakhs is proposed during the period of 11 th five year plan under the<br />

requirement of Direction and Administration of the Department. It is mainly to utilise for the<br />

expenditure for Salary, Wages, Medical Treatment, Travelling Expenses, and Office<br />

Expenses, Publications and Advertising.<br />

…..


- 292 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOWN & COUNTRY <strong>PLAN</strong>NING<br />

<strong>DRAFT</strong> ELEVENTH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong>-<strong>2012</strong> &<br />

<strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong>-2008<br />

TOWN & COUNTRY <strong>PLAN</strong>NING WING<br />

Proposed 11 th Five year Plan Outlay <strong>2007</strong>-<strong>2012</strong> = Rs. 684.00 Lakh<br />

Proposed Annual Plan Outlay <strong>2007</strong>-2008 = Rs. 159.00 Lakh<br />

The main thrust of Urban Planning and Development of urban<br />

infrastructure under integrated Development of Small & Medium Towns during 11 th Five<br />

Year Plan <strong>2007</strong>-<strong>2012</strong> and Annual Plan <strong>2007</strong>-2008 are as follows :<br />

1. Preparation of Master Plan for 22 census Towns in <strong>Mizoram</strong> under<br />

<strong>Mizoram</strong> Urban & Regional Development Act, 1990 amended in 1996 and<br />

2004 for meaningful growth and regulated development.<br />

2. Implementation of approved Master Plan Schemes such as Land use<br />

Development regulation, Building regulation & Control, construction of<br />

Lane Road, Parks, Drains and slope stability measures.<br />

3. Revision of Master Plan/Development Plan as resolved by the <strong>Mizoram</strong><br />

Urban Planning & Development Board and 9 Towns/City Development<br />

Committee Constituted by the Government under <strong>Mizoram</strong> urban &<br />

Regional Development Act 1990 amended in 1996 & 2004.<br />

4. To continue the spill over Projects which were taken up during 10 th Plan<br />

and to take up new projects under Urban Infrastructure Development<br />

scheme for small & Medium Towns (UIDSSMT).<br />

5. To enforce <strong>Mizoram</strong> Urban & Regional Development Acts and Rules to<br />

mobilise resources and to take Haphazard growth.<br />

6. To implement a new C.S.S. namely National Urban Information System<br />

(NUIS) Scheme in major urban centres of the state for which the Town &<br />

Country Planning Wing has been identified by the State Government as a<br />

State Nodal Agency.<br />

A. SCHEME – WISE DESCRIPTION OF 2217 (REVENUE)<br />

1. LAND <strong>PLAN</strong>NING & DEVELOPMENT :<br />

Preparation of Development of Plan/Master Plan : Rapid increase in<br />

Urban Population of the State has led to Haphazard growth of towns which call for proper<br />

planning and regulated development. Out of the total 22nos. of statutory towns in <strong>Mizoram</strong><br />

only half a dozen of the towns have so far been planned. This indicates the need for<br />

preparation of Master Plan/Development Plan under relevant Act for meaningful/Planned<br />

growth and regulated development of these towns. Moreover, enforcement of the <strong>Mizoram</strong><br />

Urban & Regional Development Act 1990 amended in 1996 & 2004 and Rules 1998<br />

necessitated that all the towns in <strong>Mizoram</strong> to be planned for regulated Development under


- 293 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOWN & COUNTRY <strong>PLAN</strong>NING<br />

the said Act & Rules. It is therefore, proposed to take up 8 nos. of towns and 1 District<br />

Headquarters dwith an outlay of Rs. 68.00 lakhs uring 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>.<br />

During Annual Plan <strong>2007</strong>-2008 Rs. 8.30 is envisaged for preparation of Master<br />

Plan/Mini Park i.e. Rs. 5.30 for preparation of Master Plan of Vairengte and Kawnpui<br />

Towns and Rs. 3.00 Lakh for construction of Mini Park at Rawpuichhip.<br />

Besides, Rs. 2.00 Lakh is earmarked for preparation of Lawngtlai Master Plan<br />

under Towns & Country Planning, Lunglei.<br />

2. MACHINERY & EQUIPMENT INCLUDING INFORMATION<br />

TECHNOLOGY :<br />

The rapid urbanisation process in <strong>Mizoram</strong> coupled with tremendous urban Problem<br />

necessitates Modern Equipment & Scientific Instruments like Computer with large format<br />

colour Scanner and Plotter for digitizing Maps, Drawing, and Designs etc. These<br />

instruments are also required for protecting important department documents. Hence, a<br />

token provision of Rs. 28.00 Lakhs is earmarked for purchase of instruments and<br />

maintenance of existing instruments during 11th Plan <strong>2007</strong>-<strong>2012</strong>.<br />

During Annual Plan <strong>2007</strong>-2008 Rs. 2.00 Lakh is envisaged for procurement of<br />

instrument.<br />

3. DIRECTION & ADMINISTRATION. (D & A) :<br />

(i) Entertainment of existing staff/Salary & Creation of essential New Post etc. :<br />

The Town & Country Planning is facing serious problem in the execution of important<br />

schemes owing to inadequacy of technical man-power. Due to un-Planned and unregulated<br />

growth there is lot of problems in the urban areas such as natural and man-made<br />

disaster like landslides, un-scientific land Development/ cutting, undersigned Building<br />

construction etc. It is therefore absolutely necessary to strengthen Town & Country<br />

planning administration by creating additional technical post to effectively deal with land<br />

development and Building regulation and control activities which come up rapidly on<br />

unsafe slope and un-designed High rise R.C.C Building construction and other urban<br />

problems. Hence, Rs. 27.44 Lakh is earmarked for entertainment of 14 nos of existing<br />

staff under Plan during <strong>2007</strong>-2008.<br />

(ii) Wages : Due to ban on creation of post the Town & Country planning Wing<br />

is facing tremendous problem both in fields and offices thereby resulting delay in<br />

preparation of Master Plan/Action Plan/Project/schemes and execution of project works.<br />

So, a sum of Rs. 5.06 Lakh is earmarked for engagement of existing Muster Roll<br />

employees like LDC/Typist etc. for the year <strong>2007</strong>-2008.<br />

(iii) Traveling Expense (T.E) : Apart from the on-going works under NLCPR and<br />

IDSMT/UIDSSMT programmes, conduct of Physical Survey, Traffic survey, Building<br />

survey, identification of unsafe buildings and Landslide prone areas, socio-economic<br />

survey, environmental survey etc. of various towns is apart in pacel of Master Plan<br />

preparation and implementation. Hence a provision of Rs. 2.30 Lakh i.e. 1.70 Lakhs for<br />

Aizawl and Rs. 0.60 Lakhs for Lunglei is earmarked during <strong>2007</strong>-2008 to meet the<br />

traveling expenses and for inspection of building construction of the city dwellers and<br />

supervision of construction works under NLCPR and IDSMT/UIDSSMT which are


- 294 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOWN & COUNTRY <strong>PLAN</strong>NING<br />

scattered throughout the state, and for survey and investigation of the problems of towns<br />

and growth centres.<br />

(iv) Office Expenses (O.E) : A token provision of Rs. 8.50 Lakhs, of which Rs.<br />

6.50 Lakhs for Aizawl Headquarter & Rs. 2.00 lakhs for Town & Country Planning<br />

Branch Office, Lunglei is earmarked to meet expenditure for stationery, Furniture,<br />

maintenance of tools & Plants and other miscellaneous articles during <strong>2007</strong>-2008.<br />

(v) Rent/Office Accommodation : Since the Office has no building of its own,<br />

private building is occu[pied for office on rent. Therefore, to meet the expenditure of rent<br />

for the whole year <strong>2007</strong>-2008, Rs. 1.94 lakhs is earmarked.<br />

(vi) Maintenance of Vehicle (M.V) : Project undertaken by the office are located<br />

from Headquarters, Hence good condition of Vehicle is absolutely necessary for<br />

supervision of Planning land & Building regulation and Control, Development and<br />

Construction of works. Therefore, a provision of Rs. 7.00 Lakhs, of which Rs. 6.00 Lakhs<br />

for Aizawl Headquarters and Rs. 1.00 Lakhs for Town & Country Planning Branch Office,<br />

Lunglei for maintenance and procurement of P.O.L is earmarked for the year <strong>2007</strong>-2008.<br />

(vii) Workshop/Seminar/Stipend : As per National Norms formulated by the<br />

Ministry of Urban Development, Government of India one census/notified town require<br />

4(four) number of qualified Town Planners, whereas, there are only 4 (four) number of<br />

qualified Town Planners in the state to deal with 22 number of Town Planning,<br />

Development/Land/Building regulation & control, urbanization problems in the State of<br />

<strong>Mizoram</strong>. Therefore, to send students to various Technical institutes outside <strong>Mizoram</strong> and<br />

also to conduct Public Awareness programmed and organize workshop/ seminar, a sum of<br />

Rs. 0.30 Lakhs is earmarked for the year <strong>2007</strong>-2008.<br />

(viii) Other Charges (O.C) : The Perspective/Master/Development/Action Plans<br />

(Projects) both Draft and final stage required neat and tidy documentation, publishing and<br />

printing to meet the User’s demand. A provision of Rs. 2.20 Lakhs (Rs. 1.20 Lakhs for<br />

Aizawl Hq. & Rs. 1.00 Lakhs for Lunglei Sub-Division) is earmarked for <strong>2007</strong>-2008.<br />

B. IDSMT – CAPITAL SECTION :<br />

(1) Implementation of Master Plan Schemes : There are 9 nos. of Master<br />

Plan which has been prepared under <strong>Mizoram</strong> Urban & Regional Development Act 1990<br />

as amended & Rules 1998 and Approved by the Government of <strong>Mizoram</strong>. The<br />

Government has also constituted Town Planning & Development Committee for 9 Towns<br />

to erect boundary pillars of Master plan areas/demarcation of land designated for various<br />

purposes, construction of trace path, layout Plan preparation for implementation of Master<br />

Plan Schemes. The Committee has resolved that all the Master Plan must be implemented<br />

immediately so as to develop infrastructure in urban. Hence for the<br />

implementation/execution of Master Plan Schemes such as Land use/Development<br />

regulation and Control, Building regulation and Control, Roads, Parks, Drains, slope<br />

stability measure etc. a sum of Rs. 50.00 Lakh is earmarked during 11 th five year plan<br />

<strong>2007</strong>-<strong>2012</strong>.<br />

During Annual Plan <strong>2007</strong>-2008 Rs. 28.96 Lakh is earmarked for implementation of<br />

Aizawl, Hnahthial, Serchhip and Kolasib master plan Schemes.


- 295 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

TOWN & COUNTRY <strong>PLAN</strong>NING<br />

(2) State Matching Share of C.S.S : In order to create urban infrastructure to<br />

strengthen the economic base of towns and to generate employment opportunities,<br />

Integrated Action Plan Project have been prepared and approved by the Government of<br />

India. Out of 22 census towns, 11 (eleven) priority towns have been approved by the<br />

central Government under centrally sponsored schemes for which state matching<br />

contribution is absolutely required to be provided. In fact, the required amount of State<br />

matching share cannot be met in one Financial year due to small allocation of plan fund<br />

which necessitates provision of state share to be in a phase manners. Besides, the<br />

Government of India, Ministry of Urban development has launched a new scheme namely<br />

Urban Infrastructure Development Schemes for Small & Medium Towns (UIDSSMT).<br />

The Scheme aims at improvement in urban infrastructure in towns other then Aizawl City<br />

in a planned manner. The project under UIDSSMT is a big project which will involve<br />

large amount of fund. It is, therefore, extremely necessary for the State Government to<br />

provide more fund to match the central grant-so as to avail UIDSSMT Scheme for other 21<br />

towns in the state. Hence Rs. 202.00 Lakhs is earmarked during 11 th five year Plan <strong>2007</strong>-<br />

<strong>2012</strong> for state share. And during Annual plan <strong>2007</strong>-2008 Rs. 50.00 is envisaged for ongoing<br />

Schemes.<br />

3. National Urban Information System (NUIS) : The Government of India has<br />

introduced a new Scheme of National Urban Information system (NUIS) for all states of<br />

the country. The Town & Country planning Wing is selected as Nodal Agency for<br />

implementation of NUIS scheme in <strong>Mizoram</strong>. The Government of India, Ministry of<br />

Urban Development has selected Aizawl, Champhai and Lunglei to be covered under<br />

NUIS scheme in the 1 st phase. The ratio of funding is 75% Central share and 25% state<br />

share. Hence Rs. 13.00 Lakhs is earmarked during <strong>2007</strong>-2008 in order to avail central<br />

scheme under National Urban Information system. Rs. 18.00 lakhs is earmarked for 11 th<br />

Five year Plan.<br />

…….


- 296 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV. (LAD)<br />

URBAN DEVELOPMENT (LAD)<br />

Proposed Eleventh Five Year Plan outlay <strong>2007</strong> - <strong>2012</strong> : Rs. 4815.00 lacs<br />

Proposed Annual Plan outlay <strong>2007</strong> - 2008 : Rs. 1494.00 lacs<br />

Following schemes are proposed to be taken up during the 11 th Five<br />

Year Plan <strong>2007</strong> - <strong>2012</strong> and the Annual Plan <strong>2007</strong> - 2008.<br />

050 – LAND<br />

1. Construction of Minor Roads<br />

2. Construction of park & recreation<br />

3. Construction of Steps, R/Wall & Footpath<br />

4. Protection & Rehabilitation of Land Slide Under<br />

MDS.<br />

051 – CONSTRUCTION<br />

5. Domestic Waste Disposal Line<br />

6. Office Building<br />

7. Beutification of City & Towns<br />

052 - MACHINERY & EQUIPTMENT<br />

8. Disaster Management<br />

800 - OTHER EXPENDITURE<br />

9. Clean <strong>Mizoram</strong><br />

10. Information, Education & Communication<br />

11. Direction & Administration<br />

TOTAL<br />

<strong>FIVE</strong> <strong>YEAR</strong><br />

<strong>PLAN</strong><br />

<strong>2007</strong>-<strong>2012</strong><br />

130.00<br />

720.00<br />

1208.00<br />

670.00<br />

230.00<br />

100.00<br />

200.00<br />

(In lacs of Rupees)<br />

25.00<br />

195.00<br />

70.00<br />

484.00<br />

4032.00<br />

<strong>ANNUAL</strong> <strong>PLAN</strong><br />

<strong>2007</strong>-2008<br />

30.0<br />

400.00<br />

290.00<br />

134.00<br />

86.00<br />

20.00<br />

130.00<br />

40.00<br />

60.00<br />

45.00<br />

60.00<br />

1295.00


- 297 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV. (LAD)<br />

BRIEF DISCRIPTION OF THE SCHEME<br />

1. CONSTRUCTION OF MINOR ROADS: This is proposed as a new item. The<br />

scheme is to be utilised for construction of roads for approach to Departmental land like,<br />

Garbage Dumping Ground, Solid Waste Managemnet Centre, Site offices, District offices<br />

and staff quarters. Rs 130.00 is proposed for construction of 52 kilometres of road during<br />

11 th five year plan and 12 Km for Annual Plan <strong>2007</strong> – 08 with an outlay of Rs 30.00<br />

lakhs.<br />

2. PARK AND RECREATION: The scheme is proposed as a new item. During the<br />

10 th five year plan period. Rs 110.53 lakhs was spent for construction and maintenance of<br />

Park at Aizawl and Lunglei. As of now, Lawibual Picnic spot at Aizawl and Lunglei<br />

District park are available and enjoyed by the public as a place of recreational spot. Parks<br />

at Kolasib and Lengpui (New Airport) are now under construction, and It is also intended<br />

to create another parks at the remaining District Headquarters such as : Champhai,<br />

Serchhip, Mamit.<br />

Beside many towns and village already had their own respective local parks under<br />

the maintenance of concerned NGO at their locality without financial assistance from the<br />

Government. It sd, therefore, proposed to pronote such parks as far as possible by giving<br />

financial helps as and where necessary. Hence, Rs 720.00 lakhs and Rs. 400.00 is<br />

proposed during the whole period of 11 th five Plan and Annual Plan <strong>2007</strong>-08 respectively.<br />

3. Step, retaining wall & FOOTHPATH: This can be stated as a new scheme during<br />

the 10 th plan period. It is taken up separately as ‘Step & Retaining Wall’ and ‘RCC<br />

Footpath’. In the 11 th five year plan period, it is proposed to be clapped the two schemes<br />

and rename as ‘Step, Retaining Wall and RCC Footpath’ as the technical specification and<br />

nature of works are almost the same. It is proposed to earmark Rs 1208.00 lakhs for<br />

construction of 35082m2 running metres during the 11 th five year plan Rs 290 lakhs is<br />

provided for Annual Plan <strong>2007</strong>-08.<br />

4. Protection and Rehabilitation of land slide: The scheme is taken up as<br />

‘Monsoon Damage Scheme’ during 10 th plan period. The name of this scheme is<br />

proposed to rename as ‘protection and rehabilitation of land slide’, as it is more<br />

appropriate term in solving urban problems. The scheme is very beneficial especially for<br />

