- Page 1:
SWORDS M A S T E R P L A N J A N U
- Page 4 and 5:
S W O R D S M A S T E R P L A N i i
- Page 6 and 7:
S W O R D S M A S T E R P L A N 2
- Page 9 and 10:
1.0.1 LOCAL CONTEXT: FINGAL COUNTY
- Page 11 and 12:
Local Objectives to CDP Swords Maps
- Page 13 and 14:
● An accessible public transport
- Page 15 and 16:
Good things don’t happen by accid
- Page 17 and 18:
2.4 Masterplan Development Areas Th
- Page 19 and 20:
2.5 Public Realm Strategy In recogn
- Page 21 and 22:
The Town Centre environment has fun
- Page 23 and 24:
S W O R D S M A S T E R P L A N 1 9
- Page 25 and 26:
3.4.1 THE RETAIL/COMMERCIAL CORE S
- Page 27 and 28:
3.4.2 CIVIC/COMMUNITY S W O R D S M
- Page 29 and 30:
3.4.2 CIVIC/COMMUNITY S W O R D S M
- Page 31 and 32:
3.4.3(a) COMMERCIAL/RESIDENTIAL - N
- Page 33 and 34:
3.4.3(b) COMMERCIAL/RESIDENTIAL - N
- Page 35 and 36:
3.4.3(c) COMMERCIAL/RESIDENTIAL - N
- Page 37 and 38:
3.5 Architectural Features In conju
- Page 39 and 40:
SECURITY SHUTTERS The appearance of
- Page 41 and 42:
Summary The Urban Design Guidelines
- Page 43 and 44:
3.7 Riverside Walk THE RIVERSIDE
- Page 45 and 46:
3.8 Opportunity Sites: Retail/Comme
- Page 47 and 48:
3.8.2 OPPORTUNITY SITE 2 * McNamara
- Page 49 and 50:
3.8.4 OPPORTUNITY SITE 4 16 16 Leve
- Page 51 and 52:
3.8.6 OPPORTUNITY SITE 6 24.7 16 Le
- Page 53 and 54:
4.1 Character The Civic Quarter is
- Page 55 and 56:
5.1 Introduction Swords is at prese
- Page 57 and 58:
5.4 Land Use The Cultural Quarter w
- Page 59 and 60: 6.1 Redevelopment and Expansion URB
- Page 61 and 62: Specific Local Objectives: ● Deve
- Page 63 and 64: Traffic, Mobility and Parking Manag
- Page 65 and 66: EDGE CONDITIONS The north, east and
- Page 67 and 68: 3. The Southern Edge [see Cross Sec
- Page 69 and 70: 6.6 Urban Form - Streets LINKING TH
- Page 71 and 72: STREET HIERARCHY - URBAN DESIGN PAR
- Page 73 and 74: 2.
- Page 75 and 76: 4.
- Page 77 and 78: 6.7 Open Space 6.7.1 PUBLIC SPACES/
- Page 79 and 80: Cultural Quarter and Metro Quarter
- Page 81 and 82: INTERNAL LANDSCAPE TREATMENT Nodes
- Page 83 and 84: Introduction The Metro Quarter is t
- Page 85 and 86: S W O R D S M A S T E R P L A N Pa
- Page 87 and 88: 7.4.3 BUS INTERCHANGE CHARACTER ●
- Page 89 and 90: The Barrysparks development area fa
- Page 91 and 92: PERMEABILITY AND STREET PATTERN The
- Page 93 and 94: 8.3 Density and Mix LAND USE STRATE
- Page 95 and 96: EDGE CONDITIONS The boundaries with
- Page 97 and 98: STREET HIERARCHY - URBAN DESIGN PAR
- Page 99 and 100: 8.6 Open Space 8.6.1 PUBLIC SPACES/
- Page 101 and 102: include the site boundary treatment
- Page 103 and 104: 9.1 Introduction Successful Town Ce
- Page 105 and 106: area. The development of the parks
- Page 107 and 108: 10.1 Introduction The urban design
- Page 109: 10.6 Heights Strategy Diagram A dia
- Page 113 and 114: 12.1 Introduction The purpose of th
- Page 115 and 116: This appendix identifies the existi
- Page 117 and 118: Topography Building footprints and
- Page 119 and 120: Safety and Security The principles
- Page 121 and 122: COMMERCIAL/RESIDENTIAL The North St
- Page 123 and 124: Building Orientation THE RETAIL/COM
- Page 125 and 126: Safer Places: The Planning System a
- Page 127 and 128: Active frontage Provided by a build
- Page 130: Fingal County Council • Planning