12. LISTING OF DEBT SECURITIES:<br />
42<br />
The Secured Redeemable Non-Convertible Debentures issued by the Company are listed on the Wholesale Debt Market<br />
(WDM) Segment of The National Stock Exchange of <strong>India</strong> Limited (NSE).<br />
13. PLANT LOCATIONS : (Project size – more than ` 300 Crores)<br />
Sr. No. Name of the Project Project value<br />
(in ` Crores)<br />
1. CMRL Design and Construction of under ground stations at Govt. Estate LIC<br />
Building, Thousands Lights and associated tunnels UG Package-2 and Gemini,<br />
Tenoypet, Chamiers, Road, Saidapet & associated tunnels UG Package-3 awarded<br />
to consortium of <strong>Gammon</strong> <strong>India</strong> Limited and OJSC Mosmetrostroy<br />
2. Patna Muzaffarpur Road Works 750.00<br />
3. Design Construction, Finance Operation and Maintenance of Major Bridge across<br />
river Godavari<br />
A NNUAL R EPORT I <strong>2010</strong>/11<br />
1947<br />
700.00<br />
4. Stage 3 Pumping station (5X30 MW) of Kalwakurthy Lift irrigation Scheme. 631.99<br />
5. Construction of Bridge and its approaches over river Yamuna D/s of existing bridge<br />
at Wazirabad, Delhi<br />
631.81<br />
6. BOT Nasik-Wadape-Gonde 4-Laning Road Works 621.00<br />
7. Parbati Hydro Electric Project Stage-II Civil and Hydromechanical Works for Power<br />
House, Pressure Shaft, Surge Shaft and Part HRT (Lot-PB-3) for NHPC in Himachal<br />
Pradesh<br />
603.00<br />
8. Construction of Gorakhpur Byepass in the state of U.P.-BOT 560.00<br />
9. Package -19 : Investigation, Designs and execution of water conveyor system with<br />
capacity of 84.21 Cumecs from Thipparam reservoir to Chevella Reservoir Main<br />
Canal-Reach 3 with all associated work such as lined gravity canal CM & CD<br />
works including distributory network of 25,000 acres from Muhunnadabad (v) to<br />
Cherial (v) km 70.00 to km 96.00<br />
10. Civil & Structural Steel Works and Ware house Construction for 2X600 MW Thermal<br />
Power near Tuticorin in Tamilnadu<br />
11. Western Transport Corridor, Tumkur Haveri Section of NH4 Project-Rehabitilation<br />
and upgrading of Chitrdurga-Harihar Section (Km 207 to 284) in the state of<br />
Karnataka Pkg.-4 and Harihar-Haveri Section (Km 284 to 340) in the state of<br />
Karnataka Pkg.-5 Balance Work<br />
12. Punatsangchhu-I Hydroelectric Project (1200 MW) Contract Package # MC@ “<br />
Construction of Headrace Tunnel from Adit-I & Adit-II<br />
13. Design Engineering, Procurement of Materials & Construction of Offshore Container<br />
Terminal (OCT) in Mumbai Harbour<br />
14. Rampur Hydroelctric Project - Package 1.0 Construction of Civil Works for HRT Sta.<br />
50.61m to 12900m including cut and cover section, River Diversion Works, Edits,<br />
Vehicular Gates etc.<br />
15. Construction of Steel Superstructure and other ancillary Works of Rail cum Road<br />
Bridge across river Ganga at Munger, Bihar<br />
16. Widening and strengthening to 4-lane of existing single/intermediate lane<br />
carriageway of National Highway No. 57 Section from Km. 230.00 to<br />
Km. 190.00 in the State of Bihar on East West Corridor under NHDP, Phase – II,<br />
Pkg. No. C-II/BR-3<br />
17. Construction of Nuclear island connected buildings & other safety related structures<br />
for PFBR, excavation and dewatering works, simulator building at Kalpakkam<br />
435.89<br />
410.34<br />
404.22<br />
399.94<br />
397.49<br />
382.44<br />
375.19<br />
356.51<br />
355.62