Aizawl City as landslides are the phenomenon during the rainy seasons. It is proposed to<br />

allocate fund amounting to Rs 670.00 lakhs for the whole period of 11 th five year plan Rs<br />

134.00 lakhs is provided for Annual Plan <strong>2007</strong>-08.<br />

5. Domestic waste disposal line: This is a fresh scheme to be taken up during the<br />

11 th five year plan. The problem of drainage system is enormous. In the past experiences,<br />

landslides were cause due to the absence of domestic waste disposal line. While allotting<br />

house site, there might be no plan for providing perfect small drain for disposal of liquid<br />

waste matter to be shared by the householders. Normally, all the households disposed<br />

their waste water from their respective building to a short distance thereby dispersing and<br />

saturating the soil nearby. The most effective way to prevent the problem will be to<br />

provide small drains to be shared by four or five household to link the nearest big drain /<br />

side drain. During the 11 th five year plan, it is proposed to construct 200 nos. of such<br />

small drain with allocation of Rs 230.00 lakhs. Rs. 86.00 lakhs is proposed for <strong>2007</strong>-08<br />

Annual Plan.<br />

6. Office building: The scheme is to be continued as a new item. Construction<br />

Maintenance, renovation and extension of the existing office building as well as quarters<br />

are always required due to the posting of additional staffs and officers at Directorate and


- 298 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

URBAN DEV. (LAD)<br />

sub-ordinate offices. Therefore, Rs 100.00 lakhs is proposed for the said works during the<br />

11 th five year plan. Rs. 20.00 lakhs is proposed for Annual plan <strong>2007</strong> – 08 .<br />

7. Beutification of cities and towns: The existing scheme known as ‘ Cleanliness<br />

and Beautification of City’ was taken up during the 10 th plan especially for the purposed of<br />

meeting all expenditure in connection with ‘ Observance of Cleanliness Week’ every year.<br />

With a formation of a separate of CLEAN MIZORAM SOCIETY, to pursue<br />

cleanliness work a need is felt to concentrate on the beautification programme by the<br />

Department at Urban area. It is a fact that, no separate programme for beautification<br />

activities has been taken up during the previous five year plans. Hence, to make the city<br />

and towns more attractive, relaxing and decorating, it is proposed to take up various<br />

beautification works at important public places and Rs 200.00 lakhs is earmarked for the<br />

whole period of 11 th five year plan. Rs. 130.00 lakhs is proposed for <strong>2007</strong>-08 for Annual<br />

Plan.<br />

8. MACHINERY & EQUIPMENT: There is a policy to incorporate ‘ Disaster<br />

Management Programme’ in the plan in every Department under the State Government.<br />

This will also be a fresh scheme. In case there is any kind of disaster, the Government<br />

Department is expected to make funds available in any form. It is difficult to project<br />

specific requirements. It is proposed to spend finds for upkeep and maintenance of<br />

machineries & equipments held by the Department like vehicles, etc Rs 25.00 lakhs is<br />

proposed during the whole period of 11 th five year plan to be in readiness of machines etc<br />

when deployment are required in tunes of disaster. Rs. 40.00 lakhs is proposed for<br />

Annual Plan <strong>2007</strong>-08.<br />

9. CLEAN MIZORAM: This is a continuing scheme to be considered as a new<br />

scheme. CLEAN MIZORAM SOCIETY has been formed by the Government of <strong>Mizoram</strong><br />

to propagate the gospel of cleanliness in the whole of the state since the last part of 2004 –<br />

2005. The programme is beneficial to impart awareness and instrumental in the cleanliness<br />

drive. Cleanliness campaigns were held in many educational institutions, towns and<br />

villages. During the 11 th plan it is proposed to hand over the activities of ‘Observation of<br />

Cleanliness Week’ to the society which is organized every year by the Government. For<br />

such variety of activities, Rs 195.00 lakhs is earmark for the whole period of 11 th plan.<br />

During <strong>2007</strong>-08, an outlay of Rs. 60.00 lakhs is proposed.<br />

10. INFORMATION, EDUCATION AND COMMUNICATION: This is a fresh scheme<br />

for 11 th five year plan. It has been experienced that without having a proper information,<br />

education and communication, most of the schemes and programmes cannot be<br />

implemented effectively. Most of the scheme requires detailed examination, verification,<br />

education and communication at various levels. This scheme will help in the progress of<br />

monitoring, evaluation etc. Not only that, the Right to Information has been introduced in<br />

the state, which will require preparation of information to be supplied to the requestors. In<br />

order to furnish those information, a separate cell for RTI is required to establish in the<br />

Department. During the period of 11 th five year plan, Rs 70.00 lakhs is proposed for the<br />

purposes mentioned above. Rs. 45.00 lakhs is proposed for Annual Plan <strong>2007</strong> – 08.<br />

11. DIRECTION AND ADMINISTRATION: Rs 484.00 lakhs is proposed during the<br />

period of 11 th five year plan under the requirement of Direction and Administration of the<br />

Department. It is mainly utilise for the expenditure for Salary, Wages, Medical Treatment,<br />

Travelling Expenses, and Office Expenses, Motor Vehicles, Publications and Advertising.<br />

During Annual Plan <strong>2007</strong>-08, Rs. 60.00 lakhs is proposed.<br />

……


- 299 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & PUBLIC RELATIONS<br />

INFORMATION & PUBLIC RELATIONS<br />

During the decades of insurgency, the Department was engaged in the Counterinsurgency<br />

activities providing a link between the government and the public. Public<br />

relation works was carried out extensively in various forms to wean the public specially the<br />

youth away from militancy. The department is instrumental in winning the hearts and souls<br />

of the people for a lasting peace and progress. This task was not easy. Peace, been having<br />

achieved, development is making headway in various directions and the state is now poised<br />

for celebration of twenty years of peace and progress in the State.<br />

In the same vein as winning the hearts of the people for peace, ensuring public<br />

participation and acknowledgement of the various opportunities provided by the many<br />

benevolent development projects made by the government has to percolate down to the<br />

grass root population. For this very important purpose of making peace stay in the land, a<br />

good two way communication is essential. This department of Information & Public<br />

Relations is a vital tool for acceleration, co-relation of peace and development, feed the<br />

public and get feed back. Peace and the process of development is now the envy of visitors<br />

from our neighbouring States. Thus well-informed people is the key note for building<br />

confidence, satisfaction and trust in the government and a power point for doing away<br />

ignorance and mis-conception.<br />

INFRASTRUCTURE NECESSITY :<br />

Construction of permanent assets in the form of re-inforced cement construction of<br />

office buildings with a provision for Conference Hall, Auditorium and Technical room<br />

would be most beneficial for carrying out the desired human contacts with rural residents.<br />

This would provide meeting place and showing of visual publicity and interaction with<br />

various groups of people and organisations.<br />

The eight district headquaters are still bare of these facilities. It is desired and proposed to<br />

kindly provide fund as a special project for making peace stay and bring economic<br />

prosperity in the State. An estimate of Rs. 1920 lakh is submitted for construction of the<br />

proposed buildings and staff quarters in the eight districts as enclosed.<br />

Modernisation of equipment : Media supported with visual have tremendous impact for<br />

dissemination of development news and events. As seeing is believing, capturing of<br />

important projects for telecast through electronic media both local and Government channel<br />

and through projector would bring the people and development works closer, would<br />

register better participation and a sense of pride with ownership in the mind of the people.<br />

This would be able to cover all corners of the villages.<br />

These equipments would be housed in the proposed office building cumauditorium<br />

or public meeting place for interaction and creation of awareness to various<br />

projects. <strong>Mizoram</strong> being on the border state, quenching the thirst for information of the<br />

people for active participation in government programmes would also enhance the security<br />

and defence of the country.<br />

Evince interest, Vigil and Transparency : In most project executions the people<br />

at large and also of the specific project areas are often a silent spectator and show no<br />

interest, whereas all the government projects are very much people oriented with sole<br />

targets to bring conveniences and better means to the public. Foremost priority seems<br />

creation of awareness, education and alert the people specially around the areas and the


- 300 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & PUBLIC RELATIONS<br />

districts and thereby evince sincere interest and vigilance to the projects against substandard<br />

execution or manipulation by various agencies. For this, tools of information and<br />

correct media exercises would bring the desired transparency and implementation of works.<br />

The proposed outlay for the 11 th Five Year Plan and the Annual Plan are Rs.<br />

1036.00 lakhs and Rs. 297.00 lakhs respectively . Schemewise write up and proposed<br />

outlays are given below :<br />

1. Capital outlay-during the 11 th 5 Year Plan the Department proposes construction of<br />

the following buildings. The existing old Directorate building was constructed in 1975. It<br />

has become old and overdue for re-construction. In addition to the earlier three Districts,<br />

another five new Districts were created without any provision of additional fund. The<br />

office buildings and staff quarters in these 3 old districts were constructed way back in<br />

1973 in Assam type building. These buildings are in a dilapidated from and need reconstruction<br />

while the five new districts have no infrastructure assets for office or staff<br />

quarters. Hence, new buildings are the urgent needs to enable them to function properly.<br />

Therefore, Rs. 157.00 lakhs is proposed for the 11 th Five year Plan while Rs. 50.00 lakhs is<br />

earmarked for <strong>2007</strong>-08.<br />

Out of Rs.126 lakh, an amount of Rs.50 lakh is earmarked for the year, <strong>2007</strong>-2008.<br />

2. Production of Films :- To project the image of <strong>Mizoram</strong> state and its people as well<br />

as the developmental projects and achievements of the State Government the Department<br />

has been producing numbers of documentary films. This has been highly effective among<br />

the rural and the grass root population who have no opportunity to witness the steps taken<br />

by the Government in different areas beyond their reach. The documentary films to a high<br />

degree remove the feeling of neglect and create sense of participation and pride as “ seeing<br />

is believing”.<br />

In addition to this, the Information & Public Relations Department has been<br />

doing Live Telecast of the Assembly Sessions since 1994 and send copies of the visuals to<br />

interior places where Live Telecast is not possible. To intensify introduction and improve<br />

the standard and quality and to cope with the needs and demands of the day, better<br />

equipment and technical know-how are required. Hence the above proposal is made for<br />

improvement and modernisation of production of film with modern technique. For which<br />

Rs. 59.00 lakhs is proposed during 11 th Five year Plan while Rs. 10.00 lakhs is earmarked<br />

for <strong>2007</strong> – 08.<br />

It is proposed that an amount of Rs.59.00 lakhs may be provided during the 11 th<br />

Five Year Plan. Out of which Rs.10 lakh is earmarked for the year <strong>2007</strong>-2008.<br />

3. Public Exhibition of Films : With the growing menace of drug abuse and<br />

social evils it has become necessary to intensify public exhibition of films shows to educate<br />

the mass of the people. For procurement and purchase of films on National Integration,<br />

Family Planning, Drug Abuse, and other educational films and purchase of 2 vehicles for<br />

films shows in the interior villages, an amount of Rs.60.00 lakh is proposed for the entire<br />

11 th Five Year Plan. Out of which Rs.10 lakh is earmarked for <strong>2007</strong>-2008.<br />

4. Others :<br />

(a) Training in Mass Communication : With the advancement of new<br />

techniques in Mass Communication, Public Relations and Journalism it is necessary for the


- 301 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & PUBLIC RELATIONS<br />

officers of this department to undergo training courses to catch up with modern technique<br />

and better skills even as to enable them to function as trainners of the local media, an<br />

amount of Rs.30.00 lakh is proposed out of which Rs.9 lakh is earmarked for the year<br />

<strong>2007</strong>-2008.<br />

(b) Research and Reference : The department is putting up Photo gallery and Book<br />

gallery which serve as a valuable archive which facilitates researcher and students in their<br />

research and studies and also provide documentary evidences and necessary information<br />

for the Government as well.<br />

This has to be up-graded and modernised. An amount of Rs.30.00 lakh is<br />

proposed during the 11 th Five Year Plan out of which Rs.9 lakh is earmarked for the year<br />

<strong>2007</strong>-2008.<br />

5. Advertising and Visual Publicity :<br />

It is the core of Publicity for building the image of the government. Public<br />

Relations works through various Visual and print media agencies. Due to forbidding of<br />

high tariff at the National level it is so far being almost impossible to project the image of<br />

the state and its people in the National media which results in ignorance about the state and<br />

its people to the rest of the country, thereby obstructing mutual understanding and stand on<br />

the way of National unity and emotional integration.<br />

Apart from creating the image of the state and its people, advertising and Visual<br />

publicity is an extremely useful tool for comenting National Integration and communal<br />

harmony. Hence, an amount of Rs.51.00 lakh is proposed during the 11 th Five Year Plan.<br />

Out of which Rs.20 lakh is earmarked for the year <strong>2007</strong>-2008.<br />

6. Information Centre :<br />

Altogether we have 6 (six) Information Centres in the Rural areas and 1 (one) Information<br />

Centre in New Delhi.<br />

The need for strengthening Information Centre in New Delhi is reflected in the<br />

minutes of the meeting held under the Chairmanship of Shri Darshan Kumar, Adviser (SP),<br />

with the Resident Commissioners of the North Eastern Region and Sikkim in his chamber<br />

on 17 th June, 1996 at 11:30 AM. The extract of the minutes reads- ” The need for an<br />

Information counter ” in each of the Resident Commissioner’s Office was also appreciated.<br />

It was noted that since Chief Ministers, Ministers and Senior Officers of the State<br />

Government are often visiting Delhi for attending the meetings they do need the reference<br />

materials available at the State Houses. Central Government officers also need reference<br />

material from state Houses.<br />

To strengthen and upgrade the Information centres it is proposed to set up data<br />

base and Information Kiosk not only in the Delhi Information Centre but also in all the<br />

<strong>Mizoram</strong> Houses in Mumbai, Kolkata, Vellore, Guwahati, Shillong and Silchar. In addition<br />

to this, it is also proposed to install Information Kiosk in the directorate, all districts<br />

Information offices, Lengpui Airport and the existing six rural Information centres in<br />

<strong>Mizoram</strong>.<br />

An amount of Rs.140.00 lakh is proposed during the 11 th Five year Plan which<br />

include rent for Information Centres and providing reading and Visual materials in the rural<br />

Information Centres. An amount of Rs. 40 lakh is earmarked for the year <strong>2007</strong>-2008.


- 302 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & PUBLIC RELATIONS<br />

7. Press Information Services :<br />

The department is subscribing three services of PTI at Raj Bhawan, Chief Minister’s office<br />

and the Directorate and another 3 services of UNI at the mentioned three offices. During<br />

the 11th Five Year Plan we proposed to subscribe PTI services for all the eight district<br />

offices to bring <strong>Mizoram</strong> in the news Map of India.<br />

As a nodal department for media in the State, we have to subscribe all the<br />

newspapers and Magazines in the State for monitoring and feed back of the reports. We<br />

also have to subscribe National papers and Magazines which are instrumental for our daily<br />

functioning.<br />

As a part of creating the feeling of National Integration, Journalist tours from<br />

<strong>Mizoram</strong> are necessary as the media is a powerful instrument for creating Communal<br />

Harmony as well as Communal flare up.<br />

Hence, an amount of Rs.83.00 lakh is proposed during the 11th Five Year Plan.<br />

Out of which Rs.20 lakh is earmarked for the year <strong>2007</strong>-2008.<br />

8. Field Publicity : While the Government lays emphasis on rural development<br />

and bringing democracy at the grass-root level, it is necessary that Field Publicity in all the<br />

districts, sub-divisions and wherever we have Rural Information Centres and major<br />

villages. <strong>Mizoram</strong> being sandwiched between Myanmar and Bangladesh with more than<br />

700 Kms of International boundary it is extremely necessary to educate and sensitise the<br />

people along the International border about the developmental projects and about India. For<br />

this purpose maximum mobility is necessary to reach the interior most part of the State to<br />

give them opportunity to see the works of the Government through visual media to give<br />

them the feeling of ownership and belonging. This sentimental and emotional feeling can<br />

create a human fencing along the International boundaries which are very much porous.<br />

For this purpose mobile video Van equipt with LCD Projectors and Screens for attracting<br />

and moulding the minds of the people in those far-flung areas are necessary.<br />

Hence, an amount of Rs.71.00 lakh is proposed for the entire 11th Five Year<br />

Plan. Out of which Rs. 35 lakh is earmarked for the year <strong>2007</strong>-2008.<br />

9. Songs and Drama : Cultural exchanges and interaction<br />

among the youth of different communities from different States have been found highly<br />

effective for bring about emotional integration which is the core of National Integration.<br />

We have been receiving cultural troupes from various States and we are also sending<br />

cultural troupes to other States for fostering mutual relations. Hence, an amount of<br />

Rs.48.00 lakh is proposed for the entire 11th Five Year Plan. Out of which Rs.18 lakh is<br />

earmarked for the year <strong>2007</strong>-2008.<br />

10. Photo Services : This department has been serving almost as an archive for<br />

recording important functions and historical events. It covers the entire Government<br />

functions including Video and Still coverage through out the State on all occasions. This<br />

include processing like editing, multiplication of video tapes/disc, printing and distribution<br />

of photographs to all media agencies both print and electronics media and keeping of<br />

records. The equipments for these has to be modernized and upgraded to the latest new<br />

techniques to catch up with the computer and internet Kiosk.<br />

An amount of Rs.77.00 lakh is proposed for the entire 11th Five Year Plan. Out<br />

of which Rs.20 lakh is earmarked for the year <strong>2007</strong>-2008.


