Annual Report 2010-2011 - Gammon India
Annual Report 2010-2011 - Gammon India Annual Report 2010-2011 - Gammon India
10 Region-wise Projects as on 31st March 2011 Areas of Specialisation North Zone South Zone East Zone West Zone Total Transport Engineering 12 11 12 6 41 Energy Projects/High-rise Structures/ Industrial Structures 2 23 16 23 64 Hydro Power/Tunnel/Irrigation Projects 7 5 2 1 15 Building Works 0 9 1 10 20 Ground Engineering & Environment Protection 0 1 4 4 9 Pipeline and Marine Projects 3 0 2 3 8 Total 24 49 37 47 157 Cooling Tower, Bhusawal, Maharashtra A NNUAL R EPORT I 2010/11
Signature Bridge, New Delhi Tunnel Work, Parbati Power Project, Himachal Pradesh A NNUAL R EPORT I 2010/11 11
- Page 2 and 3: Contents A NNUAL R EPORT I 2010/11
- Page 4 and 5: Gammon House the second largest con
- Page 6 and 7: 4 Board of Directors Mr. Peter Gamm
- Page 8 and 9: 6 A NNUAL R EPORT I 2010/11 Beas Br
- Page 10 and 11: 8 Sohar Jetty, Oman A NNUAL R EPORT
- Page 14 and 15: 12 Financial Highlights of the deca
- Page 16 and 17: 14 A NNUAL R EPORT I 2010/11 Off-Sh
- Page 18 and 19: 6000 5000 4000 3000 2000 1000 0 16
- Page 20 and 21: 18 Key Projects Chennai Metro Proje
- Page 22 and 23: 20 Public Private Partnership Proje
- Page 24 and 25: Pebble Bay at Dollars Colony, Benga
- Page 26 and 27: Your Directors have pleasure in pre
- Page 28 and 29: Option Scheme-2007 of erstwhile ATS
- Page 30 and 31: Considering the continuous scarcity
- Page 32 and 33: Statement showing details of Option
- Page 34 and 35: Name and Designation of Director Mr
- Page 36 and 37: (a) AUDIT COMMITTEE : The Audit Com
- Page 38 and 39: Name, Designation and Address of Co
- Page 40 and 41: (iii) Approval of the Members sough
- Page 42 and 43: 6. MEANS OF COMMUNICATION : (a) Fin
- Page 44 and 45: STOCK PERFORMANCE IN COMPARISION TO
- Page 46 and 47: 18. Widening & strenghtening of exi
- Page 48 and 49: CEO/CFO CERTIFICATION To The Board
- Page 50 and 51: after USA and China. Indian road ne
- Page 52 and 53: (a) Thermal power: In the present s
- Page 54 and 55: • Growing urbanization has also r
- Page 56 and 57: The Company sees immense opportunit
- Page 58 and 59: The operative margin for financial
- Page 60 and 61: 4. Your Company has entered into Jo
Signature Bridge, New Delhi<br />
Tunnel Work, Parbati Power Project, Himachal Pradesh<br />
A NNUAL R EPORT I <strong>2010</strong>/11<br />
11