• Growing urbanization has also resulted in large scale increase in pollution in cities all over the country<br />
which has led to growth of Treatment Plants for abatement of growing pollution in the river water sources.<br />
This is another area of opportunity for your company. Newer technologies like Membrane Technology,<br />
Reverse Osmosis are emerging trends which progressive companies engaged in the sector will bring to the<br />
table.<br />
Some of the Projects under execution include:<br />
Sr.<br />
No<br />
Name of the Project Estimated<br />
Cost<br />
(` crore)<br />
1. Design Build Contract with Operation and Maintenance for 3 yeas for 107.45<br />
Distribution MS/DI/PVC/HDPE Pipeline U/g. sumps ESRs, Staff quarters,<br />
compound wall & Pump House, Pumping Machineries with O & M for<br />
2.<br />
3 years integrated Water Supply Scheme Phase-II, Part-II Based on Sardar Sarovar Canal<br />
Based.<br />
Design Construction of a complete new 107 MLD capacity Potable Water Supply<br />
Infrastructure project on Turnkey Basis for Guwahati City.<br />
349.70<br />
3. Procurement of works (Item rate) for Supply, Installation, Construction and Commissioning<br />
of Rising & Transmission Main (Gravity Mains, Pressure Mains) Reservoirs for South Central<br />
Zone.<br />
175.71<br />
4. Bangalore Water Supply and Sewerage Project – Procurement, Fabrication and Laying of<br />
Clear Water Trunk main from Vajarahalli to HBR on the east of Bangalore.<br />
309.46<br />
5. Design, Engineering, Supply, Erection & Commissioning of Raw Water Intake project at<br />
Brahamana Gaon near Marthapur on Turnkey Basis.<br />
33.75<br />
6. Design Build Operate Contract for Distribution Network for Narmada Canal Wankaner<br />
Group Water Supply Scheme of Wankaner, Rajkot District.<br />
108.28<br />
7. EPC Contract of Jindal Intake Well at Brahmani River. 43.50<br />
5. Chimneys and Cooling Towers:<br />
Chimneys:<br />
<strong>Gammon</strong> has completed projects like Bellary TPS, Jhajjar Unit -1, Simhadri Unit-3, Jaigad TPS Chimneys, Seepco<br />
Jharsuguda in the last financial year. During the same period, the Company has also secured good number of<br />
orders from our valued clients like, <strong>India</strong>bulls Power, Nasik and Amravati Chimneys, GMR Tilda Power Project<br />
NDCT and Chimneys, JITPL Angul Civil Works & Chimneys, Aditya Birla Group Sambalpur Chimneys, Sasan Civil<br />
and Dredging works and IGCAR Buildings.<br />
Cooling Towers:<br />
Gactel Turnkey Projects Limited (GTPL) (formerly <strong>Gammon</strong> Cooling Towers Limited) is a subsidiary of <strong>Gammon</strong><br />
<strong>India</strong> and has been created to focus on Domestic and International markets for Cooling Towers and Cooling<br />
Systems. GTPL, in fact, is a sustained effort by <strong>Gammon</strong> to accumulate Experts from Cooling Towers Industry<br />
under a single roof.<br />
GTPL’s gamut of activities includes Concrete Cooling Towers, Pultruded FRP Cooling Towers, Conversion of<br />
Existing Timber Cooling Towers to Pultruded FRP Cooling Towers, Air Cooled Steam Condensers, Air Cooled Heat<br />
Exchangers and Customer services such as Refurbishment, Thermal and Structural upgradation and so on. GTPL<br />
is playing a major role in the process industry with its customized cooling solutions.<br />
GTPL is well equipped to meet the customized requirements of the clients with an in-house team of more than<br />
100 engineers from various disciplines dedicated to deliver solutions in Thermal, Mechanical, Electrical, Hydraulic,<br />
Instrumentation and Civil Engineering.<br />
In FY <strong>2010</strong>-11, GTPL has recorded an order book of approx ` 170 Crores by winning Cooling Tower projects from<br />
many prestigious clients such as Hindustan Petroleum Corporation Limited, Adani Infra <strong>India</strong> Limited, Lanco<br />
Infratech Limited, Vandana Vidhyut Limited, Jindal Steel & Power Limited, ONGC Petro Additions Limited,<br />
Mangalore Refinery and Petrochemicals Limited and many others.<br />