- 303 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

INFORMATION & PUBLIC RELATIONS<br />

11. Publication : <strong>Mizoram</strong> being on top of literacy chart, reading materials are<br />

in great demand which is still hightened by the introduction of the Right to Information<br />

Act. Publication of brochures, leaflets and information about <strong>Mizoram</strong> served almost an<br />

invitation to tourists to visit <strong>Mizoram</strong> from the mainland and abroad.<br />

To enable to work effectively on this, we proposed an amount of Rs.94.00 lakh<br />

for the entire 11th Five Year Plan. Out of which Rs.32 lakh is earmarked for the year <strong>2007</strong>-<br />

2008.<br />

12. Community Radio and Television : The Department is continually<br />

receiving heartening feed back from the rural and border areas regarding installation of<br />

community listening sets and community viewing sets. It has been found that these<br />

electronics sets are highly instrumental in deflecting foreign influences through their<br />

signals particularly among the people of border areas. This will serve in bringing to home<br />

against the feeling of geographical and communal isolation from the mainland. It is<br />

therefore proposed to intensify to install community viewing and listening sets in the rural<br />

areas to achieve the desired results. Hence, an amount of Rs.48.00 lakh is proposed for the<br />

entire 11th Five Year Plan for purchase of community listening and viewing sets, technical<br />

equipments and generators. Out of which Rs.4 lakh is earmarked for the year <strong>2007</strong>-2008.<br />

13. Cultural and Social activities : Most of the rural population have not had a chance to<br />

see their own State capital not to speak of the national capital at New Delhi. In this regard,<br />

the refrain cannot but be national integration. It is therefore found necessary to organise<br />

Aizawl Dharsan and Bharat Dharsan for the people who do not afford to go to Delhi or<br />

Aizawl. The department has been regularly sending Tribal representatives to witness<br />

Republic Day celebration in New Delhi every year. The department is also requested by the<br />

central Government to present Republic Day Tableaux in New Delhi accompanied by<br />

cultural troupe. As such, Rs. 88.00 lakh is proposed for 11 th Five year Plan and Rs. 20.00<br />

lakh is earmarked for <strong>2007</strong>-08.<br />

……..


- 304 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LABOUR & EMPLOYMENT<br />

LABOUR & EMPLOYMENT<br />

The proposed outlay for 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> is Rs 404.00 lakhs<br />

and the proposed outlay for Annual Plan <strong>2007</strong>-08 is Rs 165.00 lakhs. The proposed Subsector-wise<br />

allocation of fund is as under:-<br />

[Rupees in lakhs]<br />

Head 11 th Plan <strong>2007</strong>-<strong>2012</strong> Annual Plan <strong>2007</strong>-08<br />

Labour Welfare<br />

a) Direction & 140.00 45.00<br />

b) Administration 87.00 15.00<br />

2) Employment Services 157.00 40.00<br />

3) Craftsman Training 249.00 65.00<br />

TOTAL 633.00 165.00<br />

1. LABOUR WELFARE:<br />

‘A’ – DIRECTION :<br />

Strengthening of Directorate office, maintenance of existing staff and<br />

construction of department buildings will be taken up during the 11 th Five Year Plan.<br />

The existing office building at Republic Veng has become worn out over a<br />

year. The Department proposes to construct a new building during 11 th Five Year Plan to<br />

accommodate Directorate of Labour & Employment, District Employment Exchange Office<br />

and S.R.E.O, Office during 11 th Five Year Plan.<br />

The proposed outlay for 11 th Five year Plan under Direction is Rs. 140.00<br />

lakhs and Rs. 45.00 lakhs is proposed for Annual Plan <strong>2007</strong>-08.<br />

[Rs. in lakhs]<br />

Detailed Head Proposed outlay Proposed outlay<br />

for 11 th Plan for Annual Plan <strong>2007</strong>-08<br />

(01) Salaries 5.00 1.00<br />

(02) Wages 5.00 1.00<br />

(06) Medical treatment 1.00 0.50<br />

(11) Domestic T.E 5.00 2.00<br />

(13) Office expenses 25.00 10.00<br />

(26) Advertising & Publicity 5.00 0.50<br />

(27) Minor works 10.00 3.00<br />

(31) G.I.A 4.00 2.00<br />

(50) Other charges 25.00 5.00<br />

(53) Major works 55.00 20.00<br />

TOTAL 140.00 45.00<br />

B. ADMINISTRATION<br />

Various Central Laws, Minimum Wages Act, Payment of Wages Act and<br />

Trade Union Acts, the <strong>Mizoram</strong> Contract Labour [Regulation and Abolition] Rules and the<br />

Inter State Migrant Workmen [Regulation of Employment and Condition of Service] Rules<br />

are implemented in <strong>Mizoram</strong> so far. The Department had already framed Shop and<br />

Establishment Act, Building and other Construction Rules and Child Labour Rules and will<br />

be enforced within a short period of time.<br />

The proposed outlay for Administration during the 11 th Five Year Plan is Rs<br />

87.00 lakhs and Rs 15.00 lakhs is proposed for Annual Plan <strong>2007</strong>-08.


- 305 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LABOUR & EMPLOYMENT<br />

Detailed head Proposed outlay Proposed<br />

outlay 11th Plan for Annual Plan <strong>2007</strong>-08<br />

(01) Salaries 25.00 4.50<br />

(02) Wages 8.00 1.50<br />

(11) Domestic T.E 6.00 0.30<br />

(13) Office expenses 25.00 4.50<br />

(26) Advertising & Publ. 3.00 0.20<br />

(50) Other charges 20.00 4.00<br />

TOTAL 87.00 15.00<br />

2. EMPLOYMENT SERVICE:<br />

Due to increase of job-seekers on the Live Register of Employment<br />

Exchanges in <strong>Mizoram</strong>, which has exceeded 90,000 today, it has become almost impossible<br />

to annually handle the operation of Employment Exchange at the district headquarters. To<br />

cope with the situation, computerization of Employment Exchanges at Aizawl, Lunglei and<br />

Saiha during 11 th Plan period have been included.<br />

As per the direction received from the Ministry of Social Justice and<br />

Empowerment, it is envisaged to open separate Employment Exchanges at Aizawl, Lunglei,<br />

and Saiha exclusively for the benefit of the physically handicapped persons under CSS at<br />

80% Central Assistance.<br />

Besides, it is proposed to establish Coaching, Career Guidance and<br />

Counselling Centre. This Centre will help the follow-up programme of its Career awareness<br />

campaign and it will also be very helpful for students and their parents for choosing the rightcareer<br />

for them and for their children.<br />

The proposed o0utlay for 11 th Five Year Plan is Rs 157.00 lakhs and Rs<br />

40.00 lakhs is proposed for Annual Plan <strong>2007</strong>-08.<br />

Rs in lakh<br />

Proposed outlay Proposed outlay<br />

Detailed Head for 11 th Plan for Annual Plan <strong>2007</strong>-08<br />

(01) Salaries 5.00 1.00<br />

(02)Wages 6.00 3.00<br />

(06) Medical treatment 5.00 1.00<br />

(11) Domestic T.E 5.00 2.00<br />

(13) Office expenses 50.00 17.00<br />

(14) Rents, Rates & Taxes 10.00 2.00<br />

(26) Advertising & Publicity 5.00 1.00<br />

(27) Minor works 36.00 8.00<br />

(50) Other charges 35.00 5.00<br />

TOTAL 157.00 40.00<br />

3. CRAFTSMAN TRAINING:<br />

Under this scheme, there is one existing ITI at Aizawl under which 14<br />

trades with 21 units are introduced. A total outlay of Rs 625.12 lakhs has been allotted for the<br />

establishment of new ITI at Lunglei and Saiha including strengthening / modernising the<br />

existing ITI, Aizawl under the Prime Minister’s Economic Packages for North Eastern States<br />

during 10 th Five Year Plan. Under the Scheme there are 38 posts already filled up on contract<br />

basis. As the packages for the North East cover 10 th Plan period, the State Govt. have to take<br />

over the scheme from 11 th Five Year Plan for which a sum of Rs 21.00 lakhs is earmarked:-


- 306 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

LABOUR & EMPLOYMENT<br />

Scale of Pay<br />

1) Vice Principal 2 post Rs 5500-9000/-<br />

2) Group Instructor 1 post -do-<br />

3) Instructor 22 posts Rs 5000-8000/-<br />

4) U.D.C 2 post -do-<br />

5) L.D.C 2 post Rs 4000-6000/-<br />

6) W/Attendance 1 post Rs 2650-4000/-<br />

7) IV Grade 7 posts -do-<br />

8) Storekeeper 1 post Rs 4000-7000/-<br />

TOTAL 38 posts<br />

To start with the scheme, the Govt. of India has approved an introduction of<br />

four trades each at Lunglei and Saiha and nine more new trades to the existing ITI, Aizawl<br />

increasing the intake capacity of trainees by 192. Thus the total seating capacity becomes<br />

nearly 660. The workload and the status of the ITI. Aizawl are also simultaneously enhanced<br />

qualifying the ITI for being headed by Senior principal in the rank of Deputy Director.<br />

Students are paid monthly stipend of Rs 500/- and annual book grant of Rs 1000/- each and<br />

as also uniform. Yet there is no Assistant in the office of the Principal. Again as per Govt. of<br />

India, DGE&T norm for every 8 units of Vocational Trades there should be one group<br />

Instructors, whereas this ITI does not have even one single Group Instructor. Hence, the need<br />

for 3 Group Instructors. Still more, presently Draughtsman Civil and Radio & TV [Mechanic]<br />

trades are also functioning in the ITI. Both are of two units of two years duration. Yet there is<br />

just one Instructor each for these two trades, These acute shortage severely hampers the<br />

normal training stream and requires to be rectified urgently.<br />

The existing ITI Bus is over 15 years old and has outlived its life-span.<br />

With the heavy increase in the intake capacity of trainees it is eminent large chunk of the<br />

entrants would be from the sub-urban areas of Aizawl City and the existing rickety bus is of<br />

no use at all. In order to cope up the rust of trainees from Sihphir, Durtlang, Zemabawk,<br />

Luangmual, Hlimen etc. two new buses are proposed as additional Bus and the other as a<br />

replacement of the old one which can be fruitfully used for training purposes in the ITI.<br />

The total outlay proposed for Craftsman training during 11 th Five Year Plan<br />

<strong>2007</strong>-<strong>2012</strong> is Rs 249.00 lakhs and total proposed outlay for Annual Plan <strong>2007</strong>-08 for<br />

maintenance of existing scheme is Rs 65.00 lakhs.<br />

Rs. in lakh<br />

Detailed Head Proposed outlay Proposed outlay<br />

for 11 th Plan for Annual Plan <strong>2007</strong>-08<br />

(01) Salaries 45.00 15.00<br />

(02) Wages 15.00 2.00<br />

(06) Medical treatment 5.00 1.00<br />

(11) Domestic T.E 2.00 0.75<br />

(13) Office expenses 35.00 8.00<br />

(26) Advertising & Publicity 5.00 1.00<br />

(27) Minor works 20.00 4.00<br />

(28) Professional services 2.00 0.25<br />

(34) Scholarship/ Stipend 85.00 22.00<br />

(50) Other charges 10.00 3.00<br />

(52) Machinery &Equipment 25.00 8.00<br />

TOTAL 249.00 65.00<br />

……


- 307 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

SOCIAL WELFARE<br />

Introduction :<br />

The Department of Social Welfare attained full fledged Directorate in 1980<br />

and extends its scope of activities to formulation and enforcement of Social Legislations like<br />

Juvenile Justice Act, Immoral Traffic in Persons etc., Social Defense Services, Welfare of<br />

Disabled Persons, Women & Child Welfare, Supplementary Nutrition Programme, Socio-<br />

Economic Rehabilitation Programme, National Social Assistance Programme and<br />

Strengthening of Voluntary Organizations, Centrally Sponsored Schemes like I.C.D.S.<br />

Scheme, National Programme for Adolescent Girls, Balika Samridhi Yojana, Rashtria Mahila<br />

Kosh and programmes for social upliftment under Article 275(10 of the Constitution etc.<br />

While the outlay for the 10 th Five-Year Plan was Rs.1,439.00 lakhs for Social<br />

Welfare and Rs.2,925.00 lakhs for Nutrition (P.M.G.Y.), the actual allotment for the said<br />

period is Rs.2,554.87 lakhs for Social Welfare and Rs. 3,383.50 lakhs only for Nutrition.<br />

Abstract of scheme-wise requirement during the 11 th Five-Year Plan <strong>2007</strong>-<br />

<strong>2012</strong> and Annual Plan <strong>2007</strong>-2008 is given below.<br />

(Rs. in lakhs)<br />

Sl.<br />

Name of Scheme <strong>2007</strong>-12 <strong>2007</strong>-08<br />

No.<br />

1 2 3 4<br />

1 DIRECTION 139.00 32.35<br />

2 DISTRICT ADMINISTRATION 14.00 6.00<br />

3<br />

4.<br />

WELFARE OF HANDICAPPED<br />

(i) Disability Pension 24.00 4.80<br />

(ii) Assistance to Handicapped Persons 50.00 14.00<br />

(iii) Hostel for Handicapped Persons 13.00 2.15<br />

(iv) N.P.R.P.D. 75.00 15.00<br />

(v) Persons with Disabilities Act 1995 60.00 11.00<br />

CORRECTIONAL SERVICES<br />

(i) Reception Centre 113.00 19.56<br />

(ii) Protective Home 116.00 21.04<br />

(iii) Social Services in Jails 59.00 10.54<br />

(iv) Youth Development Centre / After Care<br />

Centre 308.00 49.88<br />

5. PROHIBITION<br />

M.S.D. & R.B. 75.00 15.00<br />

6 WOMEN WELFARE<br />

(i) Platform Strategies for Women / I.W.E.P. 10.00 2.00<br />

(ii) Socio Economic Programme For Poor &<br />

Destitute Women<br />

(iii) Protection Against Sexual Harassment of<br />

50.00 10.00<br />

Women / Domestic Violence 75.00 15.00<br />

(iv) R.I.T.C. 25.00 2.00<br />

(v) Women Commission 76.00 14.10


- 308 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

1 2 3 4<br />

7 CHILD WELFARE<br />

(i) Survey 5.00 1.00<br />

(ii) I.E.C. and Publicity / Children Innovation /<br />

Incentive Schemes<br />

25.00 5.00<br />

(iii) Pre School for Children 10.00 2.00<br />

8<br />

9<br />

10<br />

(iii) Cretch / Daycare Centre 10.00 2.00<br />

(iv) State Council for Child Welfare 5.00 1.00<br />

WELFARE OF AGED, INFIRM & DESTITUTE<br />

(i) N.O.A.P. 1579.00 285.75<br />

(ii) N.F.B.S. 309.00 51.70<br />

(iii) State Policy for Elderly Persons 25.00 5.00<br />

(iv) Social Rehabilitation Assistance<br />

Programme<br />

JUVENILE JUSTICE ACT 2000<br />

(Care & Protection of Children)<br />

50.00 10.00<br />

(i) Observation Home (Aizawl & Lunglei) 207.00 30.50<br />

(ii) Special Home 89.00 16.63<br />

(iii) Child Protection Unit<br />

(iv) Assistance to Licensed Adoption<br />

27.00 5.00<br />

Placement Agency & Children 50.00 10.00<br />

(v) Adoption Cell Home / Board of Control for<br />

Supervision of Homes in the State 5.00 1.00<br />

STRENGTHENING OF VOLUNTARY<br />

ORGANIZATIONS<br />

50.00 10.00<br />

11 PROJECTS UNDER ARTICLE 275(1) 1505.00 264.00<br />

TOTAL : 5233.00 945.00<br />

1. DIRECTION<br />

For the maintenance of existing staff of one Steno. – III and establish of the<br />

Directorate of Social Welfare, total financial requirement for the 11 th Five-Year Plan<br />

is Rs.138.76 lakhs.<br />

(a) Repairs and Maintenance of Department Buildings :-<br />

Department buildings numbering more than 200, constructed under Plan,<br />

C.S.S., B.A.D.P. Schemes are required to be maintained. As some of the buildings<br />

are now old and depleted, they require certain renovations and repairs. Rs.25.00<br />

lakhs is, therefore, earmarked for this purpose during the 11 th Five-Year Plan.<br />

