10 Region-wise Projects as on 31st March 2011 Areas of Specialisation North Zone South Zone East Zone West Zone Total Transport Engineering 12 11 12 6 41 Energy Projects/High-rise Structures/ Industrial Structures 2 23 16 23 64 Hydro Power/Tunnel/Irrigation Projects 7 5 2 1 15 Building Works 0 9 1 10 20 Ground Engineering & Environment Protection 0 1 4 4 9 Pipeline and Marine Projects 3 0 2 3 8 Total 24 49 37 47 157 Cooling Tower, Bhusawal, Maharashtra A NNUAL R EPORT I 2010/11