B–42 Appendix B: Quality Assurance Resources<br />
SAMPLE<br />
CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />
6.6 – Production QC <strong>Inspection</strong> Reporting<br />
All PQC inspection activities will be documented on the following st<strong>and</strong>ard QC <strong>Inspection</strong> Report<br />
Forms (IRFs):<br />
Form No. Form Title<br />
PQC-PPA Production QC - Pre-Production Audit Report<br />
PQC-IDR Production QC – Inspectors Daily Report<br />
A copy of the St<strong>and</strong>ard IRFs used for Production QC inspection of Earthwork materials is<br />
located in Appendix __ (see Note, page B–17).<br />
7.0 Field <strong>Management</strong><br />
The activities <strong>and</strong> procedures to be followed for QC during placement of Earthwork materials<br />
are as indicated below.<br />
7.1 – Schedule of Field Placement Operations<br />
ABC Contractors will provide Transportation Agency with a “Weekly Schedule of<br />
Earthwork Materials Placement Operations” on each Friday prior to the week of<br />
placement. A copy of the “Weekly Schedule of Earthwork Materials Placement<br />
Operations” is located in Appendix __ (see Note, page B–17). The weekly schedule of<br />
Placement Operations will identify the following:<br />
▼ Project Segment<br />
▼ Placement Location<br />
▼ Maximum Placement Depth<br />
▼ Intended Placement Locations (Roadway, Station Limits)<br />
▼ Material Type(s)<br />
▼ Estimated Placement Quantities<br />
▼ Material Source(s)<br />
ABC Contractors will track the actual placement quantities on a daily basis <strong>and</strong> maintain a “Record<br />
of Earthwork Placement” for each week. Copies of the “Record of Earthwork Placement” will be<br />
made available to Transportation Agency.<br />
7.2 – Field Placement Facilities <strong>and</strong> Equipment<br />
ABC Contractors will utilize conventional facilities <strong>and</strong> equipment for the placement of all<br />
Earthwork materials. The major types of facilities <strong>and</strong> equipment to be utilized for Earthwork<br />
placement are summarized below for each type of Earthwork Item.