(b) Information Technology & Software Development :-<br />

For the implementation of Information Technology & Software Development,<br />

it is proposed to promote the scheme during the 11 th Five-Year Plan as shown below :


- 309 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

(i) Computers to be installed in all Officers’ rooms.<br />

(ii) All computers be connected together by means of networking.<br />

(iii) Bare minimum printers be provided in each room except in the main Computer Room<br />

where three types of printers – Laser, Dot and Inkjet Printers shall be installed.<br />

(iv) Internet subscription connection be subscribed at the main Computer Room.<br />

Financial requirement during the 11 th Five-Year Plan <strong>2007</strong>-<strong>2012</strong> Rs.50.00 lakhs.<br />

(c) Research & Evaluation :-<br />

One of the drawbacks of programmes taken up by the State Govt. is lack of<br />

research. It is felt necessary to have scientific findings on the causes, factors leading to social<br />

problems like children of HIV/AIDS and drug abuse, alcoholism, divorce etc. It is also<br />

necessary to make aware of disabilities and old age for which campaigns / seminars /<br />

meetings are proposed to be held at the State, District and Block Levels. Financial<br />

requirement during the 11 th Five-Year Plan is Rs.25.00 lakhs.<br />

(Rs. in lakh)<br />

11 th Plan Outlay A.P. <strong>2007</strong>-08<br />

Salary 10.00 1.85<br />

M.T. 3.00 0.50<br />

O.E. 50.00 10.00<br />

O.C. 50.00 10.00<br />

M.W. 25.00 10.00<br />

Total : 139.00 32.35<br />

(d) Expansion of Organizational Structure :-<br />

During the 11 th Five-Year Plan, creation of posts, each of Joint Director and<br />

Assistant Engineer is proposed for efficient and more effective disposal of works.<br />

(i) Joint Director –<br />

The Department is monitoring various schemes of welfare activities such as<br />

Women & Child, Disabled Persons, Correctional Services, Welfare of Older Persons, G.I.A.<br />

and under Article 275 (1) of the Constitution, G.I.A. to N.G.O.s and Orphanages, overall<br />

monitoring of I.C.D.S. and implementation of Nutrition Scheme. The schemes undertaken are<br />

under the overall supervision of one existing Joint Director. In addition to this, the Jt.<br />

Director is in charge of the overall administration of the Department. As such, the existing Jt.<br />

Director is overloaded with such voluminous works.<br />

It is, therefore, felt imperative that creation of one post of Jt. Director is a must<br />

during the 11 th Five-Year Plan.<br />

(ii) Assistant Engineer –<br />

The need of having the post/personal Asst. Engineer is that the Department<br />

had undertaken the Technical Works/Construction Works under the scheme Article 275(1) of<br />

the Constitution. The scheme covers rural infrastructure and income generation. Financial<br />

involvement on this account normally ranges from Rs.264.00 lakhs to Rs.325.00 lakhs<br />

annually.


- 310 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

If the Department is equipped with the post of Asst. Engineer, almost all the<br />

construction works could be executed departmentally and smoothly.<br />

The financial requirement on salary of the post of Jt. Director and Asst.<br />

Engineer is given below :-<br />

Sl.<br />

Name of post Scale of Pay Per Month Per Year<br />

No.<br />

1. Jt. Director 12,500-18,000/- 22,530/- 270,360.00<br />

2. Asst. Engineer 8,000-13,5000/- 15,120/- 181,440.00<br />

TOTAL :<br />

451,800.00<br />

2. DISTRICT ADMINISTRATION<br />

For strengthening and smooth functioning of the 4 existing Offices of the<br />

District Social Welfare Officers, it is proposed to provide fund from Plan Budget in addition<br />

to fund provided under Non Plan Budget during the 11 th Five-Year Plan.<br />

Financial requirement is given below :-<br />

(Rs. in lakhs)<br />

11 th Plan <strong>2007</strong>-12 outlay A.P. <strong>2007</strong>-08 Outlay<br />

T.E. 8.00 4.00<br />

O.E. 6.00 2.00<br />

Total : 14.00 6.00<br />

3. WELFARE OF HANDICAPPED<br />

(a) Persons with Disabilities (Equal Opportunities, Protection of Rights & Full<br />

Participation) Act 1995 :-<br />

Parliament has passed the Persons with Disabilities (Equal Opportunities,<br />

Protection of Rights & Full Participation) Act 1995. All the State Govts., except Jammu &<br />

Kashmir, are instructed to implement this Act immediately.<br />

As envisaged in the Act, ‘Disability’ includes: - (i) Blindness, (ii) Low<br />

Vision, n(iii) Leprosy cured, (iv) Hearing Impairment, (v) Mental Retardation, and (vi)<br />

Mental Illness.<br />

It is proposed to function the following schemes during <strong>2007</strong>-<strong>2012</strong> as given<br />

below :-<br />

(i) Disability Pension<br />

(ii) Assistance to Handicapped Persons<br />

(iii) Grants to Handicapped Educated Unemployed Allowances<br />

(i) Disability Pension :- Disability Pension was given to disabled persons @<br />

Rs.100/- p.m. per head. It is now proposed to revise the ceiling from Rs.100/- per head to<br />

Rs.200/- p.m. per head. It is proposed to give assistance to 200 persons in the form of<br />

monthly pension.<br />

Total financial requirement during the 11 th Five-Year Plan is given below :-


- 311 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan<br />

Total : 4.80 24.00<br />

(ii) Assistance to Handicapped Persons :- As per 2001 census in the State, there are<br />

16011 disabled persons in <strong>Mizoram</strong>. In order to rehabilitate those disabled persons, it is<br />

proposed to give assistance in cash or in kind or as per individual needs like artificial limb<br />

fittings etc. Grants-in-aid are given to disabled persons for their social upliftment and<br />

economic rehabilitation in kind and in cash. Different trades are offered under this scheme,<br />

like :- (i) Piggery, (ii) Poultry, (iii) General Store, and (iv) Hand/Treddle Sewing Machine<br />

during the 10 th Five-Year Plan.<br />

Year-wise requirement is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 14.00 50.00<br />

(iii) Grants to Handicapped Educated Unemployed Allowances :- All handicapped<br />

educated unemployed with disabilities were given Rs.100/- p.m. during the 10 th Five-Year<br />

Plan. They are proposed to give financial assistance @ Rs.200/- p.m. per head to 50 persons<br />

during the 11 th Five-Year Plan, as shown below :<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 1.20 6.00<br />

(b) Hostel for Handicapped Persons :-<br />

The Department runs vocational Training Centres at Aizawl and Lunglei.<br />

Hostel facility is available only at Aizawl. The general administration for the other staff is<br />

met from Non Plan fund, but the maintenance of one post of Warden is met from Plan fund.<br />

Year-wise requirement is given below. The scheme is proposed to be continued during the<br />

11 th Five-Year Plan period.<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 1.65 10.00<br />

Medical Treatment 0.50 3.00<br />

Total : 2.15 13.00<br />

(c) National Programme for Rehabilitation of Persons with Disabilities (NPRPD):-<br />

The NPRPD is a new State Sector scheme launched in the country during<br />

1999-2000 with the basic objective of providing comprehensive rehabilitation services to<br />

persons with disabilities (p.w.d.s). The Govt. of India released fund for the programme upto<br />

2001-02 and the State Govt. should continue the programme from its own resources for<br />

which the Secretary, Ministry of Social Justice & Empowerment (D.O.No.16-24/2000-<br />

NPRPD dt.14.5.2002) and the Planning Commission [D.O.No.PC(P)2/11/2001-SPC


- 312 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

(Vol.III)dt.19.4.2002] wrote to the Chief Secretary to the Govt. of <strong>Mizoram</strong> to ensure<br />

adequate provision for rehabilitation services to the p.w.d.s.<br />

Under the NPRPD, two State Referral Centres (separately for mentally retarded and<br />

other disabilities) and one District Referral Centre, set up and run by NGOs during the 10 th<br />

Five Year Plan, have to be continued during the 11 th Five Year Plan for which Rs.75.00 lakhs<br />

is earmarked as Grant-in-aid, as given below :-<br />

Honorarium to :-<br />

1. 4 consultants @ Rs.8000/- p.m. (Eye. Ortho., E.N.T. and M.R.) in State Referral<br />

Centre.<br />

2. 15 Professionals (Audiologist, Physiotherapist, Occupational Therapist, Anesthetist,<br />

Orthodontist, Psychologist/Social Worker, Vocational Counselor, Mobility Instructor,<br />

Education Instructor).<br />

3. Training / Seminar / Meeting.<br />

4. Assessment / outreach.<br />

5. Miscellaneous / contingencies<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 15.00 75.00<br />

(d) Persons with Disabilities Act 1995 :-<br />

With the enactment and enforcement of the Persons with Disabilities (Equal<br />

Opportunities, Protection of Rights & Full Participation) Act 1995 in the country w.e.f.<br />

7.2.1996, the Govt. of <strong>Mizoram</strong> framed and enforced the <strong>Mizoram</strong> Persons with Disabilities<br />

Rules 1999 in <strong>Mizoram</strong> w.e.f. 16.8.1999. The State Level Coordination, under the<br />

Chairmanship of the Minister, Social Welfare Department, and the State Executive The<br />

Committee, under the Chairmanship of the Secretary, Social Welfare Department, had been<br />

constituted to advise and see to the implementation of the Persons with Disabilities Act and<br />

the Rules in the State.<br />

The Persons with Disabilities Act provides for both preventive and promotional<br />

aspects of rehabilitation like education, employment and vocational training, reservation,<br />

research and manpower management, creation of barrier-free environment, rehabilitation of<br />

persons with disabilities, unemployment allowance for the disabled, special insurance scheme<br />

for the disabled and establishment of homes for persons with severe disabilities.<br />

Section 60-65 of the Persons with Disabilities Act 1995 and Section 45-48 of<br />

the Persons with Disabilities Rules 1999 stipulated appointment of Commissioner for Persons<br />

with Disabilities and supporting Officers and other employees to be decided by the State<br />

Govt.<br />

The Commissioner is to :<br />

(a) coordinate with the Departments of the State Govt. for the programmes and schemes<br />

for the benefit of p.w.d.s<br />

(b) monitor the utilization of funds disbursed by the State Govt.<br />

(c) take steps to safeguard the rights and facilities made available to the p.w.d.s<br />

(d) submit reports to the State Govt. on the implementation of the Act at such intervals as<br />

the Govt. may prescribe and forward a copy thereof to the Chief Commissioner for<br />

Persons with Disabilities, look into complaints with respect to matters relating to<br />

deprivation of rights of p.w.d.s non-implementation of the Act, Rules, orders, by-laws<br />

etc.


- 313 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

The Commissioner is empowered with the same powers as are vested in a court under<br />

the Govt. of Civil Procedure 1908 while trying a suit. Every proceeding before him shall be a<br />

judicial proceeding within the meaning of Section 193 and 228 of the Indian Penal Code and<br />

the Commissioner, the competent authority, shall be deemed to be a Civil Court for the<br />

purpose of Section 195 and Chapter XXVI of the Govt. of Criminal Procedures 1973.<br />

To enable the implementation of the Persons with Disabilities Act 1995 and Persons<br />

with Disabilities Rules 1999, it is proposed to establish the Office of Commissioner for<br />

Persons with disabilities and the following posts are proposed to be created during <strong>2007</strong>-08.<br />

The Commissioner / Secretary, Social Welfare Department is acting as Commissioner for<br />

p.w.d. presently.<br />

Name of Post Scale of Pay Nos. of Posts<br />

Assistant Commissioner 10,000-15,200/- 1<br />

Assistant 5,500-9,000/- 1<br />

U.D.C. 5,000-8,000/- 1<br />

L.D.C. / Computer Operator 4,000-6,000/- 2<br />

Duftry 3,050-4,590/- 1<br />

IV Grade(Watchman, Peon, Dak<br />

Runner)<br />

2,750-4,000/- 3<br />

TOTAL : 9<br />

Requirement of fund :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 7.80 47.00<br />

Medical Treatment 0.20 2.00<br />

O.E. (Stationery, Furniture, Fixture,<br />

Telephone)<br />

2.00 6.00<br />

O.C. 1.00 5.00<br />

TOTAL : 11.00 60.00<br />

4. CORRECTIONAL SERVICES<br />

(a) Immoral Traffic (Prevention) Act 1986 :<br />

As envisaged in the Act, two kinds of institutions are established viz. Reception<br />

Centre, where women arrested under the Act are remanded, and Protective Home, where<br />

persons convicted by the Court are institutionalized. Training in different trades are imparted<br />

for their economic rehabilitation and counseling and guidance for their moral rehabilitation.<br />

These two institutions have been started since 1985-86 and proposed to be continued during<br />

the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong>.<br />

(i) Reception Centre : Financial requirement for Reception Centre during <strong>2007</strong>-<strong>2012</strong> is<br />

given below :-<br />

Sl.<br />

Name of Post Scale of Pay Existing Proposed Total<br />

No.


- 314 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

1. IV Grade 2,650-4,000/- 18 - 18<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 17.06 100.00<br />

Medical Treatment 2.00 10.00<br />

O.C. 0.50 3.00<br />

TOTAL : 19.56 113.00<br />

(ii) Protective Home :<br />

Sl.<br />

No.<br />

Name of Post Scale of Pay Existing Proposed Total<br />

1. Superintendent 8,000-13,500/- 1 - 1<br />

2. Warden 5,000-8,000/- 1 - 1<br />

3. Instructor 4,000-6,000/- 1 - 1<br />

4. L.D.C. 4,000-6,000/- 1 - 1<br />

5. IV Grade 2,650-4,000/- 5 - 5<br />

TOTAL : 9 - 9<br />

Financial requirement during the 11 th Five Year Plan <strong>2007</strong>-<strong>2012</strong> under Protective<br />

Home is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 11.24 65.50<br />

Medical Treatment 1.70 10.00<br />

T.E. 0.10 0.50<br />

O.E. 2.00 10.00<br />

M & S 5.00 25.00<br />

Minor Works 0.50 2.50<br />

O.C. 0.50 2.50<br />

TOTAL : 21.04 116.00<br />

(b) Social Services in Jails :-<br />

For the maintenance of 5 existing posts under the scheme, financial<br />

requirement during the 11 th Five-Year Plan <strong>2007</strong>-12 is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 7.54 44.00<br />

Medical Treatment 1.00 5.00<br />

O.E. 2.00 10.00<br />

TOTAL : 10.54 59.00


- 315 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

(c) Youth Development Centre :-<br />

Youth Development Centre (formerly known as De-addiction-cum-<br />

Rehabilitation Centre) is located at Sethawn on Aizawl to Silchar 54 National Highway,<br />

about 70 km. From the State capital i.e. Aizawl.<br />

Social Welfare Department had been running De-addiction-cum-<br />

Rehabilitation Centre with its own State Plan Fund since 1990. With the coming up of a good<br />

number of Non-Governmental Organizations (N.G.O.s) in the field to take up the primary<br />

tasks of detoxification and rehabilitation of drug addicts and alcoholics, the Govt. of<br />

<strong>Mizoram</strong> converted the Centre into an Aftercare Centre (Youth Development Centre). The<br />

Youth Development Centre is proposed to cater to the needs of youths who are facing<br />

unemployment problems in the State and also to act as State Referral Centre for recovered<br />

addicts. In <strong>Mizoram</strong>, urbanization is growing at a much faster rate than the infrastructures,<br />

and services to cope with it. A large populace of the rural villages migrating to the State<br />

capital and a few big towns, which provide better facilities such as health services, education,<br />

water supply, electricity, employment etc. But the employment opportunities are open only<br />

for theose youth who have the required qualifications and skills. This in turn has created<br />

frustration among the youth. Rising youth unemployment has been arousing increasing<br />

concern in the State. It is, therefore, important to plan manpower generation programmes for<br />

the youth who have been dropped out of schools and also for those who cannot make use of<br />

the educational degrees they obtained from schools and colleges and even from the<br />

Universities.<br />

Because of this, youth problem, cases of ruined lives, crime, drug addiction,<br />

lost hopes, social fears, reduced productivity, raised social expenditure and disdain for<br />

authority are becoming today’s social scenario in <strong>Mizoram</strong>. The unemployed youth are easily<br />

lured by the easy way of earning money through illegal means such as forcible collection of<br />

fund in the name of donations etc. It is a fact that the problem of unemployment is one of the<br />

causes of anti-social activities in all the Northeastern States. The inevitable result of this<br />

practice would be armed rebellion where they can be much more effective with the weapons<br />

and fear they would then wield. It is, therefore, important to plan programmes before it is too<br />

late to lead the youth in the right way and at the same time provide self employment to them.<br />

The proposed Youth Development Centre would reduce the problem of unemployment<br />

among the educated youth by equipping them with skills for different types of employment. It<br />

also aims at providing discipline to youth through physical conditioning and teamwork and to<br />

make them law-abiding citizens. There is also a growing apprehension that unless corrective<br />

measures are immediately initiated and steps taken in that direction, more youths who are<br />

bereft of employment in <strong>Mizoram</strong> will become volatile and the society itself will soon be a<br />

time bomb ticking away minutes towards the big explosion when the state will be infested<br />

with armed insurgents like the states of Manipur, Assam, Meghalaya, Tripura and Nagaland.<br />

The initial proposed trades are :- (i) Computer (ii) Electronics<br />

(iii) Automobiles (iv) Carpentry<br />

In addition to the above proposed trades, it is also proposed to provide basic<br />

skill trainings to the trainees in Agriculture, Horticulture, Sericulture, Animal Husbandry and<br />

Vetenary fields. As for the courses in Computer, it is planned to run the courses in<br />

collaboration with DOEACC Centre, Aizawl, <strong>Mizoram</strong>. The proposal for inclusion of basic


- 316 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

skill trainings in the field of Agriculture, Horticulture, Sericulture and Animal Husbandry is<br />

to enable the trainees to acquire basic knowledge and skills in these fields so that on<br />

completion of the trainings, they would become productive and good citizens.<br />

Thus, the existing infrastructure including the staff in the Centre would<br />

continue during the 11 th Five Year Plan with some modifications as mentioned above.<br />

Total financial requirement during the 11 th Five Year Plan <strong>2007</strong>-12 is given<br />

below :-<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Salary 38.18 224.00<br />

Wages 2.00 30.00<br />

Medical Treatment 1.00 5.00<br />

T.E. 1.00 5.00<br />

O.E. 2.00 15.00<br />

Minor Works 1.70 4.00<br />

M & S 4.00 25.00<br />

Total : 49.88 308.00<br />

Sl.<br />

No.<br />

Name of Post Scale of Pay<br />

Existin<br />

g<br />

Propo<br />

sed<br />

Total<br />

1. Centre Director 10,000-15,200/- 1 - 1<br />

2. Asst.<br />

Director<br />

Project 8,000-13,500/- 1 - 1<br />

3. Case Worker 6,500-10,500/- 2 - 2<br />

4. Psychologist 6,500-10,500/- 1 - 1<br />

5. Staff Nurse 5,500-9,000/- 4 - 4<br />

6. Warden 5,000-8,000/- 1 - 1<br />

7. Vocational Instructor 4,500-7,000/- 4 - 4<br />

8. Security Officer 4,500-7,000/- 2 - 2<br />

9. Physical Instructor 4,500-7,000/- 2 - 2<br />

10. Counselor 4,500-7,000/- 3 - 3<br />

11. Mechanic 3,050-3,950/- 2 - 2<br />

12. Driver Gr. I 5,000-8,000/- 1 - 1<br />

13. Driver Gr. II 4,000-6,000/- 1 - 1<br />

14. IV Grade 2,650-4,000/- 5 - 5<br />

Total : 30 - 30<br />

15 Muster Roll 12 - 12<br />

5. PROHIBITION<br />

<strong>Mizoram</strong> State Social Defense & rehabilitation Board (M.S.D. & R.B.):-<br />

As per decision of the Minister in the meeting of the Advisory Board on Deaddiction-cum-Rehabilitation<br />

& Allied Institutions under the Chairmanship of the Hon’ble<br />

Chief Minister on the 17 th of April 1999, <strong>Mizoram</strong> State Social Defense & rehabilitation<br />

Board was set up with a view to promote and advise the activities of the De-addiction Centres


- 317 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

run by N.G.O.s in the State and creation of awareness among the youth and masses on drug<br />

abuse and prevention. The M.S.D. & R.B. is also acting as Regional Resource Centre for<br />

<strong>Mizoram</strong> and North Tripura funded by the Ministry of Social Justice & Empowerment under<br />

Grant-in-Aid.<br />

Detailed financial requirement during the 11 th Five-Year Plan is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total 15.00 75.00<br />

6. WOMEN WELFARE<br />

In order to bring about advancement and development within the country,<br />

empowerment of women is a crucial issue. The Central Govt. has urged the State Govt. on<br />

the issues of Gender Budgeting vide D.O. No. 1-1/2004/GB dt.18 th October 2004 and D.O.<br />

No.1-6/2005/GB dt.20.12.2005. The exercise of Gender Budgeting seeks to examine<br />

allocation of public expenditure for the Govt. are reflected in the budgetary allocations and<br />

expenditure. Creating an environment where women are able to realize their full potential,<br />

impart knowledge on the legal rights and remedies provided under various laws to face<br />

challenges in crises situations. Awareness machineries and organs of justice delivery system<br />

available, and familiarize them on the procedures of approach and utilizing such channels for<br />

addressing their grievances. To deal with domestic violence / crime against women and<br />

sexual harassment at work places. To enable equal access to participation and decision<br />

making in social, political and economic life. To address these issues relating to social,<br />

economic, political and for the gradual upliftment. Certain schemes and programmes were<br />

functioning during the 10 th Five-Year Plan and is proposed to be continued and strengthened<br />

in vital areas.<br />

(a) Platform Strategies for Women / I.W.E.P. :-<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Total : 2.00 10.00<br />

(b) Socio-Economic Programme for Destitute Women :-<br />

Poor and destitute women who are desperately in need of care, protection and<br />

economic upliftment are proposed to be given socio-economic grant @ Rs. 2,500/- per<br />

beneficiary. This shall be a one-time grant. During the 10 th Five-Year Plan, grant was given<br />

to different trades such as piggery, vegetable vending, poultry, petty shops, sewing machines<br />

etc. with only Rs.1500-2000/- per beneficiary. In the course of the Department taking up<br />

evaluation on the scheme, it was realized that the amount of grant given was too meagre to<br />

have an effective impact on the upliftment of women. So for the 11 th Five-Year Plan, the<br />

ceiling of the grant is proposed to be enhanced. G.I.A. rules for the same will be revised or<br />

newly formulated so as to have a meaningful result in the socio-economic upliftment of poor<br />

and destitute women.<br />

The number of beneficiaries as per calculations is :<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

No. of beneficiaries 400 nos. 2000 nos.


- 318 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

Total financial requirement for the 11 th Five-Year Plan is as below :-<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Total : 10.00 50.00<br />

(c) Protection Against Sexual Harassment of Women &<br />

Implementation of Protection of Women from Domestic Violence :-<br />

Violence against women in numerous forms, sexual harassment and<br />

trafficking of women and children have gained momentum within the country during the last<br />

decade; <strong>Mizoram</strong> has its share of these social evils prevailing in the State. In order to tackle<br />

these problems, it is felt a dire necessity to set aside certain amount of fund. The fund is<br />

intended to be utilized for family counseling, short-stay homes, conducting surveys,<br />

observation of International Women’s Day, assisting and sponsoring studies to create a<br />

reliable and relevant database identification of high supply areas of commercial sex workers/<br />

routes / destinations/ causes of commercial sexual exploitation / high-risk groups / the<br />

exploiters / the magnitude of the social problem. Healthcare services, social mobilization,<br />

Information, Education & Communication (IEC) and publicity.<br />

The Protection of Women from Domestic Violence Act 2005 came into force<br />

on the 26 th of October 2006. Simultaneously, the Protection of Women from Domestic<br />

Violence Rule 2006 came to force on the same day. The Act 2005 Notification was published<br />

in the Gazette of India Extraordinary dt.14.9.2005; and the Rules Notification was published<br />

in the Gazette of India Extraordinary in the issue dt. 17 th October 2006.<br />

The Act is basically meant to provide protection to the wife or female live-in<br />

partner from violence at the hands of the husband or male live-in partner or his relatives. The<br />

law extends protection to women who are sister (including adopted) and mothers. Domestic<br />

violence under the Act includes actual abuse or the threat of abuse, whether physical, sexual,<br />

verbal, emotional or economic. Harassment by way of unlawful dowry demands to the<br />

woman victim or her relatives would also be covered under the definition of domestic<br />

violence.<br />

The above Rules provide for, among other things, appointment of Protection<br />

Officer(s) in each District as per Section 8 of the Act and provide them with necessary<br />

infrastructure to enable them to start functioning;<br />

(i) invite applications from service providers as per Rule 11 and register them after due<br />

verification as regards their suitability;<br />

(ii) publish the names and addresses with telephone numbers of the Protection Officers<br />

and the service providers prominently in newspapers and on the website of the State<br />

Govt.; and<br />

(iii) give wide publicity to the provisions of the Act so that women can avail of its<br />

benefits.


- 319 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

Under the Act, the State Govt. is entrusted to take the following measures, viz.:<br />

(i) the provisions of this Act are given wide publicity through public media including<br />

television, radio and print media at regular intervals.<br />

(ii) the State Govt. Officers, including Police Officers and the members of the Judicials<br />

Services are given periodic sensitization and awareness training on the issues addressed<br />

by this Act.<br />

(iii) effective co-ordination between the service provided by concerned Ministries and<br />

Departments dealing with law, home affairs including law and order, health and human<br />

resources to address issues of domestic violence is established and periodical review of<br />

the same is conducted.<br />

(iv) protocols for the various Ministries concerned with the delivery of services to women<br />

under this Act including the Courts are prepared and put in place.<br />

In order to implement the Protection of Women against Domestic Violence<br />

Act 2005 successfully, awareness programmes in the form of periodical workshops /<br />

seminars / trainings, will need to be conducted. As the Rules provide Counselors need to be<br />

appointed in each District, these Counselors may also act as Caseworkers wherever found<br />

applicable in the course of the implementation of the scheme.<br />

Financial requirement proposed for the 11 th Five-Year Plan is :-<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Total : 15.00 75.00<br />

(d) Residential Institute & Training Centre (R.I.T.C.) for Women in Distress :-<br />

Residential Institute & Training Centre (R.I.T.C.) for Women in Distress was<br />

established by the Department of Social Welfare, Govt. of <strong>Mizoram</strong> in August 1984. The idea<br />

behind the establishment of this institution is to rehabilitate women who are victims of<br />

circumstances, who get involved in situations where they are socially and economically<br />

deprived, discarded and handicapped by giving them a chance to improve their life situations<br />

by providing them shelter, care, treatment and training to enable them to take care of<br />

themselves and to be self-employment and security.<br />

Objective :- The main objective of R.I.T.C. is to rehabilitate women in distress who are in<br />

need of care, protection and training for self-reliant.<br />

Target Group :- The target group of R.I.T.C. is of the following categories of women :-<br />

(i) Widows (ii) Divorced women (iii) Unmarried mothers<br />

(iv) Destitutes (v) Abandoned and neglected women<br />

(vi) Victimized women (vii) Rescued women from immoral danger<br />

(viii) Women belonging to below poverty line (BPL)<br />

Due to the increasing demand of the society for the rehabilitation of women in<br />

distress in the State, the present facilities available can no longer cater to the rising needs. It<br />

is, therefore, suggested for the expansion and improvement of the existing institution to<br />

increase the present strength with a capacity of 25 to 100 beneficiaries and by introducing the<br />

following new trades, which are more modern, generating more income and high in demand


- 320 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

in the society today apart from the existing trade provided i.e. tailoring. The proposed new<br />

trades for introduction are as follows :-<br />

(i) Beauty Culture (ii) Embroidery Course<br />

(iii) Cooking & Bakery Course (iv) Fashion Designing Course etc.<br />

Besides the new proposed trades mentioned, allowance for introduction of<br />

other trades relevant to the State may be made available.<br />

Financial requirement during 11 th Five-Year Plan <strong>2007</strong>-12 is worked out<br />

approximately at Rs.25.00 lakhs as below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

O.E. 0.50 5.00<br />

O..C. 0.50 5.00<br />

M & S 1.00 15.00<br />

Total : 2.00 25.00<br />

(e) Women Commission :-<br />

The Women Commission has been functioning since 1998-1999 under the<br />

State Plan Fund. It is now proposed that the Women Commission funding may be met under<br />

Non Plan during the 11 th Five-Year Plan. As suggested by the working group, Planning<br />

Commission, Govt. of India.<br />

The financial outlay for Women Commission during the 10 th Five-Year Plan<br />

which is proposed to be discontinued under the 11 th Five-Year Plan is Rs.67.61 lakhs. If the<br />

proposal for discontinuation of the scheme under Non Plan is not possible, Rs.76.00 lakhs<br />

approximately will be the financial requirement during the 11 th Five-Year Plan.<br />

7. CHILD WELFARE<br />

Children under the age of 18 yrs. constitute 40% of India’s population. In our<br />

State, children under the age of 19 yrs. constitute 46.40% of <strong>Mizoram</strong>’s population as per<br />

2001 Age Data Census <strong>Mizoram</strong>. Children represent not just the country’s future, but are<br />

integral to securing the country’s present. Children should be looked as potential assets and<br />

future and they are not expenditures but investments. Yet development indicators continue to<br />

show slow progress towards securing their welfare and delivering their basic rights. Every<br />

child of India is entitled to the rights and freedom enumerated in the Constitution of India and<br />

the U.N. Convention on the Rights of the Child and the Protection of Child’s Right Act 2005,<br />

all emphasized on the welfare of children. Child Budgeting has now taken an important issue<br />

in the Central Govt. and expects the State to do likewise. The Govt. of India has directed the<br />

State to set up State Commission for Protection of Child’d Rights vide D.O. No.3-2/2004-<br />

CW Vol. III dt.27.1.2006.<br />

For the functioning of this Commission of State Plan of Action for Children,<br />

fund needs to be allocated.<br />

The Department of Social Welfare dealing with Child Welfare, therefore,<br />

proposes certain schemes, some of which are continued from the 10 th Five-Year Plan and<br />

proposed to be strengthened where there were gaps in the actual deliverance of the services of<br />

Child Welfare those are proposed to be continued during the 11 th Five-Year Plan.


- 321 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

(a) Survey :-<br />

Survey needs to be done on priority basis in regards to children, to have an<br />

overall picture of the <strong>Mizoram</strong> status of children. The areas on which these surveys are to be<br />

conducted is as follows :- (i) Child Labour (ii) Street Children (iii) Children in difficult<br />

circumstances (iv) Children of Alcoholics, Drug addicts (v) Children of Sex Workers (vi)<br />

Refugee Children (vii) Children affected by natural calamities, emergencies and manmade<br />

disasters (viii) Children infected with HIV/AIDS (ix) working children in need of<br />

care and protection, child abuse etc.<br />

Financial requirement proposed for the 11 th Five-Year Plan is :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 1.00 5.00<br />

(b) Information, Education & Communication (I.E.C.) and Publicity &<br />

Children Innovation / Incentive Schemes :-<br />

In order to generate awareness and mobilize sensitization amongst the public,<br />

officials, medias, N.G.O.s dealing with the issue of children, and to combat the social evils<br />

prevailing in the State, I.E.C. is the foremost necessity.<br />

An all-round development of children is the aim of the nation. In order to<br />

bring about the all-round development, children need to be given incentive in the areas in<br />

which they have potential to excel. For the 11 th Five-Year Plan, certain schemes, viz.<br />

Observation of Children’s Day, Child Awards, Talent Search and assistance to children in<br />

difficult circumstances etc. are proposed to be covered under the Child Welfare Programme,<br />

for which schemes will be formulated.<br />

Financial requirement for the 11 th Five-Year Plan is proposed as below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 5.00 25.00<br />

(c) State Council for Child Welfare :-<br />

India, being a signatory to the World Declaration (September 1990) in the<br />

survival, protection and development of children and the plan of action for implementing it, it<br />

is mandatory that the State parties give priority for the cause of children. In compliance of the<br />

above, the State Govt., besides its various activities, encourages N.G.O.s to come forward for<br />

the all-round development of children. Social Welfare Department, therefore, co-ordinates<br />

the efforts of Non-Governmental Organizations. Out of these NGOs, <strong>Mizoram</strong> State Council<br />

for Child Welfare is a newly constituted NGO body, which needs considerable assistance in<br />

the form of Grant-in-Aid.<br />

Financial requirement during the 11 th Five-Year Plan is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 1.00 5.00<br />

(d) Pre School for Children :-<br />

The Department is maintaining 30 nos. of Pre-Schools where the scheme of I.C.D.S.<br />

is not providing Anganwadi Centres. Requirement for the 11 th Five-Year Plan is Rs.10.00<br />

lakhs @ Rs.2.00 lakhs per year.


- 322 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

(e) Cretch / Daycare Centre :-<br />

The Department is maintaining 40 nos. of Cretches / Daycare Centres. Requirement<br />

for the 11 th Five-Year Plan is Rs.10.00 lakhs @ Rs.2.00 lakhs per year.<br />

8. WELFARE OF AGED, INFIRM & DESTITUTE<br />

(a) National Social Assistance Programme (N.S.A.P.) :-<br />

The Department is implementing the National Social Assistance Programme<br />

(N.S.A.P.) which includes :- (i) National Old Age Pension Scheme (N.O.A.P.S.) and (ii)<br />

National Family Benefit Scheme (N.F.B.S.) and Annapurna with the fund sanctioned by the<br />

Govt. of India.<br />

The Govt. of India has enhanced the rate of pension from Rs.75/- to Rs.200/-<br />

p.m. per head w.e.f. 1.4.2006.<br />

Financial breakup for N.O.A.P.S. and N.F.B.S., including Annapurna,<br />

is given below :-<br />

From A.C.A.<br />

Name of Scheme<br />

No. of<br />

beneficiaries<br />

Rate p.m.<br />

Total requirement<br />

for one year<br />

1. N.O.A.P. 10525 200/- 252,60,000.00<br />

2. N.F.B.S. 617 10,000/- 61,70,000.00<br />

3. Annapurna (Implemented by Food<br />

& Civil Supplies)<br />

31,00,000.00<br />

Total of N.S.A.P. : 345,30,000.00<br />

It is also proposed to contribute Rs.50/- p.m. per head from the State Budget for Old<br />

Age Pension as shown below :-<br />

N.O.A.P. 10525 50/- 63,15,000.00<br />

Total of State Share for N.O.A.P. : 63,15,000.00<br />

Financial requirement during the 11 th Five-Year Plan <strong>2007</strong>-12 is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

N.O.A.P. 285.75 1578.75<br />

N.F.B.S. 51.70 308.50<br />

Total : 337.45 1887.25<br />

(b) State Policy for Elderly Persons :-<br />

The State Policy for Elderly Persons was formulated vide Notification No. B.<br />

13012/17/2002-SWD dt.8.4.2004 was issued by the Govt. of India. For which State Plan of<br />

Action for Elderly Persons is formulated and approval of which is awaited from the State<br />

Govt. The <strong>Mizoram</strong> State Level grievances Cell Board was also formed vide Notification No.


- 323 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

D. 12011/9/05-SWD dt.28.6.2005. The State Council for Elderly Persons is also felt<br />

necessary to be set up. Certain amount of fund may be set aside for the functioning of the<br />

Cell Board, implementation of the State Policy, setting up of State Council for Elderly<br />

Persons and observation of international day in a meaningful manner.<br />

Financial requirement during the 11 th Five-Year Plan is as below :-<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Total : 5.00 25.00<br />

(c) Social Rehabilitation / Assistance Programme :-<br />

There has been a long felt need to rehabilitate and assist persons who have been<br />

victims of social eveils. The Department, therefore, proposes to rehabilitate those who have<br />

been involved in alcoholic, drug etc. trades and who want to reform and take up new trades<br />

for livelihood. This scheme may also include persons who have recovered from drugs,<br />

alcohol, commercial sex workers, persons released from jails and HIV/AIDS patients.<br />

The financial requirement for the 11 th Five Year Plan is as under :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 10.00 50.00<br />

9. JUVENILE JUSTICE ACT 2000 ( Care & Protection of Children)<br />

The Juvenile Justice Act 2000 aims at care protection treatment and<br />

rehabilitation of two types of children :-<br />

(a) Juvenile in conflict with law, and<br />

(b) Children in need of care and protection upto the age of 18 yrs. through various<br />

institutions established under this Act.<br />

Under the Act, a well-rounded Juvenile Justice system has been incorporated in<br />

conformity with the United Nations Standard Rules for the administration of the Juvenile<br />

Justice system with a view to fulfill the statutory responsibility of the State as laid down<br />

under the law. The scheme has been implemented since the 8 th Five Year Plan.<br />

(a) Observation Home, Aizawl and Lunglei :<br />

Financial Requirement for Observation Home, Aizawl and Lunglei –<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 16.00 94.00<br />

Medical Treatment 1.50 18.00<br />

T.E. 2.00 10.00<br />

O.E. 3.00 20.00<br />

M & S 5.00 50.00<br />

Minor Works 1.00 5.00<br />

M & E 2.00 10.00<br />

Total : 30.50 207.00<br />

(b) Special Home :-


- 324 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

Special Home is for temporary reception of any juvenile in conflict with law<br />

during the pendency of any enquiry.<br />

Special Home, earlier known as Certified / Approved School is a reception<br />

and rehabilitation home for juvenile in conflict with law necessary for resocialization of the<br />

juveniles.<br />

Due to financial constraints, Special Home and Observation Home for boys<br />

and girls here in <strong>Mizoram</strong> at Aizawl and Lunglei have been functioning under one<br />

establishment managed by one Superintendent each with skeleton staff.<br />

For fulfilling the vision of the Juvenile Justice Act, the Department of Social<br />

Welfare proposes to strengthen the existing Special Home considerably during the 11 th Five-<br />

Year Plan.<br />

Financial Requirement for Special Home during the 11 th Five-Year Plan is as<br />

below –<br />

<strong>2007</strong>-08<br />

(Rs. in lakhs)<br />

11 th Plan Outlay<br />

Salary 8.63 49.00<br />

M.T. 1.00 5.00<br />

O.E. 1.00 5.00<br />

M & S 5.00 25.00<br />

O.C. 1.00 5.00<br />

Total : 16.63 89.00<br />

(c) Child Protection Unit :-<br />

As envisaged in the Juvenile Justice (Care & Protection of Children)<br />

(Amendment) Act 2006, Section 62A, it is utmost important to set up a separate unit to<br />

monitor and evaluate the various boards and committees and functionaries of the Juvenile<br />

Justice System in the State.<br />

To continue using the budget head, i.e. Children’s Court, is no longer<br />

appropriate. It is, therefore, proposed to change the head to ‘Child Protection Unit’, if this<br />

proposal is approved.<br />

Financial requirement for Child Protection Unit :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Salary 3.50 19.50<br />

M.T. 1.00 5.00<br />

O.C. 0.50 2.50<br />

Total : 5.00 27.00<br />

(d) Assistance to Licensed Adoption, Placement Agency & Children’s Homes :-<br />

To bring about the true spirit of Juvenile Justice Govt. Organizations and Non-<br />

Govt. Organizations have contributed significantly in the implementation of Juvenile Justice<br />

(Care & Protection of Children) Act 2000. For still better advancement of these<br />

organizations, assistance may be made available in terms of Grants-in-Aid.<br />

Organizations such as Observation Home, Special Home, Children’s Homes,<br />

Shelter Homes, Aftercare organizations established and certified or recognized under<br />

Sections 8,9,34,37 or 44 of the Act may apply for Grants-in-Aid for the maintenance of


- 325 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

juvenile or child received by them and for expenses incurred on their education, treatment<br />

vocational training, development and rehabilitation under Rule 38 of the <strong>Mizoram</strong> Juvenile<br />

Justice Rules 2003. It is, therefore, required to set aside funds for Grants-in-Aid for<br />

assistances to recognized homes under the Act.<br />

At present, there are seven Children’s Homes operating as Placement<br />

Agencies only. Two received Grant-in-Aid from CARA and 25 Children’s Homes licenses<br />

under the Orphanages and other Charitable Homes (Supervision & Control).<br />

The financial requirement during the 11 th Five-Year Plan <strong>2007</strong>-<strong>2012</strong> for<br />

Grants-in-Aid is as follows :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 10.00 50.00<br />

(e) Adoption Cell :-<br />

Adoption Cell is established as per Govt. of India, Ministry of Social Justice &<br />

Empowerment instructions at the Directorate of Social Welfare vide Notification No. B-<br />

12011/8/2000-SWD dt.1 st July 2003.<br />

For meeting expenses, traveling allowances, sitting allowance of B.O.C. under<br />

the orphanages and other Charitable Homes (Supervise & Control) Act 1960, an amount of<br />

Rs.5.00 lakhs is proposed for the year <strong>2007</strong>-<strong>2012</strong>.<br />

10. STRENGTHENING OF VOLUNTARY ORGANIZATIONS<br />

For the purpose of strengthening and promoting voluntary organizations<br />

rendering welfare services, grant-in-aid either in cash or in kind is given.<br />

Financial requirement during the 11 th Five-Year Plan is given below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 11 th Plan Outlay<br />

Total : 10.00 50.00<br />

11. PROJECTS UNDER ARTICLE 275 (1)<br />

Several infrastructures in the State have been developed and improved during<br />

the 10 th Five-Year Plan with the Grant-in-Aid received under the Article 275(1) of the<br />

Constitution from the Ministry of Tribal Affairs, Govt. of India. The Ministry of Tribal<br />

Affairs has earmarked Rs.325.00 lakhs in favour of the State of <strong>Mizoram</strong> for the year 2006-<br />

07 under the Article 275(1) of the Constitution.<br />

Grant-in-Aid under the Article 275 (1) of the Constitution filled various gaps<br />

pertaining to improvement of rural infrastructures and creation of income generation for the<br />

needy tribal community which the State Govt. could not afford to paucity of fund. It is,<br />

therefore, felt imperative for the Ministry of Tribal Affairs to allocate more fund under the<br />

Article 275(1) of the Constitution during the 11 th Five-Year Plan.<br />

12. TRIBAL SUB <strong>PLAN</strong> FOR DEVELOPMENT OF FOREST VILLAGES IN<br />

MIZORAM<br />

Special Central Assistance (S.C.A.) for Tribal Sub-Plan (T.S.P.) for<br />

development of Forest Villages in <strong>Mizoram</strong> based on the project proposals submitted by the<br />

Govt. of <strong>Mizoram</strong>, Forest Department was sanctioned during 2006-07. The Department of<br />

Social Welfare is to monitor the progress of implementation of the project.<br />

Amount released during 2006-07 - Rs.1,275.00 lakhs


- 326 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

SOCIAL WELFARE<br />

No. of Units - 85 Units<br />

COMMENTS OF THE SCHEMES OF THE GOVT. OF INDIA<br />

IMPLEMENTED IN MIZORAM<br />

1. MINISTRY OF WOMEN & CHILD DEVELOPMENT<br />

Integrated Child Development Scheme (I.C.D.S.) :-<br />

(i) Provision of the Staff Quarter : I.C.D.S. has been operating in <strong>Mizoram</strong> for 25 yrs.<br />

Staff recruited at the beginning of the operation are now quite senior in service and age. It is a<br />

difficult task to post and transfer the staff in rural areas. Provision of staff quarter is felt<br />

necessary as follows :-<br />

(a) C.D.P.O. - Rs.7.50 lakhs per post<br />

(b) Supervisor - Rs.5.50 lakhs per post<br />

(c) UDC/LDC, Statistician - Rs.5.00 lakhs per post<br />

(d) IV Grade - Rs.3.50 lakhs per post<br />

(e) Office Building - Rs.8.00 lakhs per post<br />

(ii) Double provision of fund for Nutrition in the State :<br />

1. Malnourished Rs. 2/- per day per<br />

Children child<br />

2. Severely Rs. 2.70 per day per<br />

Malnourished<br />

Children<br />

child<br />

3. Pregnant & Rs. 2.30 per day per<br />

Lactating<br />

Mothers<br />

mother<br />

4. Adolescent Girls Rs. 2.30 per day per<br />

girl<br />

Existing Rate Proposed Remarks<br />

Rs. 4/- per day per<br />

child<br />

Rs. 5.40 per day<br />

per child<br />

Rs. 4.60 per day<br />

per mother<br />

Rs. 4.60 per day<br />

per girl<br />

The recommended<br />

daily rates could not<br />

be met in <strong>Mizoram</strong><br />

where the rate of food<br />

commodities and<br />

transportation charges<br />

are high due to the<br />

topography of the<br />

State.<br />

(iii) Creation of Research Cell in the ICDS with fund provision of at least Rs.10.00 lakhs<br />

per year.<br />

(iv) Provision for I.T. : The existing provision of 1 % of the ICDS Budget is quite<br />

UNsufficient. A separate provision of Rs.1.50 lakhs at least over the above existing<br />

allocation per Project may be made.<br />

(v) Upgradation of scale of fund provision in every item of expenditure i.e. Medicine<br />

Kits, PSE Kits, Contingencies etc.<br />

(vi) Enhancement of monetary ceiling to the following :<br />

Existing<br />

Provision<br />

Proposed Remarks


- 327 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

(a) District ICDS Cell Rs. 10.00 lakhs<br />

per annum<br />

SOCIAL WELFARE<br />

Rs. 55-65 lakhs<br />

per annum<br />

The existing provision of<br />

staff amount to Rs. 42.00<br />

lakhs for Salary alone.<br />

(b) Provision for replenishment on non-consumable items during the 11 th Five-Year<br />

Plan @ Rs. 5,000/- per Anganwadi Centre<br />

(vii) Provision of one IV Grade – It is difficult to run an Office with one IV Grade only.<br />

One more IV Grade may be provided for ICDS establishments.<br />

(viii) Hiring of vehicle for a place like <strong>Mizoram</strong> is not practicable. Hence, special<br />

consideration may be made for making provisions for purchase, maintenance etc. of<br />

vehicles for ICDS Projects for effective and timely implementation of ICDS<br />

Programmes.<br />

2. ENHANCEMENT OF SOCIAL SECTORS IN MIZORAM<br />

(i) Doner :-<br />

Social sector in <strong>Mizoram</strong> needs to be enhanced as there is no sufficient fund to<br />

meet the needs from the State’s resources.<br />

Development of basic infrastructure in the said sector should also be given<br />

priority.<br />

(ii) Ministry of Social Justice & Empowerment :-<br />

The Scheme for Rehabilitation, Counseling and De-addiction Centre. Module<br />

for treatment / counseling is only for 3 months. This is too short a period for effective<br />

treatment.<br />

The treatment / counseling period under the scheme should be at least 6<br />

months.<br />

(iii) Ministry of Tribal Affairs :-<br />

Funds for Grant-in-Aid to NGOs, Vocational Training Centres, Counseling<br />

and Allied Scheme, Eklavya Model residential School, Mobile Dispensary, are being<br />

allocated State-wise as per the percentage of Schedules Tribe population in the State. Small<br />

States with less population are allocated too less an amount of fund.<br />

……


- 328 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

NUTRITION<br />

NUTRITION<br />

The Draft 11 th Five Year Plan for <strong>2007</strong>-<strong>2012</strong> is made within Rs.4,133.00 lakhs and<br />

the Annual Plan <strong>2007</strong>-08 Outlay for Nutrition Programme is made within Rs.769.00 lakhs<br />

(exclusive of N.P.A.G.), i.e. :-<br />

1. Supplementary Nutrition Programme - Rs. 769.00 lakhs<br />

The Supplementary Nutrition Programme includes Schemes like :-<br />

1. Supplementary Nutrition Programme<br />

2. Carrying Charges / Transportation of Nutrition Foods.<br />

3. Food and Nutrition Extension Centre<br />

4. Analysis of Food & Monitoring<br />

5. Information, Education & Communication<br />

As per the Govt. of India, Ministry of Human Resource Development, Department of<br />

Women & Child Development’s letter F.No.19-5/2003-CD-I(Pt.) dt.19.10.04, the Central<br />

Govt. has revised the financial norms for Supplementary Nutrition under the I.C.D.S. Scheme<br />

as under :-<br />

1. Children (6 months to 72 months) @ Rs.2/- per day per child.<br />

2. Severely Malnourished Children (6 months to 72 months) @ Rs.2.70<br />

per day per child.<br />

3. Pregnant and Lactating Mothers @ Rs.2.30 per day per beneficiary.<br />

4. Adolescent Girls @ Rs.2.30 per day per beneficiary.<br />

However, it may be mentioned that the national cost norm fixed by the Govt. of India<br />

could not meet the daily-recommended nutrients since prices of commodities are quite high<br />

in the State of <strong>Mizoram</strong> compared to other states in the country.<br />

In order to abide by the Supreme Court’s Order dt.28.11.01 and 11.10.04 on Writ<br />

Petition (Civil) No.196 of 2001-PUCL Vs. Union of India and Others and to provide the daily<br />

recommended nutrients as per the Guidelines issued by the Govt. of India vide No.1-2/2006-<br />

CD-I dt.31.1.2006, it is proposed to enhance the daily ceiling / cost norm as follows :-<br />

1. Children (6 to 72 months) @ Rs.2.50 per day per child.<br />

2. Severely Malnourished Children (6 to 72 months) @ Rs.3.20 per day per child.<br />

3. Pregnant and Lactating Mothers @ Rs.2.80 per day per beneficiary.<br />

4. Adolescent Girls @ Rs.2.80 per day per beneficiary.<br />

The Supplementary Nutrition Programme is implemented in 23 I.C.D.S. Projects in<br />

<strong>Mizoram</strong>. Various categories of beneficiaries are as follows based on the survey report of the<br />

Projects during 2006-07.<br />

1. Children 6 – 36 months - 84455<br />

2. Severely Malnourished Children 6 – 36 months - 963<br />

3. Children 3 – 6 months - 46506<br />

4. Severely Malnourished Children 3 – 6 months - 320<br />

5. Pregnant and Lactating Mothers - 29679<br />

6. Adolescent Girls - 13032<br />

Total - 174955


- 329 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

NUTRITION<br />

A. SUPPLEMENTARY NUTRITION PROGRAMME<br />

.<br />

The Supplementary Nutrition Programme aims at eradicating the protein-calorie and<br />

micronutrient malnutrition / deficiency prevalence in the developing States.<br />

The proposed expenditure for <strong>2007</strong>-08 under Supplementary Nutrition Programme is<br />

as follows :-<br />

1. Estimated Expenditure for Procurement of Foods :<br />

Sl.<br />

No<br />

.<br />

Target Group<br />

1. Children 6 – 72<br />

months<br />

No. of<br />

Beneficiari<br />

es<br />

Daily<br />

Ceiling<br />

Daily<br />

Requireme<br />

nt<br />

No. of<br />

Feeding<br />

Days<br />

Total<br />

Requirement<br />

for the Year<br />

130961 Rs.2.50 327,402.50 150 491,10,375.00<br />

2. Severely<br />

Malnourished<br />

Children 6-72<br />

months<br />

1283 Rs.3.20 4,105.80 150 615,840.00<br />

3. Pregnant<br />

Lactating Mothers<br />

& 29679 Rs.2.80 83,101.20 150 124,65,180.00<br />

Adolescent Girls 13032 Rs.2.80 36,489.60 150 54,73,440.00<br />

TOTAL : 174955 451,098.90 150 676,64,835.00<br />

Against the national norm of 300 feeding days a year, only 150 feeding days could be<br />

covered during <strong>2007</strong>-08 with the State Plan Fund.<br />

In order to abide by the Supreme Court’s Order dt.28.11.01 and 11.10.04 on Writ<br />

Petition (Civil) No.196 of 2001-PUCL Vs. Union of India and Others i.e. to cover 300<br />

feeding days a year, 50% of the requirement will have to be funded by the Govt. of India<br />

which comes to Rs.676.65 lakhs.<br />

2. Unit Cost of Maintenance :<br />

Transportation / Carrying Charges of Nutrition –<br />

Rs.65.35 lakhs only may be set aside for transportation / carrying charges of nutrition<br />

food during <strong>2007</strong>-08.<br />

3. Food and Nutrition Extension Centre :<br />

As the model scheme furnished by the Ministry concerned, Community Food and<br />

Extension Centre is implemented and womenfolk are trained in the line of food preservation<br />

and nutrition education. For this, Rs.5.00 lakhs only is proposed during <strong>2007</strong>-08.<br />

4. Analysis of Food & Monitoring:<br />

(i) Food Analysis Plant :- The food habits of the Mizos is very different from the rest of<br />

the Indian States. The indigenous food items that are consumed in the daily diets of the<br />

people deserved special attention. Hence, Research Centre in the form of Food Analysis Plant<br />

needs to be set up for <strong>Mizoram</strong> in particular in order to explore and research the nutrients and<br />

chemicals present.<br />

This Food Analysis Plant is a dire necessity for the State, and <strong>Mizoram</strong> would greatly<br />

benefit from it as it could serve not only as a research Project but also revolutionalize the<br />

Nutrition Awareness.<br />

An amount of Rs.20.00 lakhs is proposed during <strong>2007</strong>-08.


Sl.<br />

No<br />

.<br />

1.<br />

- 330 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

NUTRITION<br />

(ii) Monitoring, Evaluation & Impact Study :- For this purpose an amount of Rs.4.00<br />

lakhs is proposed during <strong>2007</strong>-08.<br />

5. Information, Education & Communication :<br />

Nutrition Education, creation of awareness and sensitizing the public in this field<br />

is highly crucial for improvement of health status of the people within the State. For this,<br />

barely any fund has been provided so far.<br />

It is felt that this important issue should be addressed in a proper manner starting<br />

from this financial year.<br />

An amount of Rs.2.00 lakhs only is proposed for the year <strong>2007</strong>-08.<br />

Abstract of scheme-wise requirement during the 11 th Five Year Plan and Annual<br />

Plan of <strong>2007</strong>-08 under SNP is as below :-<br />

(Rs. in lakhs)<br />

<strong>2007</strong>-08 <strong>2007</strong>-<strong>2012</strong><br />

(i) Procurement of food 676.65 3,524.65<br />

(ii) Transportation of Nutrition Food 65.35 503.35<br />

(iii) Food & Nutrition Extension Centre 5.00 25.00<br />

(iv) Analysis of Food & Monitoring 20.00 70.00<br />

(v) Information, Education & Communication 2.00 10.00<br />

TOTAL : 769.00 4,133.00<br />

B. NUTRITION PROGRAMME FOR ADOLESCENT GIRLS (N.P.A.G.)<br />

The Nutrition programme for Adolescent Girls Scheme was introduced by the Central<br />

Govt. as a pilot project since 2002-03 identifying Lunglei District in respect of the State of<br />

<strong>Mizoram</strong> and the programme was implemented accordingly in Lunglei District during the<br />

year of introduction. However, the scheme was implemented throughout the State of<br />

<strong>Mizoram</strong> covering 21 ICDS Projects since 2003-04 till date. The objective of the scheme is to<br />

mobilize and enhance the potentials of adolescent girls by meeting their needs of selfdevelopment,<br />

nutrition, health, education, literacy, recreation and skill formation. These<br />

adolescent girls are provided supplementary nutrition food at the Anganwadi Centres, on the<br />

same scale as the pregnant and lactating mothers i.e. to provide 500 calories of energy and<br />

20g of protein for improvement of their nutritional and health status.<br />

An amount of Rs.17.00 lakhs only is expected to be allocated from the Govt. of India<br />

for the year <strong>2007</strong>-08 and the proposed utilization is as under :-<br />

Target Group<br />

Adolescent Girls 11-18<br />

yrs.<br />

No. of<br />

Beneficiaries<br />

Daily<br />

Ceiling<br />

Daily<br />

Require-<br />

ment<br />

No. of<br />

Feeding<br />

Days<br />

Total<br />

Requirement for<br />

the Year<br />

12593 2.80 35,260.40 49 17,27,759.00<br />

……<br />

Say : 17,00,000.00


- 331 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PRISONS<br />

PRISONS (JAILS)<br />

The administration of jails in <strong>Mizoram</strong> is mainly concentrated on security custody<br />

and confinement of prisoners. In the past, most of the works taken up by Prisons<br />

Department were security oriented with little scope for reformation and re-education of jail<br />

inmates. However, it is now intended to take up the security aspect and reformation of<br />

prisoners on an equal footing as recommended by Human Rights Commission and in line<br />

with the modern concept of prison.<br />

The existing jails in <strong>Mizoram</strong> are given below:<br />

1. Central Jail, Aizawl<br />

2. District Jail, Aizawl<br />

3. District Jail, Lunglei<br />

4. District Jail, Saiha<br />

5. District Jail, Kolasib<br />

6. District Jail, Champhai<br />

The sub-jail at Tlabung is now ready for occupation and establishment of<br />

jail.<br />

The draft Eleventh Five Year Plan <strong>2007</strong>-<strong>2012</strong> and Annual Plan <strong>2007</strong>-2008<br />

are prepared with an outlay of Rs. 1371.00 lakh and Rs. 317.00 lakh<br />

The break up of the proposed outlay of eleventh five year plan and annual<br />

plan are as follows:-<br />

11 th Five Year Plan Annual Plan<br />

1. 001(01)Direction - Rs. 150.00 lakh Rs. 14.00 lakh<br />

2. 101(02)Dist. Jails - Rs. 671.20 lakh Rs.194.00 lakh<br />

3. 101(03)Sub Jails - Rs. 50.00 lakh Rs. 5.00 lakh<br />

4. 102 Jail Manufacture - Rs. 170.00 lakh Rs. 15.00 lakh<br />

5. 800 Other expenditure - Rs. 330.00 lakh Rs. 89.00 lakh<br />

modernisation of jails<br />

TOTAL - Rs.1371.00 lakh Rs.317.00 lakh<br />

The Proposed outlay for the 11 th Five Year Plan and itemwise schemes to be taken<br />

up during <strong>2007</strong> – 08 are given below :-<br />

1. 001(01)Direction: With the ever increasing workload and programmes as well<br />

as expansion of the jails, Prison Directorate needs strengthening with additional<br />

manpower. The present system of management of records and other important<br />

documents is out-dated. It is proposed to install computers in all the jails to ensure<br />

proper documentation and shortage of records as is done in other states. The jail<br />

buildings are also needed for extensive repair and renovation. A provision of<br />

Rs.150.00 lakh is made in the 11 th Five Year Plan and Rs. 14.00 lakhs is proposed<br />

during <strong>2007</strong> – 08.


- 332 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PRISONS<br />

Sl.<br />

No<br />

Item Unit<br />

Physical<br />

target <strong>2007</strong>-<br />

08<br />

(Rs in lakh)<br />

Financial target <strong>2007</strong>-<br />

08<br />

I Strengthening of Direction No 5 Rs.4.00<br />

II T.E/O.E LS LS Rs.5.00<br />

III<br />

Repair/renovation of Dte.<br />

Office Building<br />

LS LS Rs.5.00<br />

TOTAL Rs.14.00<br />

2. 101(02)District Jails: Govt. of India, Ministry of Home Affairs has<br />

provided funds for construction of three new District Jails at Serchhip, Mamit and<br />

Lawngtlai, and the construction works are nearing completion. Recruitment of staff to man<br />

the three newly constructed jails will be necessary. Repair and renovation of the existing<br />

six jails is also very necessary to improve the jail security and to implement reformation<br />

and rehabilitation programmes. The Department is facing fund problem to meet the<br />

expenses on feeding charges of prisoners. A provision of Rs.671.00 lakh is made in the<br />

11 th Five Year Plan and Rs 194.00 lakh is proposed for <strong>2007</strong> – 08 as below :-<br />

Sl.<br />

No<br />

Item Unit<br />

Physical<br />

target<br />

<strong>2007</strong>-08<br />

(Rs. in lakh)<br />

Financial target<br />

<strong>2007</strong>-08<br />

1. T.E./O.E LS LS Rs. 5.00<br />

2.<br />

Repair/renovation of existing six<br />

jails<br />

LS LS Rs.50.00<br />

3. Feeding charges of prisoners LS LS Rs.139.00<br />

TOTAL Rs.194.00<br />

3. 101(03)Sub Jail: Sub Jail at Tlabung is almost ready for occupation and sub<br />

jail at Vairengte being constructed. Creation of posts is necessary to open the jail and make<br />

it functional. A provision of Rs.50.00 lakh is made in the 11 th Five Year Plan.<br />

(Rs in lakh)<br />

Sl.<br />

No<br />

Item Unit<br />

Physical Target<br />

<strong>2007</strong>-08<br />

Financial target<br />

<strong>2007</strong>-08<br />

I Creation of posts No 52 Rs.3.00<br />

II T.E./O.E LS LS Rs.2.00<br />

TOTAL Rs.5.00<br />

4. 102 Jail Manufacture: Introduction of Vocational Training Centre in the six<br />

existing jails during the 11 th five year Plan is proposed. This project will help in man<br />

power mobilization of the prison population for developing productive units in the jails<br />

apart from reformation and rehabilitation of the criminals. A provision of Rs.170.00 lakh<br />

is provided in the 11 th Five Year Plan and Rs 15.00 lakh is proposed for <strong>2007</strong> – 08..


Sl.<br />

No<br />

- 333 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PRISONS<br />

Item Unit<br />

Physical target<br />

<strong>2007</strong>-08<br />

(Rs. in lakh)<br />

Financial target<br />

<strong>2007</strong>-08<br />

I<br />

Salary of Junior Instructress, Peon,<br />

Chowkider<br />

No 4 Rs.5.00<br />

II Wages LS LS Rs.5.00<br />

III Purchase of tools & machineries LS LS Rs.5.00<br />

TOTAL Rs.15.00<br />

5. 800 Other Expenditure Modernisation of jails: Construction of three new<br />

District jails at Serchhip, Lawngtlai, Mamit and one new Sub-Jail at Vairengte have been<br />

taken up under the Scheme of Modernisation of Prisons. The scheme is borne by Central<br />

Government and State Government on a cost sharing basis of 75:25. The total outlay for<br />

the project is Rs.17.77 crore for a period of five years from 2002-03 to 2006-07. The fund<br />

allocated under modernisation of Prisons will be insufficient for completion of the<br />

construction works. A provision of Rs.330.00 lakh is therefore made in the 11 th Five Year<br />

Plan and Rs. 89.00 lakhs is proposed for <strong>2007</strong>-08.<br />

(Rs. in lakh)<br />

Sl.<br />

No<br />

Item Unit<br />

Physical target<br />

<strong>2007</strong>-08<br />

Financial target<br />

<strong>2007</strong>-08<br />

I Construction of new jails No 4 Rs.80.00 lakh<br />

II Correctional scheme LS LS Rs. 9.00 lakh<br />

TOTAL Rs.89.00 lakh<br />

…..


- 334 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PRINTING & STATIONERY<br />

PRINTING & STATIONERY<br />

Printing & Stationery Department is being equipped with advanced printing<br />

equipment in order to execute timely completion of urgent, time – bound and important<br />

Government Publication. The proposed Outlay during the 11 th Five Year Plan is Rs. 704.00<br />

lakhs the proposed outlay for the annual Plan <strong>2007</strong> – 08 is Rs. 198.00 lakhs.<br />

Scheme-wise description of the Annual Plan of Printing & Stationery<br />

Department for the year <strong>2007</strong> – 08 is as follows : -<br />

1. FORMS & STATIONERY :-<br />

A. Rents/Office Accomodation : The department does not yet have Building<br />

of its own at Govt. Press Champhai. Hence, Rs 0.40 lakhs is earmarked<br />

during <strong>2007</strong> - 08 for accommodating office in rented house.<br />

B. Maintenance of Motor Vehicles : For maintenance of existing Department<br />

Truck Rs 1.60 lakhs is earmarked during <strong>2007</strong> – 08.<br />

1. GOVERNMENT PRESS :-<br />

A. Maintenance of Staff : For maintenance of 2 Officers and engagement of<br />

Muster Roll Rs 14.00 lakhs is earmarked as follows : -<br />

(a) Salary - Rs 5.00 lakhs<br />

(b) Wages - Rs 1.80 lakhs<br />

(c) T.E. - Rs 0.20 lakhs<br />

(d) O.E. - Rs 6.00 lakhs<br />

(e) O.C. - Rs 1.00 lakhs<br />

TOTAL - Rs 14.00 lakhs<br />

B. Scholarship/Stipend : For imparting necessary training on D.T.P (Desk<br />

Top Publishing) and to meet stipend of trainee Rs 1.00 lakh is earmarked.<br />

C. Minor Works : For Annual repair and maintenance of Departmental<br />

building at Aizawl, Lunglei & Saiha Rs 25.00 lakhs is earmarked during<br />

<strong>2007</strong> – 08.<br />

D. Machinery & Equipment : The existing machines at Government Press<br />

are old and required regular repair and for procurement of Binding machine<br />

and copy printer Rs 43.00 lakhs is earmarked during <strong>2007</strong> – 08.<br />

E. Supply & Materials : Since the Department can execute Colour Printing<br />

Works requirement of Printing materials were increases. For procurement of<br />

printing materials Rs 55.00 lakhs is earmarked.


- 335 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PRINTING & STATIONERY<br />

F. Establishment of Institute of Printing Technology :<br />

As <strong>Mizoram</strong> Govt. Press is the only Department that can impart training in<br />

Printing technology, Institute of Printing Technology can be established in<br />

<strong>Mizoram</strong> at Aizawl. This will be the first printing institute in the North East<br />

Region under the guidance of degree and diploma holders in the said<br />

Department. For starting of this institute Rs. 1.00 lakh is earmarked.<br />

GOVERNMENT PUBLICATION :-<br />

The Government Press is entrusted with printing of important Govt.<br />

documents like Budget & Official Gazette etc. and purchase of materials for<br />

Colour printing works. Rs 57.00 lakhs is earmarked.<br />

Hence, the total proposed outlay for the annual plan for the year<br />

<strong>2007</strong>-2008 is Rs 198.00 lakhs.<br />

……


- 336 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PUBLIC WORKS BUILDING<br />

INTRODUCTION :-<br />

PUBLIC WORKS BUILDING<br />

The works taken up under this Head of Accounts are mainly Construction<br />

and Improvement of office buildings of various Government Departments, <strong>Mizoram</strong><br />

Houses at various places, Rest Houses at various places in <strong>Mizoram</strong> and other nonresidential<br />

buildings.<br />

ACHIEVEMENT OF THE 10 TH <strong>PLAN</strong> : -<br />

A provision of Rs 685.00 lakhs was approved for Direction and Administration<br />

during the 10 th Plan ( 2002 -<strong>2007</strong>) under this Head of Account.<br />

During the 10 th Plan, Construction and Improvement works of office buildings of<br />

various Government Departments, <strong>Mizoram</strong> Houses, Rest Houses at various places both<br />

inside and outside <strong>Mizoram</strong> and other non-residential buildings were taken up .<br />

The total anticipated expenditure during the 10 th Plan under this head is Rs<br />

4683.04 lakhs.<br />

TARGET FOR THE 11 TH <strong>PLAN</strong> : -<br />

A . DIRECTION & ADMINISTRATION : A sum of Rs 1339.00 lakhs is proposed for<br />

Direction and Administration during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> ) under this Head of Account.<br />

B . WORKS : - Rs. 3966.00 lakhs is proposed for works during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong><br />

) under this Head of Account.<br />

Spill over Schemes<br />

1. Construction of Excise Commissioner Office Building at Aizawl :<br />

Rs. 75.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

2. Construction of Taxation Directorate Office Building at Aizawl :<br />

Rs. 100.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

3. Construction of Circuit Houses at various District Headquarters :<br />

Rs. 400.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

4. Construction of Treasury Office Building at 5 (five) new districts :<br />

Rs. 250.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

5. Construction of <strong>Mizoram</strong> House at Shillong :<br />

Rs. 500.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

6. Construction of <strong>Mizoram</strong> Legislative Assembly Annexe Building at Aizawl :<br />

Rs. 500.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

7. Vertical Extension of CM Secretariat Building :<br />

Rs. 300.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

8. Re- Construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi :<br />

Rs. 700.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

9. Construction of PWD Divisional Office at Lawngtlai :<br />

Rs. 60.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

10. Re-construction of EE, PWD Office at Lunglei :<br />

Rs. 139.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )


- 337 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PUBLIC WORKS BUILDING<br />

New Schemes<br />

1. Improvement and Renovation of I/E to Govt. buildings at various districts :<br />

Rs. 122.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

2. Construction of Raj Bhavan at Khatla :<br />

Rs. 300.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

3. Construction of New Capital Complex at Khatla :<br />

Rs. 300.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

4. Construction of DC Complex at Lawngtlai, Mamit and Serchhip :<br />

Rs. 150.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

5. Construction of MPSC Building at Khatla :<br />

Rs. 70.00 lakhs is proposed for this work during the 11 th Plan (<strong>2007</strong> - <strong>2012</strong> )<br />

TARGET FOR THE <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> - 08 : -<br />

A. DIRECTION & ADMINISTRATION :<br />

A sum of Rs 332.00 lakhs is proposed for Direction and Administration during<br />

<strong>2007</strong> – 08 under this Head of Account. The break- up of Direction & Administration is as<br />

follows :<br />

1) Salary = 188.00 lakhs<br />

2) T.E. = 4.00 lakhs<br />

3) Office expenses = 20.00 lakhs<br />

4) Advertisement = 1.00 lakhs<br />

5) Professional charge = 1.00 lakhs<br />

6) Other charges = 1.00 lakhs<br />

7) Motor vehicles = 5.00 lakhs<br />

8) Maintenance = 112.00 lakhs<br />

Total = 332.00 lakhs<br />

B . WORKS : -<br />

Rs. 1427.00 lakhs is proposed for works during the <strong>2007</strong> – 2008 under this<br />

Head of Account.<br />

Spill over Schemes<br />

1. Construction of Excise Commissioner Office Building at Aizawl :<br />

Rs. 30.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

2. Construction of Taxation Directorate Office Building at Aizawl :<br />

Rs. 100.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

3. Construction of Circuit Houses at various District Headquarters :<br />

Rs. 150.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

4. Construction of Treasury Office Building at 5 (five) new districts :<br />

Rs. 100.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

5. Construction of <strong>Mizoram</strong> House at Shillong :<br />

Rs. 200.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

6. Construction of <strong>Mizoram</strong> Legislative Assembly Annexe Building at Aizawl :<br />

Rs. 200.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

7. Vertical Extension of CM Secretariat Building :<br />

Rs. 150.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

8. Re- Construction of <strong>Mizoram</strong> House at Chanakyapuri, New Delhi :<br />

Rs. 150.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

9. Re-construction of EE, PWD Office at Lunglei :<br />

Rs. 47.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.


- 338 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

PUBLIC WORKS BUILDING<br />

New Schemes<br />

1. Improvement and Renovation of I/E to Govt. buildings at various districts :<br />

Rs. 25.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

2. Construction of Raj Bhavan at Khatla :<br />

Rs. 100.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

3. Construction of New Capital Complex at Khatla :<br />

Rs. 80.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

7. Construction of DC Complex at Lawngtlai, Mamit and Serchhip :<br />

Rs. 60.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

8. Construction of MPSC Building at Khatla :<br />

Rs. 35.00 lakhs is proposed for this work during the Annual Plan <strong>2007</strong> – 08.<br />

The proposals could be thus summed up as :-<br />

(rupees in lakhs)<br />

Proposed Outlay<br />

Sl No Name of Work / Scheme 11 th Plan Annual Plan<br />

<strong>2007</strong> -12 <strong>2007</strong> – 08<br />

A. Direction & Administration 1339.00 332.00<br />

B. Works<br />

(a) Spill-over Schemes.<br />

1. Construction of Excise Commissioner Office Build<br />

75.00<br />

at Aizawl<br />

30.00<br />

2. Construction of Taxation Directorate Office Buildi<br />

100.00<br />

at Aizawl<br />

100.00<br />

3. Construction of Circuit Houses at various<br />

District Headquarters<br />

400.00 150.00<br />

4. Construction of Treasury Office Building at<br />

250.00<br />

5 (five) new districts<br />

100.00<br />

5 Construction of <strong>Mizoram</strong> House at Shillong 500.00 200.00<br />

6 Construction of <strong>Mizoram</strong> Legislative Assembly<br />

Annexe Building at Aizawl<br />

500.00 200.00<br />

7 Vertical Extension of CM Secretariat Building 300.00 150.00<br />

8 Re- Construction of <strong>Mizoram</strong> House at Chanakyap<br />

700.00<br />

New Delhi<br />

150.00<br />

9 Construction of PWD Divisional Office at Lawngt 60.00 0.00<br />

10 Re-construction of EE, PWD Office at Lunglei 139.00 47.00<br />

(b) New Schemes.<br />

1. Improvement and Renovation of I/E to Govt. buildi<br />

122.00<br />

at various districts<br />

25.00<br />

2. Construction of Raj Bhavan at Khatla 300.00 100.00<br />

3. Construction of New Capital Complex at Khatla 300.00 80.00<br />

4. Construction of DC Complex at Lawngtlai,<br />

Mamit and Serchhip<br />

150.00 60.00<br />

5. Construction of MPSC Building at Khatla 70.00 35.00<br />

TOTAL 5305.00 1759.00<br />

……


- 339 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

Administrative Training Institute ( ATI ), Aizawl, <strong>Mizoram</strong> was established<br />

in 1983. It is the premier and the only institute of its kind in the State. It<br />

imparts in-service training to almost all levels of Government employees under<br />

Government of <strong>Mizoram</strong> on courses like Refresher / Orientation / Foundation /<br />

Accounts Courses, Establishment & Administration, Financial Management,<br />

Disciplinary Proceedings, Senioriry & Promotion, Pension Rules, Computer<br />

Concepts, Mizo Short-Hand, RTI, etc. The Institute also conducts training on<br />

Disaster Management for Government officials as well as for the public as part<br />

of Government’s drive to generate public awareness on the subject.<br />

The role of the Administrative Training Institute in capacity building of<br />

the State Government machineries is, therefore, not only vital but centrepiece to<br />

capacity building initiatives of the Government of <strong>Mizoram</strong>.<br />

The total outlay proposed for 11 th Five Year Plan <strong>2007</strong> – 12 and Annual Plan<br />

<strong>2007</strong> – 08 are Rs. 300.00 lakhs and Rs. 100.00 lakhs respectively.<br />

EXISTING POSITION OF ATI<br />

At present, Administrative Training Institute is accommodated in a rented<br />

building at Tuikhuahtlang, Aizawl. A new Administrative Training Institute<br />

Complex is being constructed by NBCC at the new Capital Complex, Khatla,<br />

Aizawl with the fund provided by the Ministry of Urban Development,<br />

Government of India. The Complex is likely to be ready for occupation during<br />

the current financial year 2006-<strong>2007</strong>.<br />

(1) Officers / Faculties & Staff<br />

(a) Director - 1 no.<br />

(b) Joint Director - 1 no.<br />

(c) Dy.Director(Admn) - 1 no.<br />

(d) Dy.Director of Acctts(Trg.)- 2 nos.<br />

(e) Asstt.Director - 4 nos.<br />

(f) Superintendent - 1 no.<br />

(g) Assistant - 2 nos.<br />

(h) Steno-II - 1 no.<br />

(i) UDC - 2 nos.<br />

(j) LDC - 2 nos.<br />

(k) Machine Operator - 1 no.<br />

(l) Driver - 2 nos.<br />

(m) Depatch Rider - 1 no.<br />

(n) Duftry - 1 no.<br />

(o) Group D - 6 nos.<br />

Total - 28 Nos.<br />

In addition to the training programmes conducted at the Institute, the<br />

faculty members also conduct peripatetic trainings at District Headquarters other<br />

than Aizawl for which they have to travel extensively. Moreover, they are also<br />

often required to attend seminars, workshops and trainings at reputed institutions<br />

outside the State.


- 340 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

1. Strengthening of ATI<br />

The existing strength of officers and staff of ATI is felt inadequate to<br />

carry out the various training programmes to the desired level. Moreover, it is<br />

proposed to add new courses on the training schedule. Occupation of the new<br />

ATI Complex will also definitely necessitate engagement of additional staff.<br />

In view of the above, it is considered necessary to strengthen<br />

the faculty members and staff accordingly during the the 11 th Plan <strong>2007</strong> – 12.<br />

2. Strengthening of Disaster Management Cell<br />

At present, Disaster Management Cell (DM Cell) is functioning with Central<br />

Assistance. With the existing staff of 1 (one) Head Faculty, 1 (one) Research Officer<br />

and 1 (one) Steno-III without any supporting staff, it is indeed difficult to run the<br />

DM Cell smoothly and efficiently. It is, therefore, proposed to strengthen the DM<br />

Cell by creating some posts during 11 th Fiv e Year Plan <strong>2007</strong> – <strong>2012</strong>.<br />

3. Establishment of ATI Hostel<br />

As there is no Hostel Building in the new ATI Complex, it is considered<br />

necessary to establish one Hostel Building to accommodate the trainees coming<br />

from out-station places. It is expected that the site for Hostel Building will be<br />

allotted to ATI by the Government near the new ATI Complex.<br />

Moreover, creation of the some posts will be necessary for the Hostel Building<br />

in due course.<br />

4. Furnishing, etc of New ATI Complex<br />

(1) The new ATI Complex consists of four blocks, viz., Administrative Block,<br />

Lecture Halls (including Computer Labs, etc.), Guest Rooms and Auditorium. The<br />

existing furniture and fixtures, and equipments of ATI are inadequate for the new ATI.<br />

Besides, they have become old and worn-out, and are likely to be condemned<br />

soon. So, new and additional furniture and fixtures like almirahs, bookcases,<br />

tables, chairs, carpet, beds (for guest rooms), seats (for auditorium), etc., and<br />

equipments like intercom, PA sets, computers, LCD projectors, V – Sat , etc.,<br />

have to procured.<br />

For furnishing of the New ATI building additional fund of Rs. 30.00 lakhs was<br />

allocated during 2006-07 and the fund was fully utilized for furnishing of<br />

Administrative Block, Training Halls and Conference Halls. However, it is required to<br />

furnish the Auditorium, Guest Room and Library which can not be furnished during<br />

2006-07. Therefore, requirement of fund under (13)-O.E. and (50)-O.C. for Annual<br />

Plan <strong>2007</strong>-08 has been increased from the normal size under this two sub-heads.<br />

(2) Water Connection: This is to be executed by PHE Department under<br />

supervision of ATI. Since the new ATI Complex is far-flung from PHE distribution<br />

tank, more pipes and fittings than are usually necessary will be required.<br />

(3) Electric Connection & Internal Wiring: The work will be executed by Power<br />

& Electricity Department under supervision of ATI.<br />

(4) Library : It is of utmost necessity to procure more books to cater to<br />

the need of the faculties and the trainees. Moreover, the library room of the<br />

new ATI has to be furnished with bookshelves, tables, chairs, etc.


- 341 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

ADMINISTRATIVE TRAINING INSTITUTE<br />

5. Minor Works<br />

In order to safeguard the new ATI Complex, construction of proper<br />

fencing is a must. Moreover, construction of retaining wall, approach road and<br />

parking area is also necessary.<br />

6. Hiring charges of Vehicles<br />

The new ATI Complex is a bit far-flung from the city proper. As such, one<br />

Staff Bus is necessary to pick up and drop the staff, trainees etc. and for field visits.<br />

The matter was pointed out in the Review Meeting of Plan Fund under the<br />

Chairmanship of Commissioner, Planning/Finance Department held on 8 th Nov.,2006.<br />

However, purchase of bus was not recommended since maintenance and engagement of<br />

Driver and conductor cannot be afforded from the State Plan Fund. However, it was<br />

advised to make arrangement on hiring basis of private bus instead of purchasing a new<br />

one. Since the new building is ready for occupation and the Institute is being shifted<br />

from private buildings, there will be no requirement of fund for hiring charges of<br />

private building for which Rs. 4.15 lakhs was earmarked annually can be conveniently<br />

utilized for hiring charges of private bus. Hence, requirement of fund under (13)-O.E.<br />

has been increased and the sub-head (14)-Rents is deleted in the proposed Annual Plan<br />

<strong>2007</strong>-08.<br />

7. Capacity Building<br />

Capacity building is one main objectives of ATI. The Institute intends<br />

to send its faculty members to attend more training programmes within India<br />

and abroad. At the same time, it is intended that more training programmes be<br />

organized on specialized topics in the Institute by bringing in experts and<br />

professionals from outside the State.<br />

In view of the above consideration, the proposed outlay for the Eleventh<br />

Five Year Plan <strong>2007</strong>-<strong>2012</strong> is Rs. 308.00 lakhs. Since the Administrative Training<br />

Institute, <strong>Mizoram</strong> has been allocated Rs. 90.00 lakhs for the Annual Plan 2006-07,<br />

the Annual Plan for <strong>2007</strong>-08 has been increased by Rs. 100.00 lakhs ( i.e. about 10%<br />

increase) as summarized under :-<br />

Detailed Head<br />

Proposed Outlay for<br />

11 th Plan <strong>2007</strong> –<br />

<strong>2012</strong><br />

(Rs. in lakh)<br />

(Rs. in lakhs )<br />

Proposed Outlay for<br />

Annual Plan <strong>2007</strong> –<br />

08 (Rs. in lakh)<br />

(01) Salary 185.00 25.00<br />

(02) Wages 30.00 4.00<br />

(11) Domestic Traveling Expenses 15.00 3.00<br />

(13) Office Expenses 65.00 15.00<br />

(21) Supplies & Materials 15.00 3.00<br />

(28) Professional Services 15.00 2.00<br />

(50) Other Charges 40.00 9.00<br />

(52) Machinery & Equipment 30.00 5.00<br />

Total : 395.00 66.00<br />

…..


- 342 -<br />

<strong>DRAFT</strong> 11 TH <strong>FIVE</strong> <strong>YEAR</strong> <strong>PLAN</strong> <strong>2007</strong> – <strong>2012</strong> & <strong>ANNUAL</strong> <strong>PLAN</strong> <strong>2007</strong> – 08<br />

FORENSIC SCIENCE<br />

FORENSIC SCIENCE LABORATORY<br />

Under the direction of Planning Commission vide D.O. No.<br />

12018/131/87-S&T Dt. 25.3.1988, Govt. of <strong>Mizoram</strong> included Forensic Science<br />

Laboratory under Plan Budget 2070-OAS, 2055- Police, 116 Forensic Science, 116(1)-<br />

State Forensic Science with a token outlay of Rs. 15 lakhs during 10th Plan.<br />

Govt. of <strong>Mizoram</strong> took keen interest in the Development of Forensic<br />

Science in the State. During the last 6(six) years, 4(four) divisions viz. (1) Ballistics and<br />

Toolmarks, (2) Chemistry, (3) Document and (4) Finger Print Divisions were made<br />

fully functional. During the 11th Five Year Plan, it is hoped to open more Divisions<br />

like Computer Forensic, Serology, Lie Detector and DNA etc.<br />

1. Direction :- The proposed outlay for the 11th Five year Plan <strong>2007</strong>-<br />

<strong>2012</strong> and the Annual Plan <strong>2007</strong>-2008 is Rs 17.00 Lakhs and Rs 5.00 Lakhs<br />

Respectively.<br />

The detail Schemewise describtion for the Annual Plan <strong>2007</strong> - 08 is given below<br />

S/No. Name of items/ scheme Annual Plan <strong>2007</strong>-2008<br />

(Rs.in lakhs)<br />

Physical Financial<br />

1. Serological Instruments 4 1.00<br />

2. Photographic Instruments 2 0.50<br />

3. Automatic TLC Plate 1 1.50<br />

Coater<br />

4. F.P. Developing Instruments 3 0.50<br />

5. Chemicals - 0.50<br />

6. Crime Scene Instruments 2 0.50<br />

7. Books & Journals 16 0.50<br />

TOTAL :- 28 5.00<br />

……