B–34 Appendix B: Quality Assurance Resources<br />
SAMPLE<br />
CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />
5.4.2 – Roadway Embankment Material<br />
QC Sampling <strong>and</strong> Testing Requirements<br />
Quality<br />
Sublot Size/<br />
Test Point of Sampling<br />
Characteristic Test Method(s) Lot Size Frequency Sampling Method<br />
Gradation AASHTO T11 Total Quantity 1 Sample/<br />
AASHTO T27 of Embankment 5,000 m3 for From In-Place<br />
Material Type / 1st 5,000 m3 <strong>and</strong> Lift of R<strong>and</strong>om<br />
Source / Project 1 Sample/ Embankment T2, T248<br />
Segment 10,000 m3 thereafter<br />
Maximum Dry AASHTO T99 Total Quantity of 1 Sample/<br />
Density <strong>and</strong> (Method C) Embankment 5,000 m3 for From In-Place<br />
Optimum AASHTO T180 Material Type / 1st 50,000 m3 <strong>and</strong> Lift of R<strong>and</strong>om<br />
Moisture (Method D) Source / Project 1 Sample/ Embankment T2, T248<br />
Content Segment 10,000 m3 thereafter<br />
Total Quantity of<br />
Maximum Embankment Minimum From In-Place R<strong>and</strong>om<br />
Rock Size Visual/Tape Material Type / 4/Lift/Day Lift of Backfill Visual<br />
(< 1 m) Source / Project<br />
Segment<br />
Maximum Total Quantity of<br />
Lift Thickness Rod/Grade Stake Embankment Minimum From In-Place R<strong>and</strong>om Visual<br />
(< 600 mm for Material Type / 4/Lift/Day Lift of Maximum<br />
Earth Excavate) Source / Project Embankment<br />
Segment<br />
Maximum Total Quantity of<br />
Lift Thickness Embankment Minimum From In-Place R<strong>and</strong>om<br />
(< 300 mm for Rod/Grade Material Type / 4/Lift/Day Lift of Visual<br />
Ordinary Borrow Stake Source / Project Embankment<br />
<strong>and</strong> Gravel Segment<br />
Borrow)<br />
Maximum Total Quantity of<br />
Lift Thickness Rod/Grade Embankment Minimum From In-Place R<strong>and</strong>om<br />
(< 200 mm for Stake Material Type / 4/Lift/Day Lift of Visual<br />
Special Borrow) Source / Project Embankment<br />
Segment<br />
In-Place Total Quantity of 1 Sample/1,000<br />
Density <strong>and</strong> AASHTO T310 Embankment m 3 , but From R<strong>and</strong>om<br />
Moisture Content (Method B) Material Type / not less than Compacted T310<br />
(Per Targets) Source / Project 1/Placement Embankment<br />
Segment Location/Day