14.10.2013 Views

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B–36 Appendix B: Quality Assurance Resources<br />

SAMPLE<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

5.4.4 – Backfill Material for Structures<br />

QC Sampling <strong>and</strong> Testing Requirements<br />

Quality<br />

Sublot Size/<br />

Test Point of Sampling<br />

Characteristic Test Method(s) Lot Size Frequency Sampling Method<br />

Total Quantity of<br />

AASHTO T11 Backfill Material 1 Sample/ From In-Place R<strong>and</strong>om<br />

Gradation AASHTO T27 Type / Source / 1,000 m 3 Lift of Backfill T2, T248<br />

Project Segment<br />

Maximum Dry AASHTO T99 Total Quantity of<br />

Density <strong>and</strong> (Method C) Backfill Material 1 Sample/ From In-Place R<strong>and</strong>om<br />

Optimum AASHTO T180 Type / Source / 1,000 m 3 Lift of Backfill T2, T248<br />

Moisture Content (Method D) Project Segment<br />

Maximum Total Quantity of<br />

Stone Size Visual/Tape Backfill Material Minimum Minimum R<strong>and</strong>om<br />

(< 75 mm) Type / Source / 4/Lift/Day Lift of Backfill Visual<br />

Project Segment<br />

Total Quantity of<br />

Maximum Backfill Material Minimum From In-Place R<strong>and</strong>om<br />

Lift Thickness Rod/Grade Type / Source / 4/Lift/Day Lift of Backfill Visual<br />

(< 150 mm) Stake Project Segment<br />

In-Place Total Quantity of<br />

Density <strong>and</strong> AASHTO T310 Backfill Material 1 Sample/100 From R<strong>and</strong>om<br />

Moisture Content (Method B) Type / Source / m 3 , but not less Compacted T310<br />

(Per Targets) Project Segment than 1/Lift/Day Backfill

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!