18 Key Projects Chennai Metro Project Design and Construction of underground stations at Government Estate, LIC Building and thousand lights and associated tunnels. (Contract Package-UAA-02) & Design and Construction of underground stations at Gemini, Teynampet, Chamiers Road and Saidapet and associated tunnels at Chennai. Client: Chennai Metro Rail Corporation Cost: ` 1947 Crore Parbati HE Stage 2 Construction of Civil and Hydro Mechanical Works for Powerhouse, Pressure Shaft (Horizontal and Inclined), Surge Shaft, Head Race Tunnel for Parbati HE Project Stage-II, Himachal Pradesh. Client: National Hydro Power Corp Ltd Cost: ` 799 Crore Patna Muzaffarpur Road Works Upgradation of Hajipur-Muzaffarpur section of the existing NH-77 to four lane dual carriageway. New bypass starting at km 46.300 and connecting NH-28 of East-West corridor at km 515.045. Client: National Highway Authority of India Cost: ` 750 Crore Signature Bridge Construction of bridge and its approaches over river Yamuna downstream of existing bridge at Wazirabad, Delhi Client: Delhi Tourism & Transportation Development Corporation Ltd. Cost: ` 704 Crore A NNUAL R EPORT I 2010/11 Godavari Bridge Design & Construction of Godavari Bridge at Rajahmundry on BOT basis. Client: Rajahmundry Godavari Bridge Limited Cost: ` 700 Crore Kalpakkam all Jobs Nuclear Power related structures at Kalpakkam. Client: Bhavini Cost: ` 691 Crore Rampur Hydroelectric Project Construction of Civil Works for Head Race Tunnel, inclusive cut and cover section, river diversion works, edits, surge shafts, pressure shafts, Valve House, Power House Complex, Tale Race Tunnel, edits and Hydro Mechanical Works Client: Satluj Jal Vidyut Nigam Limited Cost: ` 683 Crore GIPL Project Expertise: Agra-Makhanpur Highway
Mumbai-Nasik Expressway, Maharashtra AP Lift Irrigation Scheme Execution of Stage 3 pumping station, 5x30 MW for Kalwakurthi list irrigation scheme in Andhra Pradesh. Client: Irrigation and Command Area Development Department – Govt. of Andhra Pradesh. Cost: ` 673.74 Crore Gorakhpur Bypass Design, Construction, Finance, Operation maintenance of Four- lane Km 0.00 to Km.32.27 of Gorakhpur - Bye pass on NH-28 in the state of Uttar Pradesh on Annuity Basis Client: National Highway Authority of India Cost: ` 560.42 Crore AP Irrigation Package – 19 Pranahita and Chevalla Lift Irrigation Scheme- Pkg- 19 Client: Irrigation and Command Area Development Department- Govt of Andhra Pradesh Cost: ` 466 Crore Parbati Hydroelectric Project, Himachal Pradesh A NNUAL R EPORT I 2010/11 19
- Page 2 and 3: Contents A NNUAL R EPORT I 2010/11
- Page 4 and 5: Gammon House the second largest con
- Page 6 and 7: 4 Board of Directors Mr. Peter Gamm
- Page 8 and 9: 6 A NNUAL R EPORT I 2010/11 Beas Br
- Page 10 and 11: 8 Sohar Jetty, Oman A NNUAL R EPORT
- Page 12 and 13: 10 Region-wise Projects as on 31st
- Page 14 and 15: 12 Financial Highlights of the deca
- Page 16 and 17: 14 A NNUAL R EPORT I 2010/11 Off-Sh
- Page 18 and 19: 6000 5000 4000 3000 2000 1000 0 16
- Page 22 and 23: 20 Public Private Partnership Proje
- Page 24 and 25: Pebble Bay at Dollars Colony, Benga
- Page 26 and 27: Your Directors have pleasure in pre
- Page 28 and 29: Option Scheme-2007 of erstwhile ATS
- Page 30 and 31: Considering the continuous scarcity
- Page 32 and 33: Statement showing details of Option
- Page 34 and 35: Name and Designation of Director Mr
- Page 36 and 37: (a) AUDIT COMMITTEE : The Audit Com
- Page 38 and 39: Name, Designation and Address of Co
- Page 40 and 41: (iii) Approval of the Members sough
- Page 42 and 43: 6. MEANS OF COMMUNICATION : (a) Fin
- Page 44 and 45: STOCK PERFORMANCE IN COMPARISION TO
- Page 46 and 47: 18. Widening & strenghtening of exi
- Page 48 and 49: CEO/CFO CERTIFICATION To The Board
- Page 50 and 51: after USA and China. Indian road ne
- Page 52 and 53: (a) Thermal power: In the present s
- Page 54 and 55: • Growing urbanization has also r
- Page 56 and 57: The Company sees immense opportunit
- Page 58 and 59: The operative margin for financial
- Page 60 and 61: 4. Your Company has entered into Jo
- Page 62 and 63: 4. Patna Highway Projects Limited (
- Page 64 and 65: VI. NON-FINANCIAL ORGANISATIONAL IN
- Page 66 and 67: A uditors' report to the M e M bers
- Page 68 and 69: A nnexure to the A uditors' report
18<br />
Key Projects<br />
Chennai Metro Project<br />
Design and Construction of underground stations at<br />
Government Estate, LIC Building and thousand lights and<br />
associated tunnels. (Contract Package-UAA-02) & Design<br />
and Construction of underground stations at Gemini,<br />
Teynampet, Chamiers Road and Saidapet and associated<br />
tunnels at Chennai.<br />
Client: Chennai Metro Rail Corporation<br />
Cost: ` 1947 Crore<br />
Parbati HE Stage 2<br />
Construction of Civil and Hydro Mechanical Works for<br />
Powerhouse, Pressure Shaft (Horizontal and Inclined),<br />
Surge Shaft, Head Race Tunnel for Parbati HE Project<br />
Stage-II, Himachal Pradesh.<br />
Client: National Hydro Power Corp Ltd<br />
Cost: ` 799 Crore<br />
Patna Muzaffarpur Road Works<br />
Upgradation of Hajipur-Muzaffarpur section of the existing<br />
NH-77 to four lane dual carriageway. New bypass starting<br />
at km 46.300 and connecting NH-28 of East-West<br />
corridor at km 515.045.<br />
Client: National Highway Authority of <strong>India</strong><br />
Cost: ` 750 Crore<br />
Signature Bridge<br />
Construction of bridge and its approaches over river<br />
Yamuna downstream of existing bridge<br />
at Wazirabad, Delhi<br />
Client: Delhi Tourism & Transportation Development<br />
Corporation Ltd.<br />
Cost: ` 704 Crore<br />
A NNUAL R EPORT I <strong>2010</strong>/11<br />
Godavari Bridge<br />
Design & Construction of Godavari Bridge at Rajahmundry<br />
on BOT basis.<br />
Client: Rajahmundry Godavari Bridge Limited<br />
Cost: ` 700 Crore<br />
Kalpakkam all Jobs<br />
Nuclear Power related structures at Kalpakkam.<br />
Client: Bhavini<br />
Cost: ` 691 Crore<br />
Rampur Hydroelectric Project<br />
Construction of Civil Works for Head Race Tunnel,<br />
inclusive cut and cover section, river diversion works, edits,<br />
surge shafts, pressure shafts, Valve House, Power House<br />
Complex, Tale Race Tunnel, edits and Hydro Mechanical<br />
Works<br />
Client: Satluj Jal Vidyut Nigam Limited<br />
Cost: ` 683 Crore<br />
GIPL Project Expertise: Agra-Makhanpur Highway