15.10.2013 Views

APPLICATION FOR WATER SUPPLY - Fingal County Council

APPLICATION FOR WATER SUPPLY - Fingal County Council

APPLICATION FOR WATER SUPPLY - Fingal County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Part 4 – Non Domestic Water and Wastewater Application checklist<br />

Completed Application Form<br />

Completed Direct Debit Mandate<br />

Connection Payment<br />

Please tick each box to confirm submission of the required documentation.<br />

Completed Agreement & Conditions for Supply of Water<br />

Confirmation of Payment of Development Levy<br />

Submission of Location Map<br />

Submission of ‘Design Schematic Layout’ *see Note 1<br />

Submission of ‘As Constructed Drawings’ *see Note 2<br />

Other Documentation (e.g. Local Authority / Planning Exempt etc)<br />

For Office Use Only:<br />

All documentation submitted: Yes No<br />

Credit History Checked: Yes No<br />

Low Water Pressure area: Yes No<br />

Signed: _____________________________________<br />

Senior Staff Officer<br />

Tick Box to Confirm For Office Use<br />

Date:___________________________<br />

Note 1: Design Schematic Layout to a scale 1:1000 showing the proposed development layout, layout of roads and proposed<br />

water mains<br />

Note 2: As Constructed Drawings to a scale not less than 1:500 showing the layout of Roads, Buildings, proposed Water<br />

Mains and other Services<br />

Page 8 of 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!