48<br />

The Company completed the following Projects during the year:<br />

(1) Elevated Road Project at Amritsar, valued at ` 216 crores for Design & Construction of 2-Lane<br />

Elevated Road from G.T. Road to Golden Temple and 4-Lane Elevated Road on G.T. Road from<br />

Maqbulpura Chowk to Bhandari Pul.<br />

(2) Contract No. BC 25, 27, 28, 29 and 30R of Delhi Metro Rail Corporation, valued at ` 315 crores.<br />

(3) DDA Flyover at Bund Road, Near Commonwealth Games Village completed ahead of schedule and<br />

opened to traffic before Commonwealth Games.<br />

(4) Elevated Viaduct for Bangalore Metro Rail.<br />

Some of the projects under execution are:<br />

(1) Signature Bridge Project, valued at ` 632 crores for Construction of Main Cable Stayed Bridge over<br />

Yamuna River at Wazirabad, Delhi. The bridge will have a dual carriage way of 4-Lanes each. Length<br />

of main bridge is 575 mts. with extension of 112 meters. The height of the pylon is 151 mts. above<br />

the deck level.<br />

(2) Bongaigaon TT Foundation, valued at ` 63 crores for Construction of Pile and Well Foundation<br />

Package for River Crossing Location for 440 KV D/C Byrnihat-Bongaigaon Section of Palatana-<br />

Bongaigaon Transmission Line Associated with 726.6 MW Gas Based Power Plant at Palatana,<br />

Tripura.<br />

(3) Munger Bridge, valued at ` 363 crores for Construction of Steel Super Structure and Other Ancillary<br />

Works of Rail-cum-Road Bridge across River Ganga at Munger.<br />

(4) Bogibheel Bridge, valued at ` 363 crores across River Brahmaputra Near Dibrugarh.<br />

(5) Kosi Bridge, valued at approximately ` 368 crores for design, construction, finance, operation and<br />

maintenance of four lane Bridge across River Kosi including its approaches on NH-57 on Annuity<br />

Basis.<br />

(6) Godavari Bridge at Rajahmundry, valued at ` 700 crores Design, Construction, Finance, Operation<br />

and Maintenance of major Bridge across River Godavari on Rajahmundry side.<br />

(7) Contract from Kolkata Metro Rail Corporation (valued at ` 212 crores) for Design and Construction of<br />

4.725 km. viaduct and portals for junction arrangement for future link to airport (elevated section) of<br />

East West Corridor of Kolkata Metro excluding viaduct at stations namely salt lake stadium, Bengal<br />

Chemical, City centre, Central park, Karunamoyee and Salt lake sector-V each of length 140 mts., on<br />

Subhash Sarobar to Salt lake Sector-V.<br />

(8) Wazirabad Bridge Project at Delhi, valued at ` 360 crores for Construction of major bridge and its<br />

approaches cross River Yamuna downstream of existing bridge at Wazirabad-Delhi.<br />

(c) Ports:<br />

The <strong>India</strong>n coastline is dotted with 12 major ports and 187 minor ports. <strong>India</strong> has one of the largest<br />

merchant shipping fleet and is ranked 16th among the maritime countries. <strong>India</strong>n shipbuilding industry<br />

currently accounts for about One per cent of the global shipbuilding market and is targeting a world share<br />

of 5 per cent by 2017. Your Company is currently executing the project for design, engineering, procurement<br />

and construction of Offshore Terminal for Mumbai Port Trust, valued at ` 436 crore.<br />

2. Power sector – Economic Scenario:<br />

Availability and access to energy are considered as catalysts for economic growth. The envisaged growth of the<br />

economy at 9% in the Eleventh Plan cannot be achieved without a commensurate increase in the availability of<br />

energy. At the end of 10th year plan there was 13% deficit in the peak load demand of electricity. The National<br />

Electricity Policy envisages “Power for all by 2012” and per capita availability of power to be increased to over<br />

1,000 units.. With reference to the Ministry of Power’s reports the Working Group on Power has recommended<br />

a plan size of about 82,200 MW for 12th Plan also. This would comprise hydro projects totaling about 30,000<br />

MW, thermal projects totaling 42,200 MW and nuclear projects of about 10,000 MW capacities.<br />

Industrial/Power Structure and Development:<br />

<strong>Gammon</strong> has consolidated its position in this sector on account of the growth. The increase in demand of<br />

electricity and time bound implementations of various projects have helped in realising better output for the<br />

resources deployed. This is becoming one of the most important sector in the Company’s growth agenda.<br />