21.10.2013 Views

martabe overview world class gold district - G-Resources

martabe overview world class gold district - G-Resources

martabe overview world class gold district - G-Resources

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Martabe’s estimated cash cost to <strong>gold</strong> averages<br />

around US $350 / oz over the mine plan for the<br />

Purnama pit<br />

Low costs attributable to:<br />

Good scale<br />

Low strip ratio<br />

High grade<br />

Simple process flow-sheet<br />

Excellent logistics and existing<br />

infrastructure including grid power<br />

Existing Indonesian mining capability<br />

Operating Costs Breakdown – Mine Plan Average<br />

43%<br />

LOW CASH OPERATING COSTS<br />

22%<br />

21%<br />

14%<br />

Energy<br />

Labour<br />

Consumables<br />

Other<br />

Costs based upon April 2011 estimate and then updated for general US$ industry cost increases<br />

Costs are presently being updated for the 2013 budget<br />

Operating Cost Estimate<br />

Purnama Pit<br />

Cash Costs US$M<br />

Mining 50<br />

Processing 65<br />

Maintenance 12<br />

Administration, refining and other 25<br />

Royalties 5<br />

Contingency 10<br />

Total Cash Costs 167<br />

Silver Credit (at US$32/oz) -80<br />

Gold Cash Cost 87<br />

Cash Cost / oz Gold US $350 /<br />

oz<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!