PERMEABILITY AND STREET PATTERN<br />
The following series of internal streets [see map Movement Strategy] are<br />
proposed within the lands, which will enable permeability and connectivity within<br />
the development area and also to the surrounding environment:<br />
The primary street through the scheme is a 24 hour pedestrian street called<br />
‘Upper Street’ which traverses the site northwest-southeast. This street<br />
connects at +1 with the Metro Plaza, linking up with ‘Central Street’ within the<br />
Pavilions site, and connecting ultimately to the Cultural Quarter/Ward River<br />
Valley Park and <strong>Swords</strong> Main Street.<br />
Lower Street is a 24 hour pedestrian route, which runs parallel to Upper Street<br />
and connects to the Metro Quarter to the north and ‘Main Square’ public space<br />
to the south. It links into Upper Street in proximity to the Metro Plaza and also at<br />
Main Square.<br />
The Rise will be an important street, offering 24 hour public<br />
transport/pedestrian/cyclist connection between Barrysparks through the<br />
Pavilions to <strong>Swords</strong> Main Street and supporting multi-modal interchange with<br />
Metro North. The Rise will be an inclined street with an average gradient of less<br />
than 1:20 and will be approx 12-14m wide (subject to confirmation of detailed<br />
traffic engineering design). The street climbs from existing ground level within<br />
Barrysparks, to level +1 at the Metro Plaza, returning to ground level at Malahide<br />
Road. This route will play an important part in the public transport system and<br />
will allow pedestrian connection at +1 level to the Metro Plaza and the Metro stop.<br />
Western Avenue is an “all vehicle” street traversing the development area<br />
(northwest-southeast), linking to the R132 for southbound traffic exiting the site<br />
and linking into the proposed Airside/Drynam local distributor road to the south.<br />
Eastern Avenue is an “all vehicle” route which links the R132 at the northern<br />
part of the site and proposed Airside/Drynam local distributor road to the south.<br />
This route interconnects with ‘The Rise’ public transport route.<br />
A number of secondary link streets are proposed within the development to<br />
support the primary north-south links. The Cut is a 24 hour secondary<br />
pedestrian route offering a link from The Rise to Upper Street and also provides<br />
entrances to housing above.<br />
Bridge Street traverses the site, linking Western and Eastern Avenues/The Rise<br />
and is predominately for the use of cyclists, pedestrians and service vehicles.<br />
Cross Street also traverses the site, providing access between Western and<br />
Eastern Avenues. This is predominately for cyclists/pedestrians modes and for<br />
service vehicles. At limited times of the day it may also be used by cars. In the<br />
evenings its use will help bring activity to the central parts of the development<br />
and the Main Square.<br />
S W O R D S M A S T E R P L A N<br />
CONNECTIONS [see map Levels/Movement]<br />
To ensure integration with the Metro Plaza and adjoining Pavilions development,<br />
Upper Street will slope from at grade at Main Square to +1 at the Metro Plaza (+7.5<br />
m) at a gradient of 1:30. Where Upper Street and Lower Street link to the Metro<br />
Stop, vertical circulation between levels is provided. Another stair and lift will be<br />
provided at the Main Square linking the ground level to the arcaded routes. Other<br />
stairs and lifts will be incorporated along this upper route as required.<br />
The ‘Rise’ will move from ground level within the Barrysparks lands to +1 over the<br />
Metro Plaza and connect through the Pavilions lands to the Malahide Road. This<br />
transition will occur over a slope of less than 1:20, capable of accommodating<br />
buses and pedestrians/cyclists (subject to confirmation of detailed traffic<br />
engineering design). ‘South Street’ will rise from 0 to +1 towards the western<br />
section, with car parking accommodated below this area.<br />
Metro Quarter. There will 2 pedestrian crossing facilities at ground level from<br />
Metro Platform to Barrysparks. There will be 3 vertical circulation nodes to<br />
facilitate ease of movement at this location between the Metro Plaza and<br />
Barrysparks and Pavilions. [see Section addressing Metro Quarter].<br />
8 7<br />
Levels/Movement<br />
Specific Objectives:<br />
● Development shall integrate with the Metro Plaza (providing +1 level<br />
pedestrian connectivity to existing Town Centre and Pavilions<br />
development) and underground vehicular network beneath the<br />
R132, including access ramps. These connections shall be provided<br />
for prior to the occupation of any development on the Barrysparks<br />
lands.<br />
● The Rise/Western Avenue and Eastern Avenue shall link into the<br />
proposed Airside/Drynam distributor link road. This connection<br />
shall be provided in tandem with development on the Barrysparks<br />
lands.<br />
● All the streets within the Barrysparks development area shall<br />
facilitate 24 hour public access.<br />
● Upper Street shall be the primary pedestrian street linking into the<br />
Metro Plaza and shall clearly connect to Central Street within the<br />
Pavilions site.<br />
● The Rise shall be constucted at a gradient of less than 1:20 (subject<br />
to confirmation of detailed traffic engineering design) and shall be a<br />
24 hour public transport street linking Barrysparks, over the R132,<br />
through the northern section of the Pavilions site, and connecting<br />
with the Town Centre.