12. LISTING OF DEBT SECURITIES:<br />

42<br />

The Secured Redeemable Non-Convertible Debentures issued by the Company are listed on the Wholesale Debt Market<br />

(WDM) Segment of The National Stock Exchange of <strong>India</strong> Limited (NSE).<br />

13. PLANT LOCATIONS : (Project size – more than ` 300 Crores)<br />

Sr. No. Name of the Project Project value<br />

(in ` Crores)<br />

1. CMRL Design and Construction of under ground stations at Govt. Estate LIC<br />

Building, Thousands Lights and associated tunnels UG Package-2 and Gemini,<br />

Tenoypet, Chamiers, Road, Saidapet & associated tunnels UG Package-3 awarded<br />

to consortium of <strong>Gammon</strong> <strong>India</strong> Limited and OJSC Mosmetrostroy<br />

2. Patna Muzaffarpur Road Works 750.00<br />

3. Design Construction, Finance Operation and Maintenance of Major Bridge across<br />

river Godavari<br />

A NNUAL R EPORT I <strong>2010</strong>/11<br />

1947<br />

700.00<br />

4. Stage 3 Pumping station (5X30 MW) of Kalwakurthy Lift irrigation Scheme. 631.99<br />

5. Construction of Bridge and its approaches over river Yamuna D/s of existing bridge<br />

at Wazirabad, Delhi<br />

631.81<br />

6. BOT Nasik-Wadape-Gonde 4-Laning Road Works 621.00<br />

7. Parbati Hydro Electric Project Stage-II Civil and Hydromechanical Works for Power<br />

House, Pressure Shaft, Surge Shaft and Part HRT (Lot-PB-3) for NHPC in Himachal<br />

Pradesh<br />

603.00<br />

8. Construction of Gorakhpur Byepass in the state of U.P.-BOT 560.00<br />

9. Package -19 : Investigation, Designs and execution of water conveyor system with<br />

capacity of 84.21 Cumecs from Thipparam reservoir to Chevella Reservoir Main<br />

Canal-Reach 3 with all associated work such as lined gravity canal CM & CD<br />

works including distributory network of 25,000 acres from Muhunnadabad (v) to<br />

Cherial (v) km 70.00 to km 96.00<br />

10. Civil & Structural Steel Works and Ware house Construction for 2X600 MW Thermal<br />

Power near Tuticorin in Tamilnadu<br />

11. Western Transport Corridor, Tumkur Haveri Section of NH4 Project-Rehabitilation<br />

and upgrading of Chitrdurga-Harihar Section (Km 207 to 284) in the state of<br />

Karnataka Pkg.-4 and Harihar-Haveri Section (Km 284 to 340) in the state of<br />

Karnataka Pkg.-5 Balance Work<br />

12. Punatsangchhu-I Hydroelectric Project (1200 MW) Contract Package # MC@ “<br />

Construction of Headrace Tunnel from Adit-I & Adit-II<br />

13. Design Engineering, Procurement of Materials & Construction of Offshore Container<br />

Terminal (OCT) in Mumbai Harbour<br />

14. Rampur Hydroelctric Project - Package 1.0 Construction of Civil Works for HRT Sta.<br />

50.61m to 12900m including cut and cover section, River Diversion Works, Edits,<br />

Vehicular Gates etc.<br />

15. Construction of Steel Superstructure and other ancillary Works of Rail cum Road<br />

Bridge across river Ganga at Munger, Bihar<br />

16. Widening and strengthening to 4-lane of existing single/intermediate lane<br />

carriageway of National Highway No. 57 Section from Km. 230.00 to<br />

Km. 190.00 in the State of Bihar on East West Corridor under NHDP, Phase – II,<br />

Pkg. No. C-II/BR-3<br />

17. Construction of Nuclear island connected buildings & other safety related structures<br />

for PFBR, excavation and dewatering works, simulator building at Kalpakkam<br />

435.89<br />

410.34<br />

404.22<br />

399.94<br />

397.49<br />

382.44<br />

375.19<br />

356.51<br />

355.62