B–34 Appendix B: Quality Assurance Resources<br />

SAMPLE<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

5.4.2 – Roadway Embankment Material<br />

QC Sampling <strong>and</strong> Testing Requirements<br />

Quality<br />

Sublot Size/<br />

Test Point of Sampling<br />

Characteristic Test Method(s) Lot Size Frequency Sampling Method<br />

Gradation AASHTO T11 Total Quantity 1 Sample/<br />

AASHTO T27 of Embankment 5,000 m3 for From In-Place<br />

Material Type / 1st 5,000 m3 <strong>and</strong> Lift of R<strong>and</strong>om<br />

Source / Project 1 Sample/ Embankment T2, T248<br />

Segment 10,000 m3 thereafter<br />

Maximum Dry AASHTO T99 Total Quantity of 1 Sample/<br />

Density <strong>and</strong> (Method C) Embankment 5,000 m3 for From In-Place<br />

Optimum AASHTO T180 Material Type / 1st 50,000 m3 <strong>and</strong> Lift of R<strong>and</strong>om<br />

Moisture (Method D) Source / Project 1 Sample/ Embankment T2, T248<br />

Content Segment 10,000 m3 thereafter<br />

Total Quantity of<br />

Maximum Embankment Minimum From In-Place R<strong>and</strong>om<br />

Rock Size Visual/Tape Material Type / 4/Lift/Day Lift of Backfill Visual<br />

(< 1 m) Source / Project<br />

Segment<br />

Maximum Total Quantity of<br />

Lift Thickness Rod/Grade Stake Embankment Minimum From In-Place R<strong>and</strong>om Visual<br />

(< 600 mm for Material Type / 4/Lift/Day Lift of Maximum<br />

Earth Excavate) Source / Project Embankment<br />

Segment<br />

Maximum Total Quantity of<br />

Lift Thickness Embankment Minimum From In-Place R<strong>and</strong>om<br />

(< 300 mm for Rod/Grade Material Type / 4/Lift/Day Lift of Visual<br />

Ordinary Borrow Stake Source / Project Embankment<br />

<strong>and</strong> Gravel Segment<br />

Borrow)<br />

Maximum Total Quantity of<br />

Lift Thickness Rod/Grade Embankment Minimum From In-Place R<strong>and</strong>om<br />

(< 200 mm for Stake Material Type / 4/Lift/Day Lift of Visual<br />

Special Borrow) Source / Project Embankment<br />

Segment<br />

In-Place Total Quantity of 1 Sample/1,000<br />

Density <strong>and</strong> AASHTO T310 Embankment m 3 , but From R<strong>and</strong>om<br />

Moisture Content (Method B) Material Type / not less than Compacted T310<br />

(Per Targets) Source / Project 1/Placement Embankment<br />

Segment Location